HomeMy WebLinkAboutM002.4Toe Nail
2x4 Ledger 2x4 Ledger
2x4 Ledger
2x4 Ledger
2x4 Ledger
2x4 Ledger 2x4 Ledger
2x4 Ledger 2x4 Ledger
Toe Nail
Toe Nail
EB
EB
GB
HB
E(4) E1(4) E(2)
G(6)
H(9)
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
LG1
LG3
LG2
A2
A1
BB
B2
B3
B4
CB
CG
DB
D
BG
AG1
J
J
J1
J3
FB
V2
V1
V11
V10
JUS26
JUS26
JUS26
JUS26
JUS26
A(5)
B1(2) B(12) B1(7)
C(2)
J2(7)
J2(3)
F(2)
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-11-00
1-02-00
1-00-00
17-11-00
2-00-00
2-00-00
1-04-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-03-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
4-09-00
2-00-00
1-06-00
3-03-07
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-01-10
1-06-00
Order #: 17090165
The Grove at Legacy - 4
7228 Broadcare Court
Carmel, Indiana 46033
Carter Lumber
2901 N. Morton St.
Franklin, Indiana 46131
(317) 346-1300
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated
into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified on
the placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem and
for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of
the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate
Institute, 583 D'Onifrio Drive; Madison, WI 53179.
SHOP DRAWING APPROVAL
THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR
OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL
BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU.
REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________
Pyatt Builders
Scale: NTS Date: 3/20/18 Drawn By: K. Bronnenberg
Model
Brooklyn
Notes:
1) Valley trusses are designed to sit on sheathing.
2) Installation of all temporary and permanent braces is essential.
See truss drawings, BCSI-1 Building Component Safety information
and building designers requirements.
3) Provide solid bearing for beams and girders. See Code and/or
building deigners requirements.
4) Truss are NOT designed to be field modified unless noted
otherwise. If any alterations are to be considered ALWAYS consult
aqualifiedtrussdesignerorengineerBEFOREmakinganyalterations.
5) Add/remove overhangs as needed.
Multi-Ply Girder Truss:
See drawing of multi-ply girders for fastening pattern to connect plys
so they act as one. All plys must be fastened together before supported
trusses or framing is attached to girders.
Hangers:
Install all hangers per manufacturers requirements.