Loading...
HomeMy WebLinkAboutPermit Information< A72hiT:r�/Ci^AY '.COWNSFLIP • 77F}?AR'i'Mf:N`L• Cil;("'0M1.1UN-r'1'Y I31--VELOPMr_-NT 0 r 7 t it i..t t: 3 e7 r1 CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT Olt STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PE;'(111T) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND ACCO!'.^ ^(IN, ;-L%TERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) SHALL BE !SSU]:?_'"'. PROPOSED �UR TRUCIFE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RE!!T,UC'!:; .0 1'.;! OItU";A`:CE. The following must be received by the Department of Community Development before anY building or remoduli ,rmit C:rn h_•_rcvi _wed or_issucd by the staff: 1. A completed rmprovement Location Permit application. 2. Tvo (2) complete sets of construction plans. In compliance with the State Energy Cede, must list R -values on walls, ceilings, etc. If a commercial construction, plans must be stamped approved by ttu. Indiana State Department of Fire Prevention and Puildinp Safety. " 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies Department), ) or septic permit (Hamilton County Health 4. Three (3) copies of a site or plot plan showing the following REQUIRED information (can be obtained from tiu: landowner or land developer): Lor_ drawn to Scale Ala t! i.muns ions Sea' an' North arrow All roads, a:.'-eyr: right-of-ways, etc. All other uti-i::ies and drainage right-of-ways and easements Any app!!cabl.s flood plain areal Bui.lJ.ir.g p:,d elevation and lut corner uI,v,tions All accessory bui'_dings -- uxisting or proposed All and drivew..ys Sewer and u.ltur 1-1141:;, sol,Lic system and well location Drainage fuw arrows All draina;u :;wales and subsurface facilities (retention/dutuntion areas, e :)iewn:iunr,l cro:::; :;eetien!; of all drainage swales Sump otenp (sw,,p I:u:•, p't 1 s) •.howing disch•:rge locations Ccothun,;,!hat np dzsc`largu_ucations Draina"ee_ wa!p-_: ;'•` rreuired drainage !;wales must be shown on the plot plan and eur.�tructtd in a'_'. .,uL:!-vision>: l,rior to the Department of Community Development >a:rforuurt^ a ?incl inspection of any structure per plans on file or per the fol:owing: Constructed :,wales shall be a minimwn of 1'V deep with s4 -Oe slopes u� not !css than 1. to 1. If this information is not submitted, it will extend the time it takes to get an.approved building permit. I CERTIFY THAT ALL OF TuE A710V{: L!STrD tr"FOR•lATION IS SHOWN COMPLETELY AND ACCURATELY ON 'PILE ATTAC!II'D P' "' 0!; S.... !' ;�: ,1S ":U';:ai ''!:J W11:91 A BUILDING PFx4IT APPLICATION TO THE CARMEL/CLAY D!it" i xl �''9,e1e,57.1KJ SIGNATURE: �PHONE:ADDRESS:/L ' -- �i/1'14.ic -- NAME OF PLUMBINIC C':YTRAr:TCR* (*f VALID STATE PUMIATIY; f tr,n •r. ,` .,s".r> /� J'