Loading...
HomeMy WebLinkAboutM002.7Toe Nail 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger2x4 Ledger2x4 Ledger2x4 Ledger 2x4 Ledger 2x4 Ledger LG1 LG4GG G1GMBMBPBP3P2P1PPGCJ1J3 CJ2J3CJ 2 X(6)M(6) P4(8)J1(5)J2(8)1-11-042-00-002-00-002-00-002-00-002-00-002-00-002-00-001-11-042-00-002-00-002-00-002-00-00 2-00-00 2-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-04-04 2-00-006-096-092-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-002-05-032-05-03LG2 LG3 B2 BB B B1 CCBB10 B11 B12 B13 B14 BG1 EB E E1CJ4CGBG B3 B4 B5 B6 B7 J5V2V1V3JUS26 JUS26 HUS26 JUS26 JUS26 JUS26 JUS26 JUS26B8(2)B9(8)J4(6) J4(3) 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-02-11 2-00-00 2-00-00 2-00-00 1-00-13 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-002-00-002-00-002-00-002-00-002-00-002-00-00 2-07-001-10-082-00-002-00-002-00-002-00-00Order #: 18030016 The Grove at Legacy - 7 7234 Broadacre Court Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are designed as individual building components to be incorporated into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified onthe placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem andfor the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss PlateInstitute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVALTHIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OROTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Drawn By: K. BronnenbergDate: 3/7/18 Model Berkeley Notes: 1) Valley trusses are designed to sit on sheathing. 2) Installation of all temporary and permanent braces is essential. See truss drawings, BCSI-1 Building Component Safety information and building designers requirements. 3) Provide solid bearing for beams and girders. See Code and/or building deigners requirements. 4) Truss are NOT designed to be field modified unless notedotherwise. If any alterations are to be considered ALWAYS consult aqualifiedtrussdesignerorengineerBEFOREmakinganyalterations. 5) Add/remove overhangs as needed. Multi-Ply Girder Truss:See drawing of multi-ply girders for fastening pattern to connect plys so they act as one. All plys must be fastened together before supported trusses or framing is attached to girders. Hangers:Install all hangers per manufacturers requirements.