HomeMy WebLinkAboutDLZ Indiana, LLC/Eng/38,781/Adl Serv #1a/126th Street and 136th Street and Gray Road RAB and Gray Road Culvert – Construction InspectionDLZ Indiana, LLC
Engineering Department - 2018
Appropriation # 2016 COIT Bond Fund, 2016 Storm Water Bond Fund; P.O. #100224, 100225
Contract Not To Exceed $38,781.00tO
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement') entered into
by and between the City of Carmel and DLZ Indiana, LLC (the `Professional"), as City Contract dated March 31, 2016
shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent
with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the
Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA
by and through its Board of Public
Works and Safety
By:
ccs
ames Brainard, Presiding Officer,
r- -.V1
Mary Ann urke, Memb r
Date: �/
Lori 5. Wat tuber
Date:
A E�
hristine Pauley,; k-Tr�/ s r
Date: /�
jS:'C,-V W S... a r,.. S S—W.g--g\zoi eTu m,n.,.. u.c ASA.ao AWY2oie 8.43 a1,11
DLZ Indiana, LLC
By:
Authorized Signature
Laurie D. Johnson, PE
Printed Name
Vice President
Title
FID/TIN: 31-1741713
Last Four of SSN if Sole Proprietor:
Date: 4-10-2018
WDLZ
ARCHITECTURE• ENGINEERING• PLANNING
SURVEYING • CONSTRUCTION SERVICES
November 20, 2017
Mr. Jeremy Kashman, PE
City Engineer
City of Carmel, Indiana
One Civic Square
Carmel, IN 46032
INNOVATIVE IDEAS
EXCEPTIONAL DESIGN
UNMATCHED CLIENT SERVICE
Re: Request for Supplement to Construction Observation Services
126th Street and Gray Road RAB, 136th Street and Gray Road RAB, Gray Road Culver - #165
Project Numbers 16 -ENG -16, 16 -ENG -54, 16 -SW -107
Dear Mr. Kashman:
Per your phone conversation with Mr. Tom Stoffl, PE, DLZ Indiana, LLC (DLZ) respectfully requests a
supplement to our original contract dated March 15, 2017. The schedule of the original agreement was as
follows:
• Contract Letting Date: February 1, 2017
• Anticipated Notice to Proceed for Construction Observation: February 15, 2017
• Anticipated Road Closure Date: March 15, 2017
• Substantial Completion Date: May 20, 2017
• Final Project Completion Date: June 20, 2017
The original contract construction bid was $3,205,200.00 and DLZ's original fee was $286,408.50 or
8.94%.
To date we have completed the culvert installation south of 146th Street, the RAB at Gray Road and 136th
Street and anticipate substantial completion of the RAB at Gray Road and 126th Street to be November 24,
2017. To date there have been eleven (11) change orders to the contract, totaling an additional $263,695
and DLZ anticipates at least 5-7 more change orders for an undetermined amount.
Due to the extended length of the contract, DLZ has managed our services to extend our contract hours, by
reducing inspection personnel when possible and also eliminating mileage charges that were part of the
original contract. At this time, we anticipate needing additional hours to complete the responsibilities of the
contract inspection, documentation and completion of the additional change orders noted above. Please see
the attached manhour spreadsheet included in the supplement document at illustrates the expected time
required.
Exhibit
157 E Maryland St, Indianapolis, IN 46204-3608 I OFFICE 317.633.4120 I ONLINE WWW,DLZ.COM
Akron Burns Harbor Chicago Cincinnati Cleveland Columbus Detroit Fort Wayne Indianapolis Joliet Kalamazoo Lansing Lexington
Louisville Madison Melvindale Munster Pittsburgh Saint Joseph South Bend Toledo
ray
WDLZ
ARCHITECTURE• ENGINEERING• PLANNING
SURVEYING •CONSTRUCTION SERVICES
INNOVATIVE IDEAS
EXCEPTIONAL DESIGN
UNMATCHED CLIENT SERVICE
The following table summarizes the supplemental amount requested:
Gray Corridor Construction Observation
Request for Supplement
Page 2 of 2
Description
Amount
Original Contract Amount
$286,408.50
Total Contract Amount Required for Completion
$325,199.50
Total Supplement Amount Requested
$38,781.00
Thank you for the continued confidence in our firm. We are pleased to continue working with you to
complete the Gray Road corridor projects. If you have any question on this request or wish to discuss the
contents, please feel free to contact our office at (317) 6334120 or email at liohnson@dlz.com.
Sincerely,
Laurie D. Johnson, E
Vice President
Thomas G. Stoff1,
Senior Project Manager
Exhibit
260
SUPPLEMENTAL AGREEMENT
WITNESSETH
WHEREAS, the LPA and CONSULTANT did, on March 31, 2016, enter into an agreement
for Professional Services and then amended the agreement on March 15, 2017 provide
Construction Observation services for the construction of the 12611 Street and Gray Road
Roundabout, 136th Street and Gray Road Roundabout and the Gray Road Culvert Replacement —
Culvert #165 (Project Numbers 16 -ENG -16, 16 -ENG -54, 16 -SW -107) and;
WHEREAS, the CONSULTANT has provided additional construction observation services
needed on the project due to an extension of contract time.
NOW THEREFORE, the LPA and the CONSULTANT desire to amend the above
referenced Construction Inspection Contract as follows:
Revise Section "SCHEDULE" item 4 to read as follows:
4. Based on the letting date of February 1, 2017 and the actual scope of work and
contractor schedule, the estimated construction completion date is January 31, 2018.
II. Revise Section "COMPENSATION"item 1 to read as follows:
1. The PROFESSIONAL shall receive as payment for the work performed under this
Contract the total amount not to exceed $ 325,199.50.
III. Add Exhibit "A-1" as follows:
Add the attached Exhibit A-1 to show the expected additional manhours required to
complete the services needed as part of the supplemental agreement.
Exhibit
1 of 1 ; b�c/
Supplemental Agreement
Fee Proposal Main Street and Gray Road and Trail along Gray Projects 16 -ENG -55 and 16 -ENG -97
Starting with the week ending 11-17-17
Manhours & Rates
2017-18
E
>
z
ECD CD
0
p
Li
Total
Negotiated
I Rates
Name
Classification
Hourly
Rate
Number of Estimated Manhours
Michael Smith, DLZ
Construction
Observer
Manager
$125.00
110 160 160
430
$53,750.00
Tom Stoffl, DLZ
Senior Project
Manager
$185.00
6 4 4
14
$2,590.00
Brian Geis
Construction
Observer
$100.00
100
100
$10,000.00
Total Manhours 2017-18
0 0
0 0 216 164 164 0 0 0 0 0
544
$66,340.00
Expenses
Rate
Estimated Number of Work Mileage
Total Expenses
$0.00
Total Hours and Fee Proposal to finish Gray Road RAB's @ 126th & 136th including FCR's
$66,340.00
Starting with the week ending 11-17-17
City of Car
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
ONE CIVIC SQUARE 35-6000972
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
IASE ORDER DATE DATE REQUIRED REQUISITION NO.
3/1/2017
DLZ INDIANA, LLC.
VENDOR 157 EAST MARYLAND ST
INDIANAPOLIS, IN 46204 -
PURCHASEID BLANKET CONTRACT
13219
VENDOR NO.
061515
Page 1 of 1
PURCHASE ORDER NUMBER
100224
THIS NUMBER MUST APPEAR ON INVOICES, A/P
VOUCHER, DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
DESCRIPTION
Projects 16 -ENG -16 and 16 -ENG -54; Contract Date 03.31.16
City Engineering's Office
SHIP 1 Civic Square
TO Carmel, IN 46032 -
Kate Lustig
PAYMENT TERMS FREIGHT
QUANTITY I UNIT OF MEASURE , DESCRIPTION UNIT PRICE EXTENSION
Department: 2200 Fund: 0 COIT Bond Fund
Account: 94-650.04
1 Each ASA 1 - 126th Street and Gray Road and 136th Street and $311,934.07 $311,934.07
Gray Road RAB - Inspection
Sub Total $311,934.07
Send Invoice To:
Skip Tennancour
American Structurepoint, Inc.
8425 Wicklow Way
Brownsburg, IN 46112
2016 COIT Bond
DEPARTMENT -I
A
2-4L, Li O$ - 50
ASA 1c>- k—cl-e-r.se
*IP 351 152- S. 5-4-
PLEASE INVOICE IN DUPLICATE
ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT
SHIPPING INSTRUCTIONS
'SHIP PREPAID.
'C.O.D. SHIPMENT CANNOT BE ACCEPTED.
'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO.
PAYMENT $311,934.07
A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
�� '
ORDERED BY � �ei
-- -
Jeremy Kashman James Crider
TITLE Director Administration
CONTROL NO. 100224 CLERK -TREASURER
Ci
®����INDIANA RETAIL TAX EXEMPT
ty
�III'1 CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
ONE CIVIC SQUARE 35-6000972
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
Page 1 of 1
PURCHASE ORDER NUMBER
100225
THIS NUMBER MUST APPEAR ON INVOICES, Alp
VOUCHER DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION
3/1/2017 061515 Project 16 -SW -107; Contract Date 03.31.16; Increased P.O. 41911
DLZ INDIANA, LLC.
VENDOR 157 EAST MARYLAND ST
INDIANAPOLIS, IN 46204 -
PURCHASEID BLANKET CONTRACT
13220
QUANTITY UNIT OF MEASURE DESCRIPTION
Department: 2200 Fund: 0 2016 Storm Water Bond
PAYMENTTERMS
City Engineering's Office
SHIP 1 Civic Square
TO Carmel, IN 46032 -
Kate Lustig
FREIGHT
I UNIT PRICE I EXTENSION
Account: 94-650.04
1 Each ASA 1 - 126th Street and 136th Street and Gray Road RAB $13,255.43
and Gray Road Culvert - Construction Inspect
Send Invoice To:
Jill Newport
CrossRoad Engineers, P.C.
3417 Sherman Drive
Beech Grove, IN 46107
$13,255.43
Sub Total $13,255.43
QririQ� Amou••t-
t l0� 000"
ASP, 1 a Ir,creade
* S, 2sS. x4S
Email: jnewport@crossroadengineers.com PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT - I PROJECT ACCOUNT AMOUNT
PAYMENT $13,255.43
SHIPPING INSTRUCTIONS ' Alp VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
*SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN
'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
*THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY
Jeremy Kashman James Crider
TITLE Director Administration
CONTROL NO. 100225 CLERK -TREASURER