Loading...
HomeMy WebLinkAboutM002.4Toe Nail 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger 2x4 Ledger Toe Nail Toe Nail EB EB GB HB E(4) E1(4) E(2) G(6) H(9) 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 LG1 LG3 LG2 A2 A1 BB B2 B3 B4 CB CG DB D BG AG1 J J J1 J3 FB V2 V1 V11 V10 JUS26 JUS26 JUS26 JUS26 JUS26 A(5) B1(2) B(12) B1(7) C(2) J2(7) J2(3) F(2) 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-11-00 1-02-00 1-00-00 17-11-00 2-00-00 2-00-00 1-04-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-03-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 4-09-00 2-00-00 1-06-00 3-03-07 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-01-10 1-06-00 Order #: 17090165 The Grove at Legacy - 4 7228 Broadcare Court Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified on the placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVAL THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Date: 3/20/18 Drawn By: K. Bronnenberg Model Brooklyn Notes: 1) Valley trusses are designed to sit on sheathing. 2) Installation of all temporary and permanent braces is essential. See truss drawings, BCSI-1 Building Component Safety information and building designers requirements. 3) Provide solid bearing for beams and girders. See Code and/or building deigners requirements. 4) Truss are NOT designed to be field modified unless noted otherwise. If any alterations are to be considered ALWAYS consult aqualifiedtrussdesignerorengineerBEFOREmakinganyalterations. 5) Add/remove overhangs as needed. Multi-Ply Girder Truss: See drawing of multi-ply girders for fastening pattern to connect plys so they act as one. All plys must be fastened together before supported trusses or framing is attached to girders. Hangers: Install all hangers per manufacturers requirements.