Loading...
323474 03/29/18 CITY OF CARMEL, INDIANA VENDOR: 367799 ONE CIVIC SQUARE DAYSTAR DIRECTIONAL DRILLING, INCrHECK AMOUNT: $***`*1,650.00* x ?q CARMEL, INDIANA 46032 P.O.Box 1684 CHECK NUMBER: 323474 NOBLESVILLE IN 46061 CHECK DATE: 03/29/18 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 601 5023990 8630 1,650.00 OTHER EXPENSES VOUCHER NO. 181127 WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev 1995) ALLOWED 20 Vendor# 367799 IN SUM OF$ ACCOUNTS PAYABLE VOUCHER DAYSTAR DIRECTIONAL DRILLING CITY OF CARMEL- PO BOX 1684 An invoice or bill to be properly itemized must show: kind of service,where performed, NOBLESVILLE, IN 46061 dates service rendered, by whom, rates per day, number of hours, rate per hour, numbers of units, price per unit,etc. Payee $1,650.00 367799 Purchase Order No. ON ACCOUNT OF APPROPRATION FOR DAYSTAR DIRECTIONAL DRILLING Terms Carmel Water Utility PO BOX 1684 Due Date BOARD MEMBERS I hereby certify that that attached invoice(s), NOBLESVILLE,IN 46061 or bill(s)is(are)true and correct and that PO# ACCT# the materials or services itemized thereon for DATE INVOICE# Description DEPT# INVOICE# Fund# AMOUNT which charge is made were ordered and DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT 8630 - - $1,650.00 and received except 3/20/2018 8630 $1,650.00 o6no( Valc\ I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 Cost distribution ledger classification if claim paid motor vehicle highway fund. 20 Clerk-Treasurer ��r Daystar Directional Drilling Invoice PO Box 1684 Directional Drilling Noblesville, IN 46061 Date Invoice# 3/14/2018 8630 Bill To Job Location Cannel Water P O#KR022618 3450 W. 131st St. Plant 1 Carmel,IN 46074 4915 E 106th Indianapolis DDD Job# Terms .17AW0115 Net 30 Description Qty Rate Amount Directional Drilling 2-2"poly and digging 1 1,650.00 1,650.00 All work is completed. We appreciate your business. Total $1,650.00 Payments/Credits $0.00 Web Site Phone# Balance Due $1,650.00 www.daystardrilling.com 317-773-7455 10/5/2017 Proposal motAr DIml Drilling Daystar Directional Drilling P.O.Box 1684 Noblesville,IN 46061 Contact: Andy Walsh Phone: 317-773-7455 o;317-503-6455 cell Email AndyW@daystardrilling.com Quote To:Carmel Wtr.Dept.John Mascari Job Name: 17AWO115 Phone:317-716-6624 4915 E. 1061 St.Carmel,IN Email jmascari@carmel.in.gov Billing Address: ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT Bore HDPE 2"X 2 70' Open excavate and set Vault/dig into 1/1 existing GRAND TOTAL $1,650.00 NOTES: No excavation or materials other than noted.No private utility locates.No traffic/pedestrian control,hard surface M cuts/restoration,bonds or permits included in the price. Prices quoted using standard Daystar wage rates. DDD will notify Indiana 811 but cannot be held responsible for any unmarked public or private utilities or lines. When customer is responsible for existing utility locates they agree to indemnify and hold harmless Daystar Directional Drilling Inc.(hereafter identified as DDD)from any and all actions,claims,cost,loss,damage,attorney fees or liability resulting from the following: l J 1) Damage to existing underground utilities or structures,unless one(1)copy of exact elevation and location measurements are furnished to DDD prior to excavation or unless customer field locates all existing obstacles before works begins 2) Damages caused by lack of engineering or customer Supervision unless DDD Provides Supervision on project W N , N . 0 l Any attachments included herein will be considered part of this proposal. 1✓ l�] Payment is due 30 days upon receipt of invoice.Past due invoices are subject to one and a half(1''/z)percent per month service 1— M z charge,plus reasonable attorney fees necessary to collect past due invoice. If using credit card to pay for invoice there will be a minimum convenience charge of 4%. This serves as notice of intent to file a lien for slow or nonpayment. Quality workmanship and professionalism are standard.Material if provided by DDD will be as specified.Any alteration or deviation from above specification involving,extra cost will be executed only upon written orders,and will become and extra �� H charge over and above the estimate.This was given under normal ground conditions.The price will be adjusted if abnormal v, V " conditions exist(i.e.water,sand,rock,under ground utilities or any other obstructions) d O V H o a Qni Acceptances of Proposal-The signature below indicates acceptance of stated terms,conditions and specifications by both parties.This document may be executed in multiple counterparts and by facsimile signatures. Authorized Signature Jerry K.Watson Date: Page 1 of 1