HomeMy WebLinkAboutMechanicalSECTION 15990
TESTING, START-UP, BALANCING, ETC.
GENERAL: CONDUCT TESTS UPON COMPLETION OF THE HEATING AND VENTILATION
INSTALLATIONS, AND AT TIMES AS DESIGNATED BY THE ARCHITECT. FURNISH ALL
NECESSARY PERSONNEL AND TEST INSTRUMENTS.
DUCTWORK: TEST ALL SUPPLY, RETURN AND EXHAUST DUCTS, PLENUMS, AND
CASINGS AND MAKE SUBSTANTIALLY AIRTIGHT BEFORE COVERING WITH EXTERNAL
INSULATION OR CONCEALING IN MASONRY. SUBSTANTIALLY AIRTIGHT SHALL BE
CONSTRUED TO MEAN THAT NO AIR LEAKAGE IS NOTICEABLE THROUGH THE SENSES
OF FEELING OR HEARING AT JOINTS. TEST SUPPLY DUCTWORK UNDER THE POSITIVE
PRESSURE FOR THE RESPECTIVE SYSTEM. TEST RETURN AND EXHAUST DUCTS,
PLENUM AND CASING UNDER A POSITIVE PRESSURE OF 2 INCH WG. VACUUM DEAN
DUCTS, PLENUMS, CASING AND COILS. DEMONSTRATE OPERATION OF FIRE DAMPERS
BEFORE INSTALLING FUSIBLE LINKS. CHECK THAT FLEXIBLE CONNECTIONS ARE
LOOSE AND NOT TRANSMITTING VIBRATION.
PERFORMANCE TESTS: AFTER CLEANING, BALANCING, AND TESTING ARE COMPLETED
AS SPECIFIED, TEST EACH SYSTEM AS A WHOLE TO SEE THAT ALL ITEMS PERFORM
AS INTEGRAL PARTS OF THE SYSTEM AND THAT TEMPERATURES AND CONDITIONS
ARE EVENLY CONTROLLED THROUGHOUT THE BUILDING. MAKE CORRECTIONS AND
ADJUSTMENTS AS NECESSARY TO PRODUCE THE INDICATED CONDITIONS.
AFTER BUILDING IS OCCUPIED, MAKE MINOR ADJUSTMENTS AS REQUESTED BY THE
OWNER.
BALANCING: CHECK AIR FLOW AT SUPPLY, RETURN AND EXHAUST GRILLES AND
DIFFUSERS AND OUTSIDE AIR INTAKES WITH A RECENTLY CALIBRATED
DIRECT-READING VELOCITY INSTRUMENT; ADJUST SYSTEMS TO DELIVER, RETURN OR
EXHAUST AIR QUANTITIES WITHIN 5 PERCENT OF THE INDICATED AMOUNTS.
PROVIDE INSTRUMENTS AND OTHERWISE ASSIST ENGINEER IN CHECKING THE
BALANCING AT FINAL INSPECTION.
TEST DATA: ALL TEST AND BALANCE SHALL BE CONDUCTED BY A SEPARATE
LICENSED AIR BALANCE CONTRACTOR RECOGNIZED BY THE ASSOCIATED AIR
BALANCE COUNCIL. ALL TESTS SHALL BE CONDUCTED IN ACCORDANCE WITH AABC
GUIDELINES. TWO WEEKS PRIOR TO FINAL INSPECTION, SUBMIT TYPEWRITTEN
SCHEDULES OF READINGS TAKEN DURING THE BALANCING AND TESTING
OPERATIONS INDICATING THE REQUIRED OR SPECIFIED READING, THE FIRST
READING TAKEN, AND FINAL BALANCED READING FOR THE FOLLOWING ITEMS:
(1). FANS -SIZE, TYPE, FAN SPEED IN RPM, EXTERNAL STATIC WATER PRESSURE, AIR
QUANTITY CFM, AND MOTOR LOAD IN AMPERES.
(2). AIR OUTLETS AND INLETS -SIZE, VELOCITY IN FPM, AND AIR QUANTITY IN CFM.
(3). COILS OR HEAT EXCHANGERS -SIZE, FACE VELOCITY IN FPM; AIR TEMPERATURE
ENTERING COIL AND AIR TEMPERATURE LEAVING COIL, WET-BULB AND DRY-BULB
DEGREES F.
(4). DUCTS: SIZE, VELOCITY IN FPM, STATIC PRESSURES, AND AIR QUANTITY IN CFM.
END OF SECTION 15990
SECTION 15932
DIFFUSERS, REGISTERS & GRILLES
PRODUCTS SHALL BE AS SCHEDULED ON THE DRAWINGS. SELECTIONS ARE BASED
ON THE MANUFACTURERS SCHEDULED. UNITS BY OTHER MANUFACTURERS SHALL BE
RE-SELECTED IN ACCORDANCE WITH PUBLISHED PERFORMANCE DATA TO PROVIDE
THE AIR PATTERNS, VELOCITIES, PRESSURE DROPS, AND SOUND CHARACTERISTICS
EQUAL TO THE UNIT SCHEDULED. THE RE-SELECTION SHALL BE CERTIFIED BY A
LETTER SUBMITTED AS PART OF THE SHOP DRAWING SUBMITTAL. UNITS EQUIVALENT
TO THOSE SCHEDULED BY TITUS, KRUEGER, HART & COOLEY OR OTHER PRIOR
APPROVED MANUFACTURERS ARE ACCEPTABLE.
COORDINATE EXACT LOCATION WITH LIGHTING FIXTURES, STRUCTURE AND OTHER
OBSTRUCTIONS. IF IN DOUBT ABOUT EXACT LOCATION, COORDINATE WITH
ARCHITECT.
INSTALL IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS, PARALLEL TO THE
LINES OF THE BUILDING, AND TIGHT AGAINST THE FINISHED SURFACE. MARGINS TO
FULLY OVERLAP OPENINGS IN SURFACES SO THAT OPENINGS ARE NOT VISIBLE FROM
THE FINISHED ROOM. UNITS SHALL BE ADEQUATELY SECURED TO PREVENT
T-1
EF
T
RTU-1
197.5CFM
197.5CFM
RTU-1
10"Ø 12"Ø 14"Ø 16"Ø 18"Ø 20"Ø 24"Ø 14"Ø
197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM
197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM 197.5CFM
DRAWING NUMBER
CHECKED BY: WLW
DRAWN BY:
PROJECT: HF1802
REVISION:
REVISION:
E
D
R
I
S
T
E
STATE OF
No AR 1 1 1 01 08
G
E
R
R
N
W
A
R
L
N
N
Y
W
E
C
R
H
T
C
E
I
T
A
A
N
N
D
I
I
A
R
E
D
E
T
S
I
G
E
R
THIS DOCUMENT, THE IDEAS AND
DESIGNS INCORPORATED HEREIN,
AS AN INSTRUMENT OF
PROFESSIONAL SERVICE, IS THE
PROPERTY OF WARNER
ARCHITECTURAL ASSOCIATES AND
IS NOT TO BE USED, IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT
WITHOUT THE WRITTEN
AUTHORIZATION OF WARNER
ARCHITECTURAL ASSOCIATES, INC
DATE: 02/15/2018
DATE: 02/15/2018
14598 CLAY TERRACE BLVD
#160, CARMEL, IN 46032
WYNN L. WARNER, RA
1. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND
START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT
OR ENGINEER OF ANY CONFLICTS OR DISCREPANCIES WITH
THE DRAWINGS. ANY REQUIRED MODIFICATIONS NOT
IDENTIFIED BEFORE START OF CONSTRUCTION SHALL BE MADE
AT NO ADDITIONAL COST TO THE OWNER.
2. CONTRACTOR SHALL COORDINATE EXACT THERMOSTAT
LOCATION WITH OWNER PRIOR TO INSTALLATION.
3. NEW RTU'S & ROUND DUCT TO BE INSTALLED TO MATCH NEW
LAY-OUT.
COORDINATION NOTES
(APPLIES TO THIS SHEET ONLY)
HVAC LEGEND
FIXTURE SYMBOL FIXTURE DESCRIPTION
THERMOSTAT (VERIFY LOCATION W/ OWNER)
2X2 HVAC SUPPLY DIFFUSER
(MANUAL DAMPER WHERE REQUIRED)
HVAC SUPPLY DIFFUSER
(MANUAL DAMPER WHERE REQUIRED)
RETURN AIR GRILLE
EXHAUST FAN
(MANUAL DAMPER WHERE REQUIRED)
ROOFTOP UNIT (RTU)
* PROVIDE DUCT INSULATION IN ALL DUCTWORK & REUSE ALL
EXISTING DUCTWORK WHERE APPLICABLE. DISPOSE OF DUCT THAT
IS NOT ABLE TO BE REUSED
T
EF
AIR FLOW
4"Ø EXHAUST
ALL DUCTWORK SHALL BE
MINIMUM 26 GAUGE G-90
GALVANIZED SHEET METAL.
CONTRACTOR SHALL REFER TO
SMACNA 2" PRESSURE CLASS
CONSTRUCTION DETAILS &
METHODS FOR ALL LOW
PRESSURE ROUND DUCTWORK
BACK DRAFT
ASSEMBLY
FAN ASSEMBLY W/ INTERNAL
VIBRATION ISOLATORS
UNIT SHALL HAVE
INTERNAL PLUG-IN
DISCONNECT
MOUNTING ANGLES
ACT CEILING
OFF WHITE
METAL GRILLE
1" INSULATED
BOX
MANUAL
VOLUME
CEILING DAMPER
EXHAUST GRILLE
NEW EXHAUST DUCT
THRU ROOF
A.T.R.
PIPE HANGER RING
SUPPLY AIR
SUPPLY DUCT-ROUND DOUBLE
WALLED INSULATED DUCT
AIR FLOW
SCOOP
MAIN
SUPPLY
DUCT
DOUBLE
DEFLECTION
DIFFUSER
DAMPER
(WHERE
REQUIRED)
RMM
MECHANICAL PLAN &
DETAILS
M2 SCALE: M2
1 MECHANICAL PLAN
1/4" = 1'-0"
N
PLAN NORTH
M2 SCALE:
4 ROUND PIPE HANGER
NTS M2 SCALE:
5 DIFFUSER DEFLECTION DETAIL
M2 SCALE: NTS
3 EXHAUST THRU ROOF DETAIL
M2 SCALE: NTS
2 EXHAUST FAN DETAIL
NTS
ALL DOCUMENTS ARE TO BE BUILT AND BID BASED ON THE MOST
STRINGENT CODES. G.C. TO VERIFY THAT ALL CONSTRUCTION IS
BUILT TO CODE AND THAT BIDS PROVIDED INCLUDE THE MOST
RECENT CODE PER THE MUNICIPALITY. FAILURE TO DO SO WILL
RESULT IN THE RELIEF OF LIABILITY OF THE OWNER, ARCHITECT,
ENGINEER, AND DESIGNER. DRAWINGS ARE PROVIDED AS
REFERENCE AND NOT ALL CONDITIONS ARE DETAILED. IF THERE
ARE ANY DISCREPANCIES IN THE PLANS AND THE FIELD CONDITIONS
THE CONTRACTOR MUST NOTIFY THE ARCHITECT OR ENGINEER OF
RECORD. FAILURE TO DO SO WILL RESULT IN A DENIAL OF CHANGE
ORDER REQUEST.
THIS DESIGN IS A SUGGESTIVE DESIGN FOR OPTIMUM
PERFORMANCE WITH THE EXISTING ROOF TOP UNIT. G.C. TO
VERIFY NECESSARY CHANGES TO THE EXISTING DUCTWORK
AND IF THERE IS A BETTER CONFIGURATION TO SAVE ON
COSTS THEN WE ACCEPT AN ALTERNATE DESIGN FOR THIS
TENANT SPACE.
04/12/18
Nick Mishler
MOVEMENT WHEN DAMPERS ARE ADJUSTED. DAMPERS SHALL BE MOUNTED SO THAT
DAMPER BINDING DOES NOT OCCUR. EXCEPT AS OTHERWISE APPROVED BY THE
ARCHITECT OR REQUIRED BY FIELD CONDITIONS, UNITS SHALL BY SYMMETRICAL,
EQUIDISTANT FROM WALLS OR OTHER MAJOR BUILDING LINES AND SYMMETRICAL IN
CEILING GRIDS.
COLOR OF LOUVERS, GRILLES, REGISTERS AND DIFFUSERS SHALL BE SELECTED BY
THE ARCHITECT.
ANY MATERIALS VISIBLE THROUGH A GRILLE, REGISTER, OR DIFFUSER SHALL BE
PAINTED FLAT BLACK.
FLEXIBLE DUCTS: SHALL BE EQUAL TO GENFLEX TYPE SFR-25A AND HAVE
CONSTRUCTION CONFORMING TO UL-181 CLASS 1 AIR DUCT AND NFPA 90A AND 90B.
THE DUCT SHALL HAVE A CONTINUOUS 2 PLY ALUMINUM LAMINATE FULL INTERNAL
LINER; ENCAPSULATED, ZINC COATED, HIGH CARBON STEEL HELIX; A THICK BLANKET
OF LASS FIBER INSULATION PROVIDING AN OVERALL THERMAL CONDUCTANCE OF
0.23 BTU/HR./SQ. FT./IN./DEGREE F; AND A DURABLE, SCUFF RESISTANT REINFORCED
METALIZED COPOLYMER VAPOR BARRIER JACKET.
FLEXIBLE DUCT SHALL BE FASTENED TO THE ROUND FITTINGS AND TAKEOFF
FITTINGS WITH METAL
SECTION 15010
CODES & STANDARDS
ALL MATERIALS, EQUIPMENT, AND INSTALLATION SHALL COMPLY WITH APPLICABLE
NFPA, ASME, OSHA, UMC, UBC, UPC AND SBCCI REQUIREMENTS, WITH LOCAL
PLUMBING AND GAS CODES, AND OTHER LOCAL ORDINANCES AND CODES. WHERE
CONFLICTS OCCUR BETWEEN A CODE AND CONTRACT DRAWINGS OR
SPECIFICATIONS, MOST STRINGENT REQUIREMENTS SHALL APPLY.
LICENSES, FEES & PERMITS
PROVIDE ALL PERMITS, PAY ALL FEES, AND ARRANGE FOR INSPECTIONS AS
REQUIRED BY LOCAL AND STATE AUTHORITIES. FURNISH ENGINEER, ARCHITECT AND
OWNER CERTIFICATE OF FINAL INSPECTION AND APPROVAL FROM LOCAL BUILDING
INSPECTORS.
PRE-BID COORDINATION
REVIEW THE REQUIREMENT OF OTHER SECTIONS OF THESE SPECIFICATIONS TO
DETERMINE STRUCTURAL CONDITIONS, FINISH CONDITIONS, AND OTHER CONDITIONS
WHICH MAY AFFECT WORK SPECIFIED HEREIN.
BIDDERS SHALL VISIT SITE AND BECOME ACQUAINTED WITH ALL JOB CONDITIONS. NO
CONSIDERATION WILL BE GIVEN AFTER CONTRACT FOR ALLEGED
MISUNDERSTANDING REGARDING UTILITY CONNECTIONS PERMITS, FEES, ETC.
POST-BID COORDINATION
SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH THE GENERAL CONDITIONS. SHOP
DRAWINGS SHALL BE CLEARLY IDENTIFIED, USING SAME NOMENCLATURE USED ON
DESIGN DRAWINGS. SUBMITTALS SHALL BE BOUND IN COMPLETE SETS AND SHALL BE
SUBMITTED AT ONE TIME. INCOMPLETE SUBMITTALS SHALL BE HELD WITHOUT
REVIEW. CONTROL DIAGRAMS SHALL INCLUDE EQUIPMENT INTERNAL WIRING.
ANCHOR BOLTS, SLEEVES, INSERTS, AND SUPPORTS REQUIRED FOR ITEMS
SPECIFIED HEREIN AND NOT SPECIFICALLY INDICATED TO BE PROVIDED BY OTHER
SHALL BE FURNISHED HEREIN, AND INSTALLED UNDER THE SECTION SPECIFYING THE
MATERIAL IN WHICH THEY ARE LOCATED. PROVIDE EXACT LOCATIONS UNDER THIS
SECTION.OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION IN PIPES AND DUCTS
SHALL BE MADE AS REQUIRED TO MAINTAIN PROPER HEADROOM, CLEARANCES, AND
SLOPE. PROVIDE TRAPS, VENTS, AND FITTINGS AS REQUIRED.
INSTALLATION AND ARRANGEMENT OF WORK SHALL PERMIT REMOVAL OF PARTS
REQUIRING PERIODIC REPLACEMENT OR MAINTENANCE AND ACCESS FOR
INSPECTION AND SERVICING.
ACCESS PANELS OR DOORS IN WALLS, FLOORS, CEILINGS, OR OTHER CONSTRUCTION
SHALL BE FURNISHED HEREIN AND INSTALLED UNDER THE SECTION SPECIFYING THE
MATERIAL IN WHICH THE PANELS ARE TO BE INSTALLED.
WARRANTY
GUARANTEE IN WRITING TO MAKE GOOD WITHOUT COST ANY DEFECTS IN MATERIALS
AND WORKMANSHIP WITHIN ONE YEAR FROM THE DATE OF ACCEPTANCE OF
PROJECT. PROVIDE FREE MAINTENANCE AND SERVICE DURING THE GUARANTEE
PERIOD. SEE OTHER SECTIONS FOR SPECIAL GUARANTEE OF REFRIGERATION
COMPRESSORS, WATER HEATERS, HEAT EXCHANGERS, ETC.
THE CONTRACTOR SHALL, WITHOUT FURTHER INSTRUCTIONS, MAKE ONE
"GOOD-WILL" SERVICE TRIP TO THE JOB 30 TO 45 DAYS AFTER COMPLETION FOR THE
EXPRESS PURPOSE TO CHECK OPERATION OF ALL PLUMBING ITEMS AND REPLACE
ALL LEAKING BIBB WASHERS AND CHECK ALL TRAPS FOR LEAKAGE.
WORKMANSHIP: FIRST CLASS AND IN ACCORDANCE WITH BEST PRACTICE. PIPE
SHALL BE CUT CLEAN, PROPERLY REAMED, THREADED OR SOLDERED, ERECTED
PLUMB AND SECURE. MAKE CHANGES IN PIPE SIZE WITH REDUCING FITTINGS
WITHOUT THE USE OF BUSHINGS. WORK SHALL BE EXECUTED BY EXPERIENCE
MECHANICS AND SHALL PRESENT A NEAT APPEARANCE. INSTALL EQUIPMENT IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
AT ALL STAGES OF INSTALLATION, PROTECT PIPE OPENINGS, FIXTURES, DUCT WORK,
AND EQUIPMENT AGAINST THE ENTRANCE OF FOREIGN MATERIALS, AND FROM
DAMAGE BY THE ELEMENTS, MORTAR, PAINT, ETC. MAINTAIN A CLEAN WORK AREA
AND REMOVE TRASH, DEBRIS, ETC. AS CONNECTED TO MECHANICAL WORK.
FACTORY FINISHES:
MANUFACTURER'S STANDARD UNLESS OTHERWISE STATED. SUBMIT COLOR CARDS
FOR SELECTION WHERE CHOICE EXISTS.
SECTION 15891
SHEET METAL DUCTWORK
SIZES: TAKE MEASUREMENTS AT JOB AND FIT WORK INTO AVAILABLE SPACE; REPORT
ANY UNWORKABLE CONDITIONS ENCOUNTERED. UNLESS OTHERWISE APPROVED,
CONFORM TO DIMENSIONS INDICATED. DUCT DIMENSIONS SHOWN INDICATE NET
FREE AREA AFTER INSTALLATION OF INDUCT LINER; INCREASE SIZES INDICATED TO
ACCOUNT FOR THIS.
GENERAL FABRICATION: CONSTRUCT AND ERECT IN A WORKMANLIKE MANNER,
MEETING REQUIREMENTS OF THE LATEST SMACNA 'LOW VELOCITY AND DUCT
CONSTRUCTION STANDARDS: AND NFPA CODE 90A. ASSEMBLE AND ANCHOR SO AS
TO BE COMPLETELY FREE FROM VIBRATION AND DRUMMING UNDER ALL CONDITIONS
OF OPERATION.
EXPOSED DUCTWORK: INSTALL TIGHT AGAINST THE WALL AND/OR CEILING WITH
DRIVE SLIP JOINTS.
TURNS AND TRANSITIONS: FABRICATE TURNS WITH AN INSIDE RADIUS EQUAL TO
WIDTH OF DUCT. AT 90 DEGREE TURNS CONTRACTOR MAY SUBSTITUTE SQUARE
ELBOWS, WITH STANDARD FACTORY-MADE, MULTIPLE, DOUBLE-BLADE
CONSTRUCTED VANES. AVOID ABRUPT CHANGES IN SHAPE, WITH A SLOPE OF 5:1 THE
MINIMUM ALLOWED.
UNAVOIDABLE OBSTRUCTIONS: WHERE STRUCTURAL ELEMENTS OR PIPES MUST
PASS THROUGH A DUCT, PROVIDE TWO- PIECE STREAMLINERS, AND ENLARGE DUCT
TO COMPENSATE FOR NET LOSS OF AREA. ROUND PIPES AND RODS SMALLER THAN 3
INCHES NEED NOT HAVE SPECIAL TREATMENT. NOTE: THIS PROVISION WILL NOT BE
USED TO JUSTIFY OBSTRUCTIONS WHICH CAN BE AVOIDED.
DUCT INSTRUMENT TEST HOLES: PROVIDE FOR EACH SYSTEM FOUR TEST HOLES
(TWO IN SUPPLY DUCT AND TWO IN RETURN AIR PLENUM) AT OPPOSITE ENDS NEAR
AIR HANDLING UNITS WITH SCREWED CAPS.
SECTION 15250
DUCT INSULATION
GENERAL: INTERNALLY INSULATE SUPPLY AIR, OUTSIDE AIR INTAKE AND RETURN AIR
DUCTS AND PLENUMS, WITH 1.5 IB. DENSITY FLEXIBLE DUCT LINER, LINER SHALL BE
IMPREGNATED GLASS FIBER, WATER REPELLENT, VERMIN PROOF, FIREPROOF AND
MOLD RESISTANT, WITH SURFACE IN AIR STREAM VINYL OR NEOPRENE COATED.
THERMAL CONDUCTIVITY SHALL BE .26 BTU PER HOUR, PER INCH THICKNESS, PER
SQUARE FOOT, PER DEGREE F. TEMPERATURE DIFFERENCE AT 75 DEGREES F. MEAN
TEMPERATURE.
THICKNESS: 2.0 INCHES ON ALL SUPPLY AIR DUCTS ABOVE CEILINGS DIRECTLY
BELOW ROOFS AND IN EQUIPMENT ROOMS. 2.0 INCHES ON ALL SUPPLY AIR DUCTS
BELOW CONDITIONED FLOOR CEILINGS, IN CEILING RETURN AIR PLENUMS, ALL
OUTSIDE AIR DUCTS AND ALL RETURN AIR DUCTS.
APPLICATION: CEMENT INSULATION TO THE ENTIRE SURFACE OF THE SHEET METAL
WITH BENJAMIN FOSTER NO. 81-99 ADHESIVE BEFORE THE METAL IS BROKEN, IN
ADDITION, SECURE ALL SHEETS WIDER THAN 24 INCHES WITH SHEET METAL SCREWS
AND WASHERS OR STUD PINS AND CLIPS 16 INCHES OCEW. JOINTS SHALL BE
STRAIGHT AND SMOOTH AND SHALL BE BUTTERED WITH ADHESIVE TO PREVENT
EROSION AND IMPROVE AIR FLOW.
EXTERNAL DUCT INSULATION: INSULATE SHORT BRANCH DUCT COLLAR
CONNECTIONS TO GRILLES AND HIGH PRESSURE SPIRAL DUCT EXTERNALLY WITH
TWO-INCH THICK GLASS FIBER DUCT INSULATION, OWENS-COMING FRK-25, SERIES
ED-150 WITH REINFORCED ALUMINUM FOIL AND PAPER VAPOR BARRIER IN LIEU OF
INTERIOR DUCT LINER. ALL JOINTS SHALL BE STAPLED, SEALED AND TAPED
AIR-TIGHT.
APPROVALS: AH INSULATION MATERIALS AND MASTICS SHALL MEET REQUIREMENT
OF NFPA PAMPHLET 90 AND SHALL BE UL LISTED.
SECTION 15910
CONTROLS AND SUPPORTS
THERMOSTATS, SUBBASES, AND OTHER NEEDED OPERATIONAL CONTROLS SHALL BE
FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR ON ALL HVAC
EQUIPMENT. EACH THERMOSTAT SHALL HAVE AN APPROVED LOCKING THERMOSTAT
COVER. A SAMPLE COVER SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL
PRIOR TO ORDERING OR INSTALLING SAME.
FLEXIBLE CONNECTIONS: CONNECT ALL DUCTS TO FANS (EXCEPTING DOME TYPE
FANS) WITH PREASSEMBLED FLEXIBLE CONNECTION OF FIRE-RESISTANT, NEOPRENE
COATED GLASS FIBER CLOTH (3" FABRIC WIDTH), AS MANUFACTURED BY
VENTFABRICS, WIREMOLD OR THERMOFLEX, INSTALL SO THAT CLOTH IS IN FOLDS
(NOT DRAWN TIGHT).
HANGERS AND SUPPORTS: SUPPORT SMALL HORIZONTAL DUCTS WITH 144" X 20 GA.
BAND HANGERS (1- 112' X 16 GA, AT DUCTS LARGER THAN 70 UNITED INCHES).
PROVIDE IN PAIRS CLOSE TO EACH TRANSVERSE JOIN! AND IN NO CASE MORE THAN
SIX FEET APART. BANDS SHALL PASS COMPLETELY UNDER ROUND DUCTS. AT
RECTANGULAR DUCTS BANDS SHALL BE TURNED UNDER THE LOWER COMER AND
FASTENED WITH SELF-TAPPING SCREWS INTO THE BOTTOM SURFACE AND AT 6"
INTERVALS UP THE SIDES, LOOP TOP ENDS OF HANGERS OVER STEEL STRUCTURAL
MEMBERS ABOVE AND FASTEN WITH GALVANIZED BOLTS; WHERE CONCRETE JOISTS
OCCUR OVERHEAD SECURE STRAPS TO SIDE OF JOIST WITH GALVANIZED EXPANSION
OR RAMSET BOLTS; WHERE FLAT CONCRETE SURFACE OCCURS OVERHEAD SECURE
WITH RAMSET OR EXPANSION BOLT FASTENERS.
SUPPORT SMALL VERTICAL RUNS WITH 118" STEEL BANDS SCREWED TO 3 SIDES OF
DUCT AND EXPANSION BOLTED TO ADJACENT STRUCTURAL ELEMENTS; SPACING
SHALL NOT EXCEED 12 FEET. SUPPORT VERTICAL RUNS LARGER THAN 50 UNITED
INCHES WITH STRUCTURAL BRACKETS WITH WELDED JOINTS.
END OF SECTION 15910
DRAWING NUMBER
CHECKED BY: WLW
DRAWN BY:
PROJECT: HF1802
REVISION:
REVISION:
E
D
R
IS
T
E
STATE OF
No AR 1 1 1 01 08
G
E
R
R
N
W
A
R
L
N
N
Y
W
E
C
R
H
T
C
E
I
T
A
A
N
N
D
I
I
A
R
E
D
E
T
S
I
G
E
R
THIS DOCUMENT, THE IDEAS AND
DESIGNS INCORPORATED HEREIN,
AS AN INSTRUMENT OF
PROFESSIONAL SERVICE, IS THE
PROPERTY OF WARNER
ARCHITECTURAL ASSOCIATES AND
IS NOT TO BE USED, IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT
WITHOUT THE WRITTEN
AUTHORIZATION OF WARNER
ARCHITECTURAL ASSOCIATES, INC
DATE: 02/15/2018
DATE: 02/15/2018
14598 CLAY TERRACE BLVD
#160, CARMEL, IN 46032
WYNN L. WARNER, RA
EXHAUST FAN SCHEDULE
NAME MAKE/ MODEL DUTY
VOLUME
(CFM)
SONES
MOTOR
SIZE
WEIGHT
(LB)
DUCT AMPS VOLTAGE ACCESSORIES
EF-1
EXISTING OR
GREEN HECK SP--7
OR EQUIVALENT
TOILET 75 0.25 3/4 HP 8 0'-4" 1 120 1, 2, 3, 6
ACCESSORIES:
1. GRAVITY BACK-DRAFT DAMPER
2. WIRE INTO DEDICATED WALL SWITCH. COORDINATE WITH ELECTRICAL
3. REMOTE MOUNTED SPEED CONTROL SWITCH
4. UNIT MOUNTED SPEED CONTROL SWITCH
5. ROOF MOUNTED
6. CEILING MOUNTED
ALL DOCUMENTS ARE TO BE BUILT AND BID BASED ON THE MOST STRINGENT
CODES. GC TO VERIFY THAT ALL CONSTRUCTION IS BUILT TO CODE AND
THAT BIDS PROVIDED INCLUDE THE MOST RECENT CODE PER THE
MUNICIPALITY. FAILURE TO DO SO WILL RESULT IN THE RELIEF OF LIABILITY
OF THE OWNER, ARCHITECT, ENGINEER, AND DESIGNER. DRAWINGS ARE
PROVIDED AS REFERENCE AND NOT ALL CONDITIONS ARE DETAILED. IF
THERE ARE ANY DISCREPANCIES IN THE PLANS AND THE FIELD CONDITIONS
THE CONTRACTOR MUST NOTIFY THE ARCHITECT OR ENGINEER OF RECORD.
FAILURE TO DO SO WILL RESULT IN A DENIAL OF CHANGE ORDER REQUEST.
AIR BALANCE
UNIT NAME SUPPLY RETURN EXHAUST OUSIDE AIR BALANCE
RTU-1 4000 3770 0.0 155.0 75.0
EF-1 0 0 75.0 0.0 -75.0
TOTAL 4000 3770 75.0 155.0 0.0
RTU SCHEDULE
UNIT NAME
MAKE/
MODEL
HEATING
(BTU/H)
COOLING
(BTU/H)
VOLTAGE AMPS SEER IEER LOCATION
CFM CAP.
(HIGH/LOW)
8.5 TON
RTU-1
(RTU-1)
EXISITNG
UNIT
- - - - - - ROOF 4,000
RMM
MECHANICAL NOTES &
SCHEDULES
M1
04/12/18
Nick Mishler