Loading...
HomeMy WebLinkAboutM001.4Products PlotID Length Product Plies Net Qty FJ1 36-00-00 11-7/8" BCI® 5000s-1.8 1 9 FJ2 22-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ3 20-00-00 11-7/8" BCI® 5000s-1.8 1 1 FJ4 18-00-00 11-7/8" BCI® 5000s-1.8 1 18 FJ5 16-00-00 11-7/8" BCI® 5000s-1.8 1 1 FJ6 10-00-00 11-7/8" BCI® 5000s-1.8 1 1 FJ7 8-00-00 11-7/8" BCI® 5000s-1.8 1 7 FJ8 6-00-00 11-7/8" BCI® 5000s-1.8 1 7 BM1 22-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 4 4 BM2 20-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM3 18-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM4 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 3 3 BM5 10-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM6 8-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 1 1 BM7 18-00-00 11-7/8" BCI® 5000s-1.8 2 2 BM8 14-00-00 11-7/8" BCI® 5000s-1.8 2 2 BM9 10-00-00 11-7/8" BCI® 5000s-1.8 2 2 BM10 4-00-00 11-7/8" BCI® 5000s-1.8 1 3 BM11 8-00-00 11-7/8" AJS® 24 1 1 BBO1 18-00-00 3-08 x 1-00-00 Generic Material 1 1 BBO3 10-00-00 3-08 x 1-00-00 Generic Material 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 11 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 57 Connector Summary PlotID Qty Manuf Product Hu1 2 USP SKH2024L Hu2 2 USP SKH2024R Hu3 1 USP SKH410R Hu4 1 USP THF20112-2 Hu5 2 USP THF20112 Hu6 9 USP THF20112 Hu7 1 USP THF20112 Hu8 3 USP THF20112 Hu9 1 USP THF20112 Hu10 1 USP THF20112 Hu11 1 USP THF35112 BM5 BM2 BM3 BBO1 BM11 BM8 BM7 BM1 BM10 BM9 BM4 BBO3 BM6 BM10 BM10 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Bk1 Ca1 Ca1 FJ5 FJ8 FJ7 FJ8 FJ7 FJ6 FJ3 Hu4 Hu8 Hu10 Hu7 Hu9 Hu11 Hu3 6 Hu6 Hu5 Hu1 Hu2 Hu6 Hu8 FJ4 FJ1 FJ8 FJ7 FJ2 Bk1 Bk1 Bk1 Bk1 Bk1 Bk1 Bk1 Bk1 Bk1 1-02-07 1-07-03 9-05 1-01-11 1-07-03 1-07-03 1-07-03 1-07-03 8-03 1-02-00 1-04-03 1-07-03 1-07-03 1-07-03 8-03 1-02-00 1-04-03 1-07-03 1-02-00 1-10-06 1-07-03 1-07-03 11-03 1-02-00 1-01-03 1-07-03 1-09-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 6-12 1-00-07 1-07-03 1-07-03 1-06-02 1-07-03 1-07-03 1-07-03 1-07-03 7-09 1-01-06 1-07-03 1-07-03 1-02-03 1-07-03 2-00-03 1-07-03 8-06-00 7-03-08 Sheet: 1/1 DWG: Order #: By: Date: 3/22/2018 Scale: NTS BC FRAMER 18030079 4TheGrove Second Floor NOTE: ALL MEASUREMENTS TO BE VERIFIED IN THE FIELD. Revisions: BY: DN01 DO NOT cut, notch or drill flanges above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE