HomeMy WebLinkAboutHIS Constructors/Eng/CO #1/65,641.26/Carmel Small Structures Culvert #36 - Project #16-SW-08PROJECT 'Mme/ CITY OF CARMEL TO: HIS Constructors CONTRACT CHANGE ORDER NO 01 bcv 5150 E. 65a' Street DATE: 2/27/2018 Suite B PROJECT NAME: Carmel Small Str. Culvert #36 Indianapolis, IN 46220 CITY REQ. NO.: 16 -SW -08(3) CITY PO NO.: CITY PO DATE: November 16.2017 I. You are directed to make the following changes in this Contract: Per the Post Bid request of the City of Carmel, Change Order No. I is the addition of steel backed timber guardrail at Hamilton County Bridge No. 36. SCHEDULED ADJUSTMENT DELETE ITEM AMOUNT (+) OR O DAYS Guardrail Trans., Type TGB (3) EA ($6,791.43) 0 Days Guardrail, Reset (50) LFT ($849.00) 0 Days Guardrail End Treat., Type OS (2) EA ($5659.54) 0 Days Guardrail End Treat., Type OS Mod. (1) EA ($2829.77) 0 Days Guardrail, W -Beam, 6'-3" Spacing (118.75) LFT ($2688.50) 0 Days ADD ITEM AMOUNT (+ OR - DAYS Guardrail, Steel Backed Timber, (1) LS $84,459.50 5 Days w/ End Treatments & Transitions II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 599,649.30 Contract Price will be increased/decreased by this Change Order $ 65,641.26 New Contract Price including this Change Order $__665,290.56—_______ Contract Time Prior to this Change Order Days Completion Date August 17, 21018 Net increased/decreased resulting from this Change Order 5 Days Current Contract Time including this Change Order 1 Days Substantial Completion Date August 8, 2018 / Final Completion Date August 22, 2018 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended HWC Engineering ENGINEER 135 N. Pennsylvania St. STE 2800 Address Indianapolis, IN 46204 City/State/Zip BY: vZ G Phone: 317-730-6365 The Above Changes Are Accepted: HIS Constructors CONTRACTOR 5150 E. 651" Street STE B Address Indianapolis, IN 46220 City/State/Zip By: Phone: 317-284-1195 Date: 3/5/2018 Date: 3-15-2018 Approved: Treasurer C� Date: b HIS CONSTRUCTORS, INC. HIS Job # 170041 'arl� Customer: Clry of Cannel Date: 02/06118 Project: Hamilton County Bridge #36 Work Task: CO Quote for Steel Backed Timber Guardrail DATE EFFECTIVE: EQUIPMENT DESCRIPTION LABOR STRAIGHT TIME HOURLY RATE HOURS USED TOTAL f RATE HR TIME 1/2 RATE HR DBL. TIME RATE HR TOTAL f LABORER $55.40 $74.43 $93.45 $0.00 OPERATOR $77.89 $105.79 $133.69 $0.00 CARPENTER $68.95 $91.19 $113.43 $0.00 FOREMAN $75.51 $101.02 1 $126.54 $0.00 SUPERINTENDENT $84.45 $115.62 $146.80 $0.00 GEN SUPT 124.55 3159.01 $0.00 PM / SAFETY OFCEE-0001 111.60 5138.00 $0.00 $0.00 $0.00 $0.00 TOTAL LABOR $0.00 MATERIALS & SUPPLIES QUANTITY UNIT PRICE If) TOTAL(S) $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 MATERIALS & SUPPLIES TOTAL 10% $0.00 $0.00 TRUCKING CO. PRICE HOURS 0OFTRUCKS TOTAL (f) $0.00 $0.00 $0.00 TRUCKING TOTAL 10% MOO $0.00 SUBCONTRACTORS PRICE UNIT QUANTITY TOTAL I$) Steel Backed Timber Guardrail $ 190.00 LF 415.00 $ 78 850.00 $ CONTRACTOR MARKUP 1 10% First $3,000.00 $ 300.00 CONTRACTOR MARKUP 2 7% Balance $ 5,309.50 TOTAL EQUIP COST so Oo I SUBCONTRACTORS TOTAL $ 78,eso.00 Contractor Markup: $ 5,609.50 UNIT PRICE $ 203.52 /LF Total: $ 84.459.50 HIS ConstrucIt c. Owners Authorized Representative By: --P4aV By: Printed: Earl Settles Printed: Title: Proiect Manager Title: C -TECH CORPORATION, INC. BREAKDOWN OF COSTS Wages 017 Contract; Hamilton County Bridge 936 over Williams Creek 2!5/2018 Dale 3,347.04 County; Ham6ton 0 Hrs 94.35 = 0.00 kem C Ewe 0 Hrs 69.73 - 0.00 Description: Steel Backed Timber Guardrail 41 UI 0.00 Gtech Job; 731 48 Hrs 55.68 = 2,872.64 MATERIAL 0 Hrs 76.11 = 0.00 1) Steel Backed Timber Guardrail 415 Ld 132.00 a 54,780.00 2) Concrete 4 Cy 120,00 = 480.00 3) 0 Cy 120.00 = 0.00 4) 0 Hours 0.00 - 0.00 5) 0 Ea 0.00 = 0.00 6) 0 Ea 0,00 = 0.00 7) 0 Ea 0.00 = 0.00 8) Per Diem D Nights 230.00 = 0.00 9) Load Material In Yard (Man & Forklift) 4 Hrs 70,00 = 280.00 Total Material Cost 55540,00 Material Markup 12% 6664.80 Total Materiel Bid LABOR AND FRINGES 1) Foreman 48 we 69.73 = 3,347.04 2) Foremen Premium 0 Hrs 94.35 = 0.00 3) Operator 0 Hrs 69.73 - 0.00 4) Operator Premium 0 We 94.35 = 0.00 5) Teamster 48 Hrs 55.68 = 2,872.64 6) Teamster Premium 0 Hrs 76.11 = 0.00 7) CDL Lab 48 Hre 53.40 = 2,563.20 8) CDL Lab Premium 0 Hre 72,87 = 0.00 9) Lab 48 Hrs 46.34 = 2,224.32 10) Lab Premlum 0 Hre 62.28 - 0.00 11) Flag 0 Hrs 46.34 = 0.00 12) Flag Premium 0 Hrs 62.28 = 0.00 Total Labor Coat Labor Markup 20% Labor Bid EQUIPMENT 1) Crewcab Utility Bed Superintendent Truck 2) Mack With Sterling B-7 Combo Postdriver 3) Malt Semi 4) 48' Drop Deck Trailer 20 Ton 5) International Single Azle Flat Bed 4700 6) Utility pump Trailer 7 Ton 7) Utility Trailer 7 Ton Heavy Duty 8) Utility Trailer 3 Ton Light Duty 9) Skid Steer With Trailer, Auger & Bucket 10) Air Compressor, Tools & Bit 11) Drill Rig 12) Skagle Azle Dump (Rental) 13) Cable Trailer 14) Daily Typical Trafflc Control Set Up-Signs,Cones Total Equipment Cost Equipment Markup 12 % Equipment Bid 1 dC1LID Io7di G47S7*7?Ft71Rj Allowable Unit Bid Submitter( Unit Bid $62,204.80 10807,20 2161.44 $12,968.64 48 Hrs 20.00 = 960.00 0 We 42.00 - 0,00 0 We 32.00 = 0.00 0 Hre 10.000 - 0.00 48 Hre 25.00 = 1,200.00 0 Hre 6,000 = 0.00 0 Hrs 8.000 = 0.00 0 Hrs 8.000 = 0.00 48 Hre 26.00 - 1,248.00 0 Hrs 15,00 = 0.00 0 Hrs 12.50 = 0.00 0 Hrs 35.00 = 0.00 0 Hrs 10.00 - 0.00 0 Days 50.00 = 0.00 3408.00 408.96 $3,816.96 3 7e,eao.ao 190,34 $ % S 190.00 j: QMEHICx.N,;;TIMB-ER B,R;DGE G - _ Mr. Dave Carew C -Tech Corporation 5300 W. 100 North Boggstown, IN 46110 January 31, 2018 RE: Steel Backed Timber Guardrail for Hamilton County - Bridge No. 36 (116th Street over Williams Creek) ._........_. �..__ - �.=iii: �.,�....`-..:�-��L:::^'T_Y:�' :. � _. �Y;��. �'.�=Y�...__.......__...f�CA �: :: �3�.-• 6-8 weeks from PO Approval Net 30 Days from Ready for Delivery. Our Trucks Northwest Quadrant 30' TL -2 Bridge Connection 90' Type A Rall 30' Terminal Section SBT FAT Southwest Quadrant 30' TL -2 Bridge Connection 60' Type A Rail 30' Terminal Section SBT-FAT Northeast Quadrant 30' TL -2 Bridge Connection 30' Terminal Section SBT-FAT (No Type A Rail) 30' TL -2 Bridge Connection 55' Type A Rail (Curved) (No Terminal Section SBT FAT) "Some measurements were assumed to determine quote, confirmation will be needed (if ordered) which may change final price. TOTAL DELIVERED PRICE: $54,750.00 r' • Above price does not include unloading, installation or sales tax. • All timber to be Douglas Fir, Copper Naphthenate treated. All Steel to be weathering. Includes connecting hardware. Sincerely; For: AMERICAN TIMBER BRIDGE, Michael J. Obergfell, PE, Business Representative Mobile: 317-965-9167 Email: obergfell(a)usiconsuftants.com CORPORATE OFFICE 8767 WARUF AVENUE PORTAGE, MI 49002 • (269) 649-9661 INDIANA SALES DIVISION 8415 E. 56TH STREET INDIANAPOLIS, IN 46216 • (317) 544-4996 Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 03/26/18 Re: C.O. #1 Carmel Small Structures Culvert #36 Project #16 -SW -08 Doug, please find attached 1 original of same change order for project #16 -SW -08 Carmel Small Structure Culvert #36. Please review & initial for the next BPW Meeting. Change Order #1- Original Contract Amount: $599,649.30 Increase: $65,641.26 New Contract Amount $665,290.56 Thank you, Lisa Scott 0 Page 1 HWV ENGINEERING Confidence in the buitt environment. 135 N. Pennsylvania, Suite 2800 Indianapolis, Indiana 46204 www.hwcen91neer1nr,com LETTER OF TRANSMITTAL TO: Mr. Jeremy Kashman NO. DATE: 03/15/2018 3/15/18 City of Carmel, Engineering Change order No. 1 for Ref. project RE: #SW -16-08(3) One Civic Square Carmel Small Str. Carmel, IN 46032 HWC#: 2015-112-S ATTN: Mr. Bradley Pease FROM: David Lancet WE ARE SENDING YOU: COPIES DATE NO. DESCRIPTION 1 3/15/18 4 Change order No. 1 for Ref. project REMARKS: Contained herein is change order No. 1 for the addition of steel backed timber guardrail for HCHD Bridge No. 36 on 1161h Street. Indianapolis I Terre Haute I Lafayette I New Albany I Muncie www.hweengineering.com