HomeMy WebLinkAboutA-102 - FIRST FLOOR DEMO & ARCHITECTURAL PLANS - XRAY
TABLE PARK
TABLE PARK
A. THIS DEMOLITION PLAN SHALL SERVE TO AID THE CONTRACTORS IN EVALUATION
OF THE WORK AND EXTENT OF DEMOLITION. BUT WILL NOT BE HELD TO BE ALL
INCLUSIVE. THE CONTRACTORS ARE RESPONSIBLE FOR FIELD VERIFICATION OF
EXISTING CONDITIONS, DEMOLITION AND REMOVALS AS REQUIRED FOR THE
INSTALLATION OF THE NEW WORK AND FINISHES INDICATED WHETHER OR NOT IT
IS SPECIFICALLY NOTED IN THESE DRAWINGS
B. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED WORK.
GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK WITH
OTHER CONTRACTORS.
C. DEMOLITION WORK EFFECTING OCCUPIED AREAS OF THE FACILITY WILL BE
SCHEDULED IN ADVANCE WITH THE OWNER THROUGH CONSTRUCTION/PROJECT
MANAGER. REFER TO SPECIFICATIONS.
D. OFFER REMOVED ITEMS SUCH AS DOORS, HARDWARE, PLUMBING FIXTURES, AND
TOILET ACCESSORIES TO OWNER BEFORE REMOVAL FROM THE SITE.
DETERMINE SALVAGE ITEMS WITH THE OWNER BEFORE DEMOLITION BEGINS.
E. ALL CONTRACTORS ARE RESPONSIBLE FOR SECURING CHASES AND RISERS
BEFORE DEMOLITION WORK PROCEEDS TO PREVENT DEBRIS FROM FALLING
THROUGH INTO OCCUPIED SPACES BELOW.
F. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED WORK AND
ITEMS TO BE REMOVED OR RE-INSTALLED IN NEW CONSTRUCTION. TEMPORARY
LIGHTING, COMMUNICATION AND MECHANICAL SYSTEMS WILL BE COORDINATED
WITH OTHER CONTRACTORS. MAINTAIN ALL LIFE SAFETY DEVISES.
G. HOLES LEFT IN THE CONCRETE FLOOR FROM REMOVED ITEMS SUCH AS
PLUMBING PIPES, CONDUITS, ETC. WILL BE PATCHED BY RESPECTIVE
CONTRACTOR PERFORMING THAT PORTION OF THE WORK.
H. FINISH REMOVAL NOTES APPLY TO PARTITIONS/WALLS THAT REMAIN. REMOVE
ALL FINISHES FROM WALLS THAT REMAIN WITHIN THE LIMIT OF CONSTRUCTION.
I. INTERIOR PARTITIONS AND/OR WALLS SHALL BE REMOVED ENTIRELY FROM DECK
ABOVE TO DECK BELOW.
J. PRIOR TO SAWCUTTING EXISTING CONCRETE SLAB IS TO BE SCANNED TO VERIFY
EXISTING CONDITIONS.
DEMOLITION GENERAL NOTES
1000
A
RENOVATION GRAPHIC LEGEND
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
NEW DOOR
EXISTING WINDOW TO REMAIN
EXISTING WINDOW TO BE REMOVED
NEW WINDOW
FLOOR PLAN GENERAL NOTES
A. GENERAL CONTRACTOR TAKES RESPONSIBILITY FOR
COORDINATING REQUIRED WORK WITH ALL TRADES
BASED UPON A COMPLETE SET OF CONSTRUCTION
DOCUMENTS.
B. GENERAL CONTRACTOR TO PROVIDE SOLID BLOCKING
FOR ALL WALL MOUNTED CASEWORK, EQUIPMENT, AND
ACCESSORIES, INCLUDING TOILET ACCESSORIES AS
REQUIRED.
C. REFER TO CODE REVIEW PLAN FOR RATED PARTITIONS
AND ASSEMBLIES.
D. GENERAL CONTRACTOR TO PATCH ALL CONCRETE SLABS
AT MECH/ELEC PENETRATIONS. PATCH SLAB FLUSH WITH
EXISTING SLAB AND PROVIDE #4 DOWELS INTO EXISTING
SLAB AS REQUIRED.
E. DAMAGED WALLS AND FINISHES TO BE REPAIRED AS
REQUIRED TO MATCH EXISTING ADJACENT WALLS.
F. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO
PATCH ALL CRACKS AND RESEAL JOINTS IN EXISTING
SUBSTRATES SCHEDULED TO RECEIVE NEW FINISHES.
G. UNLESS NOTED OTHERWISE, NEW WALLS TO BE 3 5/8"
METAL STUDS @ 16" O.C. WITH (1) LAYER OF 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE. EXTEND STUD AND GYPSUM
BOARD TO DECK ABOVE. SEAL AS REQUIRED FOR WALL
RATINGS INDICATED ON THE CODE REVIEW PLAN.
2' - 4"
3' - 3"
NOTE:
WALL PARTITION
DIMENSION STRINGS ARE
FROM FACE OF STUD TO
FACE OF STUD.
1.0
2.0
3.0
4.0
METAL STUD
WOOD STUD
CONCRETE
MASONRY UNIT
CAST-IN-PLACE
CONCRETE
1.3a
STRUCTURE/FRAMING
NOMINAL DIMENSION
TYPE DESIGNATION
STRUCTURE/FRAMING
RATING
R
X-RAY
108
CHANGE
126
CHANGE
125
E108
1.3A
1' - 6"
9.01
3.02
A-420 4
6.01
11.02
9.05
1.06 3.16
3.14
3.12
2.01 3.01
3.13
3.09
3.17
DRAWING CONTENTS:
ISSUE DATE:
DRAWING NO.
PROJECT NO.
ST. VINCENT
MICHIGAN ROAD
HOPD
IMAGING POS22
COMPLIANCE
10801 N MICHIGAN RD,
ZIONSVILLE, IN 46077
MKM:
ASCENSION:
Certification:
Key Plan:
Consultant Logo:
119 West Wayne Street
Fort Wayne, Indiana 46802
p 260.422.0783
f 260.426.4561
www.MKMdesign.com
30329
02/12/2018 17088
A-102
FIRST FLOOR DEMO &
ARCHITECTURAL
PLANS - XRAY
DEMOLITION PLAN NOTES
3.07 REMOVE AND DISPOSE OF EXTERIOR WINDOW SYSTEM. CLEAN/
PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW WORK AS
SCHEDULED.
3.08 REMOVE EXISTING CURTAIN (VALANCE) AND RELATED HANGERS
ONLY IN THEIR ENTIRETY AND OFFER TO OWNER BEFORE
DISPOSING. EXISTING BLINDS TO REMAIN. PROTECT DURING
CONSTRUCTION. CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE
TO ACCEPT NEW FINISHES AS SCHEDULED.
3.09 EXISTING INTERIOR WINDOW SYSTEM TO REMAIN.
3.10 REMOVE DOOR(S), HARDWARE, AND FRAME. OFFER DOOR(S)
AND HARDWARE TO OWNER BEFORE DISPOSING. CLEAN/ PREP/
PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW WORK AS
SCHEDULED.
3.11 ELECTRICAL, PHONE OR NURSE CALL PANEL/CABINET. SEE
ELECTRICAL DRAWINGS FOR MORE INFORMATION.
3.12 EXISTING DOOR(S), HARDWARE, AND FRAME TO REMAIN. CLEAN/
PREP EXISTING FRAMES FOR NEW FINISH. PROTECT DURING
CONSTRUCTION. REPAIR/REPLACE DAMAGED COMPONENTS AT
CONCLUSION OF THE WORK.
3.13 REMOVE BASE CABINET(S), COUNTERTOP, WALL CABINET(S),
MISCELLANEOUS TASKLIGHTING AND PLUMBING FIXTURES,
WHERE APPLICIABLE. OFFER TO OWNER BEFORE DISPOSING.
CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW
FINISHES AS SCHEDULED.
3.14 EXISTING CASEWORK TO REMAIN. PROTECT DURING
CONSTRUCTION.
3.16 EXISTING FURNITURE TO BE REMOVED BY OFFICEWORK.
EXISTING LARGE MEDICAL EQUIPMENT, INCLUDIING DEXA
CAMERA TO BE REMOVED BY TRIMEDEX.
3.17 EXISTING PLUMBING FIXTURE(S) TO REMAIN. PROTECT DURING
CONSTRUCTION. REPLACE DAMAGED FIXTURES AT CONCLUSION
OF THE WORK.
3.18 REMOVE PLUMBING FIXTURE(S). OFFER TO OWNER BEFORE
DISPOSING. SEE PLUMBING DRAWINGS FOR MORE INFROMATION.
3.19 REMOVE UPPER CABINET ONLY. CLEAN/ PREP/ PATCH/ REPAIR
WALL SURFACE TO ACCEPT NEW FINISHES AS SCHEDULED.
3.20 REMOVE EXISTING WALL COVERING IN ITS ENTIRETY. CLEAN/
PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW FINISHES
AS SCHEDULED.
3.21 REMOVE AND SALVAGE EXISTING WALL MOUNTED EQUIPMENT.
3.22 EXISTING WALL PROTECTION TO REMAIN. PROTECT DURING
CONSTRUCTION.
3.23 DATA AND POWER RECEPTACLES TO BE REMOVED / RELOCATED.
CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW
FINISHES AS SCHEDULED. SEE ELECTRICAL FOR ADDITIONAL
INFORMATION.
3.24 MAIL BOX TO BE REMOVED AND SALVAGED BY OFFICEWORKS.
CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW
FINISHES AS SCHEDULED.
DEMOLITION PLAN NOTES
CEILING DEMOLITION
1.01 REMOVE AND DISPOSE OF ACOUSTICAL LAY-IN CEILING SYSTEM:
TILES, GRID AND ALL RELATED HANGERS AND SUPPORTS.
1.02 EXISTING ACOUSTICAL LAY-IN CEILING SYSTEM TO REMAIN.
PROTECT DURING CONSTRUCTION. REPLACE DAMAGED CEILING
AREAS (MATCH EXISTING) AT CONCLUSION OF THE WORK.
1.03 REMOVE AND DISPOSE OF DRYWALL/PLASTER CEILING AND ALL
RELATE FRAMING, SUPPORTS AND ACCESS PANELS.
1.04 REMOVE EXISTING CEILING ACCESS DOOR.
1.06 REMOVE AND DISPOSE OF ACOUSTICAL LAY-IN CEILING SYSTEM:
TILES,GRID AND ALL RELATED HANGERS AND SUPPORTS AND
UNISTRAT SYSTEM.
FLOORING DEMOLITION
2.01 REMOVE AND DISPOSE OF VINYL FLOORING (SHEET/VCT) AND ALL
RELATED MASTIC/ADHESIVE. CLEAN/ PREP/ PATCH/ REPAIR
SUBFLOOR TO ACCEPT NEW FLOORING AS SCHEDULED.
SUBFLOOR NEEDS TO BE COMPLETELY LEVEL AND SMOOTH
PRIOR TO INSTALLATION OF NEW FINISHES AS SCHEDULE
2.02 REMOVE AND DISPOSE OF CARPET AND ALL RELATED ADHESIVE.
CLEAN/ PREP/ PATCH/ REPAIR SUBFLOOR TO ACCEPT NEW
FLOORING AS SCHEDULED. SUBFLOOR NEEDS TO BE
COMPLETELY LEVEL AND SMOOTH PRIOR TO INSTALLATION OF
NEW FINISHES AS SCHEDULED.
2.03 EXISTING FLOOR FINISH TO REMAIN. PROTECT FLOORING
DURING CONSTRUCTION. REPLACE DAMAGED FLOOR AREAS
(MATCH EXISTING) AT CONCLUSION OF THE WORK.
PARTITION DEMOLITION
3.01 REMOVE AND DISPOSE OF EXISTING WALL BASE. CLEAN/ PREP/
PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW FINISHES AS
SCHEDULED.
3.02 REMOVE AND SALVAGE PORTION OF EXISTING EXTERIOR
MANSORY WALL SYSTEM ABOVE AND BELOW THE WINDOW AS
REQUIRED AND PREPARE ADJACENT FOR NEW CONSTRUCTION.
REMOVE PA CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE TO
ACCEPT NEW WORK AS SCHEDULED.
3.03 EXISTING TV TO BE REMOVED BY OWNER. CLEAN/ PREP/ PATCH/
REPAIR WALL SURFACE TO ACCEPT NEW FINISHES AS
SCHEDULED.
3.04 FROM CORNER, REMOVE EXISTING WALL COVERING IN ITS
ENTIRETY. CLEAN/ PREP/ PATCH/ REPAIR WALL SURFACE TO
ACCEPT NEW FINISHES AS SCHEDULED.
3.05 REMOVE AND DISPOSE OF WALL PROTECTION - CORNER GUARD,
RUBSTRIP OR WAINSCOT. CLEAN/ PREP/ PATCH/ REPAIR WALL
SURFACE TO ACCEPT NEW FINISHES AS SCHEDULED. SKIM-COAT
WALL TO ACCEPT NEW WALL FINISH AS SCHEDULED.
3.06 REMOVE PORTION OF EXISTING WALL AS REQUIRED. CLEAN/
PREP/ PATCH/ REPAIR WALL SURFACE TO ACCEPT NEW WORK AS
SCHEDULED.
FLOOR PLAN NOTES
9.02 INFILL EXISTING WALL OPENING - MATCH ADJACENT
CONSTRUCTION.
9.04 MODIFY FRAMING FROM DEMOLISHED DARK ROOM DOOR AND
PATCH FINISHES TO MATCH ADJACENT AS REQUIRED.
9.05 PAINT EXISTING DOOR FRAME IN ITS ENTIRETY.
DIV 10 - SPECIALTIES
10.01 NEW 18" VERTICAL GRAB BAR TO MATCH EXISTING IN FINISH AND
TEXTURE.
DIV 11 - EQUIPMENT
11.01 FURNITURE SYSTEMS BY OFFICEWORKS. SEE VENDOR
DRAWINGS FOR MORE INFORMATION.
11.02 XRAY EQUIMPEMT BY VENDOR.
11.03 RESINTALL SALVAGED WALL MOUNTED EQUIPMENT AT THE SAME
AT AS PREVIOUSLY INSTALLED.
DIV 22 - PLUMBING
22.01 STORM PIPE. SEE MECHANICAL
DIV 32 EXTERIOR IMPROVEMENTS
32.01 EXISTING SIDEWALK PROTECT DURING CONSTRUCTION
32.02 NEW SIDEWALK. SEE DETAILS ON SHEET A-202 AND
SPECIFICATIONS FOR MORE INFORMATION
32.03 EXISTING UTILITY LIGHT POLE POWER LINE. IDENTIFY PRIOR TO
EXCAVATION
32.04 EXISTING IRRIGATION LINE TO BE MODIFIED AS NEEDED.
FLOOR PLAN NOTES
DIV 3 - CONCRETE
3.01 ALIGN NEW CONCRETE SLAB EDGE WITH FINISH HEIGHT IN NEW
VESTIBULE. SEE SECTIONS FOR MORE INFORMATION
3.02 LINE OF CONCRETE CLEARANCE FOR X-RAY EQUIPMENT.
MANUFACTURER APPROVED THE EXISTING 4" CONCRETE SLAB
FOR NEW X-RAY EQUIPMENT. CONTACTOR TO HAVE AN
ALLOWANCE FOR NEW 8" CONCRETE SLAB IF EXISTING
CONCRETE IS IN BAD CONDITION.
DIV 4 - MASONRY
4.01 NEW COLUMN MASONRY UNITS, PRECAST CONCRETE ACCENTS
AND MORTAR TO MATCH EXISTING BUILDING IN COLOR AND
FINISH. NEW BRICK TO RUN 1/3 BOND PATTERN, SPLIT-FACE CMU
TO RUN 1/2 BOND PATTERN. MORTAR TO BE LAB TESTED TO
MATCH EXISTING.
DIV 6 - WOOD, PLASTICS, AND LAMINATES
6.01 NEW LAMINATE COUNTERTOP. SEE DETAIL FOR MORE
INFORMATION.
6.02 SALVAGED MAILBOX TO BE INSTALLED BY OFFICEWORK.
DIV 7 - THERMAL PROTECTIODIV 7 - THERMAL MOISTURE PROTECTION
7.01 DOWNSPOUT. SEE MECHANICAL
DIV 8 - OPENINGS
8.01 NEW ADA PUSH BUTTON. SEE ELECTRICAL FOR ADDITIONAL
INFORMATION.
DIV 9 - FINISHES
9.01 GYPSUM BOARD BULKHEAD. SEE REFLECTED CEILING AND
FINISH PLANS FOR MORE INFORMATION.
WALL TYPE SCHEDULE
WALL
TYPE RATING DESCRIPTION
1.3 3 5/8" METAL STUD @ 16" O.C. (1) LAYER 5/8" TYPE
"X" GYPSUM BOARD EACH SIDE EXTEND TO 6"
ABOVE ABOVE AND INSULATE FULL HEIGHT
(TYPICAL WALL COMPOSITION).
1.3A 3 5/8" METAL STUD @ 16" O.C. (1) LAYER 5/8" TYPE
"X" GYPSUM BOARD EACH SIDE EXTEND TO DECK
ABOVE AND INSULATE FULL HEIGHT. 1/32" LEAD
LINED TO A HEIGHT OF 7'-0".
WALL TYPE LEGEND TYPICAL FRAMING DTL.
1/4" = 1'-0"
2 FIRST FLOOR ARCHITECTURAL PLAN 1/4" = 1'-0"
1 FIRST FLOOR DEMOLITION PLAN
REVISION
No. Date Revision
04/12/18
Nick Mishler
04/12/18
Nick Mishler