Loading...
HomeMy WebLinkAboutM001.1Products PlotID Length Product Plies Net Qty FJ1 28-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ2 26-00-00 11-7/8" BCI® 5000s-1.8 1 12 FJ3 18-00-00 11-7/8" BCI® 5000s-1.8 1 11 FJ4 14-00-00 11-7/8" BCI® 5000s-1.8 1 5 FJ5 12-00-00 11-7/8" BCI® 5000s-1.8 1 8 FJ6 10-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ7 6-00-00 11-7/8" BCI® 5000s-1.8 1 3 FJ8 4-00-00 11-7/8" BCI® 5000s-1.8 1 9 BM1 18-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM2 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 4 BM3 12-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM4 22-00-00 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 3 3 BM5 24-00-00 1-3/4" x 24" VERSA-LAM® 2.0 3100 SP 2 2 BM6 26-00-00 11-7/8" BCI® 5000s-1.8 1 1 BBO1 10-00-00 3-08 x 1-00-00 Generic Material 1 1 BBO2 10-00-00 3-08 x 1-00-00 Generic Material 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 10 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 21 PBO1 10-00-00 5-04 x 3-08 Generic Material 1 1 Connector Summary PlotID Qty Manuf Product Hu1 12 USP THF20112 Hu2 16 USP THF20112 Hu3 12 USP THF20112 E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E13 E14 E15 E16 E17 1 32 4 5 E28 E29 BM2 BBO1 BBO2 BM3 BM4 BM5 BM1 BM2 BM6 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Bk1 FJ4 FJ1 FJ1 FJ2 9 10 FJ8 FJ3 FJ3 FJ5 FJ7 FJ6 FJ2 FJ4 FJ8 Bk1 Bk1 1-06-10 1-07-03 1-06-03 1-08-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 11-06 7-13 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 6-11 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 9-14 1-06-08 1-07-03 1-07-03 1-09-11 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-00 Sheet: 1/1 DWG: Order #: By: Date: 3/5/2018 Scale: NTS BC FRAMER 18020114 5TheGrove Second Floor NOTE: ALL MEASUREMENTS TO BE VERIFIED IN THE FIELD. Revisions: BY: DN01 DO NOT cut, notch or drill flanges above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE