Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M001.7
ProductsPlotID Length ProductPlies Net QtyFJ1 28-00-00 11-7/8" BCI® 5000s-1.8 1 2FJ2 26-00-00 11-7/8" BCI® 5000s-1.8 1 12FJ3 18-00-00 11-7/8" BCI® 5000s-1.8 1 11FJ4 14-00-00 11-7/8" BCI® 5000s-1.8 1 5FJ5 12-00-00 11-7/8" BCI® 5000s-1.8 1 8FJ6 10-00-00 11-7/8" BCI® 5000s-1.8 1 2FJ7 6-00-00 11-7/8" BCI® 5000s-1.8 1 3FJ8 4-00-00 11-7/8" BCI® 5000s-1.8 1 9BM1 18-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22BM2 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 24BM3 12-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22BM4 22-00-00 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 3 3BM5 24-00-00 1-3/4" x 24" VERSA-LAM® 2.0 3100 SP 2 2BM6 26-00-00 11-7/8" BCI® 5000s-1.8 1 1BBO1 10-00-00 3-08 x 1-00-00 Generic Material 1 1BBO2 10-00-00 3-08 x 1-00-00 Generic Material 1 1Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 10Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 21PBO1 10-00-00 5-04 x 3-08 Generic Material 1 1Connector SummaryPlotID Qty Manuf ProductHu1 12 USP THF20112Hu2 16 USP THF20112Hu3 12 USP THF20112E1E2E3E4E5E6E7E8E9E10E13E14E15E16E1712345E28E29BM2BBO1 BBO2BM3BM4BM5BM1BM2BM6Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Bk1FJ4FJ1FJ1FJ2910FJ8FJ3FJ3FJ5FJ7FJ6FJ2FJ4FJ8Bk1Bk11-06-101-07-031-06-031-08-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-0311-067-131-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-036-111-07-031-07-031-07-031-07-031-07-039-141-06-081-07-031-07-031-09-111-07-031-07-031-07-031-07-031-07-031-07-00Sheet: 1/1DWG:Order #:By:Date: 3/7/2018Scale: NTSBC FRAMER180300167TheGroveSecond FloorNOTE:ALLMEASUREMENTSTO BE VERIFIEDIN THE FIELD.Revisions:BY:cut, notch or drill flangesDO NOTDN01above to bearing below.Solid block all posts fromF0810-10d nails.Nail withFiller block.Install tight to top flange.mount hanger load exceeds 250 lbs.Backer block required where topBacker block (12" wide min.)Nail with 10- 10d nails.Install tight to top flange.Joist hangerF10NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FORDETAILS NOT SHOWNAll I- Joists and Versa-Lam BeamsMust Be Installed per TheBoise Cascade Installation Guide!-----------------------------Todo yo- los Rayos de Viguetas yVersa-Huída Deben Ser Instaladospor La Guía de la Instalación deCascada de Boise!FOR MULTIPLE PLY BEAMCONNECTION SEE THE"CONNECTION DIAGRAM"SUPPLIED WITH JOB PACKAGE