Loading...
HomeMy WebLinkAboutGN 0.2PLOTTED: March 15, 2018 / Prem Kumar / 2377-ALLISON II-CZ-BASE-COVR.DWG CZ 0.2Allison Schedules and AbbreviationsIndiana DivisionLot 671900 E. Golf Road, - Suite 300Schaumburg, Illinois 60173Midwest Zone OfficePLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2018 Suzette Schuette09/30/2016 RIGHT Allison II 2377.300.00.CPM LOT 67 03/15/2018 SCHEDULE of AREAS BASE HOUSE - HEATED FIRST FLOOR 1829 SECOND FLOOR 1527 TOTAL BASE HEATED 3356 BASE HOUSE - UNDER ROOF GARAGE - 3 CAR FRONT ENTRY 609 UNFINISHED BASEMENT 1256 FRONT PORCH 107 TOTAL BASE UNDER ROOF 2438 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GATHERING RM / CAFE / KITCHEN 683.56 54.68 27.34 82.2 34.2 DINING 160.01 12.80 6.40 27.4 11.8 GAME ROOM 474.12 37.93 18.96 18 + ARTIF. 6.3 + MECH. OWNER'S SUITE 238.21 19.06 9.53 23.4 10.0 OWNER'S BATH 98.01 7.84 3.92 5.5 + ARTIF.MECH. BEDROOM 2 222.19 17.78 8.89 23.4 10 BEDROOM 3 167.92 13.43 6.72 26.5 11.3 BEDROOM 4 169.84 13.59 6.79 23.4 10 BATH 2 67.93 5.43 2.72 ARTIF.MECH. LAUNDRY 57.83 4.63 2.31 ARTIF.MECH. BATH 3 40.66 3.25 1.63 ARTIF.MECH.{\Fsimplex|c0;\W0.7;ARTIF. = ARTIFICIAL LIGHT SUPPLIED\PMECH. = MECHANICAL VENTILATION SUPPLIED\PTHIS TABLE SHOWS CALCULATIONS FOR THE BASE HOUSE CONDITION} AFF\PA/C\PALT\PARCH\PBSMT\PBLK\PBLKG\PBD\PBLDG\PCAB\PCPT\PCSMT\PCLG\PCIR\PCIRC\PCLR\PCOL\PCMU\PCONC\PCONST\PCONT\PCJ\PCF\PCY\PDET\PDIA\PDIM\PDW\PDR\PDH\PDS\PELEC\PELEV\PEQ\PEXH\PEXT\PFO\PFIN\PFPL\PFLR\PFD\PFLUOR\PFTG\PFND\PFUR\PGA\PGDO\PGFI\PGFI/WP\PGL\PGYP BD\PHDW\PHDR\PHVAC\PHGT\PHC\PHORIZ\PHB\PINSUL\PINT\PJT\PJST\PKIT\PLAV\PLT\PLNTL\PLVR\PMFR\PMAS\PMATL\PMAX\PMECH\PMC\PMTL\PMIN\PMIR\PMISC\PMOD\PMULL\PNTS\POC\POA\POH\POPT\PPB\PPNL\PPAR\PPED\PPL\PPVC\PPREFAB\PR\PREF\PREFR\PREINF\PR.A.G.\PREV\PRD\PRFG\PRM\PRO\PSCHED\PSECT\PSGD\PSHTH\PSHT\PSH\PSIM\PSL\PSC\PSPKR\PSPEC\PSQ\PSTD\PSTL\PSTOR.\PSTRUCT\PTEL\PTV\PTHR\PT&G\PTOC\PTOF\PTYP\PUNF\PUNO\PVERT\PWH\PWC\PWIN\PW/\PW/O\PWD\PWIABOVE FINISH FLOOR\PAIR CONDITIONING\PALTERNATE\PARCHITECT ARCHITECTURAL\PBASEMENT\PBLOCK\PBLOCKING\PBOARD\PBUILDING\PCABINET\PCARPET\PCASEMENT WINDOW\PCEILING\PCIRCLE\PCIRCUMFERENCE\PCLEAR CLEARANCE\PCOLUMN\PCONCRETE MASONRY UNIT\PCONCRETE\PCONSTRUCTION\PCONTINUOUS\PCONTROL OR CONSTRUCTION JOINT\PCUBIC FOOT\PCUBIC YARD\PDETAIL\PDIAMETER\PDIMENSION\PDISH WASHER\PDOOR\PDOUBLE HUNG\PDOWNSPOUT\PELECTRIC ELECTRICAL\PELEVATION\PEQUAL\PEXHAUST\PEXTERIOR\PFACE OF\PFINISH\PFIREPLACE\PFLOOR FLOORING\PFLOOR DRAIN\PFLUORESCENT\PFOOTING\PFOUNDATION\PFURR FURRED FURRING\PGAUGE\PGARAGE DOOR OPENER\PGROUND FAULT CIRCUIT\PGROUND FAULT CIRCUIT-WEATHER PROOF\PGLASS GLAZING\PGYPSUM WALLBOARD DRYWALL\PHARDWARE\PHEADER\PHEATING-VENTILATING-AIR CONDITIONING\PHEIGHT\PHOLLOW CORE\PHORIZONTAL\PHOSE BIBB\PINSULATE INSULATED INSULATION\PINTERIOR\PJOINT\PJOIST\PKITCHEN\PLAVATORY\PLIGHT\PLINTEL\PLOUVER\PMANUFACTURE MANUFACTURER\PMASONRY\PMATERIAL\PMAXIMUM\PMECHANICAL\PMEDICINE CABINET\PMETAL\PMINIMUM\PMIRROR\PMISCELLANEOUS\PMODULAR\PMULLION\PNOT TO SCALE\PON CENTER\POVERALL\POVERHEAD\POPTIONAL\PPUSH BUTTON\PPANEL\PPARTITION\PPEDESTAL\PPLATE\PPOLYVINYL CHLORIDE\PPREFABRICATE PREFABRICATED\PRISER\PREFERENCE\PREFRIGERATOR\PREINFORCE REINFORCED REINFORCING\PRETURN AIR GRILLE\PREVISIONS REVISED\PROOF DRAIN\PROOFING\PROOM\PROUGH OPENING\PSCHEDULE\PSECTION\PSLIDING GLASS DOOR\PSHEATHING\PSHEET\PSHELF SHELVING SINGLE HUNG WINDOW\PSIMILAR\PSLIDING WINDOW\PSOLID CORE\PSPEAKER\PSPECIFICATIONS\PSQUARE\PSTANDARD\PSTEEL\PSTORAGE\PSTRUCTURAL\PTELEPHONE\PTELEVISION\PTHRESHOLD\PTONGUE AND GROOVED\PTOP OF CONCRETE\PTOP OF FOUNDATION\PTYPICAL\PUNFINISHED\PUNLESS NOTED OTHERWISE\PVERTICAL\PWATER HEATER\PWATER CLOSET\PWINDOW\PWITH\PWITHOUT\PWOOD\PWROUGHT IRONABBREVIATIONS 04/02/18 Adam Schriner