HomeMy WebLinkAbout42200044 - JGC 176 - Truss DetailsDE
DANSCO ENGINEERING, LLC
P.O. Box 3400
Apollo Beach, FL 33572
Telephone (813) 645-0166
Facsimile (813) 645-9698
The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my
direct supervision based on the parameters provided by the truss designers.
Job: 1801867-12T
106 truss design(s)
57520-W1
3/26/18
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown
is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J01
TrussType
Jack-Open
Qty
5
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:212018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-J2_ceILnXeDgjxIgPB2eiytleqUUuPRwQLeZDHzX3G0
Scale=1:21.6
T2
B1
W1
T1
W2
2
1
6
5
7
3
4
1.5x4
6x10
1.5x4
1-0-0
1-0-0
2-1-0
1-1-0
2-4-8
0-3-8
-1-7-12
1-7-12
2-1-0
2-1-0
2-4-8
0-3-8
2-1-03-8-03-2-133-8-08.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.17
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.01
-0.02
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 12 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-4-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=23/Mechanical, 6=205/0-6-0(min. 0-1-8), 4=16/Mechanical
Max Horz6=111(LC 13)
Max Uplift3=-39(LC 16), 6=-9(LC 12), 4=-48(LC 13)
MaxGrav3=44(LC 30), 6=259(LC 22), 4=56(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-285/35
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 2-3-12zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 6, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J02
TrussType
Jack-OpenGirder
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:222018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-nEY_reMPIyLXL5sszvZtFAQtbErIdtw3f?O7mkzX3G?
Scale=1:21.3
T2
B1
W1
T1
W2
2
1
6
5
7
3
42x4
5x8
1.5x4
1-0-0
1-0-0
2-5-12
1-5-12
2-9-4
0-3-8
-1-11-12
1-11-12
2-5-12
2-5-12
2-9-4
0-3-8
2-1-03-7-70-4-133-2-103-7-76.6612
4.9912
PlateOffsets(X,Y)-- [2:0-3-4,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.48
0.07
0.06
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
6
6
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-9-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 6=0-10-4, 5=0-10-4.
(lb)-Max Horz6=89(LC 11)
Max UpliftAll uplift 100 lb orless at joint(s) 3 except 6=-155(LC 8), 5=-171(LC 11)
MaxGravAllreactions 250 lb orless at joint(s) 3, 4, 5 except 6=312(LC 18)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-353/174
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3 except(jt=lb)
6=155, 5=171.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51
Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-36(F=7,B=7), 6=0(F=10,B=10)-to-4=-14(F=3,B=3)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J03
TrussType
Jack-Open
Qty
6
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:232018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-FR6M3zN13GTOzFR2Xc46nNy58e8aMJlCuf7gIAzX3G_
Scale=1:24.8
T2
B1
W1
T1
W2
2
1
6
5
7
3
4
1.5x4
5x6
1.5x4
1-0-0
1-0-0
3-0-12
2-0-12
3-4-4
0-3-8
-1-7-12
1-7-12
3-0-12
3-0-12
3-4-4
0-3-8
2-1-04-3-133-10-104-3-138.0012
6.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-2-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.26
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
-0.03
-0.05
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 15 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-4-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=56/Mechanical, 6=228/0-6-0(min. 0-1-8), 4=30/Mechanical
Max Horz6=127(LC 13)
Max Uplift3=-67(LC 16), 4=-32(LC 16)
MaxGrav3=83(LC 30), 6=264(LC 2), 4=60(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-290/62
WEBS 2-5=-210/280
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-3-8zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J04
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:242018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-jdglGJOfqZbFaO0F4KcLKbVDv1Wd5mzM6JtDpczX3Fz
Scale=1:24.5
T2
B1
W1
T1
W2
2
1
6
5
7
3
4
2x4
5x8
1.5x4
1-0-0
1-0-0
3-7-14
2-7-14
3-11-6
0-3-8
-1-11-12
1-11-12
3-7-14
3-7-14
3-11-6
0-3-8
2-1-04-3-43-10-74-3-46.6612
4.9912
PlateOffsets(X,Y)-- [2:0-3-4,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.50
0.08
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 16 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 6=0-10-4, 5=0-10-4.
(lb)-Max Horz6=102(LC 11)
Max UpliftAll uplift 100 lb orless at joint(s) 3 except 6=-183(LC 8), 5=-227(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 3, 4, 5 except 6=311(LC 18)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-362/206
WEBS 2-5=-220/286
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3 except(jt=lb)
6=183, 5=227.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51
Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-50(F=0,B=0), 6=0(F=10,B=10)-to-4=-20(F=0,B=0)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J05
TrussType
Jack-ClosedGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:252018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-BpE7UfOHbtj6CYbRe17aso1RyRqNqEbVLzcnM2zX3Fy
Scale=1:24.8
W1
T1
W2
B1
1
2
4
35
3x4
2x4
1.5x4
2x4
3-4-4
3-4-4
3-0-12
3-0-12
3-4-4
0-3-8
2-1-04-3-138.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.29
0.24
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.01
-0.01
-0.00
(loc)
3-4
3-4
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 17 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-4-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)4=213/0-6-0(min. 0-1-8), 3=420/Mechanical
Max Horz4=149(LC 9)
Max Uplift4=-39(LC 8), 3=-137(LC 9)
MaxGrav4=239(LC 44), 3=420(LC 1)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
5) Refer to girder(s) for truss to trussconnections.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
3=137.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 416 lb down and 66 lb up at
2-5-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 3-4=-20
Concentrated Loads(lb)
Vert: 5=-416(B)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J06
TrussType
Jack-ClosedGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:252018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-BpE7UfOHbtj6CYbRe17aso1SrRojqEbVLzcnM2zX3Fy
Scale=1:29.7
W1
T1
W2
B1
1
2
4
3
5
6 73x4
1.5x4
2x4
2x4
4-10-4
4-10-4
4-6-12
4-6-12
4-10-4
0-3-8
2-1-05-3-138.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.23
0.34
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.02
-0.05
-0.00
(loc)
3-4
3-4
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 45 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-10-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)4=524/0-6-0(min. 0-1-8), 3=729/Mechanical
Max Horz4=189(LC 9)
Max Uplift4=-59(LC 8), 3=-196(LC 9)
MaxGrav4=524(LC 18), 3=731(LC 18)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) 2-ply truss to be connected together as follows:
Topchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnectedwith 10d (0.131"x3") nails as follows: 2x6- 2 rowsstaggered at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
3=196.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 469 lb down and 71 lb up at
1-11-4, and 461 lb down and 95 lb up at 3-11-4 on bottomchord.The design/selection of suchconnection device(s)is the
responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 3-4=-20
Concentrated Loads(lb)
Vert: 6=-469(F) 7=-461(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J07
TrussType
Jack-Open
Qty
4
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:262018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-f?nVh?PwMBryqiAdClepP0acNr7tZg_fadMKuVzX3Fx
Scale=1:29.7
W1
T2
B1
T1
W2
2
1
6
5
3
4
1.5x4
5x6
1.5x4
1-0-0
1-0-0
4-6-12
3-6-12
4-10-4
0-3-8
-1-7-12
1-7-12
4-6-12
4-6-12
4-10-4
0-3-8
2-1-05-3-134-10-105-3-138.0012
6.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-2-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.41
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.07
-0.10
0.13
(loc)
4-5
4-5
3
l/defl
>750
>578
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 19 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-10-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=273/0-6-0(min. 0-1-8), 3=96/Mechanical, 4=51/Mechanical
Max Horz6=150(LC 13)
Max Uplift3=-102(LC 16), 4=-25(LC 16)
MaxGrav6=314(LC 2), 3=133(LC 30), 4=87(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-299/123
WEBS 2-5=-306/385
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 4-9-8zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
3=102.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J08
TrussType
Jack-Open
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:272018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8CLtvLQY7UzpRslpmS92yD7n7FYaI7yopH5uQxzX3Fw
Scale=1:19.6
W1
T2
B1
T1
W2
2
1
6
5
3
4
1.5x4
5x10
1.5x4
1-0-0
1-0-0
1-5-15
0-5-15
1-9-7
0-3-8
-1-7-12
1-7-12
1-5-15
1-5-15
1-9-7
0-3-8
2-1-03-3-52-10-23-3-58.0012
6.0012
PlateOffsets(X,Y)-- [2:0-3-4,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.13
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 11 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-9-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=199/0-6-0(min. 0-1-8), 3=-1/Mechanical, 4=9/Mechanical
Max Horz6=103(LC 13)
Max Uplift6=-19(LC 12), 3=-43(LC 22), 4=-70(LC 13)
MaxGrav6=268(LC 22), 3=23(LC 12), 4=59(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-286/51
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 1-9-5zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J09
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:292018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-4aTeJ1Sof6DXhAvCttBW1eC0G2Dbm0U5Gba_VqzX3Fu
Scale:3/8"=1'
W1
T2
B1
T1
W2
2
1
6
5
7
8
3
9 10
42x4
6x6
1.5x4
1-0-0
1-0-0
2-9-1
1-9-1
5-4-14
2-7-13
5-8-6
0-3-8
-2-0-6
2-0-6
0-0-10
0-0-10
2-9-1
2-8-7
5-4-14
2-7-13
5-8-6
0-3-8
2-1-05-2-154-10-25-2-156.6612
4.9912
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.65
0.15
0.13
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.04
-0.01
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 21 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-8-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 0-9-11 except(jt=length) 3=Mechanical, 4=Mechanical.
(lb)-Max Horz6=107(LC 11)
Max UpliftAll uplift 100 lb orless at joint(s) 3, 4 except 6=-289(LC 39), 5=-560(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 3, 4 except 6=364(LC 28), 5=470(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-362/239
WEBS 2-5=-354/435
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)TheFabricationTolerance at joint 2 = 0%
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4 except(jt=lb)
6=289, 5=560.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 109 lb down and 83 lb up at
2-2-8, and 90 lb down and 53 lb up at 3-4-7 on top chord, and 46 lb down and 77 lb up at 2-2-8, and 56 lb down and 91 lb up at
3-4-7 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J09
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:292018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-4aTeJ1Sof6DXhAvCttBW1eC0G2Dbm0U5Gba_VqzX3Fu
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 9=1(F) 10=1(B)
Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-72(F=-11,B=-11), 6=0(F=10,B=10)-to-4=-29(F=-4,B=-4)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J10
TrussType
Jack-Open
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:302018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Yn10XNSQQPLOIJUORailZslHMSYmVUREVFKY1GzX3Ft
Scale=1:22.9
T2
B1
W1
T1
W2
2
1
6
5
3
4
1.5x4
5x6
1.5x4
1-0-0
1-0-0
1-6-7
0-6-7
1-9-15
0-3-8
-1-7-12
1-7-12
1-6-7
1-6-7
1-9-15
0-3-8
2-1-03-10-1512.0012
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.16
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 12 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-9-15 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=3/Mechanical, 6=199/0-6-0(min. 0-1-8), 4=7/Mechanical
Max Horz6=118(LC 13)
Max Uplift3=-40(LC 16), 6=-21(LC 12), 4=-83(LC 13)
MaxGrav3=30(LC 14), 6=267(LC 22), 4=68(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-291/80
WEBS 2-5=-201/291
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 1-9-13zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 6, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J11
TrussType
Jack-Open
Qty
16
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:312018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-0zbOkiT2BjTFwT2b?IE_63HS2stBExiOjv35ZizX3Fs
Scale=1:28.0
T2
B1
W1T1
W2
2
1
6
5
7
3
4
1.5x4
5x8
1.5x4
0-9-12
0-9-12
3-7-0
2-9-4
3-10-8
0-3-8
-1-7-12
1-7-12
3-7-0
3-7-0
3-10-8
0-3-8
1-1-04-11-84-5-14-11-812.0012
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.21
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.03
0.03
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 15 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-10-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=71/Mechanical, 6=243/0-6-0(min. 0-1-8), 4=36/Mechanical
Max Horz6=168(LC 16)
Max Uplift3=-111(LC 16), 4=-22(LC 16)
MaxGrav3=108(LC 30), 6=280(LC 2), 4=67(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-310/167
WEBS 2-5=-271/287
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-9-12zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
3=111.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J12
TrussType
Jack-Open
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:312018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-0zbOkiT2BjTFwT2b?IE_63HS1su3Ex1Ojv35ZizX3Fs
Scale=1:25.1
W1
T2
B1
T1
W2
2
1
6
5
3
4
1.5x4
5x8
1.5x4
0-9-12
0-9-12
2-11-15
2-2-3
3-3-7
0-3-8
-1-7-12
1-7-12
2-11-15
2-11-15
3-3-7
0-3-8
1-1-04-4-73-10-04-4-712.0012
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.15
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
-0.02
0.01
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=226/0-6-0(min. 0-1-8), 3=56/Mechanical, 4=27/Mechanical
Max Horz6=144(LC 16)
Max Uplift6=-1(LC 13), 3=-92(LC 16), 4=-23(LC 16)
MaxGrav6=262(LC 2), 3=88(LC 30), 4=55(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-309/121
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-2-11zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J13
TrussType
Jack-Open
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:322018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-U99my2Ugy1b6YddnY?lDfHqdsGGjzPRXyZpe58zX3Fr
Scale=1:18.4
W1
T2
B1
T1
W2
2
1
6
5
3
4
1.5x4
6x8
1.5x4
0-9-12
0-9-12
1-7-15
0-10-3
1-11-7
0-3-8
-1-7-12
1-7-12
1-7-15
1-7-15
1-11-7
0-3-8
1-1-03-0-72-6-03-0-712.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-4,0-2-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.31
0.06
0.06
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 10 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-11-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=200/0-6-0(min. 0-1-8), 3=15/Mechanical, 4=3/Mechanical
Max Horz6=100(LC 13)
Max Uplift6=-20(LC 13), 3=-45(LC 16), 4=-25(LC 16)
MaxGrav6=264(LC 22), 3=36(LC 30), 4=33(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-308/74
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 1-11-5zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J14
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:332018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-yMj89OVJjKjzAnCz6jGSBUNk5gaFir1hBDYCebzX3Fq
Scale=1:28.9
W1
T2
B1
T1
W2
2
1
6 5
7
8
3
11
9 10
42x4
6x8
1.5x4
1-11-10
1-11-10
1-11-15
0-0-5
6-6-1
4-6-3
6-9-9
0-3-8
-2-0-6
2-0-6
0-0-10
0-0-10
3-3-11
3-3-1
6-6-1
3-2-7
6-9-9
0-3-8
1-1-41-2-04-10-40-4-134-5-74-10-46.6612
4.9912
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.53
0.17
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.01
-0.04
-0.00
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 23 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x6SPF No.2 *Except*
W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 6=0-6-1, 5=0-7-10.
(lb)-Max Horz6=138(LC 34)
Max UpliftAll uplift 100 lb orless at joint(s) 6, 4 except 3=-190(LC 12), 5=-142(LC 12)
MaxGravAllreactions 250 lb orless at joint(s) 3, 4 except 6=280(LC 18), 5=256(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-273/93
BOT CHORD 5-6=-279/255
WEBS 2-5=-292/319
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 4 except(jt=lb)
3=190, 5=142.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 102 lb down and 68 lb up at
3-3-11, and 86 lb down and 62 lb up at 3-7-2, and 99 lb down and 116 lb up at 6-0-0 on top chord, and 16 lb down and 11 lb up at
3-3-11, and 25 lb down and 32 lb up at 3-7-2, and 39 lb down and 39 lb up at 6-0-0 on bottomchord.The design/selection of such
connection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-11=-51
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J14
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:332018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-yMj89OVJjKjzAnCz6jGSBUNk5gaFir1hBDYCebzX3Fq
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 8=-6(B) 9=0(F=-1,B=2) 10=-8(B)
Trapezoidal Loads(plf)
Vert: 2=-6(F=22,B=22)-to-3=-86(F=-18,B=-18), 6=-0(F=10,B=10)-to-4=-34(F=-7,B=-7), 11=0(F=25,B=25)-to-2=-6(F=22,B=22)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J15
TrussType
Jack-Open
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:342018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-QYGXNkVxUesqnxnAgQnhkivy33yXRJ_qQsIlA1zX3Fp
Scale=1:17.5
T2
B1
W1T1 W2
2
1
7
6
8
3
5
4
1.5x4
5x8
1.5x4
1-0-0
1-0-0
2-0-0
1-0-0
2-4-14
0-4-14
2-8-6
0-3-8
-1-7-12
1-7-12
2-4-14
2-4-14
2-8-6
0-3-8
1-1-02-10-108.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.32
0.04
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 11 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-8-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 7=0-3-8, 5=0-6-0.
(lb)-Max Horz7=95(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 3, 7, 4, 5
MaxGravAllreactions 250 lb orless at joint(s) 3, 4, 5 except 7=268(LC 22)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-7=-279/100
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 2-7-10zone;cantileverleft and right exposed ; end verticalleft
andright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 7, 4, 5.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J17
TrussType
Jack-Closed
Qty
7
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:352018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vkqva4WZEy_hP5MME8IwGvS50TCHAl6_eW1JiTzX3Fo
Scale=1:35.2
W1
T1
W4
B1
B2W2
W3
1
2
3
6
5
47
8
9
6x8
2x4
4x45x6
3x5
3-11-7
3-11-7
6-9-12
2-10-5
7-1-4
0-3-8
3-11-7
3-11-7
6-9-12
2-10-5
7-1-4
0-3-8
0-7-65-4-33-0-92-3-108.0012
8.0012
PlateOffsets(X,Y)-- [6:0-0-0,0-1-4], [6:0-4-8,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.50
0.39
0.13
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.08
-0.16
0.11
(loc)
5
5
4
l/defl
>967
>509
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 26 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-2-3 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=241/0-6-0(min. 0-1-8), 4=241/Mechanical
Max Horz6=177(LC 16)
Max Uplift4=-135(LC 16)
MaxGrav6=272(LC 2), 4=298(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-6=-514/201, 1-7=-691/256, 7-8=-649/257, 2-8=-646/264
BOT CHORD 5-6=-409/749, 4-5=-311/553
WEBS 2-5=-152/402, 2-4=-547/312
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-11-8zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
5) Refer to girder(s) for truss to trussconnections.
6)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
4=135.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J18GE
TrussType
Jack-Closed StructuralGable
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:362018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-NxOHoQXB?F6Y1ExYnrp9p7?JEtcwvCq7tAnsEwzX3Fn
Scale=1:27.1
0-2-2W1
T1
T2
W4
B1
B2
W2
W3
1
2
3 4
8
7
6 5
9
10
6x6
4x4 2x4
2x4
5x6
1.5x4
1.5x4
3-11-7
3-11-7
5-7-14
1-8-7
6-9-12
1-1-14
7-1-4
0-3-8
3-11-7
3-11-7
5-7-14
1-8-7
6-9-12
1-1-14
7-1-4
0-3-8
0-7-64-2-84-4-101-10-142-3-108.0012
8.0012
PlateOffsets(X,Y)-- [1:0-2-2,0-0-0], [8:Edge,0-4-0], [8:0-0-11,0-1-1]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.28
0.11
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.01
-0.03
-0.00
(loc)
7-8
7-8
5
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 23 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 3-1-13 except(jt=length) 8=0-6-0.
(lb)-Max Horz8=137(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 5 except 7=-232(LC 16), 6=-140(LC 39)
MaxGravAllreactions 250 lb orless at joint(s) 8, 5, 6 except 7=509(LC 39), 7=303(LC 1)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-7=-438/249
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 5-7-14,Exterior(2) 5-7-14 to 6-11-8
zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)Provide adequate drainage to preventwater ponding.
7)Gablestudsspaced at 2-0-0 oc.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5 except(jt=lb)
7=232, 6=140.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J19
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:362018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-NxOHoQXB?F6Y1ExYnrp9p7?LFtdmvDJ7tAnsEwzX3Fn
Scale=1:10.3
T1
B1
1
2
3
4
2x4
2-4-2
2-4-2
-1-3-11
1-3-11
2-0-10
2-0-10
2-4-2
0-3-8
0-4-121-5-95.4712
PlateOffsets(X,Y)-- [2:0-1-10,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.15
0.06
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
-0.00
(loc)
7
7
2
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-4-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=16/Mechanical, 2=105/0-5-8(min. 0-1-8), 4=3/Mechanical
Max Horz2=75(LC 16)
Max Uplift3=-38(LC 16), 2=-67(LC 16), 4=-18(LC 11)
MaxGrav3=18(LC 2), 2=148(LC 18), 4=25(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed; Lumber
DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51
Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-36(F=7,B=7), 5=0(F=10,B=10)-to-4=-14(F=3,B=3)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J20
TrussType
Jack-Open
Qty
6
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:372018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-r7yf?mYpmZEPeOWkLZKOMKXXzHzQefZG6qWPnMzX3Fm
Scale=1:10.8
T1
B1
1
2
3
4
2x4
1-8-8
1-8-8
-1-0-12
1-0-12
1-5-0
1-5-0
1-8-8
0-3-8
0-5-61-6-31-1-21-6-37.5012
PlateOffsets(X,Y)-- [2:0-2-3,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.09
0.03
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 6 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-8-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=30/Mechanical, 2=131/0-4-0(min. 0-1-8), 4=13/Mechanical
Max Horz2=66(LC 16)
Max Uplift3=-26(LC 16), 2=-32(LC 16), 4=-8(LC 13)
MaxGrav3=37(LC 30), 2=152(LC 2), 4=28(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J21
TrussType
Jack-Open
Qty
8
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:382018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-JJW1C6ZRXtMFGY5xvGsduY4iWhIjN6pQKUGzJozX3Fl
Scale:3/4"=1'
T1
B1
1
2
8
9
3
4
2x4
3-2-8
3-2-8
-0-10-12
0-10-12
2-11-0
2-11-0
3-2-8
0-3-8
0-4-72-6-22-0-152-6-28.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.10
0.09
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
-0.01
0.00
(loc)
4-7
4-7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 10 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=67/Mechanical, 2=163/0-4-0(min. 0-1-8), 4=38/Mechanical
Max Horz2=106(LC 16)
Max Uplift3=-56(LC 16), 2=-22(LC 16), 4=-16(LC 13)
MaxGrav3=83(LC 30), 2=187(LC 2), 4=58(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-1-12zone;cantileverleft exposed ;
endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J22
TrussType
Jack-Open
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:392018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-nW4QQSZ3IAU6uig7TzNsRldtr4f66Z3ZZ8?WrFzX3Fk
Scale=1:8.9
T1
B1
1
2
3
4
2x4
1-1-7
1-1-7
-0-10-12
0-10-12
0-9-15
0-9-15
1-1-7
0-3-8
0-4-71-1-78.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.07
0.02
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 4 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-1-7 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=15/Mechanical, 2=103/0-4-0(min. 0-1-8), 4=6/Mechanical
Max Horz2=51(LC 16)
Max Uplift3=-13(LC 16), 2=-31(LC 16), 4=-5(LC 22)
MaxGrav3=20(LC 30), 2=125(LC 22), 4=16(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J23
TrussType
Jack-OpenGirder
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:402018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Fieodnai3UczVsFJ0hu5zz9?HUzIr0Ijool4NhzX3Fj
Scale=1:15.4
T1
B1
HW1
1
2
8
9
3
10 4
4x4
3x6
3-11-5
3-11-5
-1-8-14
1-8-14
3-7-13
3-7-13
3-11-5
0-3-8
0-7-22-5-72-0-132-5-75.6612
PlateOffsets(X,Y)-- [2:0-0-0,0-1-10], [2:0-1-12,0-4-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.28
0.15
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
0.03
-0.01
(loc)
4-7
4-7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-5 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=41/Mechanical, 2=113/0-4-15(min. 0-1-8), 4=11/Mechanical
Max Horz2=114(LC 16)
Max Uplift3=-64(LC 16), 2=-147(LC 16), 4=-35(LC 11)
MaxGrav3=49(LC 2), 2=159(LC 18), 4=45(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed; Lumber
DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4 except(jt=lb)
2=147.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 49 lb down and 93 lb up at
1-2-7, and 68 lb down and 11 lb up at 1-2-7 on top chord, and 21 lb down and 46 lb up at 1-2-7, and 32 lb down and 2 lb up at
1-2-7 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51
Concentrated Loads(lb)
Vert: 8=30(B) 10=29(F=0,B=29)
Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-50(F=0,B=0), 5=0(F=10,B=10)-to-4=-20(F=0,B=0)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
J24
TrussType
Jack-Open
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:402018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Fieodnai3UczVsFJ0hu5zz92jU?Ir0Ijool4NhzX3Fj
Scale=1:8.9
T1
B1
HW1
1
2
3
4
4x4
0-9-7
0-9-7
-1-2-12
1-2-12
0-5-15
0-5-15
0-9-7
0-3-8
0-7-21-1-70-8-31-1-78.0012
PlateOffsets(X,Y)-- [2:0-0-7,0-0-5], [2:0-4-6,0-0-9], [2:Edge,0-2-1]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.12
0.02
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
-0.00
(loc)
5
7
2
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 4 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 0-9-7 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=-7/Mechanical, 2=139/0-4-0(min. 0-1-8), 4=-15/Mechanical
Max Horz2=50(LC 16)
Max Uplift3=-28(LC 22), 2=-48(LC 16), 4=-36(LC 22)
MaxGrav3=4(LC 12), 2=195(LC 22), 4=11(LC 20)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB01
TrussType
GABLE
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:412018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-juBAr7bKqokq70pWaOPKWAiBTuKCaS7s1SUdw7zX3Fi
Scale=1:29.1
0-1-130-1-13T1
T2
T1
B1
ST1ST1 ST1
1
2
3 4 5 6 7
89
12 11 10
13 14
3x4 3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
16-6-0
16-6-0
1-3-13
1-3-13
15-2-3
13-10-5
16-6-0
1-3-13
0-5-31-2-01-3-130-1-100-5-30-1-1012.0012
PlateOffsets(X,Y)-- [2:0-2-6,0-1-8], [3:0-2-2,0-1-8], [7:0-2-2,0-1-8], [8:0-2-6,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.25
0.10
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
8
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 39 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 15-4-6.
(lb)-Max Horz2=27(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 11, 12, 10
MaxGravAllreactions 250 lb orless at joint(s) 2, 8 except 11=498(LC 38), 12=475(LC 38), 10=475(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 5-11=-420/119, 4-12=-390/115, 6-10=-390/115
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-10 to 5-6-12,Interior(1) 5-6-12 to 15-2-3,Exterior(2) 15-2-3 to 16-3-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)Gablerequirescontinuous bottomchord bearing.
9)Gablestudsspaced at 4-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 11, 12, 10.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB02
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:432018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-gHJwGpcaMP_YMJzuipRobbnWgi?i2MS9Umzk_0zX3Fg
Scale=1:29.0
0-1-130-1-13T1
T2
T1
B1
ST1ST1 ST1
1
2
3 4 5 6 7
89
12 11 10
13 14
3x4 3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
16-6-0
16-6-0
2-7-13
2-7-13
13-10-3
11-2-5
16-6-0
2-7-13
0-5-32-6-02-7-130-1-100-5-30-1-1012.0012
PlateOffsets(X,Y)-- [2:0-2-6,0-1-8], [3:0-2-2,0-1-8], [7:0-2-2,0-1-8], [8:0-2-6,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.27
0.10
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 45 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 15-4-6.
(lb)-Max Horz2=-62(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 11, 12, 10
MaxGravAllreactions 250 lb orless at joint(s) except 2=282(LC 39), 8=282(LC 39), 11=515(LC 38), 12=422(LC
38), 10=422(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 5-11=-437/124, 4-12=-337/112, 6-10=-337/110
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-10 to 6-10-12,Interior(1) 6-10-12 to 13-10-3,Exterior(2) 13-10-3 to
16-3-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 11, 12, 10.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB03
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:442018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8TtIT9dC7j6P_TY5FXy18pKhQ5LwnpfIjQjHWSzX3Ff
Scale=1:29.0
0-1-130-1-13T1
T2
T1
B1
ST1ST1 ST1
1
2
3 4 5 6 7
89
12 11 10
13 14
3x4 3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
16-6-0
16-6-0
2-10-9
2-10-9
13-7-7
10-8-13
16-6-0
2-10-9
0-5-32-8-122-10-90-1-100-5-30-1-1012.0012
PlateOffsets(X,Y)-- [2:0-2-6,0-1-8], [3:0-2-2,0-1-8], [7:0-2-2,0-1-8], [8:0-2-6,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.27
0.10
0.11
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 46 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 15-4-6.
(lb)-Max Horz2=68(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 11, 12, 10
MaxGravAllreactions 250 lb orless at joint(s) except 2=300(LC 39), 8=300(LC 39), 11=515(LC 38), 12=419(LC
38), 10=419(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-254/58, 7-8=-254/58
WEBS 5-11=-437/124, 4-12=-334/116, 6-10=-334/113
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-10 to 7-1-8,Interior(1) 7-1-8 to 13-7-7,Exterior(2) 13-7-7 to 16-3-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 11, 12, 10.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB04
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:452018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-cfRhgVequ0EGcd7HpEUGg0tsOVhAWG5Sx4Sr3uzX3Fe
Scale=1:29.0
0-1-130-1-13T1
T2
T1
B1
ST1ST1 ST1
1
2
3 4 5 6 7
89
12 11 10
13 14
3x4 3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
16-6-0
16-6-0
1-6-9
1-6-9
14-11-7
13-4-13
16-6-0
1-6-9
0-5-31-4-121-6-90-1-100-5-30-1-1012.0012
PlateOffsets(X,Y)-- [2:0-2-6,0-1-8], [3:0-2-2,0-1-8], [7:0-2-2,0-1-8], [8:0-2-6,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.25
0.10
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
8
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 40 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 15-4-6.
(lb)-Max Horz2=33(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 11, 12, 10
MaxGravAllreactions 250 lb orless at joint(s) 2, 8 except 11=504(LC 38), 12=462(LC 38), 10=462(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 5-11=-425/120, 4-12=-378/113, 6-10=-378/113
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-10 to 5-9-8,Interior(1) 5-9-8 to 14-11-7,Exterior(2) 14-11-7 to 16-3-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 11, 12, 10.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB05
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:462018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-4s?3urfSfKM7DniTNy?VDEP1Dv1XFjRbAkCObLzX3Fd
Scale=1:41.2
0-2-20-2-2T1
T2
T1
B1
ST1ST1ST1 ST1 ST1
T3
B21
2
3 4 5 6 7 8 9 10
11
12
18 17 1615 14 13
3x4 3x4 3x4
3x4
3x4
3x4
22-11-8
22-11-8
2-11-4
2-11-4
20-0-4
17-1-0
22-11-8
2-11-4
0-4-71-7-121-11-80-1-100-4-70-1-108.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge], [10:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.25
0.09
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
-0.00
(loc)
11
12
11
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 58 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 21-5-4.
(lb)-Max Horz2=44(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 16, 17, 18, 14, 13, 11
MaxGravAllreactions 250 lb orless at joint(s) 2, 11 except 16=443(LC 38), 17=471(LC 38), 18=377(LC 38),
14=471(LC 38), 13=377(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 6-16=-364/112, 5-17=-389/124, 4-18=-305/107, 7-14=-389/124, 9-13=-305/100
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 7-5-12,Interior(1) 7-5-12 to 20-0-4,Exterior(2) 20-0-4 to 22-8-3
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 16, 17, 18, 14,
13, 11.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB06
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:472018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Y2ZR5Bf5QeU_rxHfxfWkmRyC5JNh_AAlPOxx7nzX3Fc
Scale=1:40.4
0-2-20-2-2T1
T2
T1
B2
ST2ST2
ST1
ST2
ST1
B11
2
3
4 5 6 7 8
9
10
11
17 16 15 14 13 12
18
19 20
21
3x4 3x4
3x4
3x43x4
22-11-8
22-11-8
5-11-4
5-11-4
17-0-4
11-1-0
22-11-8
5-11-4
0-4-73-7-123-11-80-1-100-4-70-1-108.0012
PlateOffsets(X,Y)-- [4:0-2-0,Edge], [8:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.24
0.10
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
10
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 68 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 21-5-4.
(lb)-Max Horz2=96(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 10, 15, 16, 13, 2 except 17=-106(LC 16), 12=-103(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 10, 2 except 15=474(LC 38), 16=394(LC 38), 17=368(LC 47),
13=394(LC 38), 12=367(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 6-15=-394/126, 5-16=-312/108, 3-17=-284/142, 7-13=-312/102, 9-12=-283/139
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-5-12,Interior(1) 3-5-12 to 5-11-4,Exterior(2) 5-11-4 to 21-3-3,
Interior(1) 21-3-3 to 22-8-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 15, 16, 13, 2
except(jt=lb) 17=106, 12=103.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB07
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:482018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-0E7pJXgjBxcrT4ssUM1zIfUNajjwjbHue2hVgDzX3Fb
Scale=1:41.4
0-2-20-2-2T1
T2
T1
B2
ST3
ST2
ST1
ST2
ST1
B11
2
3
4
5 6 7
8
9
10
11
17 16 1514 13 12
18
19 20
21
3x4 3x4
3x4
3x43x4
22-11-8
22-11-8
8-11-4
8-11-4
14-0-4
5-1-0
22-11-8
8-11-4
0-4-75-7-125-11-80-1-100-4-70-1-1057128.0012
PlateOffsets(X,Y)-- [5:0-2-0,Edge], [7:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.19
0.10
0.19
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.01
(loc)
10
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 74 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 21-5-4.
(lb)-Max Horz2=148(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) 10, 15, 16, 13, 2 except 17=-142(LC 16), 12=-143(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 10, 2 except 15=393(LC 38), 16=402(LC 39), 17=427(LC 39),
13=402(LC 39), 12=427(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 6-15=-314/95, 4-16=-321/143, 3-17=-348/181, 8-13=-321/136, 9-12=-348/183
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-5-12,Interior(1) 3-5-12 to 8-11-4,Exterior(2) 8-11-4 to 18-3-3,
Interior(1) 18-3-3 to 22-8-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 15, 16, 13, 2
except(jt=lb) 17=142, 12=143.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB08
TrussType
Piggyback
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:492018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-URgBWshLxFki4ER224YCrs1YK622S3a1siQ2CfzX3Fa
Scale=1:49.8
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
B21
2
3
4
5
6
7
8
9
15 14 13 12 11 10
16 17 18 19
20
4x4
3x4
3x4
3x4
22-11-8
22-11-8
11-5-12
11-5-12
22-11-8
11-5-12
0-4-77-6-37-7-130-1-100-4-70-1-108.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.19
0.10
0.19
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
8
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 77 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 21-5-4.
(lb)-Max Horz2=-195(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2 except 13=-156(LC 16), 15=-128(LC 16), 11=-156(LC 17),
10=-127(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 2, 8 except 12=259(LC 33), 13=371(LC 30), 15=312(LC 30),
11=370(LC 31), 10=311(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 4-13=-290/206, 6-11=-290/206
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-6 to 3-5-12,Interior(1) 3-5-12 to 11-5-12,Exterior(2) 11-5-12 to 14-5-12
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)All plates are 1.5x4MT20 unless otherwiseindicated.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
13=156, 15=128, 11=156, 10=127.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-5=-51, 5-20=-51, 2-8=-20
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB08
TrussType
Piggyback
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:492018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-URgBWshLxFki4ER224YCrs1YK622S3a1siQ2CfzX3Fa
LOADCASE(S)Standard
Trapezoidal Loads(plf)
Vert: 20=-51-to-9=-71
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB09
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:502018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-ydEakCiziZtZiO?Ecn3RN4ahJWNCBYnB5MAbk6zX3FZ
Scale=1:12.2
0-1-13T1
T2
W1
B11
2
3
4
5
6
7
3x4
4x4
3x43x4
5-11-10
5-11-10
1-9-14
1-9-14
5-11-10
4-1-11
0-4-60-11-141-1-110-1-100-10-40-1-107.5012
PlateOffsets(X,Y)-- [3:0-2-0,Edge], [4:Edge,0-3-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.37
0.17
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
1
1
5
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-11-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)5=200/5-2-0(min. 0-1-8), 2=221/5-2-0(min. 0-1-8)
Max Horz2=26(LC 13)
Max Uplift5=-41(LC 13), 2=-28(LC 13)
MaxGrav5=273(LC 35), 2=239(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-352/150, 3-6=-339/155, 3-7=-299/126, 4-7=-302/126
BOT CHORD 2-5=-110/299
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB10
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:512018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RpoyxYjbTs?PKYaRAVbgwH6uLwlEw?KKK0v9GYzX3FY
Scale=1:15.4
0-1-13T1
T2
W1
B1
ST1
1
2
3 4
6 5
7
4x4 1.5x4
1.5x42x41.5x4
5-11-10
5-11-10
3-11-8
3-11-8
5-11-10
2-0-2
0-4-62-3-142-5-110-1-102-2-40-1-107.5012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.22
0.06
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
1
1
5
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 17 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-11-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)5=68/5-2-0(min. 0-1-8), 2=126/5-2-0(min. 0-1-8), 6=206/5-2-0(min. 0-1-8)
Max Horz2=79(LC 13)
Max Uplift5=-21(LC 12), 2=-29(LC 16), 6=-31(LC 13)
MaxGrav5=97(LC 35), 2=211(LC 36), 6=241(LC 36)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-8 to 3-3-8,Interior(1) 3-3-8 to 3-11-8,Exterior(2) 3-11-8 to 5-9-14zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2, 6.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB11
TrussType
Piggyback
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:522018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-v0MK8ujDEA7Gxi9djC6vTVf08K1GfSHUYgfip_zX3FX
Scale=1:22.8
T1 W1
B11
2
3
4
5
6
7
1.5x4
1.5x42x4
5-11-10
5-11-100-4-63-8-120-1-103-7-20-1-107.5012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.41
0.26
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.01
0.01
0.00
(loc)
1
1
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 17 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-11-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)4=176/5-2-0(min. 0-1-8), 2=205/5-2-0(min. 0-1-8)
Max Horz2=132(LC 13)
Max Uplift4=-62(LC 16), 2=-34(LC 16)
MaxGrav4=220(LC 30), 2=233(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-8 to 3-3-8,Interior(1) 3-3-8 to 5-9-14zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 2.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
PB12
TrussType
Piggyback
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:532018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-NCwiMEkr?UF7ZskpHwd8?iCFhkQwOvWdnKOGLRzX3FW
Scale=1:21.0
T1 W1
B11
2
3
4
5
6
7
1.5x4
1.5x42x4
5-6-6
5-6-60-4-63-5-70-1-103-3-130-1-107.5012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.17
0.11
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
0.00
0.00
(loc)
1
1
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 32 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-6-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)4=161/4-8-12(min. 0-1-8), 2=190/4-8-12(min. 0-1-8)
Max Horz2=121(LC 13)
Max Uplift4=-57(LC 16), 2=-32(LC 16)
MaxGrav4=201(LC 30), 2=216(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) 2-ply truss to be connected together as follows:
Topchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-8 to 3-3-8,Interior(1) 3-3-8 to 5-4-10zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 2.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T01GE
TrussType
Hip SupportedGable
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:542018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-rOU4ZalUmnN_B?J0rd8NYwkRb7ny7LWn0_8pttzX3FV
Scale=1:27.7
0-2-20-2-2W1
T1
T2
T1
W1
B1
ST2ST2ST2
ST1
ST2 ST2
ST1
1
2
3
4 5 6 7 8 9 10
11
12
13
22 21 20 19 18 17 16 15 14
23 24
2x4
3x4 3x4
2x4
14-4-8
14-4-8
14-8-0
0-3-8
-0-8-12
0-8-12
3-0-6
3-0-6
11-7-10
8-7-4
14-4-8
2-8-14
14-8-0
0-3-8
15-4-12
0-8-12
1-5-04-3-44-5-61-5-04-3-412.0012
PlateOffsets(X,Y)-- [4:0-2-0,Edge], [10:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.10
0.06
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.00
(loc)
13
13
14
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 68 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 14-8-0.
(lb)-Max Horz22=-142(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 22, 14, 18, 19, 17 except 21=-108(LC 16), 15=-106(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 22, 14, 18, 20, 16, 15 except 19=255(LC 38), 21=254(LC 47),
17=255(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-0-8-12 to 2-3-4,Exterior(2) 2-3-4 to 3-0-6, Corner(3) 3-0-6 to 14-6-4,
Exterior(2) 14-6-4 to 15-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.
9)Gablerequirescontinuous bottomchord bearing.
10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).
11)Gablestudsspaced at 2-0-0 oc.
12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 22, 14, 18, 19,
17 except(jt=lb) 21=108, 15=106.
14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T02
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:552018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Jb2Tnwm6X5Vro9uCPKfc47HPIX1nsnMwFetMPJzX3FU
Scale=1:38.8
0-2-20-2-2T1
T2
T1
B1
W2 W3 W2
W1 W11
2
3 4
5
6
10 9 8 7
11
12
13 14 15 16
17
18
5x6 5x6
5x6 5x61.5x4 3x4
3x10MT18H 4x8
5-0-6
5-0-6
9-7-10
4-7-4
14-4-8
4-8-14
14-8-0
0-3-8
-0-8-12
0-8-12
5-0-6
5-0-6
9-7-10
4-7-4
14-4-8
4-8-14
14-8-0
0-3-8
15-4-12
0-8-12
1-5-06-3-46-5-61-5-06-3-412.0012
PlateOffsets(X,Y)-- [3:0-3-0,0-1-15], [4:0-3-9,0-2-8], [5:0-4-15,0-0-0], [7:Edge,0-3-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.93
0.40
0.11
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.21
0.01
(loc)
8-9
8-9
7
l/defl
>999
>830
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 65 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=576/0-6-0(min. 0-1-8), 7=576/0-6-0(min. 0-1-8)
Max Horz10=-194(LC 14)
Max Uplift10=-66(LC 16), 7=-66(LC 17)
MaxGrav10=802(LC 39), 7=802(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-11=-689/119, 11-12=-643/131, 3-12=-494/154, 3-13=-354/192, 13-14=-354/192,
14-15=-354/192, 15-16=-354/192, 4-16=-354/192, 4-17=-494/154, 17-18=-643/131,
5-18=-689/118, 2-10=-728/197, 5-7=-729/197
BOT CHORD 9-10=-92/346, 8-9=-92/344, 7-8=-28/339
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-8-12 to 2-3-4,Interior(1) 2-3-4 to 5-0-6,Exterior(2) 5-0-6 to 13-10-9,
Interior(1) 13-10-9 to 15-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 7.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T03
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:562018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-nnbr_GmkIPdiQJTOy2ArdLqaZxOabEr3TIdwylzX3FT
Scale=1:51.8
0-2-20-2-2T1
T2
T1
B1
W2W2
W1 W11
2
3 4
5 6
10 9 8 7
11
12
13
14 15
16
17
18
5x6 5x6
3x5 3x51.5x4
1.5x4
6x6 6x6
7-0-6
7-0-6
7-7-10
0-7-4
14-4-8
6-8-14
14-8-0
0-3-8
-0-8-12
0-8-12
3-7-15
3-7-15
7-0-6
3-4-7
7-7-10
0-7-4
11-0-1
3-4-7
14-4-8
3-4-7
14-8-0
0-3-8
15-4-12
0-8-12
1-5-08-3-48-5-61-5-08-3-412.0012
PlateOffsets(X,Y)-- [2:0-4-15,Edge], [3:0-3-9,0-2-8], [4:0-3-9,0-2-8], [5:0-4-15,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.90
0.30
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.20
0.01
(loc)
9-10
9-10
7
l/defl
>999
>854
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 65 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=555/0-6-0(min. 0-1-8), 7=555/0-6-0(min. 0-1-8)
Max Horz10=-250(LC 14)
Max Uplift10=-70(LC 16), 7=-70(LC 17)
MaxGrav10=947(LC 39), 7=947(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-11=-828/120, 11-12=-644/124, 12-13=-551/130, 13-14=-486/143, 3-14=-428/160,
3-4=-391/210, 4-15=-428/160, 15-16=-486/143, 16-17=-551/130, 17-18=-644/124,
5-18=-828/120, 2-10=-880/217, 5-7=-880/217
BOT CHORD 9-10=-36/411, 8-9=-39/411, 7-8=-40/414
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-8-12 to 2-3-4,Interior(1) 2-3-4 to 7-0-6,Exterior(2) 7-0-6 to 7-7-10,
Interior(1) 11-10-9 to 15-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 7.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T04
TrussType
Common
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:572018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Fz9DCbnM3ilZ2T2aWlh49YMkALiWKdBDiyMTUCzX3FS
Scale=1:53.2
T1
T2
B1
W3
W1 W2
W5W4
1
2
3
4
7 6 5
8
9
10
11
12
13
3x4
4x6
3x8
4x8
8x8
3x8
5-2-0
5-2-0
12-2-8
7-0-8
12-6-0
0-3-8
5-2-0
5-2-0
12-2-8
7-0-8
12-6-0
0-3-8
13-2-12
0-8-12
3-7-08-9-01-5-012.0012
PlateOffsets(X,Y)-- [1:0-3-7,Edge], [3:0-3-8,Edge], [7:0-4-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.97
0.39
0.34
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.18
0.00
(loc)
5-6
5-6
5
l/defl
>999
>810
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 65 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)5=478/0-6-0(min. 0-1-8), 7=911/Mechanical
Max Horz7=-279(LC 14)
Max Uplift5=-54(LC 17), 7=-197(LC 17)
MaxGrav5=543(LC 2), 7=1029(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-8=-371/115, 8-9=-330/118, 9-10=-320/124, 2-10=-299/141, 2-11=-256/136,
11-12=-298/130, 12-13=-303/107, 3-13=-441/93, 1-7=-994/243, 3-5=-473/172
BOT CHORD 6-7=-224/260, 5-6=-230/376
WEBS 1-6=-63/273, 3-6=-317/389
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 5-2-0,Exterior(2) 5-2-0 to 8-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)TheFabricationTolerance at joint 3 = 12%
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5 except(jt=lb)
7=197.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 619 lb down and 114 lb up at
0-1-12 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)StandardContinued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T04
TrussType
Common
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:572018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Fz9DCbnM3ilZ2T2aWlh49YMkALiWKdBDiyMTUCzX3FS
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-3=-51, 3-4=-51, 5-7=-20
Concentrated Loads(lb)
Vert: 1=-480
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T05
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:582018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-j9jbPxo_q0tQfddn4TDJimvvil2n34_Mxb610ezX3FR
Scale=1:53.2
0-1-11W1
T1
T2
T3
B1
W2
W3
W4
W6W5
1 2
3
4
5
8 7 6
9
10
11
12
13
1.5x4
6x6
4x6
3x44x8
8x8
3x8
1-5-4
1-5-4
5-2-0
3-8-12
12-2-8
7-0-8
12-6-0
0-3-8
1-5-4
1-5-4
5-2-0
3-8-12
12-2-8
7-0-8
12-6-0
0-3-8
13-2-12
0-8-12
4-10-98-9-01-5-04-10-912.0012
PlateOffsets(X,Y)-- [4:0-3-8,Edge], [8:0-4-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.98
0.38
0.37
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.17
0.01
(loc)
6-7
6-7
6
l/defl
>999
>839
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 70 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=479/0-6-0(min. 0-1-8), 8=923/Mechanical
Max Horz8=-295(LC 12)
Max Uplift6=-53(LC 17), 8=-184(LC 17)
MaxGrav6=543(LC 2), 8=1048(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-8=-648/132, 2-9=-399/136, 9-10=-351/143, 3-10=-324/162, 3-11=-256/138,
11-12=-298/133, 12-13=-302/110, 4-13=-441/83, 4-6=-474/174
BOT CHORD 7-8=-141/277, 6-7=-230/379
WEBS 2-8=-521/182, 4-7=-344/389
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 1-5-4,Interior(1) 1-5-4 to 5-2-0,Exterior(2) 5-2-0 to 8-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)TheFabricationTolerance at joint 4 = 12%
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
10)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6 except(jt=lb)
8=184.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 595 lb down and 144 lb up at
0-1-12 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T05
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:582018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-j9jbPxo_q0tQfddn4TDJimvvil2n34_Mxb610ezX3FR
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-61, 2-3=-51, 3-4=-51, 4-5=-51, 6-8=-20
Concentrated Loads(lb)
Vert: 1=-480
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T06
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:592018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-CMHzcHpcbK?HHnBzeAkYFzSCS8OBoTEW9FraY4zX3FQ
Scale=1:54.4
0-1-11W1
T1
T2
T3
B1
W2
W3
W4
W5 W6
W8W7
1
2
3
4
5
6
10 9 8 7
11
12
13
14
3x4
6x6
5x6
5x12MT18H3x8
3x6
5x6
5x6
6x8
2-1-8
2-1-8
5-2-0
3-0-8
9-1-12
3-11-11
12-2-8
3-0-12
12-6-0
0-3-8
2-1-8
2-1-8
5-2-0
3-0-8
9-1-12
3-11-11
12-2-8
3-0-12
12-6-0
0-3-8
13-2-12
0-8-12
5-6-138-9-01-5-05-6-1312.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-3-8], [5:0-3-4,0-1-4], [7:0-8-8,0-0-0], [10:0-4-8,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.47
0.44
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.02
-0.06
0.02
(loc)
8-9
9-10
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 90 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4,W8: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-3-13 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)7=2817/0-6-0(min. 0-1-15), 10=2408/Mechanical
Max Horz10=-301(LC 12)
Max Uplift7=-539(LC 17), 10=-491(LC 17)
MaxGrav7=3274(LC 47), 10=2733(LC 47)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-10=-644/146, 2-11=-1816/449, 3-11=-1323/367, 3-12=-1072/320, 12-13=-1447/365,
4-13=-2079/485, 4-14=-1816/403, 5-14=-2771/596, 5-6=-62/305, 5-7=-3227/728
BOT CHORD 9-10=-144/984, 8-9=-243/1645
WEBS 2-10=-2256/676, 2-9=-98/328, 3-9=-213/603, 4-9=-892/361, 4-8=-470/125,
5-8=-252/1598
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-1-8,Interior(1) 2-1-8 to 5-2-0,Exterior(2) 5-2-0 to 8-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
10)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
11)Providemetal plate or equivalent at bearing(s) 10 to supportreactionshown.
12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
7=539, 10=491.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T06
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:42:592018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-CMHzcHpcbK?HHnBzeAkYFzSCS8OBoTEW9FraY4zX3FQ
NOTES-
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 298 lb down and 72 lb up at 0-1-12 on top chord.The
design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 7-10=-20
Concentrated Loads(lb)
Vert: 1=-240
Trapezoidal Loads(plf)
Vert: 1=-301-to-2=-322, 2=-312-to-3=-345, 3=-345-to-5=-421, 5=-421-to-6=-431
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T07
TrussType
HipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:012018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8kPk1zqt7xF?X4LMlbm0KOXZqy5pGUkodZKhdzzX3FO
Scale=1:26.1
0-1-130-1-13T2
T3
T2
B1
W3 W4 W4 W3
W1W1
T1
W2
T1
W2
2
3 4 5
6
1 7
11
10 9
8
12 13 14
15 16 17
5x6
5x6 5x6
5x6
2x4 2x4
3x8
3x4
3x8
1-7-0
1-7-0
8-9-0
7-2-0
10-0-8
1-3-8
10-4-0
0-3-8
-1-7-12
1-7-12
1-7-0
1-7-0
5-2-0
3-7-0
8-9-0
3-7-0
10-0-8
1-3-8
10-4-0
0-3-8
11-11-12
1-7-12
2-1-03-6-33-8-02-1-03-6-312.0012
6.0012
PlateOffsets(X,Y)-- [3:0-3-9,0-2-8], [5:0-3-9,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.35
0.36
0.18
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.09
-0.14
0.01
(loc)
9-10
9-10
8
l/defl
>999
>865
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 56 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)11=480/0-6-0(min. 0-1-8), 8=480/0-6-0(min. 0-1-8)
Max Horz11=-122(LC 8)
Max Uplift11=-286(LC 9), 8=-306(LC 8)
MaxGrav11=626(LC 119), 8=647(LC 115)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-398/227, 3-12=-294/162, 4-12=-294/161, 4-13=-309/173, 13-14=-308/174,
5-14=-308/174, 5-6=-410/244, 6-8=-755/386, 2-11=-727/355
BOT CHORD 10-15=-233/522, 15-16=-233/522, 16-17=-233/522, 9-17=-233/522
WEBS 4-10=-307/126, 4-9=-307/109, 2-10=-229/532, 6-9=-253/554
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 11, 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
11=286, 8=306.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 177 lb down and 94 lb up at
1-7-0, 77 lb down and 34 lb up at 3-8-2, 77 lb down and 34 lb up at 5-8-2, and 77 lb down and 34 lb up at 7-8-2, and 177 lb down
and 94 lb up at 8-9-0 on top chord, and 48 lb down and 59 lb up at 1-7-0, 44 lb down and 59 lb up at 3-8-2, 44 lb down and 59 lb
up at 5-8-2, and 44 lb down and 59 lb up at 7-8-2, and 48 lb down and 59 lb up at 8-7-14 on bottomchord.The design/selection
ofsuchconnection device(s)is the responsibility of others.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T07
TrussType
HipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:012018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8kPk1zqt7xF?X4LMlbm0KOXZqy5pGUkodZKhdzzX3FO
NOTES-
12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 2-3=-51, 3-5=-61, 5-6=-51, 8-11=-20, 1-2=-51, 6-7=-51
Concentrated Loads(lb)
Vert: 10=1(F) 9=1(F) 15=1(F) 16=1(F) 17=1(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T08
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:022018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-cxz6FJrVuFNs8EwYJJHFsc4jfMRv?vhysD4E9PzX3FN
Scale=1:30.7
0-1-130-1-130-1-13W1
T1
T2
T3
T4
B1
W2 W3
W4 W4
W6W5
1
2
3 4
5
10 9 8 7 6
11 12
13
14
3x4
5x6
5x6 5x6
3x6
1.5x43x41.5x4 3x41.5x4
1-3-0
1-3-0
2-11-0
1-8-0
7-5-0
4-6-0
10-0-8
2-7-8
10-4-0
0-3-8
1-3-0
1-3-0
2-11-0
1-8-0
7-5-0
4-6-0
10-0-8
2-7-8
10-4-0
0-3-8
3-2-34-10-35-0-02-1-04-10-312.0012
PlateOffsets(X,Y)-- [3:0-3-9,0-2-8], [4:0-3-9,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.41
0.31
0.26
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.05
-0.06
0.00
(loc)
7
7-8
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 51 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 6-7.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)6=379/0-6-0(min. 0-1-8), 10=388/Mechanical
Max Horz10=-155(LC 12)
Max Uplift6=-28(LC 17), 10=-51(LC 12)
MaxGrav6=446(LC 40), 10=489(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-10=-588/192, 2-3=-319/125, 4-13=-277/107, 13-14=-284/94, 5-14=-341/93,
5-6=-419/124
WEBS 1-9=-217/605, 2-9=-309/131, 5-7=-89/276
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 1-3-0,Interior(1) 1-3-0 to 2-11-0,Exterior(2) 2-11-0 to 10-2-4
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 10.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T09
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:032018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-47XUSfs7eYVimOVks0oUPpcyqmo5kN_54tpnhrzX3FM
Scale=1:38.7
0-1-130-1-130-1-130-1-13W1
T1
T2
T3
T4
T5
W7
B1
W2 W3
W4 W4
W5 W6
1
2
3 4
5 6
12 11 10 9 8 7
13
14
15 16
173x4
6x6
5x6 5x6
5x6
3x4 1.5x4 1.5x4 3x4
3x4
1.5x4 1.5x4
2-7-0
2-7-0
4-3-0
1-8-0
6-1-0
1-10-0
8-9-0
2-8-0
10-0-8
1-3-8
10-4-0
0-3-8
2-7-0
2-7-0
4-3-0
1-8-0
6-1-0
1-10-0
8-9-0
2-8-0
10-0-8
1-3-8
10-4-0
0-3-8
4-6-36-2-33-6-36-4-03-6-36-2-312.0012
PlateOffsets(X,Y)-- [3:0-3-9,0-2-8], [4:0-3-9,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.19
0.25
0.19
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.06
0.00
(loc)
11
11
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 64 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)12=387/Mechanical, 7=381/Mechanical
Max Horz12=-206(LC 12)
Max Uplift12=-77(LC 12), 7=-48(LC 17)
MaxGrav12=479(LC 41), 7=434(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-12=-430/214, 2-14=-306/119, 3-14=-265/128, 4-17=-256/125, 5-17=-361/104,
6-7=-444/163
WEBS 1-11=-221/394, 2-11=-312/172, 5-8=-359/168, 6-8=-183/453
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-7-0,Interior(1) 2-7-0 to 4-3-0,Exterior(2) 4-3-0 to 6-1-0,
Interior(1) 8-9-0 to 10-2-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 12, 7.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T10
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:082018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-R5KNVMwGT58?s9OifZOf6tJm5nNXPX4qE9XYN3zX3FH
Scale=1:70.2
0-1-130-1-130-1-130-1-130-1-130-1-13T2
T3
T4
T5
T6
T7
T8
B1
W3 W4 W5 W4 W5 W4 W6
W7
W8
W9
W8
W10 W11 W12 W13 W14 W13 W12 W15W1
W2
W1
W16
B3B2
T1 T1
2
3 4 5
6
7 8
9 10 11 12
13
1 14
28 27 26 25 24 23 2221 20 19 18 17 16 15
29 30 31 32 33 34
35 3637 38 39
40 4142 43 44 45 46 47
4x6
5x6
4x12
6x12
5x12 5x6
4x6
3x8 4x63x44x6
3x5
4x8
1.5x4
2x4
4x8
4x6 2x4
1.5x4
4x8
4x4
4x6 3x4 3x8
4x6
3-2-13
3-2-13
7-0-4
3-9-7
10-11-7
3-11-3
14-8-13
3-9-7
16-4-13
1-8-0
16-11-3
0-6-5
19-7-3
2-8-0
23-9-3
4-2-0
27-11-3
4-2-0
32-1-3
4-2-0
34-0-8
1-11-5
34-4-0
0-3-8
-1-7-12
1-7-12
3-2-13
3-2-13
7-0-4
3-9-7
10-11-7
3-11-3
14-8-13
3-9-7
16-4-13
1-8-0
16-11-3
0-6-5
19-7-3
2-8-0
23-9-3
4-2-0
27-11-3
4-2-0
32-1-3
4-2-0
34-0-8
1-11-5
34-4-0
0-3-8
35-11-12
1-7-12
2-1-05-2-06-10-04-2-06-11-132-1-06-10-012.0012
6.0012
PlateOffsets(X,Y)-- [3:0-3-9,0-2-8], [7:0-6-0,0-2-2], [9:0-6-0,0-2-4], [12:0-3-9,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.35
0.74
0.65
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.44
0.07
(loc)
19
19
15
l/defl
>999
>926
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 452 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)28=2319/0-6-0(min. 0-2-1), 15=2034/0-6-0(min. 0-1-14)
Max Horz28=-205(LC 78)
Max Uplift28=-975(LC 12), 15=-965(LC 13)
MaxGrav28=2607(LC 46), 15=2421(LC 46)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-2248/864, 3-29=-3230/1158, 29-30=-3230/1158, 4-30=-3231/1159, 4-31=-4461/1428,
31-32=-4461/1428, 32-33=-4461/1428, 5-33=-4461/1428, 5-34=-4462/1428,
6-34=-4461/1429, 6-7=-5081/1568, 7-8=-3587/1134, 8-9=-4970/1521, 9-35=-5074/1657,
10-35=-5075/1657, 10-36=-5074/1657, 36-37=-5074/1657, 11-37=-5074/1657,
11-38=-3464/1247, 38-39=-3463/1247, 12-39=-3462/1247, 12-13=-1773/731,
2-28=-2599/993, 13-15=-2441/988
BOT CHORD 27-28=-231/319, 27-40=-629/1602, 26-40=-629/1602, 26-41=-1065/3230,
41-42=-1065/3230, 25-42=-1065/3230, 25-43=-1306/4617, 24-43=-1306/4617,
23-24=-1301/4603, 22-23=-1301/4603, 21-22=-924/3434, 20-21=-1655/5755,
19-20=-1655/5755, 19-44=-1653/5742, 18-44=-1653/5742, 18-45=-1160/3463,
17-45=-1160/3463, 17-46=-499/1293, 46-47=-499/1293, 16-47=-499/1293
WEBS 3-27=-775/289, 3-26=-790/2633, 4-26=-1972/603, 4-25=-435/1942, 5-25=-479/179,
6-25=-354/133, 6-24=-461/201, 6-22=-3144/1019, 7-22=-950/3023, 8-22=-471/1482,
8-21=-736/2394, 9-21=-4107/1348, 9-19=-62/333, 9-18=-954/178, 10-18=-483/191,
11-18=-554/2179, 11-17=-1937/595, 12-17=-926/2940, 12-16=-978/350, 2-27=-597/1669,
13-16=-595/1553
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T10
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:082018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-R5KNVMwGT58?s9OifZOf6tJm5nNXPX4qE9XYN3zX3FH
NOTES-
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=975, 15=965.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 251 lb down and 219 lb up at 3-2-13, 123 lb down and 111 lb up at
5-3-15, 123 lb down and 111 lb up at 7-3-15, 123 lb down and 111 lb up at 9-3-15, 94 lb down and 70 lb up at 23-8-1, 94 lb down and 70 lb up at 25-8-1, 94 lb down
and 70 lb up at 27-8-1, 94 lb down and 70 lb up at 29-8-1, and 94 lb down and 70 lb up at 31-8-1, and 209 lb down and 158 lb up at 32-1-3 on top chord, and 111 lb
down and 86 lb up at 3-2-13, 61 lb down and 45 lb up at 5-3-15, 61 lb down and 45 lb up at 7-3-15, 61 lb down and 45 lb up at 9-3-15, 711 lb down and 216 lb up at
11-4-8, 400 lb down and 157 lb up at 21-10-12, 48 lb down and 50 lb up at 23-8-1, 48 lb down and 50 lb up at 25-8-1, 48 lb down and 50 lb up at 27-8-1, 48 lb down
and 50 lb up at 29-8-1, and 48 lb down and 50 lb up at 31-8-1, and 52 lb down and 50 lb up at 32-0-1 on bottomchord.The design/selection of suchconnection
device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 2-3=-51, 3-6=-61, 6-7=-51, 7-8=-61, 8-9=-51, 9-12=-61, 12-13=-51, 15-28=-20, 1-2=-51, 13-14=-51
Concentrated Loads(lb)
Vert: 3=-79(F) 12=-4(F) 27=-46(F) 10=-4(F) 18=-10(F) 11=-4(F) 17=-10(F) 16=-10(F) 30=-35(F) 31=-35(F) 32=-35(F) 37=-4(F) 38=-4(F) 39=-4(F) 40=-31(F)
41=-31(F) 42=-31(F) 43=-711(F) 44=-400(F) 45=-10(F) 46=-10(F) 47=-10(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T11
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:102018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-NTS8w2xW?iOj6TX4n_Q7BIP_ga0wtR27hT0fRyzX3FF
Scale=1:68.1
0-1-130-1-130-1-130-1-13T2
T3
T4 T5
T6
B1
W3 W4 W5
W4
W6
W7
W9
W10 W9 W11
W1 W2 W1W12
B3B2
T1 T1
2
3 4 5
6 7
8
9
1 10
20 19 18 17 16 15 14 13 12 11
21
22
23 24 25 26
27 28 29
30
6x8
5x6
10x14MT18H
8x8 5x6
6x10
3x4 4x64x46x8
1.5x4
5x6
1.5x4
1.5x4
5x12 4x4 3x43x10MT18H
4-6-13
4-6-13
10-11-0
6-4-3
17-3-3
6-4-3
18-3-3
1-0-0
24-6-3
6-3-0
30-9-3
6-3-0
34-0-8
3-3-5
34-4-0
0-3-8
-1-7-12
1-7-12
4-6-13
4-6-13
10-11-0
6-4-3
17-3-3
6-4-3
18-3-3
1-0-0
24-6-3
6-3-0
30-9-3
6-3-0
34-0-8
3-3-5
34-4-0
0-3-8
35-11-12
1-7-12
2-1-06-6-05-6-06-7-132-1-06-6-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [3:0-3-9,0-2-8], [5:0-11-0,0-2-4], [6:0-1-13,Edge], [8:0-3-9,0-2-8], [9:0-2-14,Edge], [16:0-2-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.86
0.94
0.68
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.27
-0.51
0.11
(loc)
13-15
13-15
11
l/defl
>999
>798
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 182 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4,W6,W9: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 2-2-0 oc bracing.
WEBS 1 Row at midpt 5-18, 6-16, 6-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1418/0-6-0(min. 0-2-13), 11=1426/0-6-0(min. 0-2-14)
Max Horz20=-200(LC 12)
Max Uplift20=-222(LC 13), 11=-241(LC 17)
MaxGrav20=1788(LC 46), 11=1842(LC 46)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-21=-1673/231, 21-22=-1603/243, 3-22=-1594/260, 3-23=-2381/375, 23-24=-2381/375,
4-24=-2382/375, 4-25=-2381/375, 25-26=-2381/375, 5-26=-2381/375, 5-6=-4019/576,
6-27=-2697/390, 7-27=-2697/390, 7-28=-2697/390, 28-29=-2697/390, 8-29=-2696/391,
8-9=-1594/242, 2-20=-1761/354, 9-11=-1825/355
BOT CHORD 18-19=-217/1174, 17-18=-355/2712, 16-17=-355/2712, 15-16=-405/3153,
14-15=-407/3164, 13-14=-407/3164, 12-13=-122/1135
WEBS 3-19=-378/108, 3-18=-184/1691, 4-18=-739/214, 5-18=-464/116, 5-16=-336/2789,
6-16=-2282/338, 6-15=-384/81, 6-13=-609/81, 7-13=-760/212, 8-13=-289/2036,
8-12=-528/134, 2-19=-93/1158, 9-12=-131/1183
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-8-11,Interior(1) 3-8-11 to 4-6-13,Exterior(2) 4-6-13 to 18-3-3,
Interior(1) 18-3-3 to 30-9-3,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
20=222, 11=241.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T11
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:102018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-NTS8w2xW?iOj6TX4n_Q7BIP_ga0wtR27hT0fRyzX3FF
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T12
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:122018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-JsZuLkzmXJeRLmhTuPTbGjUKVOk0LLZQ9nVmWqzX3FD
Scale=1:68.7
0-1-130-1-130-1-130-1-13T2
T3
T4 T5
T6
B1
W3 W4 W5
W4
W6
W7
W8 W9
W10 W9 W11
W1
W2
W1
W12B3B2
T1 T1
2
3 4 5
6 7
8
9
1 10
20 19 18 17 16 15 14 13 12 11
21
22
23
24 25 26 27
28 29 30 31
32
33 34
8x10
5x6 10x10
5x12 5x6
6x8
3x4 4x63x55x8
1.5x4
6x6
1.5x4
1.5x4
6x8 4x4 3x44x6
5-10-13
5-10-13
10-11-0
5-0-3
15-11-3
5-0-3
16-11-3
1-0-0
23-2-3
6-3-0
29-5-3
6-3-0
34-0-8
4-7-5
34-4-0
0-3-8
-1-7-12
1-7-12
5-10-13
5-10-13
10-11-0
5-0-3
15-11-3
5-0-3
16-11-3
1-0-0
23-2-3
6-3-0
29-5-3
6-3-0
34-0-8
4-7-5
34-4-0
0-3-8
35-11-12
1-7-12
2-1-07-10-06-10-07-11-132-1-07-10-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [3:0-3-9,0-2-8], [5:0-7-4,0-2-8], [8:0-3-9,0-2-8], [9:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.83
0.77
0.68
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.41
0.08
(loc)
13-15
13-15
11
l/defl
>999
>991
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 199 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W3,W4,W5,W6,W9: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-18, 6-16, 6-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1405/0-6-0(min. 0-2-10), 11=1412/0-6-0(min. 0-2-12)
Max Horz20=-235(LC 12)
Max Uplift20=-186(LC 13), 11=-248(LC 17)
MaxGrav20=1690(LC 46), 11=1744(LC 46)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-21=-1671/244, 21-22=-1616/251, 22-23=-1607/252, 3-23=-1600/274, 3-24=-1867/349,
24-25=-1867/349, 4-25=-1868/349, 4-26=-1867/349, 26-27=-1867/349, 5-27=-1867/349,
5-6=-3179/533, 6-28=-2244/368, 7-28=-2244/368, 7-29=-2245/369, 29-30=-2244/369,
8-30=-2244/369, 8-31=-1572/262, 31-32=-1586/244, 9-32=-1657/233, 2-20=-1645/362,
9-11=-1710/362
BOT CHORD 19-20=-218/306, 18-19=-218/1150, 17-18=-291/2153, 16-17=-291/2153, 15-16=-322/2453,
14-15=-324/2461, 13-14=-324/2461, 12-13=-115/1156
WEBS 3-18=-148/1297, 4-18=-569/174, 5-18=-518/121, 5-16=-349/2373, 6-16=-1895/312,
6-15=-357/113, 6-13=-332/58, 7-13=-760/214, 8-13=-246/1578, 8-12=-342/121,
2-19=-79/1077, 9-12=-127/1123
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-8-11,Interior(1) 3-8-11 to 5-10-13,Exterior(2) 5-10-13 to
16-11-3,Interior(1) 16-11-3 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and
right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
20=186, 11=248.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T12
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:122018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-JsZuLkzmXJeRLmhTuPTbGjUKVOk0LLZQ9nVmWqzX3FD
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T13
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:132018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-n27GY4_OIdmIzwGfS6_qpw1Ulo674lUZOREJ2GzX3FC
Scale=1:68.8
0-1-130-1-130-1-130-1-13T2
T3
T4 T5
T6
B1
W3 W4
W5 W6 W7
W6
W8
W9
W10 W11
W12 W11 W13
W1
W2
W1
W14B3B2
T1 T1
2
3
4 5 6
7 8
9
10
1 11
21 20 19 18 1716 15 14 13 12
22
23
24
25 26 27
28
29
6x10
5x6 10x10
5x12 5x6
8x10
2x4
3x6
3x5 3x4 5x8
1.5x4
6x12
1.5x4
5x8 3x5 3x44x6
3-9-3
3-9-3
7-2-13
3-5-11
10-11-0
3-8-3
14-7-3
3-8-3
15-7-3
1-0-0
21-10-3
6-3-0
28-1-3
6-3-0
34-0-8
5-11-5
34-4-0
0-3-8
-1-7-12
1-7-12
3-9-3
3-9-3
7-2-13
3-5-11
10-11-0
3-8-3
14-7-3
3-8-3
15-7-3
1-0-0
21-10-3
6-3-0
28-1-3
6-3-0
34-0-8
5-11-5
34-4-0
0-3-8
35-11-12
1-7-12
2-1-09-2-08-2-09-3-132-1-09-2-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [4:0-3-9,0-2-8], [6:0-7-8,0-2-12], [9:0-3-9,0-2-8], [10:0-2-12,0-2-8], [17:0-3-12,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.93
0.65
0.83
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.16
-0.35
0.07
(loc)
14-16
14-16
12
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 227 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W4,W1,W2,W14: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-19, 5-18, 6-18, 7-17, 7-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)21=1392/0-6-0(min. 0-2-8), 12=1399/0-6-0(min. 0-2-9)
Max Horz21=-269(LC 12)
Max Uplift21=-148(LC 13), 12=-253(LC 17)
MaxGrav21=1592(LC 46), 12=1646(LC 46)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-22=-1396/222, 3-22=-1357/249, 3-23=-1553/336, 4-23=-1489/350, 4-24=-1499/340,
5-24=-1499/340, 5-6=-1499/340, 6-7=-2551/513, 7-25=-1900/358, 8-25=-1900/358,
8-26=-1901/358, 26-27=-1900/358, 9-27=-1900/358, 9-28=-1531/274, 28-29=-1587/249,
10-29=-1642/245, 2-21=-1560/349, 10-12=-1598/368
BOT CHORD 20-21=-237/286, 19-20=-239/952, 18-19=-210/1091, 17-18=-244/1725, 16-17=-264/1937,
15-16=-268/1952, 14-15=-268/1952, 13-14=-102/1128
WEBS 3-20=-413/73, 3-19=-129/294, 4-18=-117/1066, 5-18=-394/123, 6-18=-591/131,
6-17=-379/2105, 7-17=-1518/275, 7-16=-467/172, 8-14=-757/217, 9-14=-222/1243,
2-20=-59/967, 10-13=-125/1050
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-9-3,Interior(1) 3-9-3 to 7-2-13,Exterior(2) 7-2-13 to 15-7-3,
Interior(1) 15-7-3 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)TheFabricationTolerance at joint 10 = 12%
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
21=148, 12=253.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T13
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:142018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-FEhemP_13xu9a4rs0qV3M8ZfVBSMpCkjc5_tajzX3FB
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T14
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:152018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-kRF1zl?fqE0?CEQ2ZX0IuL6sEbpCYhgsrljQ79zX3FA
Scale=1:86.8
0-1-130-1-130-1-130-1-13T2
T3 T4 T5
T6
B1
W3 W4
W5
W6
W7
W8
W9 W10
W11 W10 W12
W13 W14
W1
W2
W1
W15B3B2
2
3
4 5
6 7
8
9
10
1 11
22 21 20 1918 17 16 15 14 13 12
23
24
25
26
27 28 29 30 31
32 3334 35
36
6x8
6x6 10x10
5x12
5x6
6x10
3x4 3x5
3x6
3x4 3x8
5x6
1.5x4
1.5x4
4x8 3x4
3x6
3x5 2x43x5
4-5-3
4-5-3
8-6-13
4-1-11
13-3-3
4-8-5
14-3-3
1-0-0
20-6-3
6-3-0
26-9-3
6-3-0
30-4-13
3-7-11
34-0-8
3-7-11
34-4-0
0-3-8
-1-7-12
1-7-12
4-5-3
4-5-3
8-6-13
4-1-11
13-3-3
4-8-5
14-3-3
1-0-0
20-6-3
6-3-0
26-9-3
6-3-0
30-4-13
3-7-11
34-0-8
3-7-11
34-4-0
0-3-8
35-11-12
1-7-12
2-1-010-6-09-6-010-7-132-1-010-6-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [4:0-4-1,0-3-0], [5:0-7-12,0-3-0], [8:0-3-9,0-2-8], [10:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.55
0.66
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.31
0.06
(loc)
15-18
15-18
12
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 235 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W13,W14,W1,W2,W15: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-3 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-20, 6-19, 6-18, 6-15, 7-15, 8-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)22=1378/0-6-0(min. 0-2-6), 12=1386/0-6-0(min. 0-2-7)
Max Horz22=-304(LC 14)
Max Uplift22=-135(LC 17), 12=-256(LC 17)
MaxGrav22=1525(LC 47), 12=1548(LC 46)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-23=-1376/235, 23-24=-1317/240, 3-24=-1298/254, 3-25=-1465/332, 25-26=-1395/347,
26-27=-1389/359, 4-27=-1380/363, 4-28=-1010/316, 28-29=-1010/315, 29-30=-1010/315,
5-30=-1011/315, 5-31=-1978/483, 6-31=-1995/477, 6-32=-1618/355, 7-32=-1618/355,
7-33=-1619/355, 33-34=-1618/355, 8-34=-1618/355, 8-35=-1442/351, 9-35=-1509/323,
9-36=-1329/246, 10-36=-1373/220, 2-22=-1488/349, 10-12=-1514/354
BOT CHORD 21-22=-270/330, 20-21=-243/930, 19-20=-210/1381, 18-19=-225/1548, 17-18=-226/1552,
16-17=-226/1552, 15-16=-226/1552, 14-15=-95/1067, 13-14=-78/933
WEBS 3-21=-307/70, 4-20=-138/720, 5-20=-867/153, 5-19=-383/1848, 6-19=-1436/333,
6-18=-291/125, 7-15=-757/211, 8-15=-196/984, 9-14=-155/263, 9-13=-382/71,
2-21=-47/911, 10-13=-62/935
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-8-11,Interior(1) 3-8-11 to 8-6-13,Exterior(2) 8-6-13 to 14-3-3,
Interior(1) 14-3-3 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
22=135, 12=256.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T14
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:162018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-CdpPB50HbY8sqO?E7FXXRZf1_?9RH8w04PT_fbzX3F9
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T15
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:172018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-gpNnOR1vLsGjRYaQhy2mzmBBrPWt0Xi9I3CXB2zX3F8
Scale=1:82.9
0-1-130-1-130-1-130-1-13T3
T4 T5 T6
T7
B1
W3
W4
W5
W6
W7
W8
W9 W10
W11 W10 W12
W13 W14
W1
W2
W1
W15
T2
B3B2
2
3
4
5 6
7 8
9
10
11
1 12
23 22 21 2019 18 17 16 15 14 13
24
25
26
27
28 2930
31
32
33
3x4
6x6
10x10
5x12 5x6
6x8
3x4 3x5
3x6
3x4 3x8 5x6
1.5x4
1.5x4
4x8 3x4
3x6
3x4
6x8
3x4
3x4
5-1-3
5-1-3
9-10-13
4-9-11
11-11-3
2-0-5
12-11-3
1-0-0
19-2-3
6-3-0
25-5-3
6-3-0
29-8-13
4-3-11
34-0-8
4-3-11
34-4-0
0-3-8
-1-7-12
1-7-12
5-1-3
5-1-3
9-10-13
4-9-11
11-11-3
2-0-5
12-11-3
1-0-0
19-2-3
6-3-0
25-5-3
6-3-0
29-8-13
4-3-11
34-0-8
4-3-11
34-4-0
0-3-8
35-11-12
1-7-12
2-1-011-10-010-10-011-11-132-1-011-10-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [5:0-4-1,0-3-0], [6:0-8-0,0-3-4], [9:0-3-9,0-2-8], [11:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.47
0.95
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.30
0.05
(loc)
17-19
17-19
13
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 254 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T5: 2x6SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W14,W1,W2,W15: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-10-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-21, 6-21, 7-20, 7-19, 7-17, 8-17, 9-15
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)23=1365/0-6-0(min. 0-2-7), 13=1372/0-6-0(min. 0-2-7)
Max Horz23=-339(LC 14)
Max Uplift23=-157(LC 17), 13=-257(LC 17)
MaxGrav23=1558(LC 47), 13=1567(LC 47)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-24=-1465/219, 24-25=-1354/226, 25-26=-1246/243, 3-26=-1227/249, 3-4=-1368/334,
4-27=-1349/335, 5-27=-1309/369, 5-6=-925/327, 6-7=-1587/478, 7-28=-1375/349,
8-28=-1375/349, 8-29=-1375/349, 29-30=-1375/349, 9-30=-1375/349, 9-31=-1339/374,
10-31=-1419/341, 10-32=-1266/249, 32-33=-1278/236, 11-33=-1429/229, 2-23=-1516/342,
11-13=-1529/348
BOT CHORD 22-23=-303/375, 21-22=-241/986, 20-21=-182/1077, 19-20=-194/1215, 18-19=-196/1219,
17-18=-196/1219, 16-17=-83/989, 15-16=-83/989, 14-15=-74/908
WEBS 3-21=-277/236, 5-21=-181/804, 6-21=-827/166, 6-20=-424/1730, 7-20=-1370/318,
7-19=-262/162, 7-17=-117/305, 8-17=-758/212, 9-17=-187/757, 9-15=-91/302,
10-14=-284/73, 2-22=-32/881, 11-14=-50/881
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-8-11,Interior(1) 3-8-11 to 9-10-13,Exterior(2) 9-10-13 to
11-11-3,Interior(1) 12-11-3 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and
right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
23=157, 13=257.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T15
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:182018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-80x9cn2X69Oa3h8dFga?W_kMbps6l_xJXjy4jUzX3F7
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T16
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:192018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-cCUXp729tTWRhrjpoN5F3BHWnCAdUVZSmNheGwzX3F6
Scale=1:71.5
T2
T3
T2
B1
W3 W4
W5 W6 W7 W6 W5
W4 W3
W1
W2
W1
W2
T4
B3B2
T1T1
2
3
4 5 6 7
8
9
101
19 18 17 16 15 14 13 12 11
20
21
22
23
24 25 26 27
28
29
30
31
6x8
3x5
6x8
3x6
4x8
6x6
1.5x4
6x6
3x6
4-7-4
4-7-4
8-11-0
4-3-12
17-2-0
8-3-0
25-5-0
8-3-0
29-8-12
4-3-12
34-0-8
4-3-12
34-4-0
0-3-8
-1-7-12
1-7-12
4-7-4
4-7-4
8-11-0
4-3-12
17-2-0
8-3-0
25-5-0
8-3-0
29-8-12
4-3-12
34-0-8
4-3-12
34-4-0
0-3-8
35-11-12
1-7-12
2-1-011-0-02-1-011-0-012.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [4:0-4-4,0-1-12], [7:0-4-4,0-1-12], [9:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.90
0.58
0.67
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.27
0.05
(loc)
13-15
15-17
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 202 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3: 2x4SPF 2100F 1.8E,T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W1,W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-15
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)19=1379/0-6-0(min. 0-2-6), 11=1379/0-6-0(min. 0-2-6)
Max Horz19=317(LC 13)
Max Uplift19=-132(LC 16), 11=-132(LC 17)
MaxGrav19=1508(LC 43), 11=1508(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-20=-1381/225, 20-21=-1375/243, 21-22=-1321/251, 3-22=-1302/261, 3-23=-1477/343,
4-23=-1397/376, 4-24=-1478/367, 24-25=-1478/367, 5-25=-1478/367, 5-6=-1478/367,
6-26=-1478/367, 26-27=-1478/367, 7-27=-1478/367, 7-28=-1396/376, 8-28=-1476/343,
8-29=-1302/261, 29-30=-1321/251, 30-31=-1374/242, 9-31=-1381/225, 2-19=-1467/362,
9-11=-1466/362
BOT CHORD 18-19=-283/337, 17-18=-257/935, 16-17=-208/1023, 15-16=-208/1023, 14-15=-93/1024,
13-14=-93/1024, 12-13=-50/935
WEBS 3-18=-308/65, 3-17=-251/247, 4-17=-109/345, 4-15=-204/745, 5-15=-1002/281,
7-15=-204/744, 7-13=-109/346, 8-13=-252/249, 8-12=-308/65, 2-18=-52/905,
9-12=-52/904
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 5-1-12,Interior(1) 5-1-12 to 8-11-0,Exterior(2) 8-11-0 to 30-3-4,
Interior(1) 30-3-4 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates are 3x4MT20 unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
19=132, 11=132.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T16
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:192018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-cCUXp729tTWRhrjpoN5F3BHWnCAdUVZSmNheGwzX3F6
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T17
TrussType
PIGGYBACK BASE
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:202018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-4O2w1T3neneII?I?M4cUbPphXcWrDynb?1RBoMzX3F5
Scale=1:74.4
T1
T2
T4
B1
W3 W4
W5 W6 W7 W6 W5
W4 W3
W1
W2
W8
W2
T3
B3B2
T5
1
2
3 4 5 6
7
8
9
18 17 16 15 14 13 12 11 10
19
20
21
2223
24 25 26 27
28
29
30
31
3x8
3x5
6x8
3x4 3x4
3x6
3x5 3x4
4x8
6x6
1.5x4
6x6
3x4
3x6
3x4 3x43x4
4-7-4
4-7-4
8-11-0
4-3-12
17-2-0
8-3-0
25-5-0
8-3-0
29-8-12
4-3-12
34-0-8
4-3-12
34-4-0
0-3-8
4-7-4
4-7-4
8-11-0
4-3-12
17-2-0
8-3-0
25-5-0
8-3-0
29-8-12
4-3-12
34-0-8
4-3-12
34-4-0
0-3-8
35-11-12
1-7-12
2-1-011-0-02-1-011-0-012.0012
6.0012
PlateOffsets(X,Y)-- [1:0-3-7,Edge], [3:0-4-4,0-1-12], [6:0-4-4,0-1-12], [8:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.90
0.58
0.67
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.27
0.05
(loc)
14-16
14-16
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 200 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 2100F 1.8E,T3: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W1,W2,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)18=1285/0-6-0(min. 0-2-5), 10=1381/0-6-0(min. 0-2-6)
Max Horz18=-341(LC 12)
Max Uplift18=-94(LC 16), 10=-132(LC 17)
MaxGrav18=1457(LC 41), 10=1509(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-1381/213, 19-20=-1333/225, 20-21=-1318/235, 21-22=-1310/243, 2-22=-1300/247,
2-23=-1483/331, 3-23=-1477/368, 3-24=-1480/367, 24-25=-1480/367, 4-25=-1480/367,
4-5=-1480/367, 5-26=-1480/367, 26-27=-1480/367, 6-27=-1480/367, 6-28=-1397/376,
7-28=-1478/343, 7-29=-1304/261, 29-30=-1317/256, 30-31=-1376/242, 8-31=-1382/224,
1-18=-1408/243, 8-10=-1468/362
BOT CHORD 17-18=-277/334, 16-17=-256/942, 15-16=-207/1026, 14-15=-207/1026, 13-14=-92/1025,
12-13=-92/1025, 11-12=-50/936
WEBS 2-17=-318/80, 2-16=-258/243, 3-16=-111/352, 3-14=-205/744, 4-14=-1002/282,
6-14=-203/745, 6-12=-109/346, 7-12=-251/249, 7-11=-308/65, 1-17=-84/988,
8-11=-52/905
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-6-15,Interior(1) 3-6-15 to 8-11-0,Exterior(2) 8-11-0 to 30-3-4,
Interior(1) 30-3-4 to 34-0-8,Exterior(2) 34-0-8 to 35-11-12zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 18 except(jt=lb)
10=132.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T17
TrussType
PIGGYBACK BASE
Qty
2
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:212018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-YbcIEp4QP4n9w9tCwo7j8cMsH0r4yP1lDgAkKpzX3F4
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T18
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:222018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-0nAgR952AOv0YJSOUVeygpv16QCmhsWuSKwIsFzX3F3
Scale=1:65.1
T1
T2
T4
B1
W3
W4
W5
W6 W5 W4
W7 W8
W1
W2
W10
W9
T3
B3B2
T5
1
2
3 4 5 6
7
8
9
17 16 15 14 13 12 11 10
18
19
20
21 22 23 24 25
26
27
28
6x8
4x8
6x6 1.5x4
6x6
3x6
3x5 2x4
7-3-8
7-3-8
15-6-8
8-3-0
23-9-8
8-3-0
28-1-4
4-3-12
32-5-0
4-3-12
32-8-8
0-3-8
3-9-8
3-9-8
7-3-8
3-6-0
15-6-8
8-3-0
23-9-8
8-3-0
28-1-4
4-3-12
32-5-0
4-3-12
32-8-8
0-3-8
34-4-4
1-7-12
3-8-811-0-02-1-011-0-012.0012
6.0012
PlateOffsets(X,Y)-- [3:0-4-4,0-1-12], [6:0-4-4,0-1-12], [8:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.89
0.55
0.65
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.27
0.05
(loc)
12-14
12-14
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 194 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 2100F 1.8E,T3: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W8,W1,W10,W9: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-16, 3-14, 4-14, 2-17
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)17=1232/Mechanical, 10=1319/0-6-0(min. 0-2-4)
Max Horz17=-364(LC 12)
Max Uplift17=-78(LC 16), 10=-130(LC 17)
MaxGrav17=1432(LC 40), 10=1440(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-1226/343, 3-21=-1367/350, 21-22=-1367/350, 4-22=-1367/350, 4-5=-1367/350,
5-23=-1367/350, 23-24=-1367/350, 6-24=-1367/350, 6-25=-1390/362, 7-25=-1397/325,
7-26=-1222/249, 26-27=-1241/247, 27-28=-1305/230, 8-28=-1312/213, 8-10=-1399/350
BOT CHORD 16-17=-239/678, 15-16=-198/863, 14-15=-198/863, 13-14=-90/968, 12-13=-90/968,
11-12=-42/886
WEBS 2-16=-111/436, 3-14=-209/826, 4-14=-1000/282, 6-14=-200/655, 6-12=-109/356,
7-12=-261/239, 7-11=-289/61, 2-17=-1447/204, 8-11=-44/856
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 7-3-8,Exterior(2) 7-3-8 to 28-5-0,
Interior(1) 28-5-0 to 32-5-0,Exterior(2) 32-5-0 to 34-4-4zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates are 3x4MT20 unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17 except(jt=lb)
10=130.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T18
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:222018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-0nAgR952AOv0YJSOUVeygpv16QCmhsWuSKwIsFzX3F3
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:232018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Vzk2fU5gxh1t9T1a1D9BD1RCbqYQQJk2h_frPhzX3F2
Scale=1:76.0
0-1-130-1-13T1
T2
T4
B1
W3
W4 W5 W6 W5 W4
W7 W8W1
W2
W10
W9
T3
B1B2
1
2
3 4 5 6
7
8
9
17 16 15 14 13 12 11 10
18
19
20
21 22 23 24
25
26
3x4
5x6 3x4
6x8
3x43x4
3x4
4x8
1.5x4 5x6
3x4
3x6
3x43x5 2x43x5
7-6-1
7-6-1
15-6-8
8-0-7
23-6-15
8-0-7
27-11-15
4-5-1
32-5-0
4-5-1
32-8-8
0-3-8
3-10-13
3-10-13
7-6-1
3-7-5
15-6-8
8-0-7
23-6-15
8-0-7
27-11-15
4-5-1
32-5-0
4-5-1
32-8-8
0-3-8
34-4-4
1-7-12
3-8-811-0-1211-2-92-1-011-0-1212.0012
6.0012
PlateOffsets(X,Y)-- [3:0-3-9,0-2-8], [6:0-3-9,0-2-8], [8:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.84
0.53
0.65
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.09
-0.26
0.05
(loc)
12-14
12-14
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 195 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 2100F 1.8E,T3: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W8,W1,W10,W9: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-2 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-16, 4-14, 2-17
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)17=1229/Mechanical, 10=1317/0-6-0(min. 0-2-4)
Max Horz17=-308(LC 12)
Max Uplift17=-78(LC 16), 10=-128(LC 17)
MaxGrav17=1416(LC 40), 10=1444(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-1208/330, 3-21=-1343/341, 21-22=-1343/341, 4-22=-1344/341, 4-5=-1343/341,
5-23=-1343/341, 23-24=-1343/341, 6-24=-1343/341, 6-7=-1376/352, 7-25=-1229/243,
25-26=-1254/223, 8-26=-1317/209, 8-10=-1402/343
BOT CHORD 16-17=-222/671, 15-16=-186/866, 14-15=-186/866, 13-14=-84/965, 12-13=-84/965,
11-12=-36/882
WEBS 2-16=-100/449, 3-14=-203/799, 4-14=-980/275, 6-14=-194/632, 6-12=-110/352,
7-12=-261/242, 7-11=-274/61, 2-17=-1429/170, 8-11=-36/849
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 7-6-1,Exterior(2) 7-6-1 to 27-11-15,
Interior(1) 27-11-15 to 32-5-0,Exterior(2) 32-5-0 to 34-4-4zone;cantileverright exposed ; end verticalright exposed;C-C for
members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17 except(jt=lb)
10=128.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T20
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:252018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RMso4A7wTJHbPmBz9eCfISXXhdGRuGcL8I8yTazX3F0
Scale=1:67.4
0-1-130-1-13T1
T2
T4
B1
W3 W4 W5 W4 W5 W4 W3
W6 W7W1
W2 W9
W8
T3
B3B2
T5
1
2 3 4 5 6
7
8
9
18 17 16 15 14 13 12 11 10
19
20
21 22 23 24 25 26
27
28
295x8
5x6 3x4
6x10
3x4 3x43x5
4x4
3x4 1.5x4
4x8
5x6
3x4
3x6
3x4 2x43x4
6-2-1
6-2-1
12-4-7
6-2-6
18-8-9
6-4-2
24-10-15
6-2-6
28-7-15
3-9-1
32-5-0
3-9-1
32-8-8
0-3-8
6-2-1
6-2-1
12-4-7
6-2-6
18-8-9
6-4-2
24-10-15
6-2-6
28-7-15
3-9-1
32-5-0
3-9-1
32-8-8
0-3-8
34-4-4
1-7-12
3-8-89-8-129-10-92-1-09-8-1212.0012
6.0012
PlateOffsets(X,Y)-- [1:Edge,0-1-7], [2:0-3-9,0-2-8], [6:0-3-9,0-2-8], [8:0-2-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.93
0.43
0.50
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.16
0.05
(loc)
13-16
13-16
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 195 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W6,W7,W1,W2,W9,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-17, 3-16, 5-13, 6-12
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)18=1243/Mechanical, 10=1330/0-6-0(min. 0-2-4)
Max Horz18=-331(LC 12)
Max Uplift18=-100(LC 13), 10=-143(LC 12)
MaxGrav18=1462(LC 40), 10=1454(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-1247/222, 19-20=-1196/235, 2-20=-1136/261, 2-21=-1394/332, 21-22=-1395/332,
3-22=-1396/332, 3-23=-1442/342, 4-23=-1442/342, 4-24=-1442/342, 5-24=-1442/342,
5-25=-1443/342, 25-26=-1442/342, 6-26=-1442/342, 6-27=-1338/347, 7-27=-1407/319,
7-28=-1233/242, 28-29=-1248/228, 8-29=-1293/226, 1-18=-1411/248, 8-10=-1418/349
BOT CHORD 17-18=-239/314, 16-17=-206/856, 15-16=-244/1395, 14-15=-244/1395, 13-14=-244/1395,
12-13=-100/994, 11-12=-47/876
WEBS 2-17=-366/150, 2-16=-222/982, 3-16=-696/260, 5-13=-625/197, 6-13=-201/818,
6-12=-123/267, 7-12=-190/271, 7-11=-342/66, 1-17=-136/971, 8-11=-54/872
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 6-2-1,Exterior(2) 6-2-1 to 29-6-7,
Interior(1) 29-6-7 to 32-5-0,Exterior(2) 32-5-0 to 34-4-4zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
18=100, 10=143.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T21
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:262018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vYPBHW8YEcPS0wm9jLjurf3hn1W9dfFUNyuV?0zX3F?
Scale=1:64.9
0-1-130-1-13T1
T2
T4
B1
B2
B3
B2
B4
W3
W5
W4 W6
W8
W7
W9 W10 W3
W1
W2 W12
W11
T3
T5
1
2 3 4 5 6 7
8
9
18 17 16
15 14
13 12 11 10
19
20 21 22 23 24
25
26
27
3x8
5x6 3x4
10x10
2x4 2x4
3x4 2x4
2x4 3x44x8
6x8 5x8
3x4
5x8
5x6
3x4
4-10-1
4-10-1
10-4-12
5-6-10
17-0-4
6-7-8
21-7-9
4-7-5
26-2-15
4-7-5
32-5-0
6-2-1
32-8-8
0-3-8
4-10-1
4-10-1
10-4-12
5-6-10
17-0-4
6-7-8
21-7-9
4-7-5
26-2-15
4-7-5
32-5-0
6-2-1
32-8-8
0-3-8
34-4-4
1-7-12
3-8-88-4-128-6-92-1-01-0-08-4-1212.0012
6.0012
PlateOffsets(X,Y)-- [1:0-3-7,Edge], [2:0-3-9,0-2-8], [7:0-3-9,0-2-8], [8:0-2-8,0-2-8], [14:0-2-8,0-2-12], [15:0-5-12,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.97
0.78
0.73
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.31
0.09
(loc)
14-15
14-15
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 197 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W5,W8,W1,W2,W12,W11: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 16-17,12-13.
WEBS 1 Row at midpt 6-12
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)18=1257/Mechanical, 10=1343/0-6-0(min. 0-2-5)
Max Horz18=-296(LC 12)
Max Uplift18=-142(LC 13), 10=-180(LC 12)
MaxGrav18=1492(LC 40), 10=1481(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-1152/227, 2-19=-1066/247, 2-20=-1665/331, 20-21=-1666/330, 3-21=-1667/330,
3-22=-1877/362, 4-22=-1877/362, 4-23=-1865/360, 5-23=-1865/360, 5-6=-1865/360,
6-24=-1480/327, 7-24=-1479/327, 7-25=-1375/270, 25-26=-1408/244, 26-27=-1458/230,
8-27=-1470/217, 1-18=-1456/241, 8-10=-1429/364
BOT CHORD 17-18=-207/273, 3-15=-849/276, 14-15=-318/1674, 4-14=-379/169, 11-12=-106/1001
WEBS 2-17=-648/132, 15-17=-182/792, 2-15=-220/1405, 3-14=-103/295, 12-14=-186/1466,
6-14=-172/704, 6-12=-1091/289, 7-12=-221/983, 1-17=-144/999, 8-11=-130/918
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 4-10-1,Exterior(2) 4-10-1 to 30-10-7,
Interior(1) 30-10-7 to 32-5-0,Exterior(2) 32-5-0 to 34-4-4zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)TheFabricationTolerance at joint 8 = 8%
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
18=142, 10=180.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T21
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:262018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vYPBHW8YEcPS0wm9jLjurf3hn1W9dfFUNyuV?0zX3F?
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T22
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:282018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-rxXxiC9pmEf9GEvYqmlMw486vrCf5ZlnqGNc3vzX3Ez
Scale=1:62.0
0-1-130-1-13T1
T2 T3
T5
B1
B2
B3
B2
B4
W3
W4
W5
W7
W6 W8
W10
W9
W11 W12 W13W1
W2
W15
W14
T4
T6
1
2
3 4 5 6 7 8
9
10
20 1918 17
16 15
14 13 12 11
21
22 23 24 25 26 27
28
29
30
4x4
4x12 3x4
6x6
2x4 2x4
3x4 3x4
2x4 2x44x10
4x4
6x8 5x8
3x4
6x8
5x6
3x5
4x6
5-0-6
5-0-6
5-10-3
0-9-12
10-4-12
4-6-9
17-0-4
6-7-8
22-3-9
5-3-5
27-6-15
5-3-5
32-5-0
4-10-1
32-8-8
0-3-8
5-0-6
5-0-6
5-10-3
0-9-12
10-4-12
4-6-9
17-0-4
6-7-8
22-3-9
5-3-5
27-6-15
5-3-5
32-5-0
4-10-1
32-8-8
0-3-8
34-4-4
1-7-12
4-6-157-0-127-8-112-1-01-0-07-0-127.5012
12.0012
6.0012
PlateOffsets(X,Y)-- [3:0-0-0,0-0-1], [8:0-3-9,0-2-8], [9:0-2-14,Edge], [15:0-2-8,0-3-0], [16:0-6-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.68
0.71
0.73
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.15
-0.40
0.11
(loc)
15-16
15-16
11
l/defl
>999
>982
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 200 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud*Except*
W3,W8,W9,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-10-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 17-18
9-7-14 oc bracing: 15-16.
WEBS 1 Row at midpt 3-19, 7-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1251/Mechanical, 11=1352/0-6-0(min. 0-2-7)
Max Horz20=-289(LC 12)
Max Uplift20=-206(LC 17), 11=-291(LC 17)
MaxGrav20=1433(LC 43), 11=1547(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-21=-1078/213, 21-22=-1046/217, 2-22=-1010/233, 2-3=-1032/250, 3-23=-2022/376,
4-23=-2025/376, 4-24=-2352/452, 5-24=-2352/452, 5-25=-2328/449, 6-25=-2328/449,
6-7=-2328/449, 7-26=-1753/379, 26-27=-1753/379, 8-27=-1752/379, 8-28=-1382/286,
28-29=-1429/266, 9-29=-1472/258, 1-20=-1397/235, 9-11=-1509/344
BOT CHORD 19-20=-180/257, 18-19=-215/1071, 4-16=-876/251, 15-16=-360/2041, 5-15=-454/179,
12-13=-115/1019
WEBS 2-19=-188/980, 3-19=-1549/291, 3-18=-349/93, 16-18=-189/1042, 3-16=-238/1560,
4-15=-97/404, 13-15=-228/1703, 7-15=-176/841, 7-13=-1177/295, 8-13=-229/1208,
8-12=-270/113, 1-19=-141/1179, 9-12=-128/979
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 5-0-6,Exterior(2) 5-0-6 to 30-10-3,
Interior(1) 30-10-3 to 32-5-0,Exterior(2) 32-5-0 to 34-4-4zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T22
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:282018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-rxXxiC9pmEf9GEvYqmlMw486vrCf5ZlnqGNc3vzX3Ez
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=206, 11=291.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T23
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:302018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-nJfh7uB3IrvtVY3wyBnq?VEQDewzZRq4Iasj8nzX3Ex
Scale=1:62.0
0-1-130-1-13T1
T2
T3
T5
B1
B2
B3
B2
B4
W3 W4
W5
W7
W6 W8
W10
W9
W11 W12 W13W1
W2
W15
W14
T4
T6
1
2
3 4 5
6
7 8
9
10
20 19 18 17
16 15
14 13 12 11
21
22
23
24 25 26 27
4x4
6x10 3x5
6x8
1.5x4 1.5x4
4x4 3x4
3x4 2x44x83x8
8x8 6x8
4x4
5x8
5x6
3x5
4x6
5-0-6
5-0-6
7-11-12
2-11-6
10-4-12
2-4-15
17-0-4
6-7-8
22-11-9
5-11-5
28-10-15
5-11-5
32-5-0
3-6-1
32-8-8
0-3-8
5-0-6
5-0-6
7-11-12
2-11-6
10-4-12
2-4-15
17-0-4
6-7-8
22-11-9
5-11-5
28-10-15
5-11-5
32-5-0
3-6-1
32-8-8
0-3-8
34-4-4
1-7-12
4-6-155-8-127-8-112-1-01-0-05-8-127.5012
12.0012
6.0012
PlateOffsets(X,Y)-- [3:0-5-0,0-1-15], [8:0-3-0,0-1-15], [9:0-2-14,Edge], [13:0-2-0,0-1-12], [15:0-2-8,0-3-8], [16:0-5-12,0-4-0], [18:0-3-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.60
0.89
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.20
-0.43
0.14
(loc)
15-16
15-16
11
l/defl
>999
>912
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 187 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud,B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W3,W8,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1236/Mechanical, 11=1359/0-6-0(min. 0-2-8)
Max Horz20=-289(LC 12)
Max Uplift20=-206(LC 17), 11=-291(LC 17)
MaxGrav20=1354(LC 43), 11=1608(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-21=-1007/212, 21-22=-971/217, 2-22=-957/232, 2-23=-953/246, 3-23=-991/234,
3-4=-2649/435, 4-5=-3103/532, 5-24=-3063/527, 6-24=-3063/527, 6-25=-3063/527,
7-25=-3063/527, 7-26=-2127/402, 26-27=-2126/402, 8-27=-2125/402, 8-9=-1412/261,
1-20=-1307/235, 9-11=-1589/338
BOT CHORD 19-20=-180/258, 18-19=-240/1656, 4-16=-849/227, 15-16=-400/2688, 5-15=-524/185,
12-13=-114/1000
WEBS 2-19=-155/913, 3-19=-1760/341, 3-18=-770/135, 16-18=-236/1783, 3-16=-317/2062,
4-15=-108/492, 13-15=-270/1986, 7-15=-190/1139, 7-13=-1292/299, 8-13=-247/1541,
8-12=-415/122, 1-19=-143/1089, 9-12=-124/1029
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 5-0-6,Exterior(2) 5-0-6 to 34-4-4zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
20=206, 11=291.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T23
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:302018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-nJfh7uB3IrvtVY3wyBnq?VEQDewzZRq4Iasj8nzX3Ex
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T24
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:312018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-GWD4KECh291k7he7VuI3YjmfH2DhIrvDWEbGgEzX3Ew
Scale=1:66.0
0-1-130-1-13T1 T2
T3
T5
B1
B2
B3
B2
B4
W3 W4
W5
W7
W6
W8 W9 W8
W11
W10
W12 W13 W12 W13 W14
W1
W2
W16
W15
T4
T6
1
2
3
4 5 6 7
8
9 10
11
12
24 23 22 21
20 19 18
17 16 15 14 13
25
26
27 28
29
30 31 32 33 34
5x6
4x6
6x10
1.5x4 2x4
6x12MT18H
2x4
3x4 2x44x8
5x10
4x4
8x12MT18H
3x8
2x4
6x10
4x6
4x12
3x5
5x6
6x6
3x5
3x8
5-0-6
5-0-6
7-6-14
2-6-8
10-4-12
2-9-14
13-8-8
3-3-12
17-0-4
3-3-12
21-4-9
4-4-5
25-10-10
4-6-1
30-2-15
4-4-5
32-5-0
2-2-1
32-8-8
0-3-8
5-0-6
5-0-6
7-6-14
2-6-8
10-1-6
2-6-8
13-8-8
3-7-2
17-0-4
3-3-12
21-4-9
4-4-5
25-10-10
4-6-1
30-2-15
4-4-5
32-5-0
2-2-1
32-8-8
0-3-8
34-4-4
1-7-12
4-6-154-4-127-8-112-1-01-0-04-4-127.5012
12.0012
6.0012
PlateOffsets(X,Y)-- [3:0-4-9,0-1-12], [4:0-6-0,0-2-0], [10:0-3-4,0-1-8], [11:0-2-14,Edge], [16:0-5-12,0-2-0], [18:0-3-12,0-4-0], [20:0-4-8,0-3-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.82
0.96
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.26
-0.53
0.18
(loc)
18-19
18-19
13
l/defl
>999
>733
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 218 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x6SPF No.2, T3,T4: 2x6SP 2400F 2.0E
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud,B3: 2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W3,W6,W11: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-5-2 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)24=1222/Mechanical, 13=1365/0-6-0(min. 0-2-10)
Max Horz24=-289(LC 12)
Max Uplift24=-206(LC 17), 13=-291(LC 17)
MaxGrav24=1294(LC 2), 13=1668(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-25=-933/209, 25-26=-897/214, 26-27=-882/219, 2-27=-864/230, 2-28=-898/244,
3-28=-928/239, 3-29=-3960/665, 4-29=-3996/653, 4-30=-3360/519, 5-30=-3363/518,
5-6=-4372/688, 6-31=-4348/686, 7-31=-4348/686, 7-32=-3035/505, 8-32=-3035/505,
8-9=-3035/505, 9-33=-2271/393, 33-34=-2265/394, 10-34=-2262/394, 10-11=-1226/221,
1-24=-1247/233, 11-13=-1661/328
BOT CHORD 23-24=-183/257, 22-23=-145/1443, 21-22=-37/267, 4-20=-2130/401, 19-20=-568/4253,
18-19=-568/4253, 6-18=-264/97, 16-17=-31/259, 15-16=-300/2265, 14-15=-99/879
WEBS 2-23=-174/883, 3-23=-1647/351, 3-22=-438/76, 20-22=-128/1269, 3-20=-606/3920,
5-20=-1172/194, 16-18=-396/2866, 7-18=-220/1601, 7-16=-1326/259, 9-16=-153/1033,
9-15=-1218/245, 10-15=-276/1907, 10-14=-644/120, 1-23=-139/1019, 11-14=-109/1037
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-5-0,Interior(1) 3-5-0 to 5-0-6,Exterior(2) 5-0-6 to 8-3-10,
Interior(1) 10-1-6 to 30-2-15,Exterior(2) 32-5-0 to 34-4-4zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T24
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:312018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-GWD4KECh291k7he7VuI3YjmfH2DhIrvDWEbGgEzX3Ew
NOTES-
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 24=206, 13=291.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T25
TrussType
Roof SpecialGirder
Qty
1
Ply
3
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:352018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8HSaAbFC6NXAcJyukkN?iZxQnfgzEiGpRsZUp?zX3Es
Scale=1:65.9
0-1-130-1-13T1
T2
T3 T5
B1
W3
W4 W5
W6 W7
W8
W9
W8
W9 W8 W9 W8 W9 W10 W9
W1
W2
W12
T4
B2
W11
T6
1
2
3
4 5 6 7
8
9 10 11
12
24 23 22 21 20 19 18 17 16 15 14 13
25
26
2728
29 30
31 32 33 34 35 36 37 38 39 40 41 42 43
5x8
6x8
10x14MT18H
6x8
6x12MT18H
3x10 8x12MT18H6x8
6x6
10x10
3x6 5x6
5x6 3x6
5x10
5x6
5x8
5x8
5x8
8x10
8x8
3x10MT18H8x12MT18H
5-0-6
5-0-6
8-9-5
3-8-14
12-6-3
3-8-14
16-3-4
3-9-2
20-2-2
3-10-14
24-0-15
3-10-14
27-11-13
3-10-14
31-8-15
3-9-2
32-5-0
0-8-1
32-8-8
0-3-8
5-0-6
5-0-6
8-9-5
3-8-14
12-6-3
3-8-14
16-3-4
3-9-2
20-2-2
3-10-14
24-0-15
3-10-14
27-11-13
3-10-14
31-8-15
3-9-2
32-5-0
0-8-1
32-8-8
0-3-8
34-4-4
1-7-12
4-6-152-10-127-8-112-1-02-10-127.5012
12.00126.0012
PlateOffsets(X,Y)-- [3:0-1-4,0-2-12], [9:0-3-8,0-2-8], [10:0-4-8,0-4-12], [11:0-3-12,0-2-0], [14:0-4-0,0-4-12], [15:0-3-8,0-2-8], [16:0-3-8,0-2-8], [22:0-3-8,0-5-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.19
0.41
0.81
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.32
-0.68
0.07
(loc)
19-21
19-21
13
l/defl
>999
>572
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 997 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x8SP 2400F 2.0E*Except*
T3,T4: 2x10SP 2400F 2.0E,T6: 2x6SP 2400F 2.0E
BOT CHORD2x10SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W5,W6,W8,W10: 2x4SPF No.2, W1: 2x6SP 2400F 2.0E
W12: 2x4SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 23-24.
REACTIONS.(lb/size)24=5480/Mechanical, 13=4957/0-6-0(min. 0-1-8)
Max Horz24=-204(LC 8)
Max Uplift24=-2799(LC 13), 13=-1707(LC 13)
MaxGrav24=5480(LC 1), 13=5319(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-25=-5105/1667, 2-25=-5038/1678, 2-26=-5014/1653, 26-27=-5019/1648,
27-28=-5028/1641, 3-28=-5072/1637, 3-4=-11399/3249, 4-5=-24982/7080,
5-6=-21768/6409, 6-29=-21768/6409, 29-30=-21768/6409, 7-30=-21768/6409,
7-8=-16597/5049, 8-9=-16597/5049, 9-10=-9888/3083, 10-11=-3534/1143,
1-24=-6262/2012, 11-13=-6196/1989
BOT CHORD 23-33=-2677/9709, 22-33=-2677/9709, 22-34=-6328/22985, 21-34=-6328/22985,
21-35=-6322/22914, 20-35=-6322/22914, 20-36=-6322/22914, 19-36=-6322/22914,
19-37=-7042/24973, 18-37=-7042/24973, 17-18=-7042/24973, 17-38=-5015/16597,
38-39=-5015/16597, 16-39=-5015/16597, 16-40=-3049/9888, 40-41=-3049/9888,
15-41=-3049/9888, 15-42=-848/2732, 42-43=-848/2732, 14-43=-848/2732,
13-14=-117/354
WEBS 2-23=-1637/5109, 3-23=-8588/2323, 3-22=-2544/9913, 4-22=-15459/4252,
4-21=-160/1146, 4-19=-902/2394, 5-19=-436/1513, 5-17=-3957/760, 6-17=-580/164,
7-17=-1549/5889, 7-16=-3068/820, 9-16=-2239/7639, 9-15=-4029/1163,
10-15=-2538/8254, 10-14=-2461/712, 1-23=-1750/5553, 11-14=-1483/4841
NOTES-
1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x10- 2 rowsstaggered at 0-9-0 oc, 2x6- 2 rowsstaggered at
0-9-0 oc, 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnected as follows: 2x10- 2 rowsstaggered at 0-7-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverright exposed ; end verticalright exposed; Lumber DOL=1.60 plate grip DOL=1.60
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T25
TrussType
Roof SpecialGirder
Qty
1
Ply
3
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:352018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8HSaAbFC6NXAcJyukkN?iZxQnfgzEiGpRsZUp?zX3Es
NOTES-
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate
DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than
0.500/12in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)All plates areMT20 plates unless otherwiseindicated.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11) Refer to girder(s) for truss to trussconnections.
12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 24=2799, 13=1707.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 199 lb down and 828 lb up at 0-2-12, 190 lb down and 767 lb up at
0-11-4, 130 lb down and 622 lb up at 2-11-4, 1062 lb down and 362 lb up at 4-11-4, 998 lb down and 309 lb up at 6-11-4, 927 lb down and 255 lb up at 8-11-4, 1024 lb
down and 199 lb up at 10-11-4, 1115 lb down and 197 lb up at 12-11-4, 1039 lb down and 293 lb up at 14-11-4, 978 lb down and 293 lb up at 16-11-4, 253 lb down and
155lb up at 18-11-4, 253 lb down and 155 lb up at 20-11-4, 253 lb down and 155 lb up at 22-11-4, 253 lb down and 155 lb up at 24-11-4, 253 lb down and 155 lb up at
26-11-4, and 253 lb down and 155 lb up at 28-11-4, and 253 lb down and 155 lb up at 30-11-4 on bottomchord.The design/selection of suchconnection device(s)is
theresponsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-4=-51, 4-10=-61, 10-11=-51, 13-24=-20, 11-12=-51
Concentrated Loads(lb)
Vert: 24=344(B) 23=-1062(B) 22=-927(B) 18=-234(B) 31=312(B) 32=264(B) 33=-998(B) 34=-1024(B) 35=-1115(B) 36=-1039(B) 37=-978(B) 38=-234(B) 39=-234(B)
40=-234(B) 41=-234(B) 42=-234(B) 43=-234(B)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T26
TrussType
HalfHipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:392018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-12i50zIiAc2c4wFfzaSxsP60vG2cAVFOMUXhymzX3Eo
Scale=1:71.2
0-2-2W1
T1
T3
B1
W2 W1 W2 W1 W3 W1 W4 W1 W5 W1 W5 W1 W6 W7
W8 W9
W10
W11
T1T2
B1B2
1 2 3 4 5 6 7 8 9 10
11 12
13
25 24 23 22 21 20 19 18 17 16 15 14
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
42 43 44 45 46 47 48 4950 51 52 53 54 55
2x4
4x6 3x6
6x8
3x63x4
3x4
3x4
3x4
6x8
1.5x4
4x8
1.5x4 4x4
3x4 1.5x4 6x6
3x10 4x4
4x6
6x6
3x6
3x6
3x6
4-2-7
4-2-7
8-3-1
4-0-11
12-2-0
3-10-15
17-4-13
5-2-13
22-7-10
5-2-13
27-10-7
5-2-13
33-1-4
5-2-13
37-2-6
4-1-2
38-7-8
1-5-2
38-11-0
0-3-8
4-2-7
4-2-7
8-3-1
4-0-11
12-2-0
3-10-15
17-4-13
5-2-13
22-7-10
5-2-13
27-10-7
5-2-13
33-1-4
5-2-13
37-2-6
4-1-2
38-7-8
1-5-2
38-11-0
0-3-8
40-6-12
1-7-12
4-9-61-1-04-11-81-1-04-9-68.0012
6.0012
PlateOffsets(X,Y)-- [4:0-2-4,0-1-8], [12:0-2-12,0-2-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.56
0.43
0.87
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.11
-0.14
0.03
(loc)
17-19
17-19
15
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 196 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3,T4: 2x4SP 2400F 2.0E
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4: 2x6SPF No.2, W11: 2x4SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-4-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 6-22
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 22=0-6-0, 15=0-5-4, 14=0-3-8.
(lb)-Max Horz25=-214(LC 8)
Max UpliftAll uplift 100 lb orless at joint(s) except 25=-178(LC 8), 22=-1770(LC 9),
15=-997(LC 13), 14=-514(LC 81)
MaxGravAllreactions 250 lb orless at joint(s) except 25=356(LC 35), 22=2737(LC
79), 15=1787(LC 77), 14=307(LC 11)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-25=-311/175, 2-28=-180/314, 28-29=-180/314, 3-29=-180/314, 3-30=-668/1099,
30-31=-668/1099, 4-31=-668/1099, 4-5=-668/1099, 5-32=-668/1099, 32-33=-668/1099,
6-33=-668/1099, 6-34=-1312/898, 34-35=-1312/898, 7-35=-1312/898, 7-36=-1312/898,
8-36=-1312/898, 8-37=-1509/983, 37-38=-1509/983, 9-38=-1509/983, 9-39=-1512/985,
39-40=-1509/984, 40-41=-1509/984, 10-41=-1508/984, 10-11=-999/633, 11-12=-310/544,
12-14=-295/503
BOT CHORD 23-46=-323/318, 46-47=-323/318, 22-47=-323/318, 21-22=-322/515, 21-48=-322/515,
20-48=-322/515, 20-49=-322/515, 49-50=-322/515, 50-51=-322/515, 19-51=-322/515,
19-52=-841/1374, 18-52=-841/1374, 18-53=-841/1374, 17-53=-841/1374, 17-54=-490/870,
54-55=-490/870, 16-55=-490/870, 15-16=-419/310
WEBS 2-23=-637/401, 3-23=-309/595, 3-22=-1248/744, 5-22=-343/331, 6-22=-1979/1312,
6-20=-25/284, 6-19=-695/1173, 8-19=-575/427, 8-17=-115/265, 9-17=-583/410,
10-17=-569/926, 10-16=-447/364, 11-16=-841/1412, 11-15=-1500/900, 12-15=-406/263
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T26
TrussType
HalfHipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:392018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-12i50zIiAc2c4wFfzaSxsP60vG2cAVFOMUXhymzX3Eo
NOTES-
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 178 lb uplift at joint 25, 1770 lb uplift at joint 22, 997 lb uplift at joint 15 and 514
lb uplift at joint 14.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 113 lb down and 118 lb up at 1-9-12, 113 lb down and 118 lb up at
3-9-12, 113 lb down and 118 lb up at 5-9-12, 113 lb down and 118 lb up at 7-9-12, 113 lb down and 118 lb up at 9-9-12, 113 lb down and 118 lb up at 11-9-12, 113 lb
down and 118 lb up at 13-9-12, 113 lb down and 118 lb up at 15-9-12, 113 lb down and 118 lb up at 17-9-12, 113 lb down and 118 lb up at 19-9-12, 113 lb down and
118lb up at 21-9-12, 113 lb down and 118 lb up at 23-9-12, 113 lb down and 118 lb up at 25-9-12, 113 lb down and 118 lb up at 27-9-12, 113 lb down and 118 lb up at
29-9-12, and 113 lb down and 118 lb up at 31-9-12, and 206 lb down and 213 lb up at 33-1-4 on top chord, and 46 lb down and 42 lb up at 1-9-12, 46 lb down and 42 lb
up at 3-9-12, 46 lb down and 42 lb up at 5-9-12, 46 lb down and 42 lb up at 7-9-12, 46 lb down and 42 lb up at 9-9-12, 46 lb down and 42 lb up at 11-9-12, 46 lb down
and 42 lb up at 13-9-12, 46 lb down and 42 lb up at 15-9-12, 46 lb down and 42 lb up at 17-9-12, 46 lb down and 42 lb up at 19-9-12, 46 lb down and 42 lb up at
21-9-12, 46 lb down and 42 lb up at 23-9-12, 46 lb down and 42 lb up at 25-9-12, 46 lb down and 42 lb up at 27-9-12, 46 lb down and 42 lb up at 29-9-12, and 46 lb
down and 42 lb up at 31-9-12, and 58 lb down and 35 lb up at 33-1-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-10=-61, 10-12=-51, 14-25=-20, 12-13=-51
Concentrated Loads(lb)
Vert: 4=-16(F) 21=-17(F) 9=-16(F) 10=-58(F) 17=-17(F) 16=-19(F) 26=-16(F) 27=-16(F) 28=-16(F) 29=-16(F) 30=-16(F) 32=-16(F) 33=-16(F) 34=-16(F) 35=-16(F)
36=-16(F) 37=-16(F) 38=-16(F) 39=-16(F) 41=-16(F) 42=-17(F) 43=-17(F) 44=-17(F) 45=-17(F) 46=-17(F) 47=-17(F) 48=-17(F) 49=-17(F) 50=-17(F) 51=-17(F)
52=-17(F) 53=-17(F) 54=-17(F) 55=-17(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T27
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:402018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-VFGTDIJKxwASi4qrXHzAPce7XgK0vziYb8HFUCzX3En
Scale=1:70.3
0-2-2W1
T1
T3
B1
W2 W1 W3 W1
W4
W5 W6
W4
W7
W8 W9 W11
T2
B1B2
W10
1 2 3 4 5 6 7
8 9
10
19 18 17 16 15 14 13 12 11
20 21 22 23 24
25
26
2x4
4x6 3x6
10x10
3x64x8
1.5x4 3x4
3x4
3x4
3x4
3x4
4x8
3x5
3x4
2x4
5x6
3x6
6-2-12
6-2-12
12-2-0
5-11-4
21-1-10
8-11-10
30-1-4
8-11-10
37-2-6
7-1-2
38-7-8
1-5-2
38-11-0
0-3-8
6-2-12
6-2-12
12-2-0
5-11-4
17-4-1
5-2-1
25-0-14
7-8-13
30-1-4
5-0-5
37-2-6
7-1-2
38-7-8
1-5-2
38-11-0
0-3-8
40-6-12
1-7-12
6-9-66-11-81-1-06-9-68.0012
6.0012
PlateOffsets(X,Y)-- [9:0-2-8,0-2-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.83
0.61
0.80
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.28
0.02
(loc)
15-17
13-15
12
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 188 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W2,W3,W4,W5,W6: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-17, 6-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 17=0-6-0, 12=0-5-4, 11=0-3-8.
(lb)-Max Horz19=-294(LC 12)
Max UpliftAll uplift 100 lb orless at joint(s) 11 except 19=-126(LC 12),
17=-334(LC 13), 12=-197(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 11 except 19=410(LC 39),
17=2067(LC 39), 12=1200(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-352/160, 3-4=-36/454, 4-5=-36/454, 5-22=-695/186, 6-22=-695/186,
6-23=-738/204, 23-24=-737/204, 7-24=-734/205, 7-25=-880/185, 8-25=-942/157
BOT CHORD 18-19=-274/317, 17-18=-454/230, 16-17=-102/350, 15-16=-102/350, 14-15=-133/939,
13-14=-133/939
WEBS 2-18=-632/203, 3-18=-162/854, 3-17=-903/262, 5-17=-1289/255, 5-15=-2/684,
6-15=-471/135, 6-13=-333/171, 8-13=-61/750, 8-12=-1207/297, 9-12=-63/256
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 30-1-4,Exterior(2) 30-1-4 to 40-6-12
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)TheFabricationTolerance at joint 9 = 12%
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 11 except(jt=lb)
19=126, 17=334, 12=197.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T27
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:402018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-VFGTDIJKxwASi4qrXHzAPce7XgK0vziYb8HFUCzX3En
NOTES-
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T28
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:412018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-zRpsReJyiDIJKEP25?UPyqBHY4jveURhqo0o0fzX3Em
Scale=1:70.0
0-2-2W1
T1
T3
B1
W2 W1 W3 W1 W4 W1
W5
W6
W7 W8
W9 W10 W12
T2
B1B2
W11
1 2 3 4 5 6
7
8 9
10
20 19 18 17 16 15 14 13 12 11
21 22 23 24
25
26
3x4
4x6 3x6
6x10
3x63x8
1.5x4 4x10
2x4
1.5x4
4x10
6x6
3x4
3x5
3x4
3x5
3x4
2x4
3x6
6-1-12
6-1-12
12-2-0
6-0-4
19-7-10
7-5-10
27-1-4
7-5-10
32-3-1
5-1-13
37-2-6
4-11-5
38-7-8
1-5-2
38-11-0
0-3-8
6-1-12
6-1-12
12-2-0
6-0-4
19-7-10
7-5-10
27-1-4
7-5-10
32-3-1
5-1-13
37-2-6
4-11-5
38-7-8
1-5-2
38-11-0
0-3-8
40-6-12
1-7-12
8-9-68-11-81-1-08-9-68.0012
6.0012
PlateOffsets(X,Y)-- [9:0-2-12,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.88
0.44
0.57
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.19
0.02
(loc)
14-16
14-16
12
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 212 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W7,W8,W9,W10,W12,W11: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 1-20, 2-19, 3-18, 5-16, 6-16
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 18=0-6-0, 12=0-5-4, 11=0-3-8.
(lb)-Max Horz20=-374(LC 12)
Max UpliftAll uplift 100 lb orless at joint(s) except 20=-185(LC 12), 18=-236(LC
13), 12=-171(LC 17), 11=-113(LC 39)
MaxGravAllreactions 250 lb orless at joint(s) 11 except 20=610(LC 39),
18=1793(LC 39), 12=1357(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-20=-554/206, 3-4=-708/241, 4-23=-708/241, 5-23=-708/241, 5-24=-711/242,
6-24=-708/242, 6-25=-804/247, 7-25=-888/217, 7-26=-817/183, 8-26=-1047/165
BOT CHORD 19-20=-360/398, 18-19=-269/252, 17-18=-269/252, 16-17=-269/252, 15-16=-19/711,
14-15=-19/711, 13-14=0/774
WEBS 1-19=-173/389, 2-19=-611/197, 3-19=-100/502, 3-18=-1651/316, 3-16=-174/1155,
5-16=-711/242, 6-16=-294/60, 6-14=-38/332, 7-14=-277/166, 8-13=-78/913,
8-12=-1235/215
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 27-1-4,Exterior(2) 27-1-4 to 40-6-12
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 185 lb uplift at joint 20, 236 lb uplift at
joint 18, 171 lb uplift at joint 12 and 113 lb uplift at joint 11.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T28
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:422018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RdNEe_KbTXQAxO_Efi?eU1kSIU38Nxhr2SmMZ5zX3El
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T29
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:432018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vqxcrKLDErY1ZXZQCQWt1FGgtuQ76KZ_H6Vv5XzX3Ek
Scale=1:81.3
0-2-20-2-2T1 T2
T4
B1
W2
W3
W4 W5 W4 W6 W4
W7
W2 W8
W9
W10 W11
W1
W13
W12
T3
T5
B1B2
1 2 3 4 5 6 7
8 9
1011
12
2322 21 20 19 18 17 16 15 14 13
24 25 2627
28
29
3x4
6x6 3x6
3x6
3x4 3x6
1.5x4
4x8
1.5x4 5x8
3x4 5x8
1.5x4
6x6
3x4
3x5
3x4
3x5
3x4
2x4
6x10
3x6
1-0-4
1-0-4
6-7-2
5-6-14
12-2-0
5-6-14
18-1-10
5-11-10
24-1-4
5-11-10
30-7-13
6-6-9
37-2-6
6-6-9
38-7-8
1-5-2
38-11-0
0-3-8
1-0-4
1-0-4
6-7-2
5-6-14
12-2-0
5-6-14
18-1-10
5-11-10
24-1-4
5-11-10
30-7-13
6-6-9
37-2-6
6-6-9
38-7-8
1-5-2
38-11-0
0-3-8
40-6-12
1-7-12
10-3-510-9-61-1-010-11-81-1-010-9-68.0012
6.0012
PlateOffsets(X,Y)-- [11:0-2-12,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.69
0.33
0.79
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.18
0.01
(loc)
21-22
21-22
13
l/defl
>999
>814
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 246 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W9,W10,W11,W13,W12: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-1-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 2-22, 2-21, 3-21, 6-18, 7-18, 9-16, 1-23
2 Rows at 1/3 pts 4-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 20=0-6-0, 14=0-5-4, 13=0-3-8.
(lb)-Max Horz23=-402(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) 23 except 20=-264(LC 12),
14=-189(LC 17), 13=-106(LC 7)
MaxGravAllreactions 250 lb orless at joint(s) 13 except 23=355(LC 40),
20=2150(LC 40), 14=1255(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 4-25=-285/156, 5-25=-285/156, 5-6=-285/156, 6-26=-286/157, 26-27=-286/157,
7-27=-285/158, 7-8=-615/188, 8-9=-806/151, 9-28=-864/136, 28-29=-1001/112,
10-29=-1100/111
BOT CHORD 22-23=-320/401, 21-22=-319/399, 20-21=-438/350, 19-20=-438/350, 18-19=-438/350,
17-18=0/509, 16-17=0/509, 15-16=0/833
WEBS 3-21=-575/175, 4-21=-75/729, 4-20=-2032/331, 4-18=-193/1125, 6-18=-599/195,
7-18=-530/126, 7-16=-79/459, 9-16=-475/219, 10-15=-2/885, 10-14=-1149/258
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 6-7-2,Interior(1) 6-7-2 to 24-1-4,Exterior(2) 24-1-4 to 40-6-12
zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 23 except(jt=lb)
20=264, 14=189, 13=106.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T29
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:432018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vqxcrKLDErY1ZXZQCQWt1FGgtuQ76KZ_H6Vv5XzX3Ek
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T30
TrussType
PiggybackBase
Qty
4
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:452018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-rC3MG0MTlSolorjpKrZL6gM?9h6ZaEPHkP_09QzX3Ei
Scale=1:81.9
T1 T2
T4
B1
W2
W3
W4 W5 W4 W6 W4
W7
W2 W8
W9
W10 W11 W12
W1
W13
T3
T5
B1B2
1 2 3 4 5 6 7
8 9
1011
12
2322 21 20 19 18 17 16 15 14 13
24 25 26 27
28
29
3x4
3x6
3x6
3x4 3x6
1.5x4
4x8
5x6 1.5x4 5x8
3x4 5x8
1.5x4
5x6
3x4
3x5
3x4
3x5
3x4
6x10
2x43x6
1-1-0
1-1-0
6-7-8
5-6-8
12-2-0
5-6-8
18-1-4
5-11-4
24-0-8
5-11-4
30-7-7
6-6-15
37-2-6
6-6-15
38-7-8
1-5-2
38-11-0
0-3-8
1-1-0
1-1-0
6-7-8
5-6-8
12-2-0
5-6-8
18-1-4
5-11-4
24-0-8
5-11-4
30-7-7
6-6-15
37-2-6
6-6-15
38-7-8
1-5-2
38-11-0
0-3-8
40-6-12
1-7-12
10-3-51-1-011-0-01-1-011-0-08.0012
6.0012
PlateOffsets(X,Y)-- [2:0-3-12,0-2-0], [7:0-3-12,0-2-0], [11:0-2-12,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.71
0.33
0.83
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.18
0.01
(loc)
21-22
21-22
13
l/defl
>999
>803
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 248 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W9,W10,W11,W12,W13: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 2-22, 2-21, 3-21, 6-18, 7-18, 9-16, 1-23
2 Rows at 1/3 pts 4-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearingsMechanical except(jt=length) 20=0-6-0, 14=0-5-4, 13=0-3-8.
(lb)-Max Horz23=-405(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) 23 except 20=-271(LC 12),
14=-190(LC 17), 13=-111(LC 7)
MaxGravAllreactions 250 lb orless at joint(s) 13 except 23=335(LC 40),
20=2177(LC 40), 14=1258(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 4-25=-274/157, 5-25=-274/157, 5-6=-274/157, 6-26=-274/157, 26-27=-274/157,
7-27=-274/157, 7-8=-604/187, 8-9=-796/147, 9-28=-858/133, 28-29=-996/109,
10-29=-1094/109
BOT CHORD 22-23=-320/404, 21-22=-319/402, 20-21=-448/357, 19-20=-448/357, 18-19=-448/357,
17-18=0/495, 16-17=0/495, 15-16=0/829
WEBS 3-21=-572/174, 4-21=-76/744, 4-20=-2058/338, 4-18=-194/1126, 6-18=-594/194,
7-18=-541/131, 7-16=-83/466, 9-16=-486/224, 10-15=-2/886, 10-14=-1147/258
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 6-7-8,Interior(1) 6-7-8 to 24-0-8,Exterior(2) 24-0-8 to 40-6-12
zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 23 except(jt=lb)
20=271, 14=190, 13=111.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T30
TrussType
PiggybackBase
Qty
4
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:452018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-rC3MG0MTlSolorjpKrZL6gM?9h6ZaEPHkP_09QzX3Ei
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T31
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:472018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-obB7hiOjH32T29sBRFbpB5RJAVjN25daCjT7EIzX3Eg
Scale=1:79.7
T1 T2
T4
B1
W2 W3 W4 W5 W4 W5 W4
W6
W7
W8
W9
W10
W11
W1
W13
W12
T3
T5
B1B2
1 2 3 4 5 6 7
8 9
1011
12
2322 21 20 19 18 17 16 15 14 13
24 25 26 27 28 29
30
31
3x6
3x8
4x10
4x4 3x6
1.5x4
3x8
5x6 1.5x4 3x4
5x6
5x6
4x4
8x8
4x6
4x6
3x4
6x6
4x6
12x123x6
1-1-0
1-1-0
7-8-11
6-7-11
14-4-5
6-7-11
21-0-0
6-7-11
24-0-8
3-0-8
30-7-4
6-6-12
37-2-0
6-6-12
38-7-8
1-5-8
38-11-0
0-3-8
1-1-0
1-1-0
7-8-11
6-7-11
14-4-5
6-7-11
21-0-0
6-7-11
24-0-8
3-0-8
30-7-4
6-6-12
37-2-0
6-6-12
38-7-8
1-5-8
38-11-0
0-3-8
40-6-12
1-7-12
10-3-51-1-011-0-01-1-011-0-08.0012
6.0012
PlateOffsets(X,Y)-- [2:0-3-12,0-2-0], [7:0-5-12,0-2-0], [13:0-1-12,0-0-0], [13:Edge,0-7-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.87
0.63
0.98
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.17
-0.38
0.01
(loc)
21-22
21-22
18
l/defl
>999
>657
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 268 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x6SPF No.2, T5,T6: 2x6SP 2400F 2.0E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W9,W10,W11,W12: 2x4SPFStud,W13: 2x4SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 2-22, 3-21, 4-20, 6-18, 7-18, 9-16, 1-23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 0-6-0 except(jt=length) 23=Mechanical, 13=0-4-0.
(lb)-Max Horz23=-410(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) except 23=-129(LC 12), 18=-449(LC
12), 14=-588(LC 17), 13=-172(LC 40)
MaxGravAllreactions 250 lb orless at joint(s) 13 except 23=650(LC 40),
18=3312(LC 40), 14=2897(LC 53)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 6-29=-80/794, 7-29=-80/794, 7-8=-421/540, 8-9=-580/196, 9-30=-1253/237,
30-31=-1407/292, 10-31=-2014/375, 10-11=-95/399
BOT CHORD 22-23=-314/409, 21-22=-311/408, 20-21=-355/339, 19-20=-794/373, 18-19=-794/373,
17-18=-370/283, 16-17=-370/283, 15-16=-97/1179, 14-15=-20/319
WEBS 2-22=-471/194, 2-21=-141/402, 3-21=-659/209, 4-21=-64/617, 4-20=-1047/246,
6-20=-189/1359, 6-18=-1687/326, 7-18=-1702/332, 7-16=-246/1153, 9-16=-1562/433,
10-15=-90/893, 10-14=-2955/673, 11-14=-39/399
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 6-7-1,Interior(1) 6-7-1 to 24-0-8,Exterior(2) 24-0-8 to 40-6-12
zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 129 lb uplift at joint 23, 449 lb uplift at
joint 18, 588 lb uplift at joint 14 and 172 lb uplift at joint 13.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T31
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:472018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-obB7hiOjH32T29sBRFbpB5RJAVjN25daCjT7EIzX3Eg
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-29=-61, 13-23=-20, 11-12=-51
Trapezoidal Loads(plf)
Vert: 29=-61-to-7=-87, 7=-77-to-11=-411
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T32
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:482018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-GnlVv2PL2NAKfJRO?z62kI_X6v8WnY3jRNDgmlzX3Ef
Scale=1:53.5
0-1-12W1
T1
T2 T3
B1
W2
W1 W3 W4 W5
W6 W7
W8
W9 W10
W12
W11
B2
1 2
3
4
5
6
7
15 14 13 12 11 10 9 8
16 17
18 19 20 21
8x10
4x6 5x10
4x6
6x8
6x12
3x8
10x10 4x6
3x8
10x10
3x5
10x10 4x6
5x6
1-3-8
1-3-8
3-2-0
1-10-8
6-3-14
3-1-14
9-5-12
3-1-14
12-11-2
3-5-6
16-4-8
3-5-6
16-8-0
0-3-8
1-3-8
1-3-8
3-2-0
1-10-8
6-3-14
3-1-14
9-5-12
3-1-14
12-11-2
3-5-6
16-4-8
3-5-6
16-8-0
0-3-8
4-3-58-7-93-10-14-3-58.0012
PlateOffsets(X,Y)-- [2:0-2-4,0-1-12], [3:0-5-0,0-2-1], [7:0-2-12,0-2-0], [8:Edge,0-3-8], [9:0-3-8,0-6-0], [11:0-5-0,0-6-0], [13:0-3-8,0-5-8], [14:0-5-8,0-1-8], [15:Edge,0-5-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.66
0.32
0.97
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.14
0.02
(loc)
12
12
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 299 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T1: 2x6SPF No.2
BOT CHORD2x8SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W1: 2x6SPF No.2, W3,W8: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-2-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)15=9842/0-6-0(min. 0-4-2), 8=6515/0-6-0(min. 0-2-11)
Max Horz15=119(LC 11)
Max Uplift15=-3279(LC 12), 8=-783(LC 12)
MaxGrav15=9892(LC 34), 8=6515(LC 1)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-15=-719/291, 1-2=-265/86, 2-3=-4995/1152, 3-4=-5364/983, 4-16=-4219/724,
5-16=-4128/735, 5-17=-4099/734, 6-17=-4144/721, 6-7=-3992/557, 7-8=-5396/726
BOT CHORD 14-15=-698/2145, 13-14=-698/2145, 13-18=-1218/4904, 12-18=-1218/4904,
12-19=-819/4376, 11-19=-819/4376, 10-11=-427/3275, 9-10=-427/3275
WEBS 2-15=-6889/1976, 2-14=-1223/1817, 2-13=-1111/5999, 3-13=-2314/133, 3-12=-900/632,
4-12=-632/2253, 4-11=-2015/647, 5-11=-733/4360, 6-11=-269/380, 6-9=-480/296,
7-9=-583/4489
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-2-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone; Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
7)Provide adequate drainage to preventwater ponding.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 3279 lb uplift at joint 15 and 783 lb uplift
atjoint 8.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T32
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:492018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-kzIt6NQ_phIBHS0aZgdHGWWhsIUlW?Jtf1yDJBzX3Ee
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 5447 lb down and 2815 lb up at 1-3-8, 1274 lb down and 226 lb up at
3-5-0, 1334 lb down and 226 lb up at 5-5-0, 1413 lb down and 226 lb up at 7-5-0, 1472 lb down and 162 lb up at 9-5-0, 1442 lb down and 121 lb up at 11-5-0, and 1396
lb down and 101 lb up at 13-5-0, and 1412 lb down and 98 lb up at 15-5-0 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of
others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-61, 3-5=-51, 5-7=-51, 8-15=-20
Concentrated Loads(lb)
Vert: 10=-1442(B) 14=-5447(B) 13=-1257(B) 11=-1472(B) 18=-1334(B) 19=-1413(B) 20=-1396(B) 21=-1412(B)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T33GE
TrussType
GABLECOMMON
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:502018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-CAsFJjQca_Q2vcbm7O8Wpj3yBiuWFf_0uhinrdzX3Ed
Scale=1:39.1
0-1-13W1
T2
T3
W3
B1
ST4ST4ST4ST4ST4ST4ST4ST3
ST2
ST1
B2
T1
W2
2
3
4
5
6 7 8 9 10 11 12 13 14
1
26 25 24 23 22 21 20 19 18 17 16 15
27
8x10
3x4
5x63x4
21-6-8
21-6-8
21-10-0
0-3-8
-1-7-12
1-7-12
7-0-5
7-0-5
21-6-8
14-6-3
21-10-0
0-3-8
1-1-05-3-145-5-115-3-147.5012
6.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-2-8], [6:0-2-0,Edge], [23:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.31
0.03
0.11
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.04
-0.00
(loc)
1
1
15
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 109 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 25-26.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 21-10-0.
(lb)-Max Horz26=189(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 26, 15, 16, 17, 18, 19, 20, 21, 22,
23, 24 except 25=-130(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 15, 16, 17, 18, 19, 20, 21, 22,
23, 24, 25 except 26=265(LC 22)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-1-7-12 to 3-3-8,Exterior(2) 3-3-8 to 7-0-5, Corner(3) 7-0-5 to 9-10-0zone;
cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60
plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.
9)Gablerequirescontinuous bottomchord bearing.
10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).
11)Gablestudsspaced at 2-0-0 oc.
12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 26, 15, 16, 17,
18, 19, 20, 21, 22, 23, 24 except(jt=lb) 25=130.
14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T34
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:522018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8Y_0kPSs6cgm8wl9EpB_u88A0WUvjTJJL?BtvWzX3Eb
Scale=1:45.1
0-1-13T2
T3
W11
B1
B2 B3
W3 W4
W5
W6
W7
W8 W9 W10
W1
W2
T1
2
3
4
5 6 7
1
13 12 11
10
9
8
14
15
1617 18
8x8
6x6
3x41.5x4 5x8
3x5
4x4
3x5
3x4
1.5x4
6x8
3x8
3-9-12
3-9-12
7-4-0
3-6-4
9-1-14
1-9-14
14-5-0
5-3-2
21-6-0
7-1-0
21-10-0
0-4-0
-1-7-12
1-7-12
3-9-12
3-9-12
7-4-0
3-6-4
9-1-14
1-9-14
14-5-0
5-3-2
21-6-0
7-1-0
21-10-0
0-4-0
1-1-06-7-146-9-116-7-143-6-87.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-8,0-2-12], [5:0-3-2,Edge], [11:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.42
0.50
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.36
0.16
(loc)
8-9
8-9
8
l/defl
>999
>716
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 111 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W10: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 12-13.
WEBS 1 Row at midpt 7-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=848/0-4-0(min. 0-1-8), 13=894/0-6-0(min. 0-1-10)
Max Horz13=244(LC 16)
Max Uplift8=-168(LC 13), 13=-118(LC 16)
MaxGrav8=1084(LC 39), 13=1021(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-1168/122, 3-14=-1011/143, 14-15=-945/149, 4-15=-923/162, 4-5=-1032/214,
5-16=-1912/339, 16-17=-1914/338, 6-17=-1915/338, 6-18=-1912/337, 7-18=-1912/337,
7-8=-1021/216, 2-13=-999/225
BOT CHORD 12-13=-231/305, 11-12=-249/920, 10-11=-227/887, 9-10=-233/1019
WEBS 4-11=-364/81, 4-10=-80/296, 5-9=-194/1162, 6-9=-702/221, 7-9=-360/2020,
2-12=-70/766
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 4-6-7,Interior(1) 4-6-7 to 9-1-14,Exterior(2) 9-1-14 to 13-4-13
zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
8=168, 13=118.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T34
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:522018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8Y_0kPSs6cgm8wl9EpB_u88A0WUvjTJJL?BtvWzX3Eb
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T35
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:532018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-clYOylTUtvpcm4KLoWiDRMhJawp7SwSSafwRSyzX3Ea
Scale=1:53.3
0-1-130-1-13T2 T3
T4
T5
W13
B1
B2 B3
W3W4
W5
W6
W7
W8
W9
W10 W11 W12
W1
W2
T1
2
3
4
5
6 7 8
1
15 1413 12
11
10
9
16
17
18 19
6x8
4x4 4x10
3x41.5x4 5x8
3x8
1.5x4
3x5
3x4
5x6 1.5x4
6x8
3x8
1-0-5
1-0-5
1-7-12
0-7-6
7-4-0
5-8-4
11-3-8
3-11-8
14-5-0
3-1-8
21-6-0
7-1-0
21-10-0
0-4-0
-1-7-12
1-7-12
1-0-5
1-0-5
1-7-12
0-7-6
7-4-0
5-8-4
11-3-8
3-11-8
14-5-0
3-1-8
21-6-0
7-1-0
21-10-0
0-4-0
1-1-01-11-88-1-113-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [3:0-2-0,0-1-8], [6:0-4-0,0-2-4], [12:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.94
0.42
0.51
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.33
0.09
(loc)
9-10
9-10
9
l/defl
>999
>776
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 116 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W13,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 9-1-14 oc bracing.
WEBS 1 Row at midpt 8-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)9=838/0-4-0(min. 0-1-8), 15=888/0-6-0(min. 0-1-11)
Max Horz15=352(LC 13)
Max Uplift9=-186(LC 13), 15=-147(LC 16)
MaxGrav9=1024(LC 43), 15=1064(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-634/116, 3-4=-397/44, 4-5=-1208/178, 5-16=-1087/178, 16-17=-1049/180,
6-17=-957/199, 6-7=-1148/278, 7-18=-1148/278, 18-19=-1148/278, 8-19=-1148/278,
8-9=-960/291, 2-15=-1028/247
BOT CHORD 14-15=-420/495, 13-14=-410/950, 12-13=-402/960, 11-12=-398/1027, 10-11=-403/1003
WEBS 3-14=-189/465, 4-14=-1146/147, 4-13=0/269, 5-12=-371/212, 6-10=-159/614,
7-10=-647/215, 8-10=-412/1308, 2-14=-32/595
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 1-7-12,Interior(1) 1-7-12 to 11-3-8,Exterior(2) 11-3-8 to 14-5-0
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
9=186, 15=147.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T36
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:542018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-5x6m95T6eDxTNEvYMDDSzZDVeJ9UBLGcpJg__OzX3EZ
Scale=1:55.9
0-1-130-1-130-1-13T2
T3
T4
T5
W15
B1
B2 B3
W3 W4 W5 W6
W7
W8
W9
W10
W11
W12
W13 W14
W1
W2
T1
2
3
4
5
6
7 8 9
1
17 16 15 14
13
12
11
10
18
19
20
21 2223
6x8
5x6 4x10
5x6
3x4
1.5x4 5x83x43x4
3x5
3x4
3x5
3x10
3x4
6x8
3x8
2-4-5
2-4-5
3-9-5
1-5-0
7-4-0
3-6-11
10-4-9
3-0-9
13-5-2
3-0-9
14-5-0
0-11-14
21-6-0
7-1-0
21-10-0
0-4-0
-1-7-12
1-7-12
2-4-5
2-4-5
3-9-5
1-5-0
7-4-0
3-6-11
10-4-9
3-0-9
13-5-2
3-0-9
14-5-0
0-11-14
21-6-0
7-1-0
21-10-0
0-4-0
1-1-03-3-89-3-149-5-119-3-143-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-4,0-2-12], [3:0-3-9,0-2-8], [7:0-3-2,Edge], [14:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.85
0.41
0.60
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.12
-0.32
0.08
(loc)
10-11
10-11
10
l/defl
>999
>802
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 138 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W15,W14: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-9 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 9-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=827/0-4-0(min. 0-1-8), 17=885/0-6-0(min. 0-1-11)
Max Horz17=398(LC 13)
Max Uplift10=-183(LC 13), 17=-153(LC 16)
MaxGrav10=960(LC 43), 17=1095(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-1002/130, 3-18=-1039/157, 4-18=-1038/157, 4-19=-1186/177, 5-19=-1113/191,
5-6=-1194/209, 6-20=-1007/196, 7-20=-930/213, 7-8=-793/209, 8-21=-824/233,
21-22=-824/233, 22-23=-824/233, 9-23=-824/233, 9-10=-894/317, 2-17=-1085/246
BOT CHORD 16-17=-478/559, 15-16=-436/838, 14-15=-422/1031, 13-14=-413/1050, 12-13=-452/1100,
11-12=-443/1070
WEBS 3-15=-91/808, 4-15=-674/121, 5-14=-338/169, 6-12=-269/161, 7-12=-204/788,
8-12=-814/224, 9-11=-403/1044, 2-16=-45/569
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-9-5,Interior(1) 3-9-5 to 13-5-2,Exterior(2) 13-5-2 to 16-5-2
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 10 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
10=183, 17=153.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T36
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:542018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-5x6m95T6eDxTNEvYMDDSzZDVeJ9UBLGcpJg__OzX3EZ
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T37
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:562018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-1KDXanVNAqBBdX2wTeFw3_JqF7sVf97vGd952HzX3EX
Scale:3/16"=1'0-1-130-1-130-1-13T2
T3
T4
T5
W15
B1
B2 B3W3W4W5
W6
W7 W8
W9
W10
W11
W12
W13
W14
W1
W2
T1
2
3
4
5
6
7 8 9
1
17 16 15 14
13
12
11
10
18
19 20
21
22
23
24 25
8x8
5x6 4x12
5x6
4x41.5x4 5x8
6x8
4x4 3x4
3x5
3x4
3x5
3x8
4x10
5x6
3-8-5
3-8-5
5-10-15
2-2-10
7-4-0
1-5-1
10-10-8
3-6-8
14-5-0
3-6-8
15-6-11
1-1-11
21-6-0
5-11-5
21-10-0
0-4-0
-1-7-12
1-7-12
3-8-5
3-8-5
5-10-15
2-2-10
7-4-0
1-5-1
10-10-8
3-6-8
14-5-0
3-6-8
15-6-11
1-1-11
21-6-0
5-11-5
21-10-0
0-4-0
1-1-04-7-810-7-1410-9-1110-7-143-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-2-4], [3:0-3-9,0-2-8], [8:0-3-2,Edge], [14:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.91
0.38
0.96
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.13
0.10
(loc)
12-13
12-13
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 151 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W15,W13,W14: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-1-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 9-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=816/0-4-0(min. 0-1-8), 17=883/0-6-0(min. 0-1-12)
Max Horz17=451(LC 13)
Max Uplift10=-182(LC 13), 17=-153(LC 16)
MaxGrav10=892(LC 43), 17=1120(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-18=-1117/127, 18-19=-990/140, 3-19=-900/153, 3-20=-997/188, 4-20=-997/188,
4-5=-1137/212, 5-21=-1254/195, 6-21=-1093/212, 6-22=-1009/178, 22-23=-904/181,
7-23=-860/192, 7-8=-700/212, 8-24=-617/181, 24-25=-617/181, 9-25=-618/181,
9-10=-844/341, 2-17=-1103/258
BOT CHORD 16-17=-562/657, 15-16=-462/882, 14-15=-418/1003, 13-14=-445/1080, 12-13=-488/1152,
11-12=-454/890
WEBS 3-15=-63/609, 4-15=-507/75, 5-14=-327/150, 6-12=-351/181, 7-12=-454/1015,
7-11=-1037/422, 8-11=-256/255, 9-11=-365/945, 2-16=-23/533
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-3-8,Interior(1) 3-3-8 to 3-8-5,Exterior(2) 3-8-5 to 18-6-11,
Interior(1) 18-6-11 to 21-8-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 10 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
10=182, 17=153.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T37
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:562018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-1KDXanVNAqBBdX2wTeFw3_JqF7sVf97vGd952HzX3EX
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T38
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:572018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-VWnvo6W?x8J2Ehd61Mm9bCr34XCBOjK2VHuebjzX3EW
Scale:3/16"=1'0-1-130-1-13T2
T3
T4
T5
W13
B1
B2 B3W3W4
W5 W6
W7
W8
W9
W10
W11
W12
W1
W2
T1
2
3
4
5
6
7 8
1
15 14 13
12
11
10
9
16
17
18
19
20
2122 23
24
6x8
5x6 6x6
5x6
1.5x4
2x4
5x6
5x8
4x4
3x4
3x5
3x8
4x10
3x5
5-0-5
5-0-5
7-4-0
2-3-11
11-2-12
3-10-12
14-5-0
3-2-4
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
-1-7-12
1-7-12
5-0-5
5-0-5
8-0-9
3-0-3
11-2-12
3-2-4
14-5-0
3-2-4
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
1-1-05-11-811-0-03-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-14,Edge], [3:0-3-9,0-2-8], [4:0-2-14,Edge], [7:0-4-0,0-2-4], [13:0-4-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.65
0.35
0.51
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.13
0.10
(loc)
11-12
11-12
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 147 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W13,W11,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-11-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 8-9, 6-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)9=818/0-4-0(min. 0-1-8), 15=886/0-6-0(min. 0-1-12)
Max Horz15=419(LC 16)
Max Uplift9=-199(LC 16), 15=-99(LC 16)
MaxGrav9=909(LC 43), 15=1113(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-1129/40, 16-17=-1003/48, 17-18=-953/54, 3-18=-912/74, 3-19=-822/107,
4-19=-822/108, 4-5=-1178/178, 5-20=-982/185, 6-20=-886/196, 6-7=-670/166,
7-21=-549/154, 21-22=-549/154, 22-23=-549/154, 8-23=-549/154, 8-9=-862/263,
2-15=-1093/178
BOT CHORD 14-15=-451/493, 13-14=-338/676, 12-13=-376/1048, 11-12=-354/1063, 10-11=-248/753
WEBS 3-13=0/388, 4-13=-779/129, 5-11=-329/133, 6-11=-355/1015, 6-10=-1069/404,
7-10=-145/250, 8-10=-253/899, 2-14=0/451
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-3-8,Interior(1) 3-3-8 to 5-0-5,Exterior(2) 5-0-5 to 18-10-6,
Interior(1) 18-10-6 to 21-8-4zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
9=199.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T38
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:572018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-VWnvo6W?x8J2Ehd61Mm9bCr34XCBOjK2VHuebjzX3EW
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T39
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:592018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RvvfCoXFSlZmU?nV8npdgdxPWKtesfDLybNlfczX3EU
Scale:3/16"=1'0-1-130-1-13T2
T3
T4
T5
W13
B1
B2 B3
W3 W4
W5
W6 W7
W8
W9
W10
W11
W12
W1
W2
T1
2
3
4
5
6
7 8
1
15 14 13
12
11
10
9
16
17 18
19
20
21
22 23 24
8x8
4x12 4x10
5x6
1.5x4
1.5x4
5x8
3x6
3x4
5x8
3x4
3x6
4x10
3x5
3-3-15
3-3-15
7-4-0
4-0-1
10-2-2
2-10-2
14-5-0
4-2-14
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
-1-7-12
1-7-12
3-3-15
3-3-15
6-4-5
3-0-7
10-2-2
3-9-13
14-5-0
4-2-14
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
1-1-07-3-811-0-03-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-2-4], [5:0-0-0,0-0-1], [7:0-4-0,0-2-4], [13:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.65
0.35
0.43
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.14
0.10
(loc)
11-12
11-12
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 146 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W13,W11,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 8-9, 6-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)9=824/0-4-0(min. 0-1-8), 15=889/0-6-0(min. 0-1-12)
Max Horz15=419(LC 16)
Max Uplift9=-199(LC 16), 15=-99(LC 16)
MaxGrav9=949(LC 43), 15=1108(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-1096/57, 3-16=-896/71, 3-4=-942/127, 4-17=-925/174, 17-18=-924/174,
5-18=-924/174, 5-19=-972/152, 19-20=-949/166, 20-21=-838/169, 6-21=-771/181,
6-7=-691/188, 7-22=-525/153, 22-23=-525/153, 23-24=-525/153, 8-24=-525/153,
8-9=-902/268, 2-15=-1090/162
BOT CHORD 14-15=-404/416, 13-14=-380/698, 12-13=-315/656, 11-12=-369/1025, 10-11=-254/741
WEBS 4-12=-84/605, 5-12=-567/135, 6-11=-320/900, 6-10=-1118/447, 7-10=-140/322,
8-10=-253/859, 2-14=0/560
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-3-15,Interior(1) 3-3-15 to 6-4-5,Exterior(2) 6-4-5 to 9-4-5,
Interior(1) 10-2-2 to 21-8-4zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
9=199.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T39
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:43:592018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RvvfCoXFSlZmU?nV8npdgdxPWKtesfDLybNlfczX3EU
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T40
TrussType
PiggybackBase
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:002018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-v5T1Q8YtD3hd69MhiUKsDqTaFkDtb?FUBF7JB2zX3ET
Scale:3/16"=1'0-1-130-1-13T2
T3
T4
T5
W13
B1
B2 B3W3W4
W5 W6 W7
W8 W9
W10
W11 W12
W1
W2
T1
2
3
4
5
6
7 8
1
15 14 13
12
11
10
9
16
17
18 1920 21
22
23 24
6x8
5x6
5x6
1.5x4
1.5x4 5x6
6x8
3x6
4x4
3x4
4x10
3x8
4x10
3x5
3-11-15
3-11-15
7-4-0
3-4-1
12-3-12
4-11-12
14-5-0
2-1-4
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
-1-7-12
1-7-12
3-11-15
3-11-15
7-8-5
3-8-7
12-3-12
4-7-6
14-5-0
2-1-4
15-10-6
1-5-6
21-6-0
5-7-10
21-10-0
0-4-0
1-1-08-7-811-0-03-6-812.0012
7.5012
6.0012
6.0012
PlateOffsets(X,Y)-- [2:0-2-4,0-2-12], [4:0-3-9,0-2-8], [7:0-4-0,0-2-4], [13:0-4-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.65
0.35
0.89
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.11
0.09
(loc)
11
12-13
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 151 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W13,W5,W6,W11,W12: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 8-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)9=830/0-4-0(min. 0-1-8), 15=890/0-6-0(min. 0-1-12)
Max Horz15=419(LC 16)
Max Uplift9=-199(LC 16), 15=-99(LC 16)
MaxGrav9=998(LC 43), 15=1110(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-1117/59, 3-16=-874/76, 3-17=-934/135, 17-18=-784/149, 4-18=-716/163,
4-19=-858/191, 19-20=-857/191, 20-21=-857/191, 5-21=-856/191, 5-22=-871/195,
6-22=-837/207, 6-7=-591/158, 7-23=-546/154, 23-24=-546/154, 8-24=-546/154,
8-9=-953/272, 2-15=-1086/167
BOT CHORD 14-15=-411/433, 13-14=-371/700, 12-13=-313/652, 11-12=-326/932, 10-11=-245/680
WEBS 3-13=-281/180, 4-12=-36/498, 5-12=-408/92, 5-11=-399/145, 6-11=-381/984,
6-10=-894/389, 8-10=-253/885, 2-14=0/532
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-7-12 to 3-3-8,Interior(1) 3-3-8 to 7-8-5,Exterior(2) 7-8-5 to 10-8-5,
Interior(1) 12-3-12 to 21-8-4zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
9=199.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T41
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:022018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-sTborqa7lgxLLSW4qvMKIFZ??Ytj3yynfZcPGxzX3ER
Scale=1:69.5
0-1-130-1-13T2
T3
T4 T5
W11
B1
W3 W4
W5 W6 W7
W8
W9
W10 W11
W10
W1
W2
B2T1
2
3
4
5
6 7 8
1
16 15 14 13 1211 10 9
17
18
19 2021
22 2324 25 26 27 28 29
4x6
6x6 4x12
5x6 1.5x4
4x63x44x6
3x6
4x4
3x5 3x4
5x8
2x4
5x8
4-7-15
4-7-15
9-0-5
4-4-7
14-5-5
5-5-0
15-10-6
1-5-1
18-5-13
2-7-7
21-1-4
2-7-7
21-4-12
0-3-8
-1-7-12
1-7-12
4-7-15
4-7-15
9-0-5
4-4-7
14-5-5
5-5-0
15-10-6
1-5-1
18-5-13
2-7-7
21-1-4
2-7-7
21-4-12
0-3-8
1-1-09-11-811-0-012.0012
7.5012
6.0012
PlateOffsets(X,Y)-- [4:0-4-1,0-3-0], [5:0-0-0,0-0-1], [6:0-4-0,0-2-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.38
0.45
0.68
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.12
0.02
(loc)
12-13
12-13
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 384 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W4,W1,W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 8-9, 7-9
REACTIONS.(lb/size)9=2831/Mechanical, 16=2402/0-6-0(min. 0-2-1)
Max Horz16=420(LC 12)
Max Uplift9=-788(LC 12), 16=-653(LC 12)
MaxGrav9=3041(LC 39), 16=2612(LC 40)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-17=-2943/694, 3-17=-2928/731, 3-18=-2424/647, 18-19=-2249/664, 4-19=-2210/680,
4-20=-1385/383, 20-21=-1383/383, 5-21=-1383/383, 5-6=-1443/412, 6-7=-1142/347,
2-16=-2586/671
BOT CHORD 16-22=-534/533, 15-22=-534/533, 14-15=-816/1977, 14-23=-816/1977, 23-24=-816/1977,
13-24=-816/1977, 13-25=-583/1589, 25-26=-583/1589, 26-27=-583/1589,
12-27=-583/1589, 11-12=-428/1393, 11-28=-186/673, 10-28=-186/673, 10-29=-186/673,
9-29=-186/673
WEBS 3-15=-192/448, 3-13=-599/360, 4-13=-599/1777, 4-12=-577/318, 5-12=-262/834,
5-11=-1837/597, 6-11=-200/710, 7-11=-637/1864, 7-10=-92/528, 7-9=-2651/735,
2-15=-337/1474
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10) Refer to girder(s) for truss to trussconnections.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T41
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:022018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-sTborqa7lgxLLSW4qvMKIFZ??Ytj3yynfZcPGxzX3ER
NOTES-
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=788, 16=653.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 336 lb down and 198 lb up at 3-11-4, 390 lb down and 146 lb up at
5-11-4, 590 lb down and 205 lb up at 7-11-4, 335 lb down and 109 lb up at 9-11-4, 315 lb down and 102 lb up at 11-11-4, 315 lb down and 102 lb up at 13-11-4, 315 lb
down and 102 lb up at 15-11-4, and 315 lb down and 102 lb up at 17-11-4, and 630 lb down and 149 lb up at 19-11-4 on bottomchord.The design/selection of such
connection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 2-4=-51, 4-5=-61, 5-6=-51, 6-8=-61, 9-16=-20, 1-2=-51
Concentrated Loads(lb)
Vert: 11=-315(F) 22=-336(F) 23=-390(F) 24=-590(F) 25=-335(F) 26=-315(F) 27=-315(F) 28=-315(F) 29=-630(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T42GE
TrussType
GABLE
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:032018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Kg9A2AamW_3Czc5GNctZrT5EdyKfoZHxtDMzoNzX3EQ
Scale=1:15.4
T1 W1
B1
ST11
2
3
5 4
2x4
1.5x4
1.5x41.5x4
1.5x4
2-8-8
2-8-8
3-0-0
0-3-8
0-5-112-5-118.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.07
0.02
0.04
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 11 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=13/3-0-0(min. 0-1-8), 4=54/3-0-0(min. 0-1-8), 5=135/3-0-0(min. 0-1-8)
Max Horz1=82(LC 13)
Max Uplift1=-20(LC 14), 4=-19(LC 13), 5=-75(LC 16)
MaxGrav1=48(LC 13), 4=70(LC 29), 5=168(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)Gablestudsspaced at 2-0-0 oc.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 5.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T43
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:042018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-osiYGWbOHIB3amgTxKOoNgeGHLVAXt846t5WKpzX3EP
Scale=1:76.2
0-1-12T2
T3
W6
B2
B3
W1
W2
W3
W4
W5
W6
W7
HW1
T1
1
2
3
4
5 6 7
12
11 10
98
16
17
18
19 20 21
3x5
6x6
3x5
3x6
3x4
5x12
3x4
1.5x4
3x4
3x5
1.5x4
4x6
3x8
8-5-11
8-5-11
16-10-9
8-4-15
22-3-15
5-5-5
22-7-0
0-3-1
23-1-12
0-6-12
23-5-4
0-3-8
5-8-1
5-8-1
11-3-5
5-7-4
16-10-9
5-7-4
22-3-15
5-5-5
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1111-7-011-8-124-6-127-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-6,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.59
0.71
0.64
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.35
0.07
(loc)
10-12
10-12
9
l/defl
>999
>767
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 104 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-5 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=-665/Mechanical, 9=1611/0-6-0(min. 0-2-14), 1=767/0-6-0(min. 0-1-8)
Max Horz1=455(LC 16)
Max Uplift8=-823(LC 35), 9=-433(LC 16), 1=-47(LC 16)
MaxGrav8=202(LC 16), 9=1819(LC 35), 1=935(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-2321/455, 2-16=-2206/472, 2-3=-2044/350, 3-4=-1947/378, 4-17=-933/123,
17-18=-768/140, 5-18=-734/156, 7-8=-194/776
BOT CHORD 1-12=-801/2012, 11-12=-528/1473, 10-11=-501/1499, 9-10=-199/670
WEBS 2-12=-330/238, 4-12=-88/551, 4-10=-842/337, 5-10=-147/750, 5-9=-1010/278,
6-9=-683/205, 7-9=-685/169
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 16-10-9,Exterior(2) 16-10-9 to 21-1-8
zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=823, 9=433.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T44
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:052018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-G2GwTsc02bJvCwEfV1v1wuBRalsZGFQDLXr3tGzX3EO
Scale=1:78.8
0-1-12T2
T3
W6
B2
B3
W1
W2
W3
W4
W5 W6
W7
HW1
T1
1
2
3
4
5 6 7
12
11
10
98
16
17
18
19 20
3x6
6x6
3x4
3x6
3x4
5x12
3x4
1.5x4
3x4
3x5
1.5x4
4x6
3x8
8-9-7
8-9-7
17-6-1
8-8-11
22-3-15
4-9-13
22-7-0
0-3-1
23-1-12
0-6-12
23-5-4
0-3-8
5-10-9
5-10-9
11-8-5
5-9-12
17-6-1
5-9-12
22-3-15
4-9-13
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1112-0-012-1-124-11-127-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-6,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.61
0.70
0.96
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.37
0.07
(loc)
10-12
10-12
9
l/defl
>999
>730
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 107 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=-599/Mechanical, 9=1538/0-6-0(min. 0-2-13), 1=768/0-6-0(min. 0-1-8)
Max Horz1=472(LC 16)
Max Uplift8=-760(LC 35), 9=-442(LC 16), 1=-41(LC 16)
MaxGrav8=194(LC 16), 9=1775(LC 35), 1=929(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-2296/450, 2-16=-2175/468, 2-3=-2009/342, 3-4=-1914/369, 4-17=-861/101,
17-18=-690/120, 5-18=-637/136, 7-8=-180/720
BOT CHORD 1-12=-813/2008, 11-12=-526/1432, 10-11=-498/1459, 9-10=-182/599
WEBS 2-12=-349/250, 4-12=-93/583, 4-10=-871/351, 5-10=-155/767, 5-9=-987/277,
6-9=-567/170, 7-9=-654/164
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 17-6-1,Exterior(2) 17-6-1 to 21-9-0zone;
cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60
plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=760, 9=442.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T45
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:072018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-CROhuXdGaDZdRDO1cSyV?JGm?ZXok8kWorKAx8zX3EM
Scale=1:86.3
0-1-12T2
T3
W7
B2
B3
W1 W2
W3
W4
W5 W6 W7
W8
HW1
T1 B1
1
2
3
4
5 6 7
13
12
11
10
98
17
18
19
20 21
3x4
5x6
3x4
3x6
3x4
5x12
3x5
1.5x4
3x4
3x5
3x5
1.5x4
4x6
3x8
6-6-1
6-6-1
12-11-5
6-5-4
19-4-9
6-5-4
22-3-15
2-11-5
22-7-0
0-3-1
23-1-12
0-6-12
23-5-4
0-3-8
6-6-1
6-6-1
12-11-5
6-5-4
19-4-9
6-5-4
22-3-15
2-11-5
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1113-3-013-4-126-2-127-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-11,Edge], [5:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.68
0.65
0.97
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.12
-0.29
0.07
(loc)
12-13
12-13
9
l/defl
>999
>940
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 117 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-12 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=-464/Mechanical, 9=1381/0-6-0(min. 0-2-11), 1=771/0-6-0(min. 0-1-8)
Max Horz1=523(LC 16)
Max Uplift8=-614(LC 35), 9=-436(LC 16), 1=-21(LC 16)
MaxGrav8=135(LC 16), 9=1696(LC 35), 1=914(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-2238/395, 2-17=-2098/418, 2-3=-1621/212, 3-18=-1546/226, 4-18=-1385/251,
4-19=-614/35, 19-20=-428/70, 5-20=-286/73, 7-8=-115/562
BOT CHORD 1-13=-812/1981, 12-13=-811/1992, 11-12=-488/1320, 10-11=-475/1355, 9-10=-131/370
WEBS 2-12=-685/310, 4-12=-41/452, 4-10=-1008/364, 5-10=-187/790, 5-9=-986/308,
6-9=-286/84, 7-9=-545/122
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 19-4-9,Exterior(2) 19-4-9 to 23-3-8zone;
cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60
plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=614, 9=436.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T46
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:082018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-gdy35teuLWhU3NzEAATkYWpv?zt1Tbfg1U3kTazX3EL
Scale=1:94.3
0-1-12T2
T3
W7
B2
B3
W1 W2
W3
W4 W5
W6
W7
W8
HW1
T1
1
2
3
4
5 67
13
12 11
109 8
17
18
19
3x5
6x6
1.5x4
3x5
3x4
5x6
3x5
1.5x4
3x4
3x5
4x4
3x8
4x6
3x8 7-1-9
7-1-9
14-2-5
7-0-12
21-3-1
7-0-12
22-3-15
1-0-13
23-1-12
0-9-13
23-5-4
0-3-8
7-1-9
7-1-9
14-2-5
7-0-12
21-3-1
7-0-12
22-3-15
1-0-13
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1114-6-014-7-127-5-127-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-6,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.79
0.65
0.92
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.33
0.10
(loc)
12-13
12-13
8
l/defl
>999
>842
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 126 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4,W5,W6: 2x4SPF No.2
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-2-8 oc bracing.
WEBS 1 Row at midpt 4-10, 5-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=844/Mechanical, 1=825/0-6-0(min. 0-1-8)
Max Horz1=574(LC 16)
Max Uplift8=-342(LC 16), 1=-13(LC 16)
MaxGrav8=1082(LC 35), 1=955(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-2340/406, 2-17=-2248/434, 2-3=-1650/201, 3-18=-1556/219, 4-18=-1414/243,
4-19=-582/16, 5-19=-382/44
BOT CHORD 1-13=-872/2094, 12-13=-869/2102, 11-12=-507/1357, 10-11=-493/1396, 9-10=-114/305
WEBS 2-13=0/256, 2-12=-775/347, 4-12=-47/499, 4-10=-1084/400, 5-10=-200/883,
5-9=-1129/359, 6-9=-387/1115, 6-8=-857/271
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 21-3-1,Exterior(2) 21-3-1 to 23-3-8zone;
cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60
plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=342.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T47
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:092018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-8qWRJDfW6qqLhXYQkt_z4kL6HMC6C1_pG8pH01zX3EK
Scale=1:87.0
0-1-12T2
T3
W7
B2
B3
W1 W2
W3
W4
W5 W6 W7
W8
HW1
T1 B1
1
2
3
4
5 67
13
12
11
10
98
17
18
19
20
3x4
5x6
1.5x4
3x5
3x4
5x6
3x5
1.5x4
3x4
3x5
3x5
4x4
4x6
3x8 6-6-12
6-6-12
13-0-12
6-6-0
19-6-12
6-6-0
22-3-15
2-9-3
23-1-12
0-9-13
23-5-4
0-3-8
6-6-12
6-6-12
13-0-12
6-6-0
19-6-12
6-6-0
22-3-15
2-9-3
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1113-4-713-6-36-4-37-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.70
0.72
0.98
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.33
0.09
(loc)
12-13
12-13
8
l/defl
>999
>838
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 118 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-5-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-3-10 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=859/Mechanical, 1=828/0-6-0(min. 0-1-8)
Max Horz1=528(LC 16)
Max Uplift8=-289(LC 16), 1=-37(LC 16)
MaxGrav8=1018(LC 35), 1=982(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-2438/445, 2-17=-2301/469, 2-3=-1831/265, 3-18=-1752/279, 4-18=-1595/304,
4-19=-827/88, 5-19=-639/126
BOT CHORD 1-13=-860/2140, 12-13=-859/2156, 11-12=-537/1501, 10-11=-524/1536, 9-10=-176/544
WEBS 2-12=-679/309, 4-12=-39/452, 4-10=-1008/365, 5-10=-195/816, 5-9=-900/286,
6-9=-283/949, 6-8=-814/236
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 19-6-12,Exterior(2) 19-6-12 to 23-3-8
zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=289.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T48
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:102018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-d04pWZg9t8yCIh7cIbVCdxuI0mYexXMyUoYqYTzX3EJ
Scale=1:79.6
0-1-12T2
T3
W6
B2
B3
W1
W2
W3
W4
W5 W6
W7
HW1
T1
1
2
3
4
5 67
12
11
10
98
16
17
18
19 20
3x6
6x6
2x4
3x5
3x5
5x6
3x4
1.5x4
3x4
3x5
3x5
4x6
3x8 8-10-8
8-10-8
17-8-4
8-9-12
22-3-15
4-7-11
23-1-12
0-9-13
23-5-4
0-3-8
5-11-4
5-11-4
11-9-12
5-10-8
17-8-4
5-10-8
22-3-15
4-7-11
23-1-12
0-9-13
23-5-4
0-3-8
0-5-1112-1-712-3-35-1-37-0-48.0012
3.8612
PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-6,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.63
0.77
0.78
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.15
-0.41
0.09
(loc)
10-12
10-12
8
l/defl
>999
>680
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 107 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-15 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-3-8 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=874/Mechanical, 1=831/0-6-0(min. 0-1-8)
Max Horz1=477(LC 16)
Max Uplift8=-235(LC 16), 1=-58(LC 16)
MaxGrav8=947(LC 35), 1=1000(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-2507/503, 2-16=-2385/522, 2-3=-2223/396, 3-4=-2129/423, 4-17=-1086/157,
17-18=-914/175, 5-18=-854/192, 7-8=-130/265
BOT CHORD 1-12=-863/2173, 11-12=-578/1626, 10-11=-554/1654, 9-10=-231/788
WEBS 2-12=-347/251, 4-12=-90/580, 4-10=-870/352, 5-10=-159/778, 5-9=-820/236,
6-9=-202/824, 6-8=-1108/300
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 17-8-4,Exterior(2) 17-8-4 to 21-11-3
zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
8=235.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T49
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:112018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-5CeBkvhneR43wriprI0R99QSzAyfg?O6jSIO4vzX3EI
Scale=1:66.9
0-1-130-1-130-1-12T1
T2
T3
T4
W11
B2
B3
W3
W4
W5
W6 W7
W8
W9
W10 W11
W12
W1 W2
B1
1
2
3
4
5 67
15
14
13
12
11
10
9
8
16
17
18
19
20
21 22 23
3x6
6x6 4x10
5x6 6x6
2x4
3x4
6x8
3x5
3x5
3x4
3x4
3x4
1.5x4
1.5x4 4-5-9
4-5-9
8-7-10
4-2-1
11-4-2
2-8-8
15-9-12
4-5-10
22-3-15
6-6-3
23-1-12
0-9-13
23-5-4
0-3-8
4-5-9
4-5-9
8-7-10
4-2-1
11-4-2
2-8-8
15-9-12
4-5-10
22-3-15
6-6-3
23-1-12
0-9-13
23-5-4
0-3-8
2-3-67-10-1010-10-711-0-33-10-37-0-48.0012
3.8612
PlateOffsets(X,Y)-- [3:0-3-5,Edge], [5:0-3-0,0-2-3], [9:0-5-12,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.68
0.46
0.73
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.19
0.05
(loc)
9-10
9-10
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 121 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W10: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 8-2-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=894/Mechanical, 15=847/0-6-0(min. 0-1-11)
Max Horz15=318(LC 16)
Max Uplift8=-179(LC 16), 15=-78(LC 16)
MaxGrav8=1044(LC 40), 15=1132(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1423/233, 2-16=-1222/249, 2-17=-1455/288, 3-17=-1332/312, 3-4=-1438/335,
4-18=-1191/221, 18-19=-1079/226, 19-20=-1072/227, 5-20=-1012/241, 5-21=-363/79,
21-22=-365/79, 22-23=-365/79, 6-23=-367/78, 6-7=-398/86, 7-8=-1024/210,
1-15=-1100/208
BOT CHORD 14-15=-365/364, 13-14=-526/1172, 12-13=-445/1177, 11-12=-480/1491, 10-11=-466/1509,
9-10=-268/944
WEBS 2-14=-452/134, 3-12=-74/563, 4-12=-514/107, 4-10=-619/247, 5-10=-125/639,
5-9=-722/217, 6-9=-817/276, 7-9=-317/1465, 1-14=-152/1084
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 8-7-10,Exterior(2) 8-7-10 to 18-9-12,
Interior(1) 18-9-12 to 23-3-8zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 15 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
8=179.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T50
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:132018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-1bly8bi193Kn98sBzj3vFaWrY_fZ8z_PBmnV9ozX3EG
Scale=1:59.1
0-1-130-1-130-1-12T1
T2 T3 T4
W12
B2
B3
W3
W4
W5
W6 W7
W8 W9 W10
W11
W12
W13
W1 W2
B11
2
3 4
5 6 7 8
17
16
15
14
13 12
11
10
9
18
19
20
21 22 23
3x8
6x6 6x6
5x6
1.5x4
3x5
3x4
5x6
3x5
3x5
3x4
3x4
1.5x4
3x4
3x4
3x5
2x4 5-5-9
5-5-9
10-7-10
5-2-1
13-4-2
2-8-8
13-11-4
0-7-2
18-1-9
4-2-5
22-3-15
4-2-5
23-1-12
0-9-13
23-5-4
0-3-8
5-5-9
5-5-9
10-7-10
5-2-1
13-4-2
2-8-8
13-11-4
0-7-2
18-1-9
4-2-5
22-3-15
4-2-5
23-1-12
0-9-13
23-5-4
0-3-8
2-3-69-2-109-7-79-9-32-7-37-0-48.0012
3.8612
PlateOffsets(X,Y)-- [3:0-3-5,Edge], [4:0-2-11,Edge], [5:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.49
0.37
0.47
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.12
0.05
(loc)
14-15
14-15
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 121 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-2-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-0-11 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)9=908/Mechanical, 17=851/0-6-0(min. 0-1-10)
Max Horz17=260(LC 16)
Max Uplift9=-177(LC 13), 17=-63(LC 16)
MaxGrav9=1135(LC 40), 17=1104(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-18=-1494/216, 2-18=-1339/237, 2-19=-1303/246, 19-20=-1192/257, 3-20=-1152/277,
3-21=-1179/274, 4-21=-1179/274, 4-5=-1282/294, 5-22=-1240/251, 6-22=-1242/250,
6-23=-488/95, 7-23=-488/95, 1-17=-1069/182
BOT CHORD 16-17=-317/340, 15-16=-423/1218, 14-15=-306/1011, 13-14=-331/1296, 12-13=-298/1196,
11-12=-294/1220, 10-11=-271/1310, 9-10=-87/436
WEBS 2-16=-339/121, 2-15=-261/162, 3-15=-80/300, 3-14=-103/422, 4-14=-672/143,
5-13=-98/448, 6-10=-857/185, 7-10=-129/835, 7-9=-1250/250, 1-16=-118/1094
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 10-7-10,Exterior(2) 10-7-10 to
16-11-4,Interior(1) 16-11-4 to 23-3-8zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 17 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17 except(jt=lb)
9=177.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T51
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:142018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-VnJKMxjfwMSenIQOXQa8nn2__Ny_tONYPQW2hEzX3EF
Scale=1:61.8
0-1-120-1-12T1
T2
T3
W13
B2
B3
W3
W4
W5
W6 W7
W8
W9
W10
W11W12
W1 W2
B11
2
3 4
5
6
7
15
14
13
12
11
10 9
8
16
17 18
3x6
5x6
1.5x4
3x5
3x5
5x6
3x5
3x4
3x4
3x4
4x4
3x4
4x12
5x6
1.5x4 4-9-14
4-9-14
9-4-4
4-6-6
15-2-12
5-10-8
21-1-5
5-10-8
22-3-15
1-2-10
23-1-12
0-9-13
23-5-4
0-3-8
4-9-14
4-9-14
9-4-4
4-6-6
15-2-12
5-10-8
21-1-5
5-10-8
22-3-15
1-2-10
23-1-12
0-9-13
23-5-4
0-3-8
2-3-68-4-710-0-133-0-97-0-41-4-38.0012
3.8612
PlateOffsets(X,Y)-- [3:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.63
0.55
0.59
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.19
0.07
(loc)
12
12-13
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 108 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 8-0-12 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=896/Mechanical, 15=860/0-6-0(min. 0-1-9)
Max Horz15=280(LC 16)
Max Uplift8=-273(LC 16), 15=-116(LC 16)
MaxGrav8=1059(LC 37), 15=1048(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1342/279, 2-16=-1125/297, 2-3=-1319/362, 3-17=-1869/435, 17-18=-1869/435,
4-18=-1871/435, 4-5=-1536/274, 5-6=-647/114, 1-15=-1014/238
BOT CHORD 14-15=-339/339, 13-14=-520/1097, 12-13=-437/1154, 11-12=-535/1955, 10-11=-524/1980,
9-10=-365/1626, 8-9=-98/379
WEBS 2-14=-372/143, 3-12=-152/909, 4-12=-581/195, 4-10=-344/166, 5-10=-27/343,
5-9=-1470/296, 6-9=-306/1370, 6-8=-996/260, 1-14=-183/997
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-4-4,Exterior(2) 9-4-4 to 13-7-3,
Interior(1) 21-1-5 to 23-3-8zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)Provide adequate drainage to preventwater ponding.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Bearing at joint(s) 15 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
8=273, 15=116.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T52
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:152018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-z_tiZGkHhgaVPS?a485NK?bDanJpcqqie4GbDgzX3EE
Scale=1:59.1
0-1-120-1-12T1
T2
T3 W17
B2
B3
W3
W4
W5
W6 W7
W8 W9
W10 W11
W12
W13
W14
W15W16
W1 W2
B1
1
2
3 4 5
6
7
8
9
19
18
17
16
15
14
13 12 11
10
20
21
22 23 24
25
3x5
5x6
5x12MT18H
1.5x4
3x5
3x5
5x63x5
3x4
3x4
4x4
4x4
3x5
4x4
3x6
5x6
5x6
4x6
1.5x4
3-10-10
3-10-10
7-5-12
3-7-2
11-4-12
3-11-0
15-3-12
3-11-0
19-2-13
3-11-0
20-9-6
1-6-9
22-3-15
1-6-9
23-1-12
0-9-13
23-5-4
0-3-8
3-10-10
3-10-10
7-5-12
3-7-2
11-4-12
3-11-0
15-3-12
3-11-0
19-2-13
3-11-0
20-9-6
1-6-9
22-3-15
1-6-9
23-1-12
0-9-13
23-5-4
0-3-8
2-3-67-1-710-0-133-0-97-0-40-1-38.0012
3.8612
PlateOffsets(X,Y)-- [3:0-3-0,0-2-3], [6:0-8-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.32
0.51
0.64
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.18
-0.38
0.10
(loc)
13-14
13-14
10
l/defl
>999
>727
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 118 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SP 2400F 2.0E
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W11: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 7-7-1 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=886/Mechanical, 19=870/0-6-0(min. 0-1-8)
Max Horz19=280(LC 16)
Max Uplift10=-273(LC 16), 19=-116(LC 16)
MaxGrav10=998(LC 37), 19=987(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-20=-1141/252, 20-21=-1042/259, 2-21=-1036/267, 2-3=-1380/359, 3-22=-1977/462,
4-22=-1979/462, 4-23=-2964/617, 5-23=-2964/617, 5-24=-4241/822, 6-24=-4238/822,
6-25=-1994/379, 7-25=-1976/386, 7-8=-565/97, 1-19=-956/231
BOT CHORD 18-19=-337/323, 17-18=-508/986, 16-17=-477/1212, 15-16=-612/2077, 14-15=-599/2092,
13-14=-774/3109, 12-13=-946/4277, 11-12=-426/1713, 10-11=-101/371
WEBS 2-18=-431/151, 2-17=-85/313, 3-16=-169/1099, 4-16=-918/201, 4-14=-177/1114,
5-14=-690/171, 5-13=-207/1294, 6-13=-731/173, 6-12=-2452/493, 7-12=-290/1490,
7-11=-1385/335, 8-11=-270/1204, 8-10=-980/269, 1-18=-180/891
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 7-5-12,Exterior(2) 7-5-12 to 11-8-11,
Interior(1) 19-2-13 to 23-3-8zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)Provide adequate drainage to preventwater ponding.
5)All plates areMT20 plates unless otherwiseindicated.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Bearing at joint(s) 19 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
10=273, 19=116.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T52
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:152018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-z_tiZGkHhgaVPS?a485NK?bDanJpcqqie4GbDgzX3EE
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T53
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:162018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RAR4nckvS_iM0camerccsC8MVBjdLG_rtk?9m7zX3ED
Scale=1:58.1
0-1-12T2
T3
W8
B1
W1 W2
W3 W4
W5 W6 W7 W6
T1
B3B212
3
4
5
6 7 8
15 14 13 12 11 10 9
19 20
21
22
23 24
3x4
6x6
3x4
3x4
3x5
1.5x4
3x4
3x5
3x4
1.5x4
3x8
3x4
4x6
3x6
5-5-12
5-5-12
10-7-0
5-1-4
12-11-4
2-4-4
18-1-14
5-2-10
23-4-8
5-2-10
23-8-0
0-3-8
-0-10-12
0-10-12
5-5-12
5-5-12
10-7-0
5-1-4
12-11-4
2-4-4
18-1-14
5-2-10
23-4-8
5-2-10
23-8-0
0-3-8
0-4-118-10-79-0-38-4-150-5-88-10-78.0012
PlateOffsets(X,Y)-- [6:0-3-6,Edge], [9:0-2-7,0-1-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.51
0.22
0.71
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.06
0.01
(loc)
15-18
9-11
14
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 136 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPF No.2 *Except*
W1,W2,W3: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 12-14.
WEBS 1 Row at midpt 8-9, 6-12, 7-11
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=434/0-4-0(min. 0-1-8), 14=861/0-6-0(min. 0-1-11), 9=522/0-1-8(min. 0-1-8)
Max Horz2=369(LC 16)
Max Uplift2=-42(LC 13), 14=-219(LC 13), 9=-116(LC 13)
MaxGrav2=532(LC 36), 14=1070(LC 36), 9=736(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-19=-579/76, 19-20=-513/79, 3-20=-399/98, 6-23=-311/52, 7-23=-313/52,
7-24=-311/51, 8-24=-311/51, 8-9=-688/142
BOT CHORD 2-15=-288/418, 14-15=-288/418
WEBS 3-14=-529/343, 5-14=-675/184, 5-12=-41/431, 6-12=-350/111, 6-11=-49/256,
7-11=-584/181, 8-11=-94/570
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 12-11-4,Exterior(2) 12-11-4 to 17-2-3
zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 9.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
14=219, 9=116.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T53
TrussType
HalfHip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:162018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RAR4nckvS_iM0camerccsC8MVBjdLG_rtk?9m7zX3ED
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T54
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:172018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-vM?T_ylYDHqCem9yCZ7rPQgVDb1N4lb_5OliIZzX3EC
Scale=1:57.2
0-1-120-1-12T1
T2 T3
W7
B1
W1 W2
W3 W4 W5 W4 W6
B3B212
3
4 5 6
7
14 13 12 11 10 98
18
19
20
21
2223
5x6 6x6
3x4
3x4 3x4
3x5
1.5x4 3x4
1.5x4
4x8 2x4
4x6
3x6
5-8-10
5-8-10
10-4-0
4-7-6
11-0-12
0-8-12
16-11-4
5-10-8
22-9-13
5-10-8
23-4-8
0-6-11
23-8-0
0-3-8
-0-10-12
0-10-12
5-8-10
5-8-10
11-0-12
5-4-2
16-11-4
5-10-8
22-9-13
5-10-8
23-4-8
0-6-11
23-8-0
0-3-8
0-4-117-7-78-4-07-10-80-5-88-4-07-7-78.0012
PlateOffsets(X,Y)-- [2:0-4-8,0-0-8], [4:0-3-0,0-2-3], [6:0-2-10,Edge], [8:Edge,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.64
0.38
0.62
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.18
-0.01
(loc)
9-11
9-11
8
l/defl
>999
>840
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 124 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPF No.2 *Except*
W1,W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 7-8, 4-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=280/0-4-0(min. 0-1-8), 13=1190/0-6-0(min. 0-2-1), 8=359/0-1-8(min. 0-1-8)
Max Horz2=341(LC 16)
Max Uplift2=-57(LC 13), 13=-300(LC 16), 8=-110(LC 16)
MaxGrav2=493(LC 39), 13=1319(LC 38), 8=503(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-18=-432/70, 18-19=-418/84, 3-20=-149/290, 20-21=-140/299, 4-21=-130/374
BOT CHORD 2-14=-280/270, 13-14=-280/270
WEBS 3-13=-601/386, 4-13=-1070/252, 4-11=-93/755, 5-11=-655/203, 6-11=-83/306,
6-9=-418/166
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 11-0-12,Exterior(2) 11-0-12 to
15-3-11,Interior(1) 22-9-13 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers
and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 8.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
13=300, 8=110.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T55
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:182018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-OYZrCImA_by3Gwk9mGe4ydDj5?LkpBA8K2UFq?zX3EB
Scale=1:53.9
0-1-120-1-12T1
T2
T3
W9
B1
W1
W2
W3
W4 W5 W4 W6 W7 W8
B3B212
3
4 5 6
7
8
15 14 13 12 11 10 9
19
20 21
5x6 4x10
1.5x4
4x4 3x43x4
1.5x4
3x4
3x4 1.5x4
3x8 1.5x4 4x6
4x4
9-2-4
9-2-4
10-7-0
1-4-12
15-9-2
5-2-2
20-11-5
5-2-2
23-4-8
2-5-3
23-8-0
0-3-8
-0-10-12
0-10-12
4-9-6
4-9-6
9-2-4
4-4-14
10-7-0
1-4-12
15-9-2
5-2-2
20-11-5
5-2-2
23-4-8
2-5-3
23-8-0
0-3-8
0-4-116-4-78-4-07-10-80-5-88-4-06-4-78.0012
PlateOffsets(X,Y)-- [2:0-1-0,Edge], [4:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.44
0.43
0.67
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.18
-0.27
0.01
(loc)
15-18
15-18
9
l/defl
>723
>474
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 131 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W9,W5,W6: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 8-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=386/0-4-0(min. 0-1-8), 14=986/0-6-0(min. 0-1-12), 9=457/0-1-8(min. 0-1-8)
Max Horz2=341(LC 16)
Max Uplift2=-59(LC 13), 14=-291(LC 16), 9=-121(LC 16)
MaxGrav2=622(LC 39), 14=1123(LC 38), 9=548(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-19=-532/79, 3-19=-350/98, 5-20=-364/67, 20-21=-364/67, 6-21=-364/67, 6-7=-366/68
BOT CHORD 2-15=-308/365
WEBS 3-15=-419/200, 4-15=-426/389, 4-14=-600/467, 5-14=-855/182, 5-12=-71/628,
6-12=-540/168, 7-9=-563/79
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 9-2-4,Exterior(2) 9-2-4 to 13-5-3,
Interior(1) 20-11-5 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 9.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
14=291, 9=121.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T56
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:202018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Kxgbc_oQWCCnVDuXthhY12Izqo_2H7aRoMzMvuzX3E9
Scale=1:54.7
0-1-120-1-12T1
T2
T3
W8
B1
W1 W2 W3 W4 W5 W6 W7
B3HW1B212
3 4
5
6
7
13 12 11 10 9 8
17
18
19
20 21 22
235x6
3x4
3x8 3x41.5x4 3x8
1.5x4
3x4
3x4
4x10
4x6
4x4
7-3-12
7-3-12
10-7-0
3-3-4
19-0-13
8-5-12
23-4-8
4-3-11
23-8-0
0-3-8
-0-10-12
0-10-12
7-3-12
7-3-12
10-7-0
3-3-4
14-9-14
4-2-14
19-0-13
4-2-14
23-4-8
4-3-11
23-8-0
0-3-8
0-4-115-1-78-4-07-10-80-5-88-4-05-1-78.0012
PlateOffsets(X,Y)-- [2:0-1-10,0-1-8], [3:0-3-0,0-2-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.74
0.64
0.54
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.12
-0.30
0.01
(loc)
10-12
10-12
8
l/defl
>999
>524
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 111 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W8: 2x4SPF No.2
WEDGE
Left: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-5-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 7-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=392/0-4-0(min. 0-1-8), 12=1001/0-6-0(min. 0-1-15), 8=435/0-1-8(min. 0-1-8)
Max Horz2=341(LC 16)
Max Uplift2=-81(LC 13), 12=-207(LC 16), 8=-152(LC 16)
MaxGrav2=651(LC 39), 12=1247(LC 38), 8=518(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-17=-415/94, 17-18=-308/96, 18-19=-278/100, 5-22=-325/0, 6-22=-321/0
BOT CHORD 2-13=-276/201, 12-13=-268/198, 11-12=-122/286, 10-11=-122/286, 9-10=-60/326,
8-9=-60/326
WEBS 3-12=-457/393, 4-12=-354/125, 5-12=-632/103, 6-8=-476/83
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 7-3-12,Exterior(2) 7-3-12 to 11-6-11,
Interior(1) 19-0-13 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 8.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
12=207, 8=152.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T57
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:212018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-o7EzqKo2HWKe7NTkROCnZGr7_CO20Y4a00jwRKzX3E8
Scale=1:54.7
0-1-120-1-12T1
T2
T3
W7
B1
W1 W2 W3 W4 W5 W6
B3B212
3 4
5
6
12 11 10 9 8 7
16
17
18 19 20
21
22
5x6 5x10
3x5
3x5 3x41.5x4 3x8
1.5x4
1.5x4 4x6
3x8
5-5-4
5-5-4
10-7-0
5-1-12
17-2-5
6-7-4
23-4-8
6-2-3
23-8-0
0-3-8
-0-10-12
0-10-12
5-5-4
5-5-4
10-7-0
5-1-12
17-2-5
6-7-4
23-4-8
6-2-3
23-8-0
0-3-8
0-4-113-10-78-4-07-10-80-5-88-4-03-10-78.0012
PlateOffsets(X,Y)-- [2:0-5-0,0-0-8], [3:0-3-0,0-2-3], [5:0-5-0,0-2-1], [7:0-4-7,0-1-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.78
0.33
0.66
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.03
-0.09
0.02
(loc)
7-9
9-11
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 102 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W7,W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-7-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-14 oc bracing.
WEBS 1 Row at midpt 6-7
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=376/0-4-0(min. 0-1-8), 11=1035/0-6-0(min. 0-2-0), 7=417/0-1-8(min. 0-1-8)
Max Horz2=341(LC 16)
Max Uplift2=-76(LC 13), 11=-208(LC 16), 7=-154(LC 16)
MaxGrav2=566(LC 39), 11=1292(LC 38), 7=575(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-419/186, 16-17=-331/194, 3-17=-278/216, 6-7=-276/140
BOT CHORD 2-12=-372/289, 11-12=-363/286, 10-11=-85/437, 9-10=-85/437, 8-9=-81/442,
7-8=-80/446
WEBS 3-11=-444/382, 4-11=-647/214, 5-11=-652/12, 5-9=0/278, 5-7=-484/85
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 5-5-4,Exterior(2) 5-5-4 to 9-8-3,
Interior(1) 17-2-5 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 7.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
11=208, 7=154.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T58
TrussType
Roof Special
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:222018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-GKoM1gpg2qSVkX2w?6j06TOIHciOl?PjFgSTzmzX3E7
Scale=1:54.7
0-1-120-1-12T1
T2
T3
W8
B1
W1
W2 W3 W4
W5
W6 W7
B3B212
3 4
5
6
7
13 12 11 10 9 8
17 18 19 20
21
22
5x6 5x6
2x4
3x4 3x41.5x4 3x8
1.5x4
3x4
3x4
4x6
3x8
3-6-12
3-6-12
10-7-0
7-0-4
15-3-13
4-8-12
23-4-8
8-0-11
23-8-0
0-3-8
-0-10-12
0-10-12
3-6-12
3-6-12
10-7-0
7-0-4
15-3-13
4-8-12
19-4-2
4-0-6
23-4-8
4-0-6
23-8-0
0-3-8
0-4-112-7-78-4-07-10-80-5-88-4-02-7-78.0012
PlateOffsets(X,Y)-- [3:0-3-0,0-2-3], [5:0-3-0,0-2-3], [8:0-4-7,0-1-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.81
0.45
0.65
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.32
-0.01
(loc)
8-10
8-10
8
l/defl
>999
>481
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 103 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W8,W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 7-7-5 oc bracing.
WEBS 1 Row at midpt 7-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=368/0-4-0(min. 0-1-8), 12=1059/0-6-0(min. 0-2-0), 8=402/0-1-8(min. 0-1-8)
Max Horz2=341(LC 16)
Max Uplift2=-92(LC 13), 12=-172(LC 12), 8=-178(LC 16)
MaxGrav2=464(LC 39), 12=1289(LC 38), 8=613(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-17=-512/393, 3-17=-468/412, 3-18=-76/266, 18-19=-76/265, 4-19=-76/265,
4-20=-76/265, 5-20=-76/266, 5-6=-722/0
BOT CHORD 2-13=-555/431, 12-13=-541/424, 11-12=-98/554, 10-11=-98/554, 9-10=-115/325,
8-9=-112/330
WEBS 3-13=-222/254, 3-12=-659/406, 4-12=-666/208, 5-12=-916/0, 6-10=0/398, 6-8=-494/183
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-6-12,Exterior(2) 3-6-12 to 7-9-11,
Interior(1) 15-3-13 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 8.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
12=172, 8=178.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T59
TrussType
Roof SpecialGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:242018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Ciw6SLrxaRiD_rBJ6XlUBuTivPP_Dun0i_xa2fzX3E5
Scale=1:54.7
0-1-120-1-12T1
T2
T3
W10
B1W1W2
W3
W4 W3 W5 W6 W7
W8 W9
B3B212
3 4 5
6
7
8
16 15 14 13 12 11 10 9
20 21 22 23 24
25
26 27 28 29
6x6 4x10
2x4
3x4 3x41.5x4 4x4
4x4
4x8
1.5x4
1.5x4 3x4
3x5
4x6
3x8
1-8-4
1-8-4
6-1-10
4-5-6
10-7-0
4-5-6
13-5-5
2-10-4
18-4-14
4-11-10
23-4-8
4-11-10
23-8-0
0-3-8
-0-10-12
0-10-12
1-8-4
1-8-4
6-1-10
4-5-6
10-7-0
4-5-6
13-5-5
2-10-4
18-4-14
4-11-10
23-4-8
4-11-10
23-8-0
0-3-8
0-4-111-4-78-4-07-10-80-5-88-4-01-4-78.0012
PlateOffsets(X,Y)-- [2:0-2-4,Edge], [3:0-3-6,Edge], [9:0-4-7,0-1-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.44
0.72
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.11
0.02
(loc)
15-16
15-16
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 102 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W10: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-1-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 8-5-13 oc bracing.
WEBS 1 Row at midpt 8-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=401/0-4-0(min. 0-1-8), 14=1034/0-6-0(min. 0-1-14), 9=390/0-1-8(min. 0-1-8)
Max Horz2=341(LC 75)
Max Uplift2=-172(LC 8), 14=-210(LC 12), 9=-194(LC 75)
MaxGrav2=467(LC 34), 14=1204(LC 34), 9=638(LC 64)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-692/311, 3-20=-1073/488, 20-21=-1075/488, 4-21=-1075/487, 4-22=-201/580,
22-23=-201/580, 5-23=-201/580, 5-24=-226/612, 6-24=-226/613, 6-25=-668/0,
7-25=-434/0
BOT CHORD 2-16=-435/593, 16-26=-437/590, 26-27=-437/590, 15-27=-437/590, 15-28=-486/1073,
28-29=-486/1073, 14-29=-486/1073, 13-14=-163/685, 12-13=-163/685, 11-12=-158/691,
10-11=-142/466, 9-10=-140/469
WEBS 3-15=-233/532, 4-14=-1608/477, 5-14=-415/132, 6-14=-1352/17, 7-9=-606/184
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 9.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=172, 14=210, 9=194.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T59
TrussType
Roof SpecialGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:242018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Ciw6SLrxaRiD_rBJ6XlUBuTivPP_Dun0i_xa2fzX3E5
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 113 lb down and 73 lb up at 1-8-4, 56 lb down and 22 lb up at 3-9-1,
56lb down and 22 lb up at 5-9-1, 56 lb down and 22 lb up at 7-9-1, and 56 lb down and 22 lb up at 9-9-1, and 56 lb down and 22 lb up at 11-9-1 on top chord, and 40 lb
down and 45 lb up at 1-8-4, 3 lb down and 16 lb up at 3-9-1, 3 lb down and 16 lb up at 5-9-1, 3 lb down and 16 lb up at 7-9-1, and 3 lb down and 16 lb up at 9-9-1, and
3lb down and 16 lb up at 11-9-1 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-6=-61, 6-8=-51, 9-17=-20
Concentrated Loads(lb)
Vert: 13=0(B) 16=3(B) 26=0(B) 27=0(B) 28=0(B) 29=0(B)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T60GE
TrussType
GABLE
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:252018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-gvUUghrZLlr4b_mVgEGjk60_ppqlyUDAxeh7a5zX3E4
Scale=1:40.6
T1 W1
B1
ST5
ST4
ST3
ST2
ST11
2
3
4
5
6
7
13 12 11 10 9 8
14
3x4
11-6-12
11-6-12
11-10-4
0-3-8
0-5-38-4-08.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.08
0.03
0.13
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 60 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 7-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 11-10-4.
(lb)-Max Horz1=323(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 8, 9, 10, 11, 12, 13
MaxGravAllreactions 250 lb orless at joint(s) 1, 8, 9, 10, 11, 12, 13
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-376/315, 2-3=-295/244
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3) 0-0-0 to 3-0-0,Exterior(2) 3-0-0 to 11-8-8zone;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)All plates are 1.5x4MT20 unless otherwiseindicated.
6)Gablerequirescontinuous bottomchord bearing.
7)Gablestudsspaced at 2-0-0 oc.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 8, 9, 10, 11, 12,
13.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T61
TrussType
HipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:272018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-dHbF4NtpsM5orIwtnfJBpX5DBdL0QGuTPyAEe_zX3E2
Scale=1:36.0
0-1-130-1-13T1
T2
T1
B1
W1 W2 W3 W2 W3 W2 W1
B1HW1 HW1
1
2
3 4 5 6
7
8
13 12 11 10 9
20 21 22 23 24 25 26 27
28 29 30 31 32 33
6x6 6x6
3x8
4x61.5x4 3x8
3x4 1.5x4
4x10 1.5x4 3x8
2-10-8
2-10-8
7-3-9
4-5-1
11-10-7
4-6-13
16-3-8
4-5-1
18-10-8
2-7-0
19-2-0
0-3-8
-1-2-12
1-2-12
2-10-8
2-10-8
7-3-9
4-5-1
11-10-7
4-6-13
16-3-8
4-5-1
18-10-8
2-7-0
19-2-0
0-3-8
20-4-12
1-2-12
0-7-22-4-52-6-20-7-22-4-58.0012
PlateOffsets(X,Y)-- [2:0-3-8,Edge], [2:0-0-9,0-4-6], [2:0-0-5,0-0-7], [3:0-3-5,Edge], [6:0-3-5,Edge], [7:0-3-8,Edge], [7:0-0-9,0-4-6], [7:0-0-5,0-0-7], [12:0-3-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.74
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.17
-0.28
0.06
(loc)
10-12
10-12
7
l/defl
>999
>835
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 74 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-12 oc purlins.
BOT CHORD Rigidceiling directly applied or 5-3-10 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=921/0-4-0(min. 0-1-10), 7=915/0-4-0(min. 0-1-10)
Max Horz2=-69(LC 81)
Max Uplift2=-528(LC 9), 7=-520(LC 8)
MaxGrav2=1047(LC 34), 7=1041(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-1550/820, 3-20=-2603/1253, 20-21=-2604/1253, 21-22=-2604/1253,
4-22=-2607/1253, 4-23=-2598/1245, 23-24=-2598/1245, 5-24=-2598/1245,
5-25=-2601/1246, 25-26=-2600/1246, 26-27=-2598/1246, 6-27=-2597/1246,
6-7=-1539/807
BOT CHORD 2-13=-692/1277, 13-28=-690/1277, 28-29=-690/1277, 12-29=-690/1277,
12-30=-1250/2604, 11-30=-1250/2604, 11-31=-1250/2604, 10-31=-1250/2604,
10-32=-650/1268, 32-33=-650/1268, 9-33=-650/1268, 7-9=-650/1268
WEBS 3-12=-646/1471, 4-12=-492/218, 5-10=-493/216, 6-10=-651/1474
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right
exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=528, 7=520.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
Continued on page 2
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T61
TrussType
HipGirder
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:272018 Page2ID:eMggPZfMaCgNyhWFExcPqYyfJZj-dHbF4NtpsM5orIwtnfJBpX5DBdL0QGuTPyAEe_zX3E2
NOTES-
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 150 lb down and 151 lb up at 2-10-8, 82 lb down and 62 lb up at
4-2-12, 82 lb down and 62 lb up at 6-2-12, 82 lb down and 62 lb up at 8-2-12, 82 lb down and 62 lb up at 10-2-12, 82 lb down and 62 lb up at 12-2-12, and 82 lb down
and 62 lb up at 14-2-12, and 150 lb down and 151 lb up at 16-3-8 on top chord, and 74 lb down and 85 lb up at 2-10-8, 22 lb down and 34 lb up at 4-2-12, 22 lb down
and 34 lb up at 6-2-12, 22 lb down and 34 lb up at 8-2-12, 22 lb down and 34 lb up at 10-2-12, 22 lb down and 34 lb up at 12-2-12, and 22 lb down and 34 lb up at
14-2-12, and 74 lb down and 85 lb up at 16-2-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-6=-61, 6-8=-51, 14-17=-20
Concentrated Loads(lb)
Vert: 3=-12(F) 6=-12(F) 13=-17(F) 9=-17(F) 21=-9(F) 22=-9(F) 23=-9(F) 24=-9(F) 25=-9(F) 26=-9(F) 28=-18(F) 29=-18(F) 30=-18(F) 31=-18(F) 32=-18(F) 33=-18(F)
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T62
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:282018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-5U9dIjuRdgDfTSV4LMqQMkeQ?0mZ9pJcdcvnBQzX3E1
Scale=1:34.8
0-1-130-1-13T1
T2
T3
B1
W1 W2 W3 W2 W1
HW1 HW1B1
1
2 3 4
5
6
9 8 7
16
17 18 19 20
21
6x6 6x6
1.5x4 5x8
1.5x4
1.5x43x8 3x8
4-10-8
4-10-8
9-7-0
4-8-8
14-3-8
4-8-8
18-10-8
4-7-0
19-2-0
0-3-8
4-10-8
4-10-8
9-7-0
4-8-8
14-3-8
4-8-8
18-10-8
4-7-0
19-2-0
0-3-8
20-4-12
1-2-12
0-7-23-8-53-10-20-7-23-8-58.0012
PlateOffsets(X,Y)-- [1:0-3-8,Edge], [1:0-0-9,0-4-6], [1:0-0-5,0-0-7], [2:0-3-5,Edge], [4:0-3-5,Edge], [5:0-3-8,Edge], [5:0-0-9,0-4-6], [5:0-0-5,0-0-7], [8:0-4-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.41
0.40
0.24
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.11
0.04
(loc)
7-8
7-8
5
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 73 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
WEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 7-6-15 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=724/0-4-0(min. 0-1-8), 5=790/0-4-0(min. 0-1-8)
Max Horz1=-97(LC 14)
Max Uplift1=-237(LC 13), 5=-244(LC 12)
MaxGrav1=780(LC 39), 5=901(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1157/829, 2-16=-1094/843, 2-17=-1377/957, 17-18=-1380/957, 3-18=-1380/957,
3-19=-1380/957, 19-20=-1380/957, 4-20=-1378/957, 4-21=-1132/832, 5-21=-1152/812
BOT CHORD 1-9=-599/936, 8-9=-592/933, 7-8=-588/929, 5-7=-596/931
WEBS 2-8=-279/551, 3-8=-541/169, 4-8=-291/556
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 4-10-8,Exterior(2) 4-10-8 to 18-7-14,
Interior(1) 18-7-14 to 20-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=237, 5=244.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
T63
TrussType
Hip
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:292018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Zgj?V3v3OzLW4c4Gv4LfuyAUzQ3huIOlsGfLjszX3E0
Scale=1:35.1
0-1-130-1-13T1
T2
T3
B1
W1 W2 W1
HW1 HW1B1
1
2 3
4
5
8 7 6
15 16
17 18 19 20
21
22
23
5x6
3x41.5x4 3x4
6x6
4x6 5x6
6-10-8
6-10-8
12-3-8
5-5-0
18-10-8
6-7-0
19-2-0
0-3-8
6-10-8
6-10-8
12-3-8
5-5-0
18-10-8
6-7-0
19-2-0
0-3-8
20-4-12
1-2-12
0-7-25-0-55-2-20-7-25-0-58.0012
PlateOffsets(X,Y)-- [1:0-0-9,0-4-6], [1:0-0-5,0-0-7], [2:0-3-5,Edge], [3:0-3-0,0-2-3], [4:0-0-5,0-0-7], [4:0-0-9,0-4-6]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.84
0.60
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.11
-0.19
0.03
(loc)
8-11
8-11
1
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 68 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W2: 2x4SPF No.2
WEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 7-8-7 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=704/0-4-0(min. 0-1-8), 4=770/0-4-0(min. 0-1-10)
Max Horz1=-132(LC 14)
Max Uplift1=-178(LC 13), 4=-185(LC 12)
MaxGrav1=907(LC 39), 4=1029(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-15=-1128/738, 15-16=-1001/740, 2-16=-959/766, 2-17=-788/693, 17-18=-788/693,
18-19=-788/693, 19-20=-788/693, 3-20=-788/693, 3-21=-948/762, 21-22=-990/737,
22-23=-1012/734, 4-23=-1121/729
BOT CHORD 1-8=-510/802, 7-8=-502/797, 6-7=-502/797, 4-6=-517/793
WEBS 2-8=-257/253, 3-6=-259/252
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 6-10-8,Exterior(2) 6-10-8 to 16-6-7,
Interior(1) 16-6-7 to 20-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=178, 4=185.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V01
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:302018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-1sHNjPvi9HTMimfSTnsuR9jp3qXHdmpv5wOuFJzX3E?
Scale=1:22.0
T1 T2
B1 B2
W1
1
2
3
6 5
7
8 9
10
4
2x4
4x4
3x4
4x4 2x4
0-0-6
0-0-6
2-3-14
2-3-8
4-3-14
2-0-0
8-7-4
4-3-6
8-10-12
0-3-8
4-3-14
4-3-14
8-7-4
4-3-6
8-10-12
0-3-8
0-0-42-10-93-0-90-0-40-2-08.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.24
0.07
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.01
0.00
(loc)
1-5
1-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 28 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x6SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=145/2-3-8(min. 0-1-8), 3=184/6-6-14(min. 0-1-8), 5=252/6-6-14(min. 0-1-8), 4=-23/0-3-8(min. 0-1-8)
Max Horz1=-69(LC 12)
Max Uplift1=-45(LC 16), 3=-30(LC 17), 4=-48(LC 7)
MaxGrav1=167(LC 2), 3=206(LC 2), 5=279(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 4-3-14,Exterior(2) 4-3-14 to 7-3-14
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3, 4.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V02
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:312018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-V3rlwlwKwbbDKvEf0VN7zNF1NEtqMDn2JZ8SolzX3E_
Scale:1.5"=1'
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-6
0-0-6
2-10-4
2-9-14
3-1-12
0-3-8
1-6-14
1-6-14
2-10-4
1-3-6
3-1-12
0-3-8
0-0-41-0-90-0-48.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.02
0.05
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-12 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=77/3-1-0(min. 0-1-8), 3=77/3-1-0(min. 0-1-8)
Max Horz1=-19(LC 12)
Max Uplift1=-11(LC 16), 3=-11(LC 17)
MaxGrav1=87(LC 2), 3=87(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V03
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:322018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-zFP884xyhuj4x3oraCuMWao9OeBJ5g1CYDt?JBzX3Dz
Scale=1:17.3
T1
W1
B1
1
2
3
4
5
2x4
1.5x4
1.5x4
4-3-15
4-3-15
4-7-7
0-3-8
0-0-42-10-117.5012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.25
0.16
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=140/4-7-1(min. 0-1-8), 3=140/4-7-1(min. 0-1-8)
Max Horz1=99(LC 13)
Max Uplift1=-17(LC 16), 3=-50(LC 16)
MaxGrav1=159(LC 2), 3=175(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-6-2 to 3-6-2,Interior(1) 3-6-2 to 4-5-11zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V04
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:322018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-zFP884xyhuj4x3oraCuMWaoCceDK5g1CYDt?JBzX3Dz
Scale=1:10.6
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
2-2-6
2-2-6
2-5-14
0-3-8
0-0-41-6-117.5012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.05
0.03
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-5-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)1=65/2-5-7(min. 0-1-8), 3=65/2-5-7(min. 0-1-8)
Max Horz1=46(LC 13)
Max Uplift1=-8(LC 16), 3=-23(LC 16)
MaxGrav1=73(LC 2), 3=81(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V05
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:332018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-RRzWLQyaSCrxZDN18wQb2oLC31Rwq4DLntdYrezX3Dy
Scale=1:30.6
0-1-130-1-13T1
T2
T3
B1 B2
B3
ST1 ST11
2
3 4
5
9
8 7 6
10
11 12
13
14
15
3x4
5x6 6x6
4x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
3-5-10
3-5-10
12-6-5
9-0-10
12-9-13
0-3-8
3-5-10
3-5-10
4-4-2
0-10-8
5-9-2
1-5-0
12-6-5
6-9-2
12-9-13
0-3-8
4-6-104-8-71-9-111-9-114-6-108.0012
PlateOffsets(X,Y)-- [3:0-3-0,0-2-3], [4:0-3-5,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.71
0.52
0.20
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 44 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 12-9-13.
(lb)-Max Horz1=-118(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 6 except 9=-103(LC 16), 7=-418(LC 48)
MaxGravAllreactions 250 lb orless at joint(s) 1, 8, 7 except 5=302(LC 38), 9=309(LC 38), 6=755(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
BOT CHORD 2-9=-259/111
WEBS 4-6=-474/123
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-7-6,Interior(1) 3-7-6 to 4-4-2,Exterior(2) 4-4-2 to 5-9-2,
Interior(1) 10-0-1 to 12-4-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)TheFabricationTolerance at joint 4 = 12%
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Bearing at joint(s) 9 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 6 except
(jt=lb) 9=103, 7=418.
11)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 1.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V06
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:342018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-wdWuZmyCDWzoBNyEidxqb?tRTRsBZacV0XM6N4zX3Dx
Scale=1:26.0
T1
T2B1
B2
B3
ST1
1
2
3
4
7
6 5
8
9
10
2x4
4x4
2x4
1.5x4
1.5x4
1.5x4 1.5x4
0-0-6
0-0-6
1-5-10
1-5-4
8-6-5
7-0-10
8-9-13
0-3-8
1-5-10
1-5-10
3-0-10
1-7-0
8-6-5
5-5-10
8-9-13
0-3-8
0-0-43-10-21-9-110-0-41-9-118.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.47
0.20
0.06
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 27 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 8-9-1.
(lb)-Max Horz1=-104(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 4, 7, 6
MaxGravAllreactions 250 lb orless at joint(s) 1, 4, 7 except 5=304(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 6-0-10,Interior(1) 6-0-10 to 8-4-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 7, 6.
9)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 1.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V07
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:352018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-Oq4Gm6zq_p5foXXQFLS38DQhzrEPI1FeEB6fwWzX3Dw
Scale=1:17.8
W1
T1
T2
B1
ST1
1
2
3
5 4
1.5x4
1.5x4
4x4
2x41.5x4
5-0-10
5-0-10
5-4-2
0-3-8
1-7-0
1-7-0
5-0-10
3-5-10
5-4-2
0-3-8
1-5-72-6-20-0-48.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.17
0.07
0.03
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 16 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-2 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)5=37/5-3-12(min. 0-1-8), 3=110/5-3-12(min. 0-1-8), 4=187/5-3-12(min. 0-1-8)
Max Horz5=-74(LC 12)
Max Uplift5=-28(LC 16), 3=-24(LC 17), 4=-6(LC 17)
MaxGrav5=56(LC 29), 3=125(LC 2), 4=220(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57520-W1
Dansco Engineering, LLC
Date: 3/26/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801867-12T
Truss
V08
TrussType
Valley
Qty
1
Ply
1
1801867-12TDWH Jackson'sGrantLot176
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.MonMar2613:44:362018 Page1ID:eMggPZfMaCgNyhWFExcPqYyfJZj-s0eezS_Sl7DWQh6cp2zIgQzscFaf1U0nTrrCSzzX3Dv
Scale=1:11.4
0-1-13W1
T1
T2
B1
1 2
3
4
1.5x4
1.5x4 3x4
2x4
3-0-10
3-0-10
3-4-2
0-3-8
0-9-2
0-9-2
3-0-10
2-3-8
3-4-2
0-3-8
1-6-141-8-110-0-41-6-148.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.11
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 9 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-4-2 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)4=102/3-3-12(min. 0-1-8), 3=97/3-3-12(min. 0-1-8)
Max Horz4=-50(LC 14)
Max Uplift4=-20(LC 12), 3=-15(LC 17)
MaxGrav4=119(LC 35), 3=149(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard