Loading...
HomeMy WebLinkAbout Right-of-Way PermitCITY OF CARMEL RIGHT-OF-WAY PERMITP e",) �- �a PERMIT NUMBER: e/S/' TODAY'S DATE: '2- fb `4— ESTIMATED DATE OF WORK: `/_/ •.ef - APPLICANT (Person doing the work) �lQ/+�! tr 2X Ca�u �/0-7 (-' %%/ &,& COMPANY: �/t M/'-c r ADDRESS: f Q G I ,,P ti• fi b• �. �7 S �. fipa c h 15a,4, PHONE: EMAIL PERMIT TO: itr ex G4C-u CUSTOMER: tt�df-ytley ADDRESS: /7)j J WC <CCkv'-t- =91MI N ADDRESS OF PROJECT: y (/ 9> DESCRIPTION OF WORK (check all that apply ROAD BORE E] CONSTRUCTION ENTRANCE ❑ STREET CUT ❑ OTHER ❑ DESCRIPTION: TYPE OF SURFACE CUT (if applicable): muS w� �GU�rt` ) DRIVEWAY REPLACEMENT ❑ LANE CLOSURE ❑ ROAD CLOSURE /pF ❑ o J�6Ec�j��D 0 1 � 3 *NOTE: OPEN CUTS IN PAVEMENT REQUIRE BOARD OF PUBLIC WORKS (BPW) hff�la USE OF HEAVY EQUIPMENT YES NO �/ DRAWING ATTACHED YES NO ❑ 9�.�/` �` *NOTE: ON REVERSE SIDE OF THIS PERMIT, PROVIDE NAMES AND CONTACTS OF ALL SUB -CONTRACT RS INn SURETY BOND. Please see Item #1 of the Right -of -Way Conditions. BONDING COMPANY: /-% -4nc/ 4h�'I r.1.1 BONDING NUMBER: IV S/Q 4i42e ;l EXPIRATION DATE: J(,//may 27 As applicant for this Right -of -Way Permit, l understand and agree to al/ of the specifications and conditions listed n the attached sheet. VC 4"r' �w�L _ (Applicant's Signature) (Print Name) PERMIT GRANTED BY: � r� -� DATE ISSUED: / (City Official) COMMENTS: REPAIR WORK INSPECTED AND APPROVED I have inspected the repair of the above right-of-way and find it to be completely satisfactory. (City Inspector) (Date Released) merit g. Show how area will drain after pool is constructed. Show drainage flow arrows, or submit two (2) copies of cross sections through pool and adjacent ground area, OR existing and proposed contours with elevations for pool and deck and disturbed area around the pool. !�. Show all pool accessory structures: Heater, filter, automatic pool cover, and any other equipment. Indicate any automatic fill device or backflow preventer. i. Show ENTIRE deck area and all dimensions on all sides. j. Show any retaining walls, and detail their construction. 9. RIGHT-OF-WAY PERMIT: For pools being built within the City limits, a copy of your approved/issued Right -of - Way permit from the City of Carmel Department of Engineering is required. 10. THE COLOR PATTERN, OR FINISH OF THE POOL INTERIOR shall not obscure the existence or presence of objects or surfaces within the pool. The floor of all pools shall be white, light colored, or light colored patterns in order to facilitate the identification of any objects within the pool. (675MC20-2-3; Effective 10/11/01) 11. ORDINANCES & REGULATIONS: k. In accordance with County Ordinance, the minimum setback requirement for a swimming pool to the septic system is fifty (50) feet, if there are suction water lines. However, if the swimming pool is a completely sealed system, the setback requirement is ten (10) feet from the swimming pool to any part of the septic system. I. Pools, pool decks, and/or related pool equipment CANNOT be located within any type of easements, or closer than three (3) feet to any easement, and no closer than ten (10) feet to any property line or septic tank or leach field. RESIDENTIAL POOLS: TWO (2) sets of the above plan information is required. COMMERCIAL/INSTITUTIONAL POOLS: THREE (3) sets of the above plan information is required. 1. Submit for and obtain the appropriate approvals by: the City of Carmel Plan Commission, Board of Zoning Appeals,Technical Advisory Committee, the Dept. of Community Services, and/or approvals required by any other City, County, or State agency that may have requirements for this project. 2. Submit for and obtain a Construction Design Release (CDR) from the State of Indiana Department of Homeland Security, Division of Fire & Building Safety. If the project does not require a CDR, write a statement to that effect, using one of the following as a reason: 1) On a specific date a specific reviewer said that a CDR is not required. 2) Specific exemption/s state/s that a CDR is not required. Exemptions are covered under the General Administrative Rule (GAR) 675 IAC 12-6-4. If the project does not require a CDR, under Carmel City Code, Chapter 7, it may still require a permit from the Department of Community Services, Division Building & Code Services (BCS). Please contact the State of Indiana Department of Homeland Security, Division of Fire & Bui(ding Safety, Plan Review with any questions: (317) 232-6422. of Fir' �0nlf�a�� A �,�N���OT f�,,�, /,o