HomeMy WebLinkAbout42240034 - WWC 34 - Truss DetailsDE
DANSCO ENGINEERING, LLC
P.O. Box 3400
Apollo Beach, FL 33572
Telephone (813) 645-0166
Facsimile (813) 645-9698
The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my
direct supervision based on the parameters provided by the truss designers.
Job: 1801919-12T
61 truss design(s)
57333-W1
3/16/18
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown
is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J01
TrussType
Jack-Open
Qty
30
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:232018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-5ertRt?pSJgLgvm9txvfdMAVY0uDrqbMubR??CzaMg_
Scale=1:25.3
W1
T1
B1
1
2
5
6
7
8
3
4
4x4
2x4
3-11-43-11-4
-0-9-120-9-12 3-11-43-11-4
1-1-144-5-40-5-133-11-74-5-410.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.33
0.220.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.02
-0.030.04
(loc)4-5
4-53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 13 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-4 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=187/0-6-0(min. 0-1-8), 3=84/Mechanical, 4=41/Mechanical
Max Horz5=141(LC 16)
Max Uplift3=-107(LC 16), 4=-8(LC 16)MaxGrav5=214(LC 2), 3=119(LC 30), 4=72(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 2-2-4,Interior(1) 2-2-4 to 3-10-8zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 107 lb uplift at joint 3 and 8 lb uplift at
joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J02
TrussType
Jack-Open
Qty
2
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:242018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ZqPGeD0RCdoCI2LLRfQu9Zjj_QEWaGrW7FBYXfzaMfz
Scale=1:25.3
W1
T1
B1
B2
B3
1
2
3
8
7
69
10
4
5
2x4
3x4
1.5x4
3x4
3x4
3-6-03-6-0 3-11-40-5-4
-0-9-120-9-12 3-6-03-6-0 3-11-40-5-4
1-1-144-5-40-5-133-11-73-5-41-0-010.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.16
0.220.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.01
-0.01-0.02
(loc)7-8
7-84
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 17 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-4 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)8=187/0-6-0(min. 0-1-8), 4=21/Mechanical, 5=104/Mechanical
Max Horz8=141(LC 16)
Max Uplift5=-139(LC 16)MaxGrav8=214(LC 2), 4=29(LC 7), 5=155(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 2-2-4,Interior(1) 2-2-4 to 3-10-8zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 139 lb uplift at joint 5.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J03
TrussType
Jack-Open
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:242018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ZqPGeD0RCdoCI2LLRfQu9ZjjdQG9aGrW7FBYXfzaMfz
Scale=1:19.2
W1
T1
B1
1
2
5
3
4
3x4
3x4
2-5-92-5-9
-0-9-120-9-12 2-5-92-5-9
1-1-143-2-82-8-113-2-810.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.18
0.110.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.00
-0.01-0.01
(loc)4-5
4-53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 9 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-5-9 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=139/0-6-0(min. 0-1-8), 3=47/Mechanical, 4=22/Mechanical
Max Horz5=91(LC 16)
Max Uplift3=-71(LC 16), 4=-12(LC 16)MaxGrav5=160(LC 2), 3=71(LC 30), 4=43(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 71 lb uplift at joint 3 and 12 lb uplift atjoint 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J04
TrussType
Jack-Open
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:252018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-11zesZ13zww3wCwX?Mx7inFvUqdPJj5fLvw635zaMfy
Scale=1:13.3
W1
T1
B1
1
2
5
3
4
1.5x4
2x4
1-0-121-0-12
-0-9-120-9-12 1-0-121-0-12
1-1-142-0-81-6-112-0-810.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.11
0.050.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.00
-0.00-0.00
(loc)5
53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 5 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-0-12 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=106/0-6-0(min. 0-1-8), 3=2/Mechanical, 4=4/Mechanical
Max Horz5=52(LC 13)
Max Uplift3=-32(LC 16), 4=-19(LC 16)MaxGrav5=138(LC 22), 3=20(LC 14), 4=24(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 32 lb uplift at joint 3 and 19 lb uplift atjoint 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J05
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:262018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-VDX03v1ikE2wXMUkY4SMF_o1QEt12ALpaZgfbXzaMfx
Scale=1:25.9
W1
T1
B1
B2
B3
1
2
3
8
7
6
9
10
11
4
12 13 14
5
2x4
3x4
2x4
3x5
4x4
3-1-53-1-5 5-11-22-9-13 6-8-40-9-2
-1-5-01-5-0 3-1-53-1-5 5-11-22-9-13 6-8-40-9-2
1-1-144-4-43-4-41-0-05.7412
PlateOffsets(X,Y)-- [6:0-2-4,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MR
0.290.41
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.05-0.08
-0.04
(loc)
7-87-8
4
l/defl
>999>920
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 23 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=221/0-9-6(min. 0-1-8), 4=67/Mechanical, 5=182/Mechanical
Max Horz8=117(LC 12)Max Uplift8=-132(LC 16), 4=-52(LC 34), 5=-148(LC 12)
MaxGrav8=252(LC 2), 4=102(LC 26), 5=218(LC 44)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 132 lb uplift at joint 8, 52 lb uplift at joint
4 and 148 lb uplift at joint 5.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 74 lb down and 27 lb up at
1-11-2, and 101 lb down and 56 lb up at 3-3-11, and 88 lb down and 76 lb up at 4-4-7 on top chord, and 18 lb down and 23 lb up at 1-11-2, and 11 lb down and 15 lb up at 3-3-11, and 19 lb down and 25 lb up at 4-4-7 on bottomchord.The design/selection of
suchconnection device(s)is the responsibility of others.10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51Concentrated Loads(lb)
Vert: 12=1(F) 13=0(B) 14=-1(F)
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J05
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:262018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-VDX03v1ikE2wXMUkY4SMF_o1QEt12ALpaZgfbXzaMfx
LOADCASE(S)Standard
Trapezoidal Loads(plf)
Vert: 2=-2(F=24,B=24)-to-4=-85(F=-17,B=-17), 8=0(F=10,B=10)-to-7=-29(F=-5,B=-5), 6=-29(F=-5,B=-5)-to-5=-33(F=-7,B=-7)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J06
TrussType
Jack-Open
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:272018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-zP5OHF2KVYAn9W3w6n_bnCLEJeIGndaypDPD7zzaMfw
Scale=1:16.6
W1
T1
B1
1
2
5
6
3
4
2x4
2x4
2-8-12-8-1
-1-2-121-2-12 2-8-12-8-1
1-1-132-8-82-3-92-8-87.0012
PlateOffsets(X,Y)-- [2:0-3-4,0-1-4]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MR
0.160.09
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.00-0.01
-0.01
(loc)
4-54-5
3
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 9 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-8-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)5=177/0-6-0(min. 0-1-8), 3=46/Mechanical, 4=21/Mechanical
Max Horz5=74(LC 16)Max Uplift5=-19(LC 16), 3=-53(LC 16), 4=-2(LC 16)
MaxGrav5=204(LC 2), 3=65(LC 30), 4=45(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 2-7-5zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 19 lb uplift at joint 5, 53 lb uplift at joint 3and 2 lb uplift at joint 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J07
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:282018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-RcemUb3yGrIenge6gVVqKPtO11eWW4q51t9mgQzaMfv
Scale=1:16.2
W1
T1
B1
1
2
5
6
3
4
2x4
2x4
3-1-53-1-5
-1-5-01-5-0 3-1-53-1-5
1-1-142-7-115.7412
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15NO
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.22
0.080.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.01
-0.00-0.01
(loc)4-5
4-53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 10 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-5 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=129/0-9-6(min. 0-1-8), 3=23/Mechanical, 4=9/Mechanical
Max Horz5=72(LC 11)
Max Uplift5=-55(LC 16), 3=-65(LC 16), 4=-3(LC 16)MaxGrav5=178(LC 18), 3=28(LC 2), 4=39(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverifycapacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 55 lb uplift at joint 5, 65 lb uplift at joint 3and 3 lb uplift at joint 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51Trapezoidal Loads(plf)
Vert: 2=-2(F=24,B=24)-to-3=-39(F=6,B=6), 5=0(F=10,B=10)-to-4=-16(F=2,B=2)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J08
TrussType
Jack-Open
Qty
8
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:282018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-RcemUb3yGrIenge6gVVqKPtPd1ftW4q51t9mgQzaMfv
Scale=1:11.1
W1
T1
B1
1
2
5
6
3
4
3x8
2-4-82-4-8
-1-4-121-4-12 2-4-82-4-8
0-10-31-7-111-3-81-7-114.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.18
0.060.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.00
-0.00-0.00
(loc)4-5
4-53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 8 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-4-8 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=183/0-6-0(min. 0-1-8), 3=34/Mechanical, 4=15/Mechanical
Max Horz5=47(LC 12)
Max Uplift5=-91(LC 12), 3=-28(LC 16)MaxGrav5=214(LC 22), 3=40(LC 2), 4=38(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 2-3-12zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 91 lb uplift at joint 5 and 28 lb uplift at
joint 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
J09
TrussType
Jack-OpenGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:292018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-voC9ix4a19QVOqDJEC03sdQVKRzTFX4FGXuJCszaMfu
Scale=1:10.9
W1
T1
B1
1
2
5
3
4
3x4
2x4
1-4-101-4-10
-2-2-42-2-4 1-4-101-4-10
1-1-141-7-03.7112
PlateOffsets(X,Y)-- [2:0-2-0,0-0-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MR
0.510.10
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
-0.01
(loc)
54-5
3
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-4-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)5=243/0-6-0(min. 0-1-8), 3=-71/Mechanical, 4=-20/Mechanical
Max Horz5=50(LC 11)Max Uplift5=-165(LC 8), 3=-133(LC 18), 4=-36(LC 18)
MaxGrav5=378(LC 18), 3=81(LC 8), 4=20(LC 8)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-5=-333/150
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 165 lb uplift at joint 5, 133 lb uplift at
joint 3 and 36 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-2=-51
Trapezoidal Loads(plf)Vert: 2=-4(F=23,B=23)-to-3=-36(F=7,B=7), 5=0(F=10,B=10)-to-4=-14(F=3,B=3)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
PB01
TrussType
Piggyback
Qty
2
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:302018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-O_mXvH5CoSYM0zoVnvXIPqylUrJg__bOVBetkIzaMft
Scale=1:17.2
0-1-150-1-15T1
T2
T1
B1
ST1
1
2
3 4 5
6
7
8
9
10
3x4 3x4
2x4 2x41.5x4
1.5x4
8-7-58-7-5
3-10-113-10-11 4-8-90-9-14 8-7-53-10-11
0-4-52-1-52-3-40-1-100-4-50-1-107.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge], [5:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.160.10
0.05
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.010.01
0.00
(loc)
77
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 21 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=159/6-10-15(min. 0-1-8), 6=159/6-10-15(min. 0-1-8), 8=235/6-10-15(min. 0-1-8)
Max Horz2=-52(LC 14)
Max Uplift2=-52(LC 16), 6=-58(LC 17)MaxGrav2=257(LC 39), 6=257(LC 39), 8=297(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 3-10-11,Exterior(2) 3-10-11 to 4-8-9zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 52 lb uplift at joint 2 and 58 lb uplift at
joint 6.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
PB02
TrussType
Piggyback
Qty
1
Ply
3
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:322018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-KNuHKy6SK4p3FHyuvKZmUF27Zf0FSuehyU7zpBzaMfr
Scale=1:17.4
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
9
10
11
12
4x4
2x4 2x41.5x4
8-7-58-7-5
4-3-104-3-10 8-7-54-3-10
0-4-52-6-20-1-100-4-50-1-107.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.06
0.030.01
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.00
0.000.00
(loc)5
54
l/defln/r
n/rn/a
L/d120
120n/a
PLATESMT20
Weight: 63 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)2=157/6-10-15(min. 0-1-8), 4=157/6-10-15(min. 0-1-8), 6=231/6-10-15(min. 0-1-8)
Max Horz2=-61(LC 14)Max Uplift2=-52(LC 16), 4=-60(LC 17)MaxGrav2=180(LC 2), 4=180(LC 2), 6=257(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 4-3-10,Exterior(2) 4-3-10 to 7-3-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
8)Gablerequirescontinuous bottomchord bearing.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 52 lb uplift at joint 2 and 60 lb uplift atjoint 4.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
PB03
TrussType
Piggyback
Qty
11
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:332018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-oZSfXI755NxwtRX4T2401TaIV2MZBI1qB8sXLdzaMfq
Scale=1:17.4
T1 T1
B1
ST1
W1W1
1
2
3
4
5
6
7
10 9 8
11
12
13
14
15
16
4x4
2x4 2x41.5x4
1.5x4
1.5x4
1.5x4
1.5x4
8-7-58-7-5
4-3-104-3-10 8-7-54-3-10
0-4-52-6-20-1-100-4-50-1-107.0012
PlateOffsets(X,Y)-- [3:0-0-0,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.050.03
0.20
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
67
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 23 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStudOTHERS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 6-10-15.
(lb)-Max Horz2=-61(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 6, 10 except 8=-224(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9, 10 except 8=946(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 5-8=-904/285
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 4-3-10,Exterior(2) 4-3-10 to 7-3-10
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 10 except
(jt=lb) 8=224.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 778 lb down and 189 lb up at 5-9-8 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-4=-51, 4-7=-51, 2-6=-20
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
PB03
TrussType
Piggyback
Qty
11
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:332018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-oZSfXI755NxwtRX4T2401TaIV2MZBI1qB8sXLdzaMfq
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 5=-680
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T01
TrussType
FlatGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:342018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-Gm02le8jsh3nVb6G0lcFZg7K2SUxwdD_Qoc4t3zaMfp
Scale=1:54.2
W1
T1
W1
B1
W2 W1 W2 W1 W3 W1 W3 W1 W2 W1 W2
T1T2
B1
1 2 3 4 5 6 7 8 9
16 15 14 13 12 11 10
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
5x6
3x4 5x10 3x4
5x6
4x8
1.5x4 4x4 5x8
1.5x4 5x10
4x4 1.5x4
4x8
5-1-115-1-11 10-1-104-11-15 15-9-45-7-11 21-4-155-7-11 26-4-134-11-15 31-6-85-1-11
5-1-115-1-11 10-1-104-11-15 15-9-45-7-11 21-4-155-7-11 26-4-134-11-15 31-6-85-1-11
4-3-5PlateOffsets(X,Y)-- [2:0-4-0,0-1-8], [3:0-2-8,0-3-0], [3:0-0-0,0-1-12], [6:0-2-8,0-3-0], [7:0-0-0,0-1-12], [8:0-4-0,0-1-8], [10:0-3-0,0-3-0], [12:0-1-12,0-1-12], [13:0-4-0,0-3-0],[14:0-1-12,0-1-12], [16:0-3-0,0-3-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.64
0.920.71
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.36
-0.500.15
(loc)13-14
13-1410
l/defl>999
>750n/a
L/d240
180n/a
PLATESMT20
Weight: 143 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-8-3 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 4-3-14 oc bracing.
WEBS 1 Row at midpt 2-16, 8-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)16=1678/Mechanical, 10=1624/Mechanical
Max Horz16=152(LC 9)Max Uplift16=-1082(LC 8), 10=-1037(LC 9)MaxGrav16=1779(LC 2), 10=1713(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-20=-3013/1820, 20-21=-3013/1820, 3-21=-3013/1820, 3-4=-3013/1820,
4-22=-3467/2079, 22-23=-3467/2079, 23-24=-3467/2079, 5-24=-3467/2079,5-25=-3467/2079, 25-26=-3467/2079, 26-27=-3467/2079, 6-27=-3467/2079,
6-7=-3012/1821, 7-28=-3012/1821, 28-29=-3012/1821, 8-29=-3012/1821BOT CHORD 16-32=-1223/1886, 32-33=-1223/1886, 33-34=-1223/1886, 15-34=-1223/1886,15-35=-1223/1886, 35-36=-1223/1886, 14-36=-1223/1886, 14-37=-1886/3013,
37-38=-1886/3013, 38-39=-1886/3013, 13-39=-1886/3013, 13-40=-1859/3012,40-41=-1859/3012, 41-42=-1859/3012, 12-42=-1859/3012, 12-43=-1172/1881,
43-44=-1172/1881, 11-44=-1172/1881, 11-45=-1172/1881, 45-46=-1172/1881,10-46=-1172/1881WEBS2-16=-2381/1439, 2-15=0/295, 2-14=-879/1442, 4-14=-733/554, 4-13=-349/555,
5-13=-463/397, 6-13=-349/557, 6-12=-735/555, 8-12=-880/1447, 8-11=0/295,8-10=-2377/1438
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)Provide adequate drainage to preventwater ponding.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)16=1082, 10=1037.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T01
TrussType
FlatGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:352018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-kyaQy_8Ld?Be6lgSaT7U6ugVospAf4T7eSLePWzaMfo
NOTES-
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 105 lb down and 99 lb up at 0-5-12, 112 lb down and 98 lb up at
2-5-12, 112 lb down and 98 lb up at 4-5-12, 112 lb down and 98 lb up at 6-5-12, 112 lb down and 98 lb up at 8-5-12, 112 lb down and 98 lb up at 10-5-12, 112 lb downand 98 lb up at 12-5-12, 112 lb down and 98 lb up at 14-5-12, 112 lb down and 98 lb up at 16-5-12, 112 lb down and 98 lb up at 18-5-12, 112 lb down and 98 lb up at
20-5-12, 112 lb down and 98 lb up at 22-5-12, 112 lb down and 98 lb up at 24-5-12, 112 lb down and 98 lb up at 26-5-12, and 112 lb down and 98 lb up at 28-5-12, and110lb down and 89 lb up at 30-5-12 on top chord, and 45 lb down and 22 lb up at 0-5-12, 38 lb down and 28 lb up at 2-5-12, 38 lb down and 28 lb up at 4-5-12, 38 lbdown and 28 lb up at 6-5-12, 38 lb down and 28 lb up at 8-5-12, 38 lb down and 28 lb up at 10-5-12, 38 lb down and 28 lb up at 12-5-12, 38 lb down and 28 lb up at
14-5-12, 38 lb down and 28 lb up at 16-5-12, 38 lb down and 28 lb up at 18-5-12, 38 lb down and 28 lb up at 20-5-12, 38 lb down and 28 lb up at 22-5-12, 38 lb downand 28 lb up at 24-5-12, 38 lb down and 28 lb up at 26-5-12, and 38 lb down and 28 lb up at 28-5-12, and 37 lb down and 23 lb up at 30-5-12 on bottomchord.The
design/selection of suchconnection device(s)is the responsibility of others.10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-9=-61, 10-16=-20Concentrated Loads(lb)
Vert: 11=-22(B) 8=-26(B) 17=-47(B) 18=-26(B) 19=-26(B) 20=-26(B) 21=-26(B) 22=-26(B) 23=-26(B) 24=-26(B) 25=-26(B) 26=-26(B) 27=-26(B) 28=-26(B)
29=-26(B) 30=-26(B) 31=-20(B) 32=-28(B) 33=-22(B) 34=-22(B) 35=-22(B) 36=-22(B) 37=-22(B) 38=-22(B) 39=-22(B) 40=-22(B) 41=-22(B) 42=-22(B) 43=-22(B)44=-22(B) 45=-22(B) 46=-14(B)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T02
TrussType
HalfHip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:362018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-C87oAK9zOIJVkuFf8Aeje5Cb3GEAOTpHt65ByyzaMfn
Scale=1:55.1
0-1-15W1
T1
T3
B1
W2 W1 W2 W1 W2 W3
W4
W6
W5
T2
B1
1 2 3 4 5
6
7
12 11 10 9 8
13 14 15 16 17
18 19
3x4
4x6 3x4
3x4
4x6
3x4 1.5x4
5x10
5x6
3x4
4x4
3x6
7-9-157-9-15 15-6-27-8-3 23-0-97-6-7 31-6-88-5-15
7-9-157-9-15 15-6-27-8-3 23-0-97-6-7 27-2-104-2-1 31-6-84-3-14
5-11-56-1-41-1-135-11-57.0012
PlateOffsets(X,Y)-- [1:0-2-12,0-1-12], [5:0-3-0,0-1-12], [10:0-3-4,0-3-0], [11:0-2-4,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.920.61
0.96
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.13-0.32
0.07
(loc)
10-118-9
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 142 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T3: 2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 1-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)12=1251/Mechanical, 8=1190/MechanicalMax Horz12=-222(LC 12)
Max Uplift12=-263(LC 12), 8=-115(LC 12)MaxGrav12=1629(LC 34), 8=1266(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-12=-1559/298, 1-13=-1742/291, 2-13=-1742/291, 2-14=-2261/371, 14-15=-2261/371,
3-15=-2261/371, 3-4=-2261/371, 4-16=-2231/363, 16-17=-2228/363, 5-17=-2228/363,
5-6=-1839/305, 7-19=-273/39, 7-8=-263/67BOT CHORD 10-11=-293/1742, 9-10=-147/1596, 8-9=-211/1414
WEBS 1-11=-348/2120, 2-11=-1089/315, 2-10=-132/637, 4-10=-720/237, 5-10=-224/804,5-9=-2/292, 6-9=-205/268, 6-8=-1634/265
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 23-0-9,Exterior(2) 23-0-9 to 27-4-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)12=263, 8=115.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T03
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:372018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-gLhANgAb9cRMM2qriu9yBJlrQgYS70oQ6mqkUOzaMfm
Scale=1:57.3
0-1-150-1-15T1 T2
T4
B1
W3
W4
W5 W5
W4
W3
W6 W7
W1
W2
W9
W8
T3
B1
1
2 3 4 5
6
7
14 13 12 11 10 9 8
15 1617
18
19
20
21
3x8
4x4
4x6
2x4 3x64x8
3x4
3x4
6x8
3x8
3x4
4x4 3x4
4x6
2-2-112-2-11 11-2-88-11-13 20-2-58-11-13 25-9-25-6-13 31-6-85-9-6
2-2-112-2-11 8-2-95-11-14 14-2-75-11-14 20-2-55-11-14 25-9-25-6-13 31-6-85-9-6
6-5-117-7-57-9-41-1-137-7-57.0012
PlateOffsets(X,Y)-- [2:0-2-0,0-1-12], [4:0-4-0,Edge], [5:0-3-0,0-1-12], [6:0-1-12,0-1-8], [7:Edge,0-1-12], [9:0-1-12,0-2-0], [13:0-3-0,0-1-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.560.74
0.59
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.14-0.40
0.07
(loc)
10-1210-12
8
l/defl
>999>947
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 162 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W6,W7,W1,W2,W9,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-9-13 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 3-13, 4-10, 1-14
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)14=1222/Mechanical, 8=1170/MechanicalMax Horz14=-277(LC 12)
Max Uplift14=-170(LC 12), 8=-133(LC 17)MaxGrav14=1479(LC 37), 8=1324(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-450/181, 2-15=-407/168, 3-15=-410/168, 3-4=-1494/289, 4-16=-1363/298,
16-17=-1361/299, 5-17=-1360/299, 5-18=-1540/309, 6-18=-1612/279, 6-19=-1564/272,
19-20=-1651/269, 20-21=-1774/253, 7-21=-1782/238, 1-14=-1501/195, 7-8=-1262/214BOT CHORD 13-14=-261/264, 12-13=-222/1295, 11-12=-198/1611, 10-11=-198/1611, 9-10=-180/1447
WEBS 3-13=-1383/262, 3-12=-24/526, 4-12=-314/148, 4-10=-389/209, 5-10=-19/465,6-10=-451/186, 1-13=-195/1360, 7-9=-138/1288
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 6-5-10,Interior(1) 6-5-10 to 20-2-5,Exterior(2) 20-2-5 to 24-5-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)14=170, 8=133.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T04
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:392018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-djpxoMCrgDh4bM_EpIBQGkq78TIQbxkjZ4JrYHzaMfk
Scale=1:60.9
0-1-150-1-15T1
T2
T3
B1
W3
W4
W5
W4
W3
W6
W7
W1
W2
W9
W8
T4
B1
1
2 3 4
5
6
7
14 13 12 11 10 9 8
15
16
17 18 19 20
21
22
4x4
4x6
3x6
2x4 3x44x8
3x8
1.5x4 3x8
3x4
4x4
4x4
4x4
5x6
5-1-05-1-0 11-2-86-1-8 17-4-06-1-8 24-0-26-8-2 24-1-140-1-12 31-6-87-4-10
5-1-05-1-0 11-2-86-1-8 17-4-06-1-8 24-0-26-8-2 24-1-140-1-12 31-6-87-4-10
6-5-119-3-59-5-41-1-139-3-57.0012
PlateOffsets(X,Y)-- [1:0-1-4,0-1-8], [2:0-2-0,0-1-12], [4:0-3-0,0-1-12], [6:0-1-12,0-1-8], [7:Edge,0-1-12], [8:Edge,0-3-8], [9:0-1-12,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.810.51
0.57
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.07-0.20
0.05
(loc)
8-98-9
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 169 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W7,W1,W9,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-13, 3-13, 3-10, 6-10, 1-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)14=1185/Mechanical, 8=1150/Mechanical
Max Horz14=-320(LC 12)Max Uplift14=-78(LC 16), 8=-155(LC 17)
MaxGrav14=1253(LC 37), 8=1347(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-15=-743/211, 15-16=-716/224, 2-16=-679/238, 2-17=-621/245, 17-18=-622/245,3-18=-625/244, 3-19=-1090/307, 19-20=-1089/307, 4-20=-1088/308, 4-5=-1254/314,
5-21=-1296/283, 6-21=-1418/279, 6-22=-1798/269, 7-22=-1900/243, 1-14=-1214/247,
7-8=-1275/216BOT CHORD 13-14=-254/271, 12-13=-132/1128, 11-12=-132/1128, 10-11=-132/1128, 9-10=-160/1554
WEBS 3-13=-885/182, 3-12=0/252, 3-10=-129/355, 4-10=-14/366, 6-10=-635/231,1-13=-172/1015, 7-9=-88/1314
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 5-1-0,Exterior(2) 5-1-0 to 21-6-15,Interior(1) 21-6-15 to 31-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 14 except(jt=lb)8=155.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T05
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:402018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-5vNJ?hCURXpxDWZQN0ifpxNHYtb9KQnsok3P5jzaMfj
Scale=1:67.1
0-1-150-1-15T1
T2
T3
B1
W3 W4 W3
W5
W6
W1
W2
W8
W7
T4
B1
1
2 3
4
5
6
12 11 10 9 8 7
13
14
15
16 17 18
19 20
21
22
5x6
4x6
3x10MT18H
3x4 3x43x4
3x8
3x4
4x4
5x6
4x4
5x6
7-11-57-11-5 14-5-116-6-7 22-10-68-4-10 23-1-130-3-8 31-6-88-4-11
7-11-57-11-5 14-5-116-6-7 22-10-68-4-10 23-1-130-3-8 31-6-88-4-11
6-5-1110-11-511-1-41-1-1310-11-57.0012
PlateOffsets(X,Y)-- [1:Edge,0-1-12], [2:0-3-0,0-1-12], [3:0-3-0,0-1-12], [5:0-1-12,0-1-8], [6:Edge,0-1-12], [7:Edge,0-3-8], [8:0-2-0,0-1-12], [11:0-1-12,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.890.67
0.39
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.10-0.30
0.04
(loc)
7-88-10
7
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 160 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T1: 2x4SPF 2100F 1.8E,T2: 2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W6,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 2-11, 5-10, 1-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)12=1148/Mechanical, 7=1129/MechanicalMax Horz12=-364(LC 12)
Max Uplift12=-109(LC 16), 7=-171(LC 17)MaxGrav12=1444(LC 38), 7=1368(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-13=-1048/218, 13-14=-913/231, 14-15=-888/235, 2-15=-873/260, 2-16=-1025/310,
16-17=-1025/310, 17-18=-1025/310, 3-18=-1025/310, 3-19=-1182/304, 19-20=-1210/279,
4-20=-1229/277, 4-5=-1399/260, 5-21=-1753/262, 21-22=-1892/232, 6-22=-1984/229,1-12=-1372/258, 6-7=-1291/214
BOT CHORD 11-12=-243/322, 10-11=-93/763, 9-10=-145/1634, 8-9=-145/1634, 7-8=-100/280WEBS2-11=-437/190, 2-10=-137/521, 3-10=0/268, 5-10=-777/289, 5-8=0/269, 1-11=-142/927,6-8=-56/1416
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 7-11-5,Exterior(2) 7-11-5 to 18-8-10,
Interior(1) 18-8-10 to 31-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.6)All plates areMT20 plates unless otherwiseindicated.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
12=109, 7=171.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T06
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:412018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-Z6xhD1D6Crxorg8cxjEuL9wSrHxk3uh01Ooyd9zaMfi
Scale=1:62.0
T1
T2
T3
B1
W3
W4
W4 W3
W5
W6
W1
W2
W8
W7
T4
B1
1
2 3 4
5
6
7
12 11 10 9 8
13
14
15 16
17 18
19
20
5x6 5x6
3x4
3x4 5x123x10
3x4
3x4
4x4
4x6
4x4
5x6
6-10-146-10-14 15-6-28-7-5 23-4-97-10-7 31-6-88-1-15
6-10-146-10-14 11-2-84-3-10 15-6-24-3-10 23-4-97-10-7 31-6-88-1-15
6-5-1110-6-01-1-1310-6-07.0012
PlateOffsets(X,Y)-- [1:0-3-0,0-1-8], [2:0-3-8,0-2-8], [4:0-3-8,0-2-8], [6:0-1-12,0-1-8], [7:Edge,0-1-12], [8:Edge,0-3-8], [9:0-1-12,0-1-12], [10:0-3-8,0-3-4], [11:0-3-8,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.860.59
0.34
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.11-0.31
0.04
(loc)
10-1110-11
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 167 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T2: 2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W6,W1,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-0-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 2-11, 3-11, 6-10, 1-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)12=1162/Mechanical, 8=1137/MechanicalMax Horz12=-351(LC 12)
Max Uplift12=-98(LC 16), 8=-165(LC 17)MaxGrav12=1369(LC 38), 8=1357(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-13=-957/229, 13-14=-820/232, 2-14=-807/255, 2-15=-702/275, 15-16=-702/275,
3-16=-702/275, 3-4=-1043/309, 4-17=-1215/307, 17-18=-1251/281, 5-18=-1283/277,
5-6=-1416/264, 6-19=-1730/271, 19-20=-1870/243, 7-20=-1959/241, 1-12=-1311/253,7-8=-1279/218
BOT CHORD 11-12=-244/305, 10-11=-89/875, 9-10=-153/1616, 8-9=-83/257WEBS3-11=-568/187, 3-10=-104/489, 4-10=-8/325, 6-10=-730/272, 1-11=-149/902,7-9=-85/1400
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-10-14,Exterior(2) 6-10-14 to 19-9-1,
Interior(1) 19-9-1 to 31-4-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 12 except(jt=lb)
8=165.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T07
TrussType
PiggybackBaseGirder
Qty
1
Ply
3
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:462018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-w3kaGlHE1NZ4xR0ajHp32CdQSIhkk1slAgWjINzaMfd
Scale=1:91.8
T1
T2
T3
T4
T5
B1W1W2
W3W4
W5 W6 W7 W8W9 W10
W11 W12 W11 W12 W11
W13 W14
W15 W16
W17 W18 W19
W20
B3B212
3
4
5
6
7
8 9 10
11
12
13
14
1516
30 29 28 27 26 25 24 23 22 21 20 19 18 17
37
38
39
40
41 42
43
44
45 46
47
48 49 50 5152
6x8 5x8
5x6
5x12 6x12MT18H
4x6
3x6 4x6 5x6
8x8
4x6
10x10
5x6
5x6
5x6
10x10 4x10
2x4
4x4
3x5
4x4
3x5
4x4 4x6
4x6
2x44x6
4x6
3-8-53-8-5 6-11-113-3-6 9-3-72-3-12 12-6-03-2-9 15-3-82-9-8 19-6-64-2-14 23-10-04-3-10 28-1-104-3-10 32-11-144-10-4 37-2-154-3-1 41-9-104-6-11 43-11-02-1-6 50-2-06-3-0
-1-4-121-4-12 3-8-53-8-5 6-11-113-3-6 9-3-72-3-12 12-6-03-2-9 15-3-82-9-8 19-6-64-2-14 23-10-04-3-10 28-1-104-3-10 32-11-144-10-4 37-2-154-3-1 41-9-104-6-11 43-11-02-1-6 50-2-06-3-0 51-4-121-2-12
0-10-33-2-22-6-610-6-00-5-410-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [4:0-5-0,0-4-8], [5:0-2-0,0-2-0], [6:0-1-12,0-2-4], [7:0-1-12,0-2-4], [8:0-6-0,0-2-4], [10:0-6-0,0-2-4], [14:0-2-0,0-2-0], [15:0-3-15,0-0-5], [18:0-2-12,0-2-0],[23:0-2-4,0-2-0], [25:0-2-4,0-2-0], [27:0-5-0,0-6-4]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.42
0.470.80
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.27
-0.560.11
(loc)27
2717
l/defl>999
>946n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 1124 lbFT= 20%
GRIP197/144
244/190
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T1: 2x8SP 2400F 2.0E,T2: 2x6SP 2400F 2.0EBOT CHORD2x8SP 2400F 2.0E*Except*
B4,B3: 2x6SPF No.2WEBS2x4SPFStud*Except*W7: 2x8SP 2400F 2.0E
W9,W10,W11,W12,W13,W14: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 17-18,15-17.
REACTIONS.(lb/size)2=9335/0-6-0(min. 0-2-10), 17=5165/0-6-0(min. 0-2-13), 15=-680/0-4-0(min. 0-1-8)
Max Horz2=-186(LC 13)Max Uplift2=-1520(LC 12), 17=-765(LC 13), 15=-829(LC 39)
MaxGrav2=9429(LC 39), 17=5425(LC 39), 15=127(LC 12)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-37=-14292/2222, 2-3=-21377/3341, 3-4=-22762/3528, 4-38=-20588/3165,5-38=-20546/3178, 5-39=-16960/2595, 6-39=-16828/2601, 6-7=-12450/1918,
7-40=-8483/1303, 8-40=-8362/1327, 8-41=-6108/966, 9-41=-6108/966, 9-42=-6108/966,
10-42=-6108/966, 10-43=-5782/886, 11-43=-5903/869, 11-44=-5620/829,12-44=-5795/805, 12-45=-4925/689, 45-46=-5006/687, 13-46=-5065/674, 13-14=-969/142,
14-47=-455/3504, 15-47=-461/3477
BOT CHORD 2-48=-3243/19925, 30-48=-3243/19925, 30-49=-3243/19925, 49-50=-3243/19925,
29-50=-3243/19925, 29-51=-3430/21583, 28-51=-3430/21583, 28-52=-2798/17877,
27-52=-2798/17877, 26-27=-2194/14480, 25-26=-2194/14480, 24-25=-1578/10842,23-24=-928/7134, 22-23=-524/4984, 21-22=-498/4927, 20-21=-439/4346,
19-20=-439/4346, 18-19=-82/1176, 17-18=-3373/489, 15-17=-3373/489
WEBS 3-30=-303/59, 3-29=-222/1887, 4-29=-201/1102, 4-28=-5582/952, 5-28=-887/5417,5-27=-5390/958, 6-27=-1625/10022, 6-25=-8425/1429, 7-25=-1272/7869,
7-24=-7563/1324, 8-24=-1082/6548, 8-23=-2724/516, 9-23=-419/153, 10-23=-576/3021,10-22=-273/514, 11-22=-515/432, 11-21=-649/246, 12-21=-206/963, 12-19=-1385/228,13-19=-412/3504, 13-18=-3858/543, 14-18=-691/5554, 14-17=-4815/709
NOTES-
1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc.Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-4-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply toplyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T07
TrussType
PiggybackBaseGirder
Qty
1
Ply
3
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:462018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-w3kaGlHE1NZ4xR0ajHp32CdQSIhkk1slAgWjINzaMfd
NOTES-
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;
cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15PlateDOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC
1608.3.4.6) Unbalancedsnowloads have been considered for this design.7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.9)All plates areMT20 plates unless otherwiseindicated.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=1520, 17=765, 15=829.12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 900 lb down and 160 lb up at 2-5-4, 900 lb down and 155 lb up at 4-5-4, 894 lb down and 158 lb up at 6-5-4, 880 lb down and 162 lb up at 8-5-4, and 855 lb down and 168 lb up at 10-5-4, and 5621 lb down and 885 lb up at 12-6-0 on
bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-4=-51, 4-8=-51, 8-10=-61, 10-13=-51, 13-16=-51, 31-34=-20
Concentrated Loads(lb)Vert: 27=-5621(B) 48=-900(B) 49=-900(B) 50=-894(B) 51=-880(B) 52=-855(B)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T07GE
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:472018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-OGIyT5ItohhxZbbmH_LIbQAcRi5STgXuPKFGrpzaMfc
Scale=1:11.8
T1 W1
B11
2
3
4
5
6
1.5x4
1.5x43x4
-1-2-121-2-12 5-0-05-0-0
0-5-41-8-43.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.34
0.240.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.04
0.070.00
(loc)1
14
l/defln/r
n/rn/a
L/d120
120n/a
PLATESMT20
Weight: 14 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)4=164/5-0-0(min. 0-1-8), 2=242/5-0-0(min. 0-1-8)
Max Horz2=62(LC 13)
Max Uplift4=-41(LC 16), 2=-96(LC 12)MaxGrav4=185(LC 2), 2=277(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-1-2-12 to 1-9-4,Exterior(2) 1-9-4 to 4-10-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Gablerequirescontinuous bottomchord bearing.
7)Gablestudsspaced at 2-0-0 oc.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 2.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:492018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-KeQiumJ7KIyfoul9PPNmgrFp_VcnxN0BsekNvizaMfa
Scale=1:89.6
T1
T2
T3
T4
T5
B1W2W3
W4 W5
W6
W7 W8
W9 W9
W8 W7
W6
W10 W11 W12
W13W1
B3B1B2123
4
5
6 7 8
9
10
11
12
13
2524 23 2221 20 19 18 17 16 15 14
29
30
31
32
33
3435 36 37
38
39
40
41
42
43 44
5x6
5x8 5x8
5x6
4x10 3x10MT18H
4x8
3x5
6x6
3x5
3x5
3x8
3x5
3x8
3x5
4x6 5x6
5x6
3x5
3x6 4x6
3x6
0-2-00-2-0
1-2-4
1-0-4
1-2-8
0-0-4
6-11-115-9-3 12-8-105-8-15 19-6-66-9-12 28-1-108-7-5 34-11-86-9-13 41-9-106-10-2 43-11-02-1-6 50-2-06-3-0
-1-4-12
1-4-12
1-2-8
1-2-8
6-11-11
5-9-3
12-8-10
5-8-15
19-6-6
6-9-12
23-10-0
4-3-10
28-1-10
4-3-10
34-11-8
6-9-13
41-9-10
6-10-2
43-11-0
2-1-6
50-2-0
6-3-0
51-4-12
1-2-12
0-10-33-2-22-6-610-6-00-5-410-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [3:0-3-0,0-1-12], [6:0-5-0,0-1-12], [8:0-5-0,0-1-12], [11:0-2-12,0-1-8], [14:0-3-0,0-1-8], [15:0-1-12,0-2-4], [23:0-2-4,0-3-0], [24:0-2-12,0-1-8], [25:0-5-7,0-2-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.91
0.890.83
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.19
-0.530.14
(loc)21
18-2014
l/defl>999
>969n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 237 lb FT= 20%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2,T4: 2x4SPF 1650F 1.5EBOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W2,W4,W5,W6,W10,W11,W13: 2x4SPFStud,W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 4-9-13 oc bracing.WEBS 1 Row at midpt 5-20, 7-20, 7-18, 9-18
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 0-4-0 except(jt=length) 24=0-8-8, 14=0-6-0.(lb)-Max Horz25=184(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) except 25=-669(LC 2), 24=-442(LC 16), 14=-487(LC 17), 12=-323(LC 57)MaxGravAllreactions 250 lb orless at joint(s) 25, 12 except 24=2591(LC 2),
14=3380(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-29=-186/589, 3-29=-182/606, 3-30=-3117/405, 4-30=-3114/427, 4-31=-3002/446,31-32=-2946/450, 5-32=-2815/471, 5-33=-2335/456, 6-33=-2160/474, 6-34=-1874/457,
34-35=-1874/457, 7-35=-1874/457, 7-36=-1814/478, 36-37=-1814/478, 8-37=-1814/478,8-38=-2093/496, 9-38=-2305/487, 9-39=-2439/527, 39-40=-2555/532, 40-41=-2617/536,10-41=-2758/553, 10-42=-1076/325, 11-42=-1253/440, 11-43=-176/1323,
43-44=-186/1291, 12-44=-189/1289, 2-25=-149/413BOT CHORD 24-25=-449/159, 23-24=-449/159, 22-23=-404/2950, 21-22=-404/2950, 20-21=-284/2547,
19-20=-143/1856, 18-19=-143/1856, 17-18=-329/2264, 16-17=-328/1251,15-16=-328/1251, 14-15=-1251/220, 12-14=-1251/220WEBS3-24=-2227/472, 3-23=-454/3397, 4-23=-503/152, 4-21=-505/134, 5-21=0/437,
5-20=-917/273, 6-20=-102/724, 7-18=-335/164, 8-18=-100/666, 9-18=-663/279,10-17=-20/1065, 10-15=-2036/571, 11-15=-661/3133, 11-14=-3194/929
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,Interior(1) 31-1-10 to 41-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:492018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-KeQiumJ7KIyfoul9PPNmgrFp_VcnxN0BsekNvizaMfa
NOTES-
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 669 lb uplift at joint 25, 442 lb uplift at joint 24, 487 lb uplift at joint 14 and 323lb uplift at joint 12.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 790 lb down and 472 lb up at 42-10-0 on top chord.Thedesign/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-2=-51, 2-4=-51, 4-6=-51, 6-37=-61, 13-42=-51, 25-26=-20
Concentrated Loads(lb)Vert: 42=-710
Trapezoidal Loads(plf)
Vert: 37=-61-to-8=-67, 8=-57-to-10=-89, 10=-89-to-42=-91
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T09
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:512018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-G1XTJSLNrvCN1CvXWqPElGK9gJKiPJ9UKyDU_azaMfY
Scale=1:89.6
T1
T2
T3
T4
T5
B1W2W3
W4 W5
W6
W7 W8
W9 W9
W8 W7
W6
W10 W11 W12
W13
W1 B3B1B212
3
4
5
6 7 8
9
10
11
12
13
25 24 23 2221 20 19 18 17 16 15 14
2930
31
32
33
3435 36 37
38
39
40
41
42
43 44
5x6
5x8 5x8
5x6
4x8 3x6
4x6
2x4 4x6
3x5
3x5
3x8
3x5
3x8
3x5
4x6 5x6
5x6
3x5
3x6 4x6
3x6
0-2-00-2-03-2-43-0-4 6-11-113-9-7 12-8-105-8-15 19-6-66-9-12 28-1-108-7-5 34-11-86-9-13 41-9-106-10-2 43-11-02-1-6 50-2-06-3-0
-1-4-121-4-12 3-2-43-2-4 6-11-113-9-7 12-8-105-8-15 19-6-66-9-12 23-10-04-3-10 28-1-104-3-10 34-11-86-9-13 41-9-106-10-2 43-11-02-1-6 50-2-06-3-0 51-4-121-2-12
0-10-33-2-22-6-610-6-00-5-410-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [3:0-2-4,0-1-12], [6:0-5-0,0-1-12], [8:0-5-0,0-1-12], [11:0-2-12,0-1-12], [14:0-3-0,0-1-8], [15:0-2-0,0-2-4], [23:0-2-0,0-2-0], [24:0-2-4,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.900.74
0.73
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.14-0.42
0.12
(loc)
18-2018-20
14
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 235 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2,T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W2,W4,W5,W6,W10,W11,W13: 2x4SPFStud,W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 5-3-15 oc bracing.
WEBS 1 Row at midpt 5-20, 7-20, 7-18, 9-18
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 0-4-0 except(jt=length) 24=0-8-8, 14=0-6-0.
(lb)-Max Horz25=184(LC 15)Max UpliftAll uplift 100 lb orless at joint(s) except 25=-255(LC 55), 24=-287(LC 16), 14=-493(LC 12),
12=-276(LC 57)MaxGravAllreactions 250 lb orless at joint(s) 25, 12 except 24=2128(LC 43), 14=3224(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-29=-92/495, 29-30=-90/496, 3-30=-83/524, 3-4=-1923/287, 4-31=-2511/385,
31-32=-2454/389, 5-32=-2324/410, 5-33=-2113/426, 6-33=-1939/444, 6-34=-1681/434,
34-35=-1681/434, 7-35=-1681/434, 7-36=-1701/463, 36-37=-1701/463, 8-37=-1701/463,8-38=-1962/480, 9-38=-2175/471, 9-39=-2348/516, 39-40=-2464/521, 40-41=-2527/526,
10-41=-2667/542, 10-42=-1161/337, 11-42=-1338/452, 11-43=-146/1108,43-44=-157/1076, 12-44=-159/1075BOT CHORD 24-25=-457/179, 23-24=-457/179, 22-23=-284/1849, 21-22=-284/1849, 20-21=-238/2122,
19-20=-122/1703, 18-19=-122/1703, 17-18=-318/2185, 16-17=-338/1328,15-16=-338/1328, 14-15=-1043/192, 12-14=-1043/192
WEBS 3-24=-1959/317, 3-23=-311/2467, 4-23=-946/197, 4-21=-15/305, 5-20=-605/239,6-20=-87/613, 7-20=-319/233, 8-18=-92/601, 9-18=-699/281, 10-17=-2/902,10-15=-1923/557, 11-15=-640/2970, 11-14=-3047/911
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,
Interior(1) 31-1-10 to 41-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T09
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:512018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-G1XTJSLNrvCN1CvXWqPElGK9gJKiPJ9UKyDU_azaMfY
NOTES-
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 255 lb uplift at joint 25, 287 lb uplift at joint 24, 493 lb uplift at joint 14 and 276
lb uplift at joint 12.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 790 lb down and 472 lb up at 42-10-0 on top chord.The
design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51, 2-4=-51, 4-6=-51, 6-37=-61, 13-42=-51, 25-26=-20Concentrated Loads(lb)Vert: 42=-710
Trapezoidal Loads(plf)Vert: 37=-61-to-8=-67, 8=-57-to-10=-89, 10=-89-to-42=-91
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T10
TrussType
PiggybackBase
Qty
3
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:532018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-CQfDk8MeNXS5HW3weFRirhPTq61AtEsnnGib2TzaMfW
Scale=1:89.6
T1
T2
T3
T4
T5
B1
W2
W3
W4 W5
W6 W7
W8
W9 W9
W8 W7
W6
W10 W11 W12
W13
W1 B3B1B212
3 4
5
6 7 8
9
10
11
12
13
25 2423 2221 20 19 18 17 16 15 14
2930
31
32
33
3435 36 37
38
39
40
41
42
43 44
5x6
8x12MT18H
5x8
5x6
4x8 3x62x4
3x5
4x6
3x6
3x5
3x8
3x5
3x8
3x5
4x6 4x6
5x6
3x5
3x6 4x6
3x6
0-2-00-2-0 6-11-116-9-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 28-1-108-7-5 34-11-86-9-13 41-9-106-10-2 43-11-02-1-6 50-2-06-3-0
-1-4-121-4-12 6-11-116-11-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 23-10-04-3-10 28-1-104-3-10 34-11-86-9-13 41-9-106-10-2 43-11-02-1-6 50-2-06-3-0 51-4-121-2-12
0-10-33-2-22-6-610-6-00-5-410-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [6:0-9-0,0-1-12], [8:0-5-0,0-1-12], [11:0-2-12,0-2-0], [14:0-2-12,0-1-8], [15:0-2-0,0-1-8], [21:0-2-0,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.980.67
0.65
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.11-0.33
0.08
(loc)
18-2018-20
14
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 236 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W7,W8,W9,W12: 2x4SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 7-20, 7-18, 9-18
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 0-4-0 except(jt=length) 23=0-6-0, 14=0-6-0.
(lb)-Max Horz25=184(LC 15)Max UpliftAll uplift 100 lb orless at joint(s) except 25=-271(LC 12), 23=-166(LC 16), 14=-525(LC 12),
12=-221(LC 57)MaxGravAllreactions 250 lb orless at joint(s) 12 except 25=541(LC 47), 23=1941(LC 43), 14=2931(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-29=-386/214, 29-30=-376/216, 3-30=-299/239, 4-31=-1294/265, 31-32=-1281/273,
5-32=-1118/292, 5-33=-1554/368, 6-33=-1380/387, 6-34=-1198/385, 34-35=-1198/385,
7-35=-1198/385, 7-36=-1397/432, 36-37=-1397/432, 8-37=-1397/432, 8-38=-1612/446,9-38=-1825/436, 9-39=-2060/488, 39-40=-2176/494, 40-41=-2238/498, 10-41=-2378/514,
10-42=-1161/343, 11-42=-1338/458, 11-43=-112/877, 43-44=-123/847, 12-44=-125/844,2-25=-490/250BOT CHORD 24-25=-238/284, 23-24=-234/277, 20-21=-182/1066, 19-20=-78/1309, 18-19=-78/1309,
17-18=-290/1936, 16-17=-341/1315, 15-16=-341/1315, 14-15=-801/160, 12-14=-801/160WEBS3-24=-186/264, 3-23=-495/313, 4-23=-1680/201, 4-21=-148/1443, 5-21=-800/162,
5-20=-72/387, 6-20=-52/390, 7-20=-477/205, 7-18=-84/341, 8-18=-74/452,9-18=-754/282, 10-17=0/653, 10-15=-1707/533, 11-15=-605/2651, 11-14=-2768/880
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,Interior(1) 31-1-10 to 41-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T10
TrussType
PiggybackBase
Qty
3
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:542018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-hcDbxUNG8qayufd6ByzxNuyeaWMPch6w0wS8avzaMfV
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 271 lb uplift at joint 25, 166 lb uplift at joint 23, 525 lb uplift at joint 14 and 221
lb uplift at joint 12.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 790 lb down and 472 lb up at 42-10-0 on top chord.The
design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51, 2-3=-51, 3-6=-51, 6-37=-61, 13-42=-51, 25-26=-20Concentrated Loads(lb)Vert: 42=-710
Trapezoidal Loads(plf)Vert: 37=-61-to-8=-67, 8=-57-to-10=-89, 10=-89-to-42=-91
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T11
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:562018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-d_LMMAPWgSqf8znVJN?PSJ1?ZK4e4aRDTDxFfozaMfT
Scale=1:98.0
T1
T2
T3
T4
T5
B1
W2
W3
W4 W5
W6
W7 W8
W9 W9
W8
W7 W6 W10 W11 W12
W13W14
W15
W1 B3B1B212
3 4
5
6 7 8
9
10 11 12
1314
27 2625 24 23 22 21 20 19 18 17 16 15
3132
33 34
35
3637 38 39
40
41
42 43
44 45
5x6
8x12MT18H
5x6
5x6
4x8 3x62x4
3x5
4x6
3x5
3x5
3x8
3x5
3x8
3x5
3x8
4x6
5x6
4x6
5x6
2x4
3x6
4x6
3x6
0-2-0
0-2-0
6-11-11
6-9-11
8-3-0
1-3-5
12-8-9
4-5-9
19-6-6
6-9-13
28-1-10
8-7-5
34-11-7
6-9-13
39-9-0
4-9-9
41-9-10
2-0-10
42-10-0
1-0-6
50-2-0
7-4-0
-1-4-12
1-4-12
6-11-11
6-11-11
8-3-0
1-3-5
12-8-9
4-5-9
19-6-6
6-9-13
23-10-0
4-3-10
28-1-10
4-3-10
34-11-7
6-9-13
39-9-0
4-9-9
41-9-10
2-0-10
42-10-0
1-0-6
50-2-0
7-4-0
51-4-12
1-2-12
0-10-33-2-22-6-610-6-00-5-410-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [6:0-9-0,0-1-12], [8:0-3-8,0-2-8], [10:0-3-0,0-1-12], [12:0-3-0,0-3-0], [17:0-3-0,0-3-0], [19:0-2-8,0-1-8], [23:0-2-0,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.950.56
0.73
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.11-0.26
0.04
(loc)
15-3020-22
17
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 241 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W7,W8,W9: 2x4SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-22, 7-22, 7-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 0-4-0 except(jt=length) 25=0-6-0, 17=0-6-0.
(lb)-Max Horz27=184(LC 15)Max UpliftAll uplift 100 lb orless at joint(s) except 27=-273(LC 12), 25=-141(LC 16), 17=-538(LC 12),
13=-273(LC 13)MaxGravAllreactions 250 lb orless at joint(s) except 27=559(LC 47), 25=1652(LC 43), 17=2783(LC 43),13=618(LC 51)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-31=-427/219, 31-32=-417/222, 3-32=-339/245, 4-33=-1120/205, 33-34=-1107/213,
5-34=-945/232, 5-35=-1245/266, 6-35=-1070/285, 6-36=-929/296, 36-37=-929/296,7-37=-929/296, 7-38=-919/275, 38-39=-919/275, 8-39=-919/275, 8-40=-1059/261,
9-40=-1266/252, 9-41=-817/147, 41-42=-854/143, 42-43=-960/137, 10-43=-1059/133,10-11=-361/754, 11-12=-412/290, 12-44=-803/517, 44-45=-826/502, 13-45=-860/500,2-27=-506/252
BOT CHORD 26-27=-238/322, 25-26=-234/315, 22-23=-168/917, 21-22=0/934, 20-21=0/934,19-20=0/830, 18-19=-593/404, 17-18=-593/404, 15-16=-450/779, 13-15=-450/779
WEBS 3-26=-184/259, 3-25=-493/312, 4-25=-1393/111, 4-23=-63/1171, 5-23=-627/108,5-22=-62/275, 6-22=-23/276, 7-20=-261/199, 9-20=-160/362, 9-19=-872/307,10-19=-396/1686, 10-17=-2103/592, 11-17=-927/643, 11-16=-760/1301, 12-16=-1560/900,
12-15=-254/448
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,Interior(1) 31-1-10 to 41-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T11
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:562018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-d_LMMAPWgSqf8znVJN?PSJ1?ZK4e4aRDTDxFfozaMfT
NOTES-
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 273 lb uplift at joint 27, 141 lb uplift at joint 25, 538 lb uplift at joint 17 and 273
lb uplift at joint 13.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 790 lb down and 472 lb up at 42-10-0 on top chord.Thedesign/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51, 2-3=-51, 3-6=-51, 6-39=-61, 12-14=-51, 27-28=-20Concentrated Loads(lb)
Vert: 12=-710Trapezoidal Loads(plf)
Vert: 39=-61-to-8=-67, 8=-57-to-11=-89, 11=-89-to-12=-91
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T12
TrussType
PiggybackBase
Qty
2
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:592018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-1Z0U_BROzNCE?RW4_VY64yfW0X4CHxAfAB9vG7zaMfQ
Scale=1:92.8
T1
T2
T3
T4
T5
B1
B3
B4
B5
B6
W2
W3
W4 W5
W6
W7 W8
W9 W9
W8
W11
W10
W12
W14
W13
W15 W16
W17W18
W19
W1 B1B212
3 4
5
6 7 8 9
10
11 12 13
1415
30 2928 2726 25 24 2322
21 20
19 18 17 16
3435
36 37
38
3940 41 42
43
44
45 46
47 48
5x6
6x8 5x6
5x6
4x8 3x6 3x4
3x4
4x6
3x4 4x62x4
3x5
4x6
3x5
3x5
3x8
3x5
3x10 5x10
5x8
6x10
4x6
4x6
5x6
2x43x6
0-2-0
0-2-0
6-11-11
6-9-11
8-3-0
1-3-5
12-8-9
4-5-9
19-6-6
6-9-13
28-1-10
8-7-5
29-8-0
1-6-6
36-8-0
7-0-0
39-9-0
3-1-0
41-9-10
2-0-10
42-10-0
1-0-6
50-2-0
7-4-0
-1-4-12
1-4-12
6-11-11
6-11-11
8-3-0
1-3-5
12-8-9
4-5-9
19-6-6
6-9-13
23-10-0
4-3-10
28-1-10
4-3-10
29-8-0
1-6-6
36-8-0
7-0-0
39-9-0
3-1-0
41-9-10
2-0-10
42-10-0
1-0-6
50-2-0
7-4-0
51-4-12
1-2-12
0-10-33-2-22-6-610-6-00-5-41-0-010-6-04.0012
7.0012
3.0012
PlateOffsets(X,Y)-- [6:0-5-0,0-1-12], [8:0-3-0,0-1-12], [11:0-3-0,0-1-12], [13:0-3-0,0-3-0], [18:0-4-0,0-3-0], [20:0-7-0,0-4-0], [21:0-3-4,0-2-8], [23:0-2-12,0-1-8], [26:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.940.70
0.73
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.11-0.27
0.06
(loc)
16-3320-21
18
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 262 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B5: 2x4SPFStudWEBS2x4SPFStud*Except*
W7,W8,W9,W10,W12: 2x4SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.Except:
1 Row at midpt 9-21WEBS1 Row at midpt 5-24, 7-24, 7-23, 8-23
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 0-4-0 except(jt=length) 28=0-6-0, 18=0-6-0.(lb)-Max Horz30=184(LC 15)
Max UpliftAll uplift 100 lb orless at joint(s) except 30=-274(LC 12), 14=-290(LC13), 28=-140(LC 16), 18=-535(LC 12)MaxGravAllreactions 250 lb orless at joint(s) except 30=559(LC 47), 14=570(LC
51), 28=1622(LC 43), 18=2914(LC 43)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-426/221, 34-35=-416/223, 3-35=-339/246, 4-36=-1091/204, 36-37=-1078/212,5-37=-915/231, 5-38=-1201/264, 6-38=-1027/282, 6-39=-890/294, 39-40=-890/294,
7-40=-890/294, 7-41=-842/267, 41-42=-842/267, 8-42=-842/267, 8-9=-1288/355,9-43=-1010/225, 43-44=-1162/219, 10-44=-1366/224, 10-45=-420/67, 45-46=-451/51,11-46=-553/47, 11-12=-388/1045, 12-13=-234/337, 13-47=-630/493, 47-48=-652/479,
14-48=-687/477, 2-30=-506/253BOT CHORD 29-30=-241/321, 28-29=-237/314, 25-26=-168/892, 24-25=-168/892, 23-24=-2/890,
9-21=-656/298, 20-21=0/514, 10-20=-1272/432, 17-18=-376/43, 16-17=-422/611,14-16=-422/611WEBS3-29=-184/259, 3-28=-493/312, 4-28=-1363/108, 4-26=-60/1144, 5-26=-609/106,
5-24=-76/266, 6-24=-26/267, 7-23=-289/186, 8-23=-256/0, 21-23=0/986, 8-21=-167/919, 10-21=-176/649, 18-20=-935/488, 11-20=-291/1687, 11-18=-1910/395, 12-18=-896/656,
12-17=-751/1306, 13-17=-1573/902, 13-16=-262/460
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,
Interior(1) 31-1-10 to 41-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T12
TrussType
PiggybackBase
Qty
2
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:10:592018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-1Z0U_BROzNCE?RW4_VY64yfW0X4CHxAfAB9vG7zaMfQ
NOTES-
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 274 lb uplift at joint 30, 290 lb uplift at joint 14, 140 lb uplift at joint 28 and 535lb uplift at joint 18.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 790 lb down and 472 lb up at 42-10-0 on top chord.Thedesign/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-2=-51, 2-3=-51, 3-6=-51, 6-42=-61, 13-15=-51, 22-30=-20, 20-21=-20, 19-31=-20
Concentrated Loads(lb)Vert: 13=-710
Trapezoidal Loads(plf)
Vert: 42=-61-to-8=-67, 8=-57-to-12=-89, 12=-89-to-13=-91
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T13
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:002018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-VmatCXS1kgK5ca5GYD3Ld9CkZxSB0RopOrvSoZzaMfP
Scale=1:77.7
T1
T2
T3
T4
B1
B3
B4
B5
B6
W2
W3
W4 W5
W6 W7
W8
W9 W9
W8
W11
W10
W12
W1
W15
B1
W14W13
B212
3 4
5
6 7 8 9
10
11
24 23 22 21 20 19 18 17 16
15 14
13 12
25 26
27
28
29
30
31 32 3334
35
36
375x6
6x8
5x6
3x10 3x6 2x4
3x4
4x6
2x41.5x4
3x4
4x4
3x5
3x4
3x8
3x4
4x8
5x12
3x6
4x6
5x10
3x5
0-2-00-2-0 6-11-116-9-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 28-1-108-7-5 29-8-01-6-6 36-8-07-0-0 40-3-03-7-0
-1-4-121-4-12 6-11-116-11-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 23-10-04-3-10 28-1-104-3-10 29-8-01-6-6 36-8-07-0-0 40-3-03-7-0
0-10-33-2-210-6-03-5-31-0-010-6-04.0012
7.0012
PlateOffsets(X,Y)-- [4:0-1-12,0-1-12], [5:0-1-12,0-1-8], [6:0-5-0,0-1-12], [8:0-3-0,0-1-12], [14:0-6-12,0-2-8], [15:0-4-0,0-2-4], [17:0-2-0,0-2-0], [20:0-2-0,0-1-8], [22:0-1-12,0-1-8], [24:0-5-5,0-1-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.76
0.520.57
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.11
-0.300.09
(loc)14-15
14-1512
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 228 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B5: 2x4SPFStud
WEBS 2x4SPFStud*Except*W7,W8,W9,W10,W12: 2x4SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.Except:
1 Row at midpt 9-15WEBS1 Row at midpt 7-18, 7-17, 8-17
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)24=389/0-4-0(min. 0-1-8), 22=1429/0-6-0(min. 0-2-11), 12=1173/MechanicalMax Horz24=332(LC 13)Max Uplift24=-273(LC 12), 22=-144(LC 16), 12=-144(LC 17)
MaxGrav24=532(LC 44), 22=1704(LC 41), 12=1456(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-25=-402/219, 25-26=-393/222, 3-26=-319/245, 4-27=-1153/197, 27-28=-1140/206,5-28=-978/224, 5-29=-1301/258, 29-30=-1273/280, 6-30=-1127/299, 6-31=-977/302,
7-31=-977/302, 7-32=-996/301, 32-33=-996/301, 33-34=-996/301, 8-34=-996/301,8-9=-1491/397, 9-35=-1258/294, 35-36=-1388/273, 10-36=-1553/255, 10-37=-1197/188,11-37=-1303/170, 2-24=-478/252, 11-12=-1419/210
BOT CHORD 23-24=-368/303, 22-23=-365/296, 21-22=-292/114, 20-21=-292/114, 19-20=-231/945,18-19=-231/945, 17-18=-140/1007, 9-15=-559/275, 14-15=-189/1155, 10-14=-621/167
WEBS 3-23=-189/259, 3-22=-474/315, 4-22=-1445/127, 4-20=-78/1221, 5-20=-657/117,5-18=-53/292, 6-18=-26/303, 7-18=-277/170, 8-17=-427/81, 15-17=-55/1161,8-15=-282/1181, 11-14=-185/1333
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,
Interior(1) 31-1-10 to 40-1-4zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T13
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:002018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-VmatCXS1kgK5ca5GYD3Ld9CkZxSB0RopOrvSoZzaMfP
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 273 lb uplift at joint 24, 144 lb uplift at joint 22 and 144 lb uplift at joint 12.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T14
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:022018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-S8iddDTHGIapsuFffe6piaH46l7dUKw6s9OZsSzaMfN
Scale=1:80.6
T1
T2
T3
T4
B1
W2
W3
W4 W5
W6 W7
W8
W9 W9
W8 W7
W6
W1
W11
W10
B3B212
3 4
5
6 7 8
9
10
20 1918 1716 15 14 13 12 11
21 22
23
24
25
26
27 28 29 30
31
32 33 345x6
8x12MT18H
6x8
3x10 3x61.5x4
3x4
4x4
3x5
3x4
3x8
3x4
3x8
3x4
3x5 2x4
4x6
3x6
0-2-00-2-0 6-11-116-9-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 28-1-108-7-5 34-11-76-9-13 40-3-05-3-9
-1-4-121-4-12 6-11-116-11-11 8-3-01-3-5 12-8-94-5-9 19-6-66-9-13 23-10-04-3-10 28-1-104-3-10 34-11-76-9-13 40-3-05-3-9
0-10-33-2-210-6-03-5-310-6-04.0012
7.0012
PlateOffsets(X,Y)-- [2:0-0-15,0-2-12], [4:0-1-12,0-1-12], [5:0-1-12,0-1-8], [6:0-9-0,0-1-12], [8:0-5-0,0-1-12], [9:0-1-12,0-1-8], [12:0-2-0,0-1-8], [16:0-2-0,0-1-8], [18:0-1-12,0-1-8], [20:0-3-1,0-1-0], [20:0-0-0,0-2-12]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.76
0.520.53
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.09
-0.270.05
(loc)13-15
13-1511
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 207 lb FT= 20%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W7,W8,W9: 2x4SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 7-15, 7-13, 9-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)20=393/0-4-0(min. 0-1-8), 18=1425/0-6-0(min. 0-2-11), 11=1174/Mechanical
Max Horz20=332(LC 13)Max Uplift20=-273(LC 12), 18=-144(LC 16), 11=-145(LC 17)MaxGrav20=535(LC 44), 18=1698(LC 41), 11=1458(LC 41)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-21=-408/219, 21-22=-399/222, 3-22=-325/245, 4-23=-1159/198, 23-24=-1147/206,
5-24=-984/225, 5-25=-1305/258, 25-26=-1277/281, 6-26=-1130/299, 6-27=-981/302,7-27=-981/302, 7-28=-1007/305, 28-29=-1007/305, 29-30=-1007/305, 8-30=-1007/305,
8-31=-1162/295, 9-31=-1337/277, 9-32=-1119/218, 32-33=-1147/211, 33-34=-1242/198,10-34=-1308/193, 2-20=-481/252, 10-11=-1412/215BOT CHORD 19-20=-367/308, 18-19=-363/301, 17-18=-291/123, 16-17=-291/123, 15-16=-231/951,
14-15=-140/1005, 13-14=-140/1005, 12-13=-159/1073WEBS3-19=-188/258, 3-18=-473/314, 4-18=-1438/126, 4-16=-77/1212, 5-16=-653/117,
5-15=-53/290, 6-15=-24/302, 7-15=-268/168, 8-13=-21/313, 9-12=-535/157,10-12=-149/1240
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-4-12 to 1-7-4,Interior(1) 1-7-4 to 19-6-6,Exterior(2) 19-6-6 to 31-1-10,Interior(1) 31-1-10 to 40-1-4zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C for
members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9) Refer to girder(s) for truss to trussconnections.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T14
TrussType
PiggybackBase
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:022018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-S8iddDTHGIapsuFffe6piaH46l7dUKw6s9OZsSzaMfN
NOTES-
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 273 lb uplift at joint 20, 144 lb uplift at joint 18 and 145 lb uplift at joint 11.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T14GE
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:032018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-wLG?qZUv1bigT2prDLd2EoqOj8ZuDvfF4p76PuzaMfM
Scale=1:13.8
W1
T1 W3
B1
ST1
W21
2
3
5
4
8
9
10
1.5x4
1.5x4
4x4
1.5x4
1.5x4
3x4
0-2-00-2-0 4-0-03-10-0
-1-4-121-4-12 4-0-04-0-0
0-10-32-2-34.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MP
0.19
0.140.05
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.00
0.01-0.00
(loc)1
14
l/defln/r
n/rn/a
L/d120
120n/a
PLATESMT20
Weight: 18 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=226/3-10-0(min. 0-1-8), 4=115/3-10-0(min. 0-1-8)
Max Horz5=89(LC 13)
Max Uplift5=-101(LC 12), 4=-32(LC 16)MaxGrav5=260(LC 2), 4=129(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-5=-223/319
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-1-4-12 to 1-7-4,Exterior(2) 1-7-4 to 3-10-4zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Gablestudsspaced at 2-0-0 oc.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 101 lb uplift at joint 5 and 32 lb uplift at
joint 4.9) Non Standard bearingcondition. Reviewrequired.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T15
TrussType
PiggybackBase
Qty
2
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:052018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-sjOmFFW9YDzOjMzDLmfWKDvYVy8XhgMYY7cDTmzaMfK
Scale=1:69.6
T2
T3
T4
B1
W3
W4 W5
W6 W6
W5 W4
W3
W1
W2
W8
W7
T1
B1B2
1
2
3 4
5 6 7
8
9
16 15 14 13 12 11 10
17
18
19
20
21 22
23
24
25
26
3x8
5x6
8x8
4x4
3x4
4x4 5x10
3x4
3x8
3x4
4x4
4x8
2x4
4x6
3x6
9-2-89-2-8 16-0-66-9-14 24-7-108-7-5 31-5-76-9-13 36-9-05-3-9
-1-2-121-2-12 9-2-89-2-8 16-0-66-9-14 20-4-04-3-10 24-7-104-3-10 31-5-76-9-13 36-9-05-3-9
1-1-1310-6-03-5-310-6-07.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [3:0-1-12,0-1-8], [5:0-3-0,0-1-12], [7:0-5-0,0-1-12], [8:0-1-12,0-1-8], [10:0-2-0,0-1-4], [11:0-1-12,0-1-12], [14:0-3-4,0-3-4], [15:0-1-12,0-1-12]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.94
0.640.62
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.18
-0.470.07
(loc)15-16
15-1610
l/defl>999
>935n/a
L/d240
180n/a
PLATESMT20
Weight: 193 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W3,W8,W7: 2x4SPFStud,W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-0 oc bracing.WEBS 1 Row at midpt 3-14, 6-14, 6-12, 8-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)16=1402/0-6-0(min. 0-2-10), 10=1334/MechanicalMax Horz16=324(LC 13)
Max Uplift16=-212(LC 16), 10=-144(LC 17)MaxGrav16=1666(LC 39), 10=1661(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-17=-2301/262, 17-18=-2175/284, 3-18=-2170/311, 3-19=-1793/318, 4-19=-1765/323,
4-20=-1751/324, 5-20=-1612/360, 5-6=-1385/348, 6-21=-1249/338, 21-22=-1249/338,
7-22=-1249/338, 7-23=-1442/331, 8-23=-1614/305, 8-24=-1289/246, 24-25=-1312/243,25-26=-1436/225, 9-26=-1502/221, 2-16=-1577/314, 9-10=-1614/240
BOT CHORD 15-16=-371/696, 14-15=-288/1874, 13-14=-176/1328, 12-13=-176/1328, 11-12=-180/1240WEBS3-14=-689/255, 5-14=-53/472, 6-14=-151/260, 6-12=-395/194, 7-12=-30/409,8-12=-134/253, 8-11=-641/168, 2-15=-8/1399, 9-11=-174/1436
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 16-0-6,Exterior(2) 16-0-6 to 28-10-9,
Interior(1) 28-10-9 to 36-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 212 lb uplift at joint 16 and 144 lb upliftatjoint 10.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:072018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-o6VWgwXQ4qD6yf7cSBh_Pe?uImlL9X4r?R5KYfzaMfI
Scale=1:77.6
0-1-150-1-15T2
T3
T4
B1
B2 B3
B4
B5
W3
W5
W4 W6
W7 W8
W9
W8
W10
W11
W1
W2 W13
W12
T1
B6
1 2
3
4
5
6
7 8
9
10
21 20
19 18
17 16 15 14 13 12 11
22
23
24
25 26 27
28
29
30 31
3x6
5x6
5x6
3x4 2x4
4x6
8x8
3x4
2x4 3x63x6
4x8
3x4 3x8
3x4
4x4
5x6
4x10
2x4
4x6
1-1-10
1-1-10
2-6-0
1-4-6
9-0-0
6-6-0
12-7-11
3-7-11
17-0-13
4-5-1
23-7-3
6-6-7
31-5-7
7-10-4
36-9-0
5-3-9
-1-2-12
1-2-12
1-1-10
1-1-10
2-6-0
1-4-6
9-0-0
6-6-0
12-7-11
3-7-11
17-0-13
4-5-1
23-7-3
6-6-7
31-5-7
7-10-4
36-9-0
5-3-9
1-1-1310-11-511-1-43-5-31-0-010-11-57.0012
PlateOffsets(X,Y)-- [2:0-2-9,0-2-8], [3:0-1-4,0-1-12], [4:0-3-4,0-0-8], [6:0-3-0,0-2-0], [7:0-3-0,0-1-12], [9:0-1-12,0-1-8], [11:0-2-0,0-1-0], [12:0-1-12,0-1-8], [16:0-1-12,0-1-8],[18:0-2-12,Edge], [19:0-4-0,0-0-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.92
0.870.79
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.14
-0.390.19
(loc)4
18-1911
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 208 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x4SPF 1650F 1.5EBOT CHORD2x4SPF No.2 *Except*
B2,B4: 2x4SPFStudWEBS2x4SPF No.2 *Except*W3,W5,W11,W1,W13,W12: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 19-20
7-3-8 oc bracing: 18-19.WEBS 1 Row at midpt 6-16, 6-15, 7-13, 9-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)21=1391/0-6-0(min. 0-2-10), 11=1325/MechanicalMax Horz21=336(LC 13)Max Uplift21=-218(LC 16), 11=-153(LC 17)
MaxGrav21=1684(LC 39), 11=1689(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-22=-3174/464, 3-22=-3123/467, 3-23=-2718/352, 4-23=-2621/372, 4-5=-2669/446,5-24=-2594/454, 6-24=-2523/466, 6-7=-1712/369, 7-25=-1296/347, 25-26=-1296/347,
26-27=-1296/347, 8-27=-1296/347, 8-28=-1498/332, 28-29=-1658/306, 9-29=-1692/285,9-30=-1383/242, 30-31=-1498/223, 10-31=-1539/220, 2-21=-1634/256, 10-11=-1648/234BOT CHORD 18-19=-647/2930, 4-18=-424/224, 15-16=-225/1695, 14-15=-155/1389, 13-14=-155/1389,
12-13=-180/1305WEBS3-18=-826/355, 16-18=-193/1677, 6-18=-292/1229, 6-16=-392/98, 6-15=-666/232,
7-15=-138/700, 7-13=-286/141, 8-13=-25/361, 9-12=-671/180, 2-19=-436/2613,10-12=-175/1526
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 17-0-13,Exterior(2) 17-0-13 to 27-10-2,Interior(1) 27-10-2 to 36-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:072018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-o6VWgwXQ4qD6yf7cSBh_Pe?uImlL9X4r?R5KYfzaMfI
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 218 lb uplift at joint 21 and 153 lb uplift at joint 11.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:082018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-GI3utGY2r8Lyapio0uDDxrX6I95juzK_E5rt45zaMfH
Scale=1:70.5
0-1-150-1-15T2
T3
T4
B1
B2 B3
B4
B5
W3
W5
W4
W6
W7
W8 W7 W6
W9 W10
W1
W2 W12
W11
T1
B6
1 2
3
4
5
6 7 8
9
10
21 20
19 18
17 16 15 14 13 12 11
22
23
24
25
2627 28 29
30
31 32
3x6
6x8 5x6
3x4 2x4
5x6
8x8
3x4
2x4 3x64x4
1.5x4
3x8
3x4
3x4
3x5
5x6
4x10
2x4
4x6
1-4-121-4-122-6-01-1-4 9-0-06-6-0 14-2-85-2-8 20-4-06-1-8 26-5-86-1-8 31-5-85-0-0 36-9-05-3-8
-1-2-12
1-2-12
1-4-12
1-4-12
2-6-0
1-1-4
9-0-0
6-6-0
14-2-8
5-2-8
20-4-0
6-1-8
26-5-8
6-1-8
31-5-8
5-0-0
36-9-0
5-3-8
1-1-139-3-59-5-43-5-31-0-09-3-57.0012
PlateOffsets(X,Y)-- [2:0-2-9,0-2-8], [3:0-1-0,0-2-4], [6:0-2-12,0-0-12], [8:0-3-0,0-1-12], [9:0-1-12,0-1-8], [11:0-2-0,0-1-4], [12:0-2-0,0-1-8], [14:0-2-0,0-1-8], [16:0-1-12,0-1-12],[18:0-2-12,Edge], [19:0-4-0,0-0-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.71
0.860.86
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.13
-0.380.18
(loc)4
18-1911
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 205 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B2,B4: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*W3,W5,W10,W1,W12,W11: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-7-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 19-207-7-7 oc bracing: 18-19.WEBS 1 Row at midpt 6-16, 6-15, 7-15, 8-13
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)21=1416/0-6-0(min. 0-2-9), 11=1357/MechanicalMax Horz21=292(LC 13)
Max Uplift21=-197(LC 16), 11=-127(LC 17)MaxGrav21=1629(LC 39), 11=1591(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-22=-3087/459, 3-22=-3036/462, 3-23=-2552/354, 23-24=-2425/369, 4-24=-2296/390,
4-25=-2502/491, 5-25=-2462/493, 5-6=-2359/517, 6-26=-1571/373, 26-27=-1572/372,7-27=-1574/372, 7-28=-1574/372, 28-29=-1571/372, 8-29=-1571/373, 8-30=-1370/336,9-30=-1474/309, 9-31=-1213/251, 31-32=-1292/235, 10-32=-1407/233, 2-21=-1577/264,
10-11=-1540/248BOT CHORD 18-19=-592/2881, 4-18=-533/265, 15-16=-207/1403, 14-15=-167/1206, 13-14=-167/1206,
12-13=-180/1129WEBS3-18=-892/325, 16-18=-180/1353, 6-18=-312/1242, 6-15=-190/321, 7-15=-676/211,8-15=-175/650, 9-13=-139/334, 9-12=-586/157, 2-19=-409/2551, 10-12=-170/1293
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 14-2-8,Exterior(2) 14-2-8 to 30-8-7,
Interior(1) 30-8-7 to 36-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:092018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-kVdG5cZgcRTpCzH?ackSU34G2ZRydQa8TlaRcYzaMfG
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 197 lb uplift at joint 21 and 127 lb uplift at joint 11.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:102018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-DhBfIyaINlbgp7sB7JFh1GcNjzoiMshHhPK_9_zaMfF
Scale=1:68.7
0-1-150-1-15T1
T2
T4
B1
B2 B3
B4
B5
W3
W5
W4
W6
W7
W8 W8
W7
W6
W1
W2 W10
W9
T3
B6
1 2
3
4
5 6 7 8 9
10
20 19
18 17
16 15 14 13 12 11
21
22
23
24
25 26
27
6x12
3x6
5x6
3x4 2x4
5x6
3x4
2x4 3x10MT18H4x10
6x10
3x4
3x4
3x4
4x6
4x10
3x44x8
5x6
1-4-121-4-122-6-01-1-4 9-0-06-6-0 11-4-32-4-3 20-4-08-11-13 29-3-138-11-13 36-9-07-5-3
-1-2-12
1-2-12
1-4-12
1-4-12
2-6-0
1-1-4
9-0-0
6-6-0
11-4-3
2-4-3
17-4-1
5-11-14
23-3-15
5-11-14
29-3-13
5-11-14
36-9-0
7-5-3
1-1-137-7-57-9-43-5-31-0-07-7-57.0012
PlateOffsets(X,Y)-- [2:0-2-12,0-1-12], [3:0-1-0,0-2-4], [4:0-0-4,0-1-8], [5:0-6-0,0-0-9], [10:0-3-0,0-1-8], [12:0-1-12,0-2-0], [13:0-4-0,0-1-8], [15:0-4-0,0-2-0], [17:0-3-8,0-2-12],[18:0-4-4,0-0-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.97
0.830.93
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.16
-0.480.20
(loc)14-15
14-1511
l/defl>999
>906n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 185 lb FT= 20%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T4: 2x4SPF 1650F 1.5EBOT CHORD2x4SPF No.2 *Except*
B2,B4: 2x4SPFStudWEBS2x4SPF No.2 *Except*W3,W5,W4,W1,W10: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.WEBS 1 Row at midpt 6-15, 7-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1442/0-6-0(min. 0-2-8), 11=1389/Mechanical
Max Horz20=249(LC 13)
Max Uplift20=-171(LC 16), 11=-96(LC 12)MaxGrav20=1581(LC 39), 11=1505(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-21=-2954/471, 21-22=-2946/480, 3-22=-2870/483, 3-23=-2422/375, 23-24=-2375/384,
4-24=-2352/404, 4-5=-2312/490, 5-25=-1705/340, 6-25=-1708/339, 6-7=-2123/373,7-8=-1324/299, 8-26=-1324/299, 9-26=-1324/300, 9-27=-1535/277, 10-27=-1584/252,
2-20=-1530/271, 10-11=-1445/264
BOT CHORD 17-18=-617/2756, 4-17=-421/217, 14-15=-344/2148, 13-14=-299/2023, 12-13=-299/2023WEBS3-17=-968/316, 15-17=-251/1856, 5-17=-308/1320, 5-15=-365/142, 6-15=-689/229,
7-14=0/329, 7-12=-1087/250, 9-12=-29/420, 2-18=-427/2427, 10-12=-148/1428
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 11-4-3,Exterior(2) 11-4-3 to 33-6-11,
Interior(1) 33-6-11 to 36-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9) Refer to girder(s) for truss to trussconnections.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 171 lb uplift at joint 20 and 96 lb uplift
atjoint 11.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:102018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-DhBfIyaINlbgp7sB7JFh1GcNjzoiMshHhPK_9_zaMfF
NOTES-
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:112018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-htl1WIaw83jXRHRNh1mwZU9YCN685NHQw33YhQzaMfE
Scale=1:68.7
0-1-150-1-15T1
T2
T4
B1
B2 B3
B4
B5
W3 W4
W5
W7
W6
W8 W9 W8 W10 W11
W1 W2
W13W12
T3
B6
1 2
3
45 6 7 8
9
20 19
18 17
16
15 14 13 12 11 10
21 22
23
2425 26 27 28 29
30
5x6
3x4 2x4
4x6
6x12
3x4
3x4 3x10MT18H
5x6
6x8
3x4 5x12MT18H
4x6
5x6
4x4
4x6
4x10
2x4
4x6
1-4-121-4-122-6-01-1-4 8-5-155-11-15 9-0-00-6-1 16-2-97-2-9 24-5-158-3-6 32-2-17-8-2 36-9-04-6-15
-1-2-12
1-2-12
1-4-12
1-4-12
2-6-0
1-1-4
8-5-15
5-11-15
9-0-0
0-6-1
16-2-9
7-2-9
24-5-15
8-3-6
32-2-1
7-8-2
36-9-0
4-6-15
1-1-135-11-56-1-43-5-31-0-05-11-57.0012
PlateOffsets(X,Y)-- [2:0-2-4,0-2-0], [3:0-1-0,0-1-8], [4:0-3-0,0-1-12], [7:0-6-0,0-3-4], [8:0-3-8,0-1-12], [10:0-2-0,0-1-0], [11:0-1-12,0-1-8], [12:0-2-12,0-2-0], [14:0-3-0,0-3-0],[16:0-6-0,0-2-12], [17:0-3-0,0-3-0], [18:0-4-4,0-0-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.99
0.940.65
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.22
-0.520.20
(loc)12-14
12-1410
l/defl>999
>846n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 182 lb FT= 20%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3: 2x4SPF 1650F 1.5EBOT CHORD2x4SPF No.2 *Except*
B2,B4: 2x4SPFStudWEBS2x4SPFStud*Except*W7,W6,W9,W10,W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 2-2-0 oc bracing.WEBS 1 Row at midpt 6-16
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)20=1467/0-6-0(min. 0-2-7), 10=1420/Mechanical
Max Horz20=205(LC 13)
Max Uplift20=-158(LC 13), 10=-180(LC 12)MaxGrav20=1551(LC 38), 10=1657(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-21=-2968/495, 21-22=-2944/503, 3-22=-2939/507, 3-23=-2747/394, 4-23=-2707/419,
4-5=-2519/429, 5-24=-2496/429, 24-25=-2496/429, 6-25=-2496/429, 6-26=-2930/447,26-27=-2930/447, 7-27=-2930/447, 7-28=-2698/417, 28-29=-2695/418, 8-29=-2693/418,
8-30=-1360/242, 9-30=-1411/228, 2-20=-1507/280, 9-10=-1630/255
BOT CHORD 17-18=-648/2666, 16-17=-429/2334, 5-16=-781/253, 14-15=-24/318, 13-14=-443/2709,12-13=-443/2709, 11-12=-187/1241
WEBS 3-17=-831/294, 4-17=-15/560, 4-16=-359/1112, 14-16=-478/2646, 6-16=-529/208,6-14=-365/201, 7-14=-61/273, 7-12=-916/291, 8-12=-323/1812, 8-11=-777/197,
2-18=-450/2429, 9-11=-193/1520
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 8-5-15,Exterior(2) 8-5-15 to 36-7-4
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9) Refer to girder(s) for truss to trussconnections.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:122018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-93JPjebYvMrO3R?aFkH96hijynSNqqWa9jp5DszaMfD
NOTES-
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 158 lb uplift at joint 20 and 180 lb uplift at joint 10.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T20
TrussType
HipGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:172018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-V16ImLfhkvTh9CuX2HtKplPjOoDzV0fJJ?Wsu4zaMf8
Scale=1:68.8
0-1-150-1-15T1
T2 T4
B1
B2 B3
B4
B5
W3
W4 W5
W7
W6
W8 W9 W8 W10 W8 W9 W8 W9 W11
W1 W2
W13
W12
T3
B6
1 2
3
4 5 6 7 8 9 10 11
12
25 24
23 22 21
20 19 18 17 16 15 14 13
26 27 28 29 30 31 32 33 343536 37 38 39 40
41
4243 44 45 46 47 48 4950 51 5253
5x6 3x6
3x5 2x4
4x6
6x8
2x4
2x4 3x6
3x4
6x6
3x8
1.5x4
3x8 1.5x4
3x8 1.5x4
4x8
5x6
4x4
4x6
4x8
3x5
4x6
1-4-121-4-122-6-01-1-4 5-7-103-1-10 9-0-03-4-6 13-8-104-8-10 18-8-104-11-15 25-2-36-5-9 30-2-24-11-15 35-0-64-10-3 36-9-01-8-10
-1-2-12
1-2-12
1-4-12
1-4-12
2-6-0
1-1-4
5-7-10
3-1-10
9-0-0
3-4-6
13-8-10
4-8-10
18-8-10
4-11-15
25-2-3
6-5-9
30-2-2
4-11-15
35-0-6
4-10-3
36-9-0
1-8-10
1-1-134-3-54-5-43-5-31-0-04-3-57.0012
PlateOffsets(X,Y)-- [2:0-2-14,0-2-0], [4:0-3-0,0-1-12], [11:0-3-0,0-1-12], [13:0-3-0,0-1-8], [15:0-1-12,0-2-0], [19:0-3-0,0-2-8], [21:0-2-8,0-2-12], [23:0-2-12,0-0-0], [25:0-3-0,0-1-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.43
0.660.98
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.35
-0.500.18
(loc)18-19
16-1813
l/defl>999
>868n/a
L/d240
180n/a
PLATESMT20
Weight: 352 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B2,B4: 2x4SPFStud
WEBS 2x4SPFStud*Except*W10: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-2-13 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
REACTIONS.(lb/size)25=2033/0-6-0(min. 0-1-11), 13=1924/MechanicalMax Horz25=162(LC 9)
Max Uplift25=-1188(LC 9), 13=-1209(LC 8)
MaxGrav25=2189(LC 2), 13=2180(LC 76)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-4159/2454, 3-4=-4176/2539, 4-26=-5215/3089, 5-26=-5218/3088, 5-27=-5161/3058,27-28=-5161/3058, 6-28=-5161/3058, 6-29=-5108/2958, 29-30=-5108/2958,
30-31=-5108/2958, 7-31=-5108/2958, 7-8=-5108/2958, 8-32=-5108/2958,32-33=-5108/2958, 33-34=-5108/2958, 34-35=-5108/2958, 9-35=-5108/2958,
9-36=-3032/1719, 36-37=-3032/1719, 37-38=-3032/1719, 10-38=-3032/1719,
10-39=-3035/1721, 39-40=-3032/1720, 11-40=-3031/1720, 11-12=-928/541,2-25=-2134/1209, 12-13=-2180/1208
BOT CHORD 22-23=-2317/3753, 22-41=-2271/3611, 21-41=-2271/3611, 5-21=-468/271,
20-42=-165/327, 42-43=-165/327, 19-43=-165/327, 19-44=-2864/4855, 44-45=-2864/4855,
18-45=-2864/4855, 18-46=-2574/4423, 17-46=-2574/4423, 17-47=-2574/4423,
47-48=-2574/4423, 16-48=-2574/4423, 16-49=-2574/4423, 49-50=-2574/4423,50-51=-2574/4423, 15-51=-2574/4423, 15-52=-520/877, 52-53=-520/877, 14-53=-520/877
WEBS 3-22=-406/200, 4-22=-446/592, 4-21=-1195/2127, 19-21=-2763/4634, 6-21=-302/417,
6-19=-850/613, 6-18=-228/404, 7-18=-471/404, 9-18=-520/811, 9-16=0/331,9-15=-1782/1068, 10-15=-540/360, 11-15=-1587/2811, 11-14=-1639/1023,
2-23=-2025/3385, 12-14=-1098/1945
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T20
TrussType
HipGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:172018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-V16ImLfhkvTh9CuX2HtKplPjOoDzV0fJJ?Wsu4zaMf8
NOTES-
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate
DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC
1608.3.4.6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.8)Provide adequate drainage to preventwater ponding.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10) Refer to girder(s) for truss to trussconnections.11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 1188 lb uplift at joint 25 and 1209 lb uplift at joint 13.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 167 lb down and 67 lb up at 5-7-10, 59 lb down at 7-8-6, 112 lb downand 116 lb up at 9-8-6, 112 lb down and 116 lb up at 11-8-6, 112 lb down and 116 lb up at 13-8-6, 112 lb down and 116 lb up at 15-8-6, 112 lb down and 116 lb up at
17-8-6, 112 lb down and 116 lb up at 19-8-6, 112 lb down and 116 lb up at 21-8-6, 112 lb down and 116 lb up at 23-8-6, 112 lb down and 116 lb up at 25-8-6, 112 lbdown and 116 lb up at 27-8-6, 112 lb down and 116 lb up at 29-8-6, 112 lb down and 116 lb up at 31-8-6, and 112 lb down and 116 lb up at 33-8-6, and 104 lb down
and 119 lb up at 35-0-6 on top chord, and 319 lb down and 380 lb up at 5-7-10, 124 lb down and 159 lb up at 7-8-6, 38 lb down and 28 lb up at 9-8-6, 38 lb down and
28lb up at 11-8-6, 38 lb down and 28 lb up at 13-8-6, 38 lb down and 28 lb up at 15-8-6, 38 lb down and 28 lb up at 17-8-6, 38 lb down and 28 lb up at 19-8-6, 38 lbdown and 28 lb up at 21-8-6, 38 lb down and 28 lb up at 23-8-6, 38 lb down and 28 lb up at 25-8-6, 38 lb down and 28 lb up at 27-8-6, 38 lb down and 28 lb up at
29-8-6, 38 lb down and 28 lb up at 31-8-6, and 38 lb down and 28 lb up at 33-8-6, and 38 lb down and 28 lb up at 34-11-9 on bottomchord.The design/selection of
suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-4=-51, 4-11=-61, 11-12=-51, 24-25=-20, 21-23=-20, 13-20=-20Concentrated Loads(lb)
Vert: 4=-8(F) 22=-246(F) 19=-22(F) 6=-26(F) 11=-31(F) 14=-22(F) 27=-26(F) 28=-26(F) 29=-26(F) 31=-26(F) 32=-26(F) 33=-26(F) 34=-26(F) 36=-26(F) 37=-26(F)
38=-26(F) 39=-26(F) 40=-26(F) 41=-85(F) 42=-22(F) 43=-22(F) 44=-22(F) 45=-22(F) 46=-22(F) 47=-22(F) 48=-22(F) 49=-22(F) 50=-22(F) 51=-22(F) 52=-22(F)
53=-22(F)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T21
TrussType
COMMON
Qty
10
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:182018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-_Dgg_hgJVCbYnMTjb?OZLyywOBY0EeOSXeGPRWzaMf7
Scale=1:55.0
T2 T2
B1
W2
W1W1
T1 T1
B112
3
4
5
6
7
8
9
10
17
18 19
20
3x4
3x8 5x10
4x4
1.5x41.5x4
3x4
3x8
10-6-010-6-0 21-0-010-6-0
-0-10-120-10-12 5-4-155-4-15 10-6-05-1-1 15-7-15-1-1 21-0-05-4-15 21-10-120-10-12
0-4-139-1-130-4-1310.0012
PlateOffsets(X,Y)-- [2:0-6-1,0-1-8], [8:0-6-1,0-1-8], [10:0-5-0,0-3-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.290.74
0.31
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.16-0.41
0.03
(loc)
10-1610-16
8
l/defl
>999>620
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 83 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-5-15 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=789/0-6-0(min. 0-1-8), 8=789/0-6-0(min. 0-1-8)
Max Horz2=-248(LC 14)
Max Uplift2=-121(LC 16), 8=-121(LC 17)MaxGrav2=894(LC 2), 8=894(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-17=-996/154, 3-17=-824/188, 3-4=-762/177, 4-18=-689/181, 5-18=-688/199,
5-19=-688/199, 6-19=-689/181, 6-7=-762/177, 7-20=-824/188, 8-20=-996/154BOT CHORD 2-10=-156/769, 8-10=-51/700
WEBS 5-10=-114/639, 7-10=-326/247, 3-10=-326/247
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-0,Exterior(2) 10-6-0 to 13-6-0
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 121 lb uplift at joint 2 and 121 lb uplift atjoint 8.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T21GE
TrussType
COMMON SUPPORTEDGAB
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:202018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-wcoQPNhZ0qsG0fd6jQQ1RN1J5?NziaCl?ylWVPzaMf5
Scale=1:59.0
T2 T2
B1
ST5
ST4
ST3
ST2
ST1
ST4
ST3
ST2
ST1
T1 T1
B2
W1
W1
W2
1 2
3
4
5
6
7
8
9
10
11
12
13
14
15
25 24 2322 21 20 19 18 17 16
26
29
27
30
28
31
3x4
4x4
3x4
3x4
3x4
3x4
10-6-010-6-0 21-0-010-6-0
-0-10-120-10-12 10-6-010-6-0 21-0-010-6-0 21-10-120-10-12
0-4-139-1-130-4-1310.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-8], [14:0-2-1,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.080.07
0.10
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.01
(loc)
1414
14
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 113 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStudOTHERS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
JOINTS 1Brace at Jt(s): 26, 27, 28, 31
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 21-0-0.
(lb)-Max Horz2=248(LC 15)Max UpliftAll uplift 100 lb orless at joint(s) 2, 21, 23, 24, 19, 17, 14 except 25=-116(LC 16), 18=-102(LC 17),
16=-115(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 21, 23, 24, 25, 19, 18, 17, 16, 14, 20
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-326/203, 13-14=-312/206
BOT CHORD 2-25=-189/298, 24-25=-189/298, 23-24=-189/298, 22-23=-189/298, 21-22=-189/298,
20-21=-190/299, 19-20=-190/299, 18-19=-189/298, 17-18=-189/298, 16-17=-189/298,14-16=-189/298
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-12 to 2-1-4,Exterior(2) 2-1-4 to 10-6-0, Corner(3) 10-6-0 to 13-6-0
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.7)All plates are 1.5x4MT20 unless otherwiseindicated.8)Gablerequirescontinuous bottomchord bearing.
9)Gablestudsspaced at 2-0-0 oc.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 21, 23, 24, 19,
17, 14 except(jt=lb) 25=116, 18=102, 16=115.12)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 2.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T22
TrussType
Roof Special
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:212018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-OoLpcjiCn7_6epCIH7yGzbaPcPhpRyRvDcU31rzaMf4
Scale=1:59.2
0-1-9T1
T2
T3
W9
B1
W1 W2
W3
W4 W5
W6 W7
W8
B212
3
4
5
6 7
13 12 11 10 9 8
17
18
19 20
21
4x4
4x8
1.5x4
3x4
3x4
3x4
3x4
1.5x4 3x8
3x4
4x4
1.5x4
5-4-155-4-15 10-6-05-1-1 15-4-04-10-0 19-10-44-6-4 21-0-01-1-12
-0-10-120-10-12 5-4-155-4-15 10-6-05-1-1 15-4-04-10-0 19-10-44-6-4 21-0-01-1-12
0-4-131-2-119-1-131-2-1110.0012
PlateOffsets(X,Y)-- [2:0-1-9,0-1-8], [3:0-1-8,0-1-8], [5:0-1-8,0-1-8], [6:0-5-4,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.420.22
0.42
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.02-0.04
0.01
(loc)
13-1613-16
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 99 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 10-11.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=162/0-6-0(min. 0-1-8), 2=581/0-6-0(min. 0-1-8), 10=789/0-4-0(min. 0-1-9)Max Horz2=254(LC 15)
Max Uplift2=-92(LC 16), 10=-129(LC 17)MaxGrav8=239(LC 39), 2=661(LC 2), 10=1005(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-17=-706/76, 3-17=-555/101, 3-18=-391/122, 18-19=-341/139, 4-19=-338/157,
4-20=-344/158, 20-21=-345/140, 5-21=-437/125
BOT CHORD 2-13=-106/559, 12-13=-106/559, 11-12=-106/559, 9-10=-16/294, 8-9=-24/287WEBS3-11=-411/207, 5-11=-19/365, 5-10=-844/184, 6-10=-269/98, 6-8=-391/26
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-0,Exterior(2) 10-6-0 to 13-6-0,
Interior(1) 19-10-4 to 20-10-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
10=129.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T23
TrussType
Roof Special
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:222018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-s?vBp3jqYR6zFzmVqqTVWo6bvpzUAPf2SGEdaHzaMf3
Scale=1:56.6
0-1-9T1
T2
T3
W8
B1
W1 W2
W3
W4 W5
W6
W7B212
3
4
5
6 7
12 11 10 9 8
16
17
18 19
20
4x4
5x6
1.5x4
3x43x43x4
3x4
1.5x4 3x8
4x4
3x4
5-3-155-3-15 10-6-05-2-1 19-3-18-9-1 21-0-01-8-15
-0-10-120-10-12 5-3-155-3-15 10-6-05-2-1 14-10-94-4-9 19-3-14-4-9 21-0-01-8-15
0-4-131-8-119-1-131-8-1110.0012
PlateOffsets(X,Y)-- [2:0-1-9,0-1-8], [3:0-1-8,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.380.51
0.42
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.12-0.33
0.03
(loc)
9-109-10
8
l/defl
>999>767
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 98 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-6-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=747/0-6-0(min. 0-1-8), 2=791/0-6-0(min. 0-1-8)
Max Horz2=261(LC 15)Max Uplift8=-97(LC 17), 2=-121(LC 16)
MaxGrav8=938(LC 39), 2=895(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-1060/131, 3-16=-887/156, 3-17=-766/180, 17-18=-694/185, 4-18=-690/203,4-19=-703/205, 19-20=-705/188, 5-20=-843/174, 5-6=-1448/179
BOT CHORD 2-12=-147/803, 11-12=-147/803, 10-11=-147/803, 9-10=-96/820, 8-9=-96/1057
WEBS 3-10=-388/215, 4-10=-134/667, 5-10=-447/225, 5-9=-22/411, 6-8=-1416/100
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-0,Exterior(2) 10-6-0 to 13-6-0,Interior(1) 19-3-1 to 20-10-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8 except(jt=lb)2=121.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T24
TrussType
Roof Special
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:232018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-KBTZ1OkSJlEqt7LhOY_k20fmVCJdvs2BhwzA6kzaMf2
Scale=1:55.7
0-1-9T1
T2
T3
W8
B1
W1 W2
W3
W4 W5
W6
W7B212
3
4
5
6 7
12 11 10 9 8
16
17
18 19
20
4x4
5x6
1.5x4
3x43x4
3x4
3x4
1.5x4 3x8
3x4
3x4
5-4-155-4-15 10-6-05-1-1 18-7-148-1-14 21-0-02-4-2
-0-10-120-10-12 5-4-155-4-15 10-6-05-1-1 14-6-154-0-15 18-7-144-0-15 21-0-02-4-2
0-4-132-2-119-1-132-2-1110.0012
PlateOffsets(X,Y)-- [2:0-1-9,0-1-8], [3:0-1-8,0-1-8], [5:0-1-12,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.330.45
0.41
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.10-0.26
0.03
(loc)
9-109-10
8
l/defl
>999>947
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 100 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=752/0-6-0(min. 0-1-8), 2=792/0-6-0(min. 0-1-8)
Max Horz2=268(LC 15)Max Uplift8=-99(LC 17), 2=-121(LC 16)
MaxGrav8=901(LC 39), 2=896(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-1058/130, 3-16=-882/156, 3-17=-762/172, 17-18=-691/188, 4-18=-688/205,4-19=-705/208, 19-20=-709/191, 5-20=-819/180, 5-6=-1399/208
BOT CHORD 2-12=-145/797, 11-12=-145/797, 10-11=-145/797, 9-10=-106/777, 8-9=-117/998
WEBS 3-10=-391/213, 4-10=-148/680, 5-10=-436/216, 5-9=-46/370, 6-8=-1327/124
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-0,Exterior(2) 10-6-0 to 13-6-0,Interior(1) 18-7-14 to 20-10-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8 except(jt=lb)2=121.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T25
TrussType
Roof Special
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:242018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-oN1xEkk442MhVHwtyFVzbDCt9cfueHOLwajkeAzaMf1
Scale=1:49.4
0-1-9T1 T2
T3
W8
B1
W3
W4 W5
W6
W7
W1
W2
B2
1
2
3
4 5
10 9 8 7 6
11
12
13
14
15
5x6
4x4
5x6 3x4
3x42x4
3x4
3x8
4x4
3x5
6-10-06-10-0 14-4-107-6-11 17-10-03-5-5
6-10-06-10-0 11-0-124-2-13 14-4-103-3-14 17-10-03-5-5
2-5-81-8-118-1-131-8-1110.0012
PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-2-0,0-2-4], [7:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.590.45
0.53
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.08-0.23
0.02
(loc)
7-97-9
6
l/defl
>999>928
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 84 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-13 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)6=651/0-6-0(min. 0-1-8), 10=624/Mechanical
Max Horz10=-232(LC 14)Max Uplift6=-97(LC 17), 10=-80(LC 17)
MaxGrav6=742(LC 38), 10=702(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-11=-650/122, 11-12=-563/124, 12-13=-554/127, 2-13=-538/150, 2-14=-527/175,14-15=-563/157, 3-15=-710/145, 3-4=-1924/255, 1-10=-645/142
BOT CHORD 9-10=-214/257, 8-9=-112/830, 7-8=-112/830, 6-7=-190/1499
WEBS 2-9=-58/430, 3-9=-562/211, 3-7=-107/1005, 4-7=-717/165, 4-6=-1597/177, 1-9=-25/433
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-10-0,Exterior(2) 6-10-0 to 9-10-0,Interior(1) 14-4-10 to 17-8-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 10.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T26
TrussType
Roof Special
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:252018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-GabJS4lirMUY6QV3Wz0C8RkzT0?PNddU8ESHAczaMf0
Scale=1:49.4
0-1-9T1 T2
T3
W7
B1
W3
W4 W5
W6
W1
W2
B2
1
2
3 4
9 8 7 6 5
10
11
12
13
14
15
16
5x6
4x4
4x10 3x4
3x42x43x4
3x8
1.5x4
6-10-06-10-0 13-9-76-11-7 17-10-04-0-9
6-10-06-10-0 13-9-76-11-7 17-10-04-0-9
2-5-82-2-118-1-132-2-1110.0012
PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-2-0,0-1-8], [3:0-5-8,0-2-4], [9:0-1-12,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.870.50
0.98
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.05-0.15
0.03
(loc)
6-86-8
5
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 81 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-1-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)5=656/0-6-0(min. 0-1-8), 9=625/Mechanical
Max Horz9=-232(LC 12)Max Uplift5=-100(LC 17), 9=-77(LC 17)
MaxGrav5=709(LC 38), 9=702(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-10=-650/122, 10-11=-561/122, 11-12=-548/128, 2-12=-504/151, 2-13=-476/144,13-14=-542/121, 14-15=-770/116, 3-15=-792/90, 1-9=-643/143
BOT CHORD 8-9=-224/258, 7-8=-206/1337, 6-7=-206/1337, 5-6=-211/1330
WEBS 2-8=0/377, 3-8=-935/240, 3-5=-1479/210, 1-8=-35/448
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-10-0,Exterior(2) 6-10-0 to 9-10-0,Interior(1) 13-9-7 to 17-8-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 9.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T27
TrussType
Roof SpecialGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:272018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-Dyj4tmnyNzkGMkfSdO2gDrqPpqfTrYyncYxOFVzaMf_
Scale=1:49.8
0-1-120-1-120-1-12T1
T2
T3 T3
T4
W13
B1
W3 W4 W5
W6 W7
W8
W9 W10
W11 W12W1
W2 B2
1
2
3
4
5
6
7
8 9
15 14 13 12 11 10
16
17
18
19
20
21
22
23
4x6 6x6
4x4
4x6
2x43x4
8x88x8
3x4
4x8
3x4
4x10
4x6
4x6
1-10-51-10-5 3-11-92-1-5 6-8-102-9-1 10-6-03-9-6 17-0-76-6-7 21-6-04-5-9
-0-9-120-9-12 1-10-51-10-5 3-11-92-1-5 6-8-102-9-1 10-6-03-9-6 14-3-63-9-6 17-0-72-9-1 21-6-04-5-9
1-1-142-6-128-1-132-6-1210.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [3:0-3-0,0-1-4], [4:0-2-1,Edge], [5:0-1-0,0-1-8], [6:0-2-0,0-1-8], [7:0-1-4,0-1-8], [8:0-3-0,0-2-12], [9:0-2-4,0-2-0], [11:0-2-12,0-1-12],[14:0-2-8,0-4-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.50
0.520.93
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.11
-0.270.04
(loc)11-12
11-1210
l/defl>999
>936n/a
L/d240
180n/a
PLATESMT20
Weight: 118 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B1: 2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*W8: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-7 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 14-15.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)10=943/0-6-0(min. 0-1-12), 15=1676/0-6-0(min. 0-1-11)
Max Horz15=245(LC 11)Max Uplift10=-152(LC 13), 15=-341(LC 12)MaxGrav10=1115(LC 39), 15=2041(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-2076/356, 3-16=-1508/289, 4-16=-1508/289, 4-17=-2215/307, 5-17=-2074/322,
5-18=-1435/243, 6-18=-1311/260, 6-19=-1270/260, 19-20=-1311/245, 7-20=-1437/243,7-21=-2333/303, 8-21=-2474/286, 8-22=-1955/200, 9-22=-1956/200, 9-10=-1066/168,
2-15=-2289/384BOT CHORD 14-23=-429/2406, 13-23=-427/2390, 12-13=-234/1618, 11-12=-158/1383WEBS3-14=-82/1057, 4-14=-1243/123, 4-13=-995/250, 5-13=-166/958, 5-12=-969/290,
6-12=-226/1328, 7-12=-596/202, 7-11=-113/951, 8-11=-1713/281, 9-11=-230/2156,2-14=-257/1753
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)10=152, 15=341.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T27
TrussType
Roof SpecialGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:272018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-Dyj4tmnyNzkGMkfSdO2gDrqPpqfTrYyncYxOFVzaMf_
NOTES-
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 165 lb down and 161 lb up at 1-10-5 on top chord, and 53 lb down
and 9 lb up at 1-10-5, and 933 lb down and 173 lb up at 3-7-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51, 2-3=-51, 3-4=-61, 4-6=-51, 6-8=-51, 8-9=-61, 10-15=-20Concentrated Loads(lb)
Vert: 3=-92(F) 14=-53(F) 23=-859(F)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T28
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:292018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-9LqqHSoDvb__b2prlo58IGvdbdKaJTs43sQVJNzaMey
Scale=1:53.1
0-1-120-1-120-1-12T1
T2
T3 T3
T4
W12
B1
W3 W4 W5 W6
W7 W8
W9
W8 W7
W6 W5 W10 W11W1
W2 B2
1
2
3
4
5
6
7
8
9
10
19 18 17 16 15 14 13 12 11
20
21
22
23
24
25
26 27
28 29 30 31 32 33 34
8x8
5x12MT18H
5x8
5x12MT18H
3x4
6x12MT18H3x85x12MT18H5x68x8
8x8
4x6
12x12
4x6
5x6 10x10
6x12MT18H
6x8
2-6-112-6-11 4-8-02-1-5 7-7-02-11-0 10-6-02-11-0 13-5-02-11-0 16-4-02-11-0 21-6-05-2-0
-0-9-120-9-12 2-6-112-6-11 4-8-02-1-5 7-7-02-11-0 10-6-02-11-0 13-5-02-11-0 16-4-02-11-0 18-9-42-5-4 21-6-02-8-12
1-1-143-1-128-1-133-1-1210.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-2-8], [3:0-5-15,Edge], [4:0-8-8,0-2-0], [5:0-1-4,0-1-12], [6:0-3-0,0-2-8], [7:0-1-0,0-1-8], [8:0-8-8,0-2-0], [9:0-3-12,0-2-0], [12:0-3-8,0-5-0],[13:0-2-8,0-1-12], [15:0-3-4,0-2-8], [16:0-3-8,0-4-8], [17:0-2-4,0-4-0], [18:0-1-12,0-2-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.99
0.610.84
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.19
-0.420.08
(loc)13-14
13-1411
l/defl>999
>600n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 319 lb FT= 20%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3: 2x6SPF No.2BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*W12,W1: 2x6SPF No.2, W4,W9,W10: 2x4SPF 1650F 1.5EW7,W11,W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-6-11 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)11=8720/0-6-0(min. 0-3-11), 19=7536/0-6-0(min. 0-3-4)
Max Horz19=204(LC 9)
Max Uplift11=-1087(LC 13), 19=-1603(LC 12)MaxGrav11=8846(LC 39), 19=7899(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-8211/1729, 3-20=-11856/2288, 4-20=-11857/2288, 4-21=-11160/1692,
5-21=-11063/1703, 5-22=-8617/1236, 6-22=-8452/1256, 6-23=-8455/1256,23-24=-8576/1239, 7-24=-8619/1236, 7-25=-11398/1482, 8-25=-11492/1469,
8-26=-13265/1610, 9-26=-13265/1610, 9-27=-332/36, 10-27=-332/36, 2-19=-7830/1652
BOT CHORD 18-19=-257/476, 18-28=-1463/6425, 17-28=-1463/6425, 17-29=-2364/11628,16-29=-2364/11628, 15-16=-1336/8510, 15-30=-1336/8510, 14-30=-1336/8510,
14-31=-1103/8768, 13-31=-1103/8768, 13-32=-1583/13092, 12-32=-1583/13092,
12-33=-849/6756, 33-34=-849/6756, 11-34=-849/6756
WEBS 3-18=-1747/102, 3-17=-1470/8660, 4-17=-4360/189, 4-16=-4298/1418, 5-16=-1005/4775,
5-14=-3733/907, 6-14=-1485/10316, 7-14=-4259/547, 7-13=-557/5442, 8-13=-5961/704,8-12=-3293/524, 9-12=-1136/9542, 9-11=-9591/1214, 2-18=-1305/6394
NOTES-1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-4-0 oc, 2x6- 2 rowsstaggered at 0-7-0 oc.Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-5-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply toplyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T28
TrussType
Roof SpecialGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:292018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-9LqqHSoDvb__b2prlo58IGvdbdKaJTs43sQVJNzaMey
NOTES-
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)All plates areMT20 plates unless otherwiseindicated.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=1087, 19=1603.12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 2126 lb down and 1229 lb up at 4-0-12, 1637 lb down and 200 lb up
at 6-0-0, 1485 lb down and 116 lb up at 8-0-0, 1571 lb down and 147 lb up at 10-0-0, 1669 lb down and 173 lb up at 12-0-0, 1640 lb down and 164 lb up at 14-0-0,1640lb down and 164 lb up at 16-0-0, and 1438 lb down and 165 lb up at 18-0-0, and 1436 lb down and 164 lb up at 20-0-0 on bottomchord.The design/selection of
suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51, 2-3=-51, 3-4=-61, 4-6=-51, 6-8=-51, 8-10=-61, 11-19=-20
Concentrated Loads(lb)Vert: 15=-1485(B) 12=-1640(B) 28=-2126(B) 29=-1637(B) 30=-1571(B) 31=-1669(B) 32=-1640(B) 33=-1438(B) 34=-1436(B)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T29
TrussType
FlatGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:302018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-dXOCVoprgu6rDCO1IWcNrUR1v1jb20BDIWA2rqzaMex
Scale=1:13.8
W1
T1
W1
B1
W2 W1 W2
1 2 3
6
5 478
1.5x4 1.5x4
4x4
3x8
4x4
3x8
2-3-02-3-0 4-6-02-3-0
2-3-02-3-0 4-6-02-3-0
2-2-5PlateOffsets(X,Y)-- [4:0-1-12,0-2-0], [5:0-4-12,0-1-8], [6:0-1-12,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.060.43
0.45
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.01-0.01
0.00
(loc)
55
4
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 23 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-6-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)6=698/0-4-0(min. 0-1-8), 4=879/Mechanical
Max Horz6=69(LC 31)Max Uplift6=-128(LC 8), 4=-153(LC 9)
MaxGrav6=749(LC 2), 4=953(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
BOT CHORD 6-7=-120/593, 5-7=-120/593, 5-8=-120/593, 4-8=-120/593WEBS2-6=-783/140, 2-5=-80/886, 2-4=-783/138
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.4)Provide adequate drainage to preventwater ponding.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
6=128, 4=153.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 682 lb down and 100 lb up at
1-6-12, and 684 lb down and 95 lb up at 3-6-12 on bottomchord.The design/selection of suchconnection device(s)is theresponsibility of others.10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-3=-61, 4-6=-20
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T29
TrussType
FlatGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:302018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-dXOCVoprgu6rDCO1IWcNrUR1v1jb20BDIWA2rqzaMex
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 7=-622(F) 8=-615(F)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T30
TrussType
Jack-Open
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:312018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-5jybi8qTRCEiqLyDsD7cNh_9kR5Lna3NXAvbNGzaMew
Scale=1:16.4
0-1-15W1
T1
T2
B1
W2
1
2
6
5
7
3
4
1.5x4
1.5x4
6x8
1-6-51-6-5 4-6-02-11-11
1-6-51-6-5 4-6-02-11-11
0-9-112-8-72-3-92-8-70-9-117.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-13], [5:0-1-8,0-0-14]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.250.27
0.02
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.03-0.06
-0.01
(loc)
4-54-5
3
l/defl
>999>844
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 12 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-6-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)6=164/0-4-0(min. 0-1-8), 3=91/Mechanical, 4=63/Mechanical
Max Horz6=68(LC 16)Max Uplift6=-11(LC 16), 3=-61(LC 16)
MaxGrav6=177(LC 33), 3=148(LC 34), 4=79(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 1-6-5,Interior(1) 1-6-5 to 4-5-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.8)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T31
TrussType
COMMONGIRDER
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:322018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ZwWzwTr5CWMZSVXQQxerwvXIArQwWoHWlqf9vizaMev
Scale=1:46.0
T1 T2
B1
W5
W4 W3W4W3
W1
W2
W1
W2
1
2
3
4
5
6
11 10 9 8 7
12 13
14 15 16 17
4x6
4x4
5x6
5x6
8x8
3x4
8x8
3x4
8x8
4x6
4-0-04-0-0 7-9-03-9-0 11-6-03-9-0 15-6-04-0-0
4-0-04-0-0 7-9-03-9-0 11-6-03-9-0 15-6-04-0-0 16-3-120-9-12
1-1-147-7-61-1-1410.0012
PlateOffsets(X,Y)-- [1:0-2-4,0-1-12], [2:0-1-4,0-1-8], [3:0-1-4,0-2-0], [4:0-1-4,0-1-8], [5:0-2-4,0-1-12], [8:0-3-8,0-4-4], [9:0-4-0,0-4-8], [10:0-3-8,0-4-4]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.330.31
0.99
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.05-0.12
0.01
(loc)
8-98-9
7
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 199 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-6-3 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)11=5203/0-6-0(min. 0-2-2), 7=4080/0-6-0(min. 0-1-11)Max Horz11=-214(LC 8)
Max Uplift11=-863(LC 12), 7=-1138(LC 13)MaxGrav11=5203(LC 1), 7=4111(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-5068/908, 2-12=-3796/837, 3-12=-3739/852, 3-13=-3728/851, 4-13=-3793/834,
4-5=-4768/1335, 1-11=-4066/728, 5-7=-3990/1108
BOT CHORD 11-14=-284/780, 14-15=-284/780, 10-15=-284/780, 10-16=-690/3836, 9-16=-690/3836,9-17=-940/3587, 8-17=-940/3587, 7-8=-142/398
WEBS 3-9=-981/4580, 4-9=-1138/753, 4-8=-795/1328, 2-9=-1412/276, 2-10=-168/1687,1-10=-528/3147, 5-8=-849/3288
NOTES-1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-6-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply toplyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
11=863, 7=1138.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T31
TrussType
COMMONGIRDER
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:322018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ZwWzwTr5CWMZSVXQQxerwvXIArQwWoHWlqf9vizaMev
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1337 lb down and 185 lb up at 1-6-0, 1348 lb down and 191 lb up at
3-6-0, 1327 lb down and 175 lb up at 5-6-0, 1304 lb down and 153 lb up at 7-6-0, and 1246 lb down and 135 lb up at 9-6-0, and 1693 lb down and 1057 lb up at 11-6-0
on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-3=-51, 3-5=-51, 5-6=-51, 7-11=-20Concentrated Loads(lb)
Vert: 9=-1304(B) 8=-1604(B) 14=-1337(B) 15=-1348(B) 16=-1327(B) 17=-1246(B)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T31GE
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:332018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-164L7prjypUP4f6c_e94S63TWEpCFTBg_UOiS9zaMeu
Scale=1:51.6
W1
T1
T2
W1
B1
ST4
ST3
ST2ST1
ST4
ST3
ST2 ST11
2
3
4
5
6
7
8
9
10
11
12
2221 20 19 18 17 16 15 1413
23
24
2x4
3x5
3x4
3x5
2x41.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
15-6-015-6-0
7-9-07-9-0 15-6-07-9-0 17-4-121-10-12
1-1-147-7-61-1-1410.0012
PlateOffsets(X,Y)-- [6:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-R
0.360.12
0.11
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.03-0.06
0.00
(loc)
1212
13
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 80 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStudOTHERS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 15-6-0.
(lb)-Max Horz22=-231(LC 12)Max UpliftAll uplift 100 lb orless at joint(s) 20, 15 except 22=-258(LC 14), 13=-149(LC 13), 19=-122(LC 16),
21=-287(LC 16), 16=-123(LC 17), 14=-211(LC 22)MaxGravAllreactions 250 lb orless at joint(s) 18, 19, 20, 17, 16, 15, 14 except 22=317(LC 16), 13=423(LC22), 21=289(LC 14)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 11-13=-393/179
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 7-9-0, Corner(3) 7-9-0 to 10-9-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.15) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.7)Gablerequirescontinuous bottomchord bearing.
8)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).9)Gablestudsspaced at 2-0-0 oc.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 20, 15 except(jt=lb) 22=258, 13=149, 19=122, 21=287, 16=123, 14=211.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T32
TrussType
HalfHipGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:352018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-_VC5YVt_URl7JzG_53CYXX9i52JrjEJzRotpW1zaMes
Scale=1:28.8
0-1-9T1
T2
W2
B1
W3 W2 W4 W2 W5W21
2
3 4 5 6
11
10 9 8 7
12 13 14 15 16 17
18 19 20 21 22 23
5x8 4x6
3x43x10MT18H5x8
1.5x4 4x4
5x6
1.5x4
0-7-00-7-0 5-7-45-0-4 10-7-85-0-4 15-11-45-3-12
-0-9-120-9-12 0-7-00-7-0 5-7-45-0-4 10-7-85-0-4 15-11-45-3-12
1-1-141-6-21-7-111-6-210.0012
PlateOffsets(X,Y)-- [2:0-1-7,0-1-12], [3:0-6-4,0-1-12], [6:0-2-4,0-1-8], [8:0-2-4,0-2-8], [9:0-3-0,0-2-0], [11:0-0-0,0-1-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.800.87
0.65
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.23-0.41
0.03
(loc)
8-98-9
7
l/defl
>822>458
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 61 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T2: 2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W3,W5: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-8-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:8-11-5 oc bracing: 8-9.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)7=626/Mechanical, 11=610/0-6-0(min. 0-1-8)Max Horz11=61(LC 9)
Max Uplift7=-140(LC 9), 11=-186(LC 9)MaxGrav7=918(LC 31), 11=856(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-764/146, 3-12=-2776/440, 12-13=-2776/440, 4-13=-2776/440, 4-14=-2776/440,
14-15=-2776/440, 5-15=-2776/440, 5-16=-2727/422, 16-17=-2727/422, 6-17=-2727/422,
6-7=-851/164, 2-11=-685/115BOT CHORD 10-11=-123/440, 10-18=-113/427, 18-19=-113/427, 9-19=-113/427, 9-20=-432/2727,
20-21=-432/2727, 8-21=-432/2727WEBS3-9=-371/2431, 4-9=-500/152, 5-8=-521/164, 6-8=-409/2638
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9) Refer to girder(s) for truss to trussconnections.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
7=140, 11=186.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T32
TrussType
HalfHipGirder
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:352018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-_VC5YVt_URl7JzG_53CYXX9i52JrjEJzRotpW1zaMes
NOTES-
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 113 lb down and 149 lb up at 0-7-0, 16 lb down and 26 lb up at 2-8-5
, 16 lb down and 26 lb up at 4-8-5, 16 lb down and 26 lb up at 6-8-5, 16 lb down and 26 lb up at 8-8-5, 16 lb down and 26 lb up at 10-8-5, and 16 lb down and 26 lb up
at 12-8-5, and 16 lb down and 26 lb up at 14-8-5 on top chord, and 23 lb down and 37 lb up at 0-7-0, 9 lb down and 12 lb up at 2-8-5, 9 lb down and 12 lb up at 4-8-5, 9lb down and 12 lb up at 6-8-5, 9 lb down and 12 lb up at 8-8-5, 9 lb down and 12 lb up at 10-8-5, and 9 lb down and 12 lb up at 12-8-5, and 9 lb down and 12 lb up at
14-8-5 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.13)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51, 2-3=-51, 3-6=-61, 7-11=-20Concentrated Loads(lb)
Vert: 3=50(F) 8=1(F) 10=18(F) 18=1(F) 19=1(F) 20=1(F) 21=1(F) 22=1(F) 23=1(F)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T33
TrussType
HalfHip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:362018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ShlUlrucFkt_x7rBfnjn4lhwSSh5ScA6gSdM2TzaMer
Scale=1:29.4
0-1-9T1
T2
W11
B1
B2 B3 B2
B4
W3 W5
W4 W6 W7 W8 W7 W6
W10
W9
W1 W21
2
3 4 5 6 7 8
17
16 15
14 13 12 11
10 9
18 19
4x6
3x41.5x4 1.5x4
4x4
8x10
5x6
1.5x4
3x8
4x4
4x4
4x4
5x6
5x8
4x4
3x4
1-4-101-4-10 2-6-01-1-6 6-7-54-1-5 10-8-114-1-5 14-10-04-1-5 15-11-41-1-4
-0-9-120-9-12 1-4-101-4-10 2-6-01-1-6 6-7-54-1-5 10-8-114-1-5 14-10-04-1-5 15-11-41-1-4
1-1-142-2-22-3-112-2-21-0-010.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [3:0-3-0,0-1-8], [7:0-3-0,0-1-8], [8:0-1-12,0-1-12], [9:0-1-12,0-1-8], [11:0-5-8,0-3-4], [12:0-3-0,0-1-8], [14:0-4-4,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.630.75
0.99
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.32-0.57
0.25
(loc)
12-1312-13
9
l/defl
>585>328
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 67 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud,B3: 2x4SPF 1650F 1.5EWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-3-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)9=630/Mechanical, 17=670/0-6-0(min. 0-1-8)
Max Horz17=87(LC 13)Max Uplift9=-135(LC 13), 17=-111(LC 13)
MaxGrav9=920(LC 35), 17=871(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-644/112, 3-4=-1834/329, 4-18=-2137/378, 5-18=-2137/378, 5-6=-3867/595,6-19=-3509/524, 7-19=-3509/524, 7-8=-919/147, 8-9=-834/137, 2-17=-844/171
BOT CHORD 4-14=-367/115, 13-14=-627/3867, 12-13=-556/3509, 11-12=-230/1253, 7-11=-849/178
WEBS 3-16=-783/144, 14-16=-144/560, 3-14=-314/1762, 5-14=-1768/262, 6-13=-73/367,6-12=-448/131, 7-12=-334/2307, 8-11=-226/1272, 2-16=-73/599
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 5-7-8,Interior(1) 5-7-8 to 15-9-8zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)9=135, 17=111.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T34
TrussType
HalfHip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:382018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-O4tEAXvsnM7iAQ?ZmBlF9AnKsFQPwb_P8m6T7MzaMep
Scale=1:29.4
0-1-9T1
T2
W8
B1
B2
B3
B4
B5
W3 W4 W5 W4 W3
W7
W6
W1 W21
2
3 4 5 6 7
15 14
13 12 11 10
9 8
16
3x41.5x4
4x10
3x8
3x6
1.5x4
3x10
1.5x4 3x4
3x5
8x8
4x4
3x4
4x6
2-6-02-6-0 6-7-54-1-5 10-8-114-1-5 14-10-04-1-5 15-11-41-1-4
-0-9-120-9-12 2-2-32-2-3 2-6-00-3-13 6-7-54-1-5 10-8-114-1-5 14-10-04-1-5 15-11-41-1-4
1-1-142-10-22-11-112-10-21-0-010.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [3:0-2-8,0-1-12], [6:0-2-12,0-1-8], [7:0-1-12,0-2-0], [8:0-1-12,0-1-8], [10:0-5-8,0-6-0], [11:0-1-12,0-1-8], [12:0-4-0,0-1-8], [13:0-2-4,0-1-8],[14:0-2-4,0-2-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.38
0.560.59
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.12
-0.210.11
(loc)11-12
11-128
l/defl>999
>876n/a
L/d240
180n/a
PLATESMT20
Weight: 73 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B2: 2x8SP 2400F 2.0E,B4: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-5-11 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)8=629/Mechanical, 15=663/0-6-0(min. 0-1-8)Max Horz15=114(LC 13)
Max Uplift8=-138(LC 13), 15=-94(LC 13)MaxGrav8=914(LC 35), 15=822(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-782/138, 3-4=-2273/361, 4-5=-2273/361, 5-16=-2072/311, 6-16=-2072/311,
6-7=-641/106, 7-8=-840/152, 2-15=-803/180
BOT CHORD 12-13=-273/1053, 11-12=-353/2072, 10-11=-178/798, 6-10=-812/176WEBS3-12=-211/1292, 4-12=-427/128, 5-11=-470/137, 6-11=-193/1366, 7-10=-217/1089,
2-14=-73/619
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 6-7-5,Interior(1) 6-7-5 to 15-9-8zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
8=138.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T35
TrussType
HalfHip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:392018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-sGRcOtwUYfFZoaamKvGUiNJSJfiify6YMQr0fozaMeo
Scale=1:32.8
0-1-12T1
T2
W9
B1
B2
B3
B4
B5
W3W4 W5 W6 W5
W8
W7
W1
W2
1
2
3
4 5 6 7
15 14
13 12 11 10
9 8
16 17 18
4x6 3x5
3x41.5x4
3x6
4x6
3x4
1.5x4
5x8
1.5x4
3x8
6x8
3x4
3x5
2-6-02-6-0 3-4-140-10-14 9-1-75-8-9 14-10-05-8-9 15-11-41-1-4
-0-9-120-9-12 2-6-02-6-0 3-4-140-10-14 9-1-75-8-9 14-10-05-8-9 15-11-41-1-4
1-1-143-10-33-11-153-10-31-0-010.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [3:0-2-0,0-1-8], [4:0-3-12,0-1-8], [7:0-2-0,0-1-8], [8:0-1-12,0-1-8], [10:0-2-0,0-2-12], [12:0-4-0,0-3-0], [14:0-2-0,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.530.75
0.98
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.07-0.14
0.13
(loc)
1111-12
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 78 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B4: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-6-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=627/Mechanical, 15=653/0-6-0(min. 0-1-8)
Max Horz15=153(LC 13)Max Uplift8=-142(LC 13), 15=-69(LC 13)
MaxGrav8=900(LC 35), 15=752(LC 35)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-756/137, 3-4=-1006/219, 4-16=-858/198, 16-17=-859/198, 5-17=-861/198,5-18=-376/83, 6-18=-376/83, 6-7=-317/79, 7-8=-823/139, 2-15=-784/179
BOT CHORD 3-13=-417/58, 12-13=-280/678, 11-12=-283/1452, 10-11=-283/1452, 6-10=-512/170
WEBS 3-12=-51/431, 4-12=-40/285, 5-12=-647/152, 5-10=-1174/195, 7-10=-213/1027,2-14=-37/534
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 2-4-4,Interior(1) 2-4-4 to 3-4-14,Exterior(2) 3-4-14 to 7-7-12
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)8=142.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T36
TrussType
HalfHip
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:402018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-KS?_bCx6JzNQQk8yucnjEbsfV33QOUnib4baBFzaMen
Scale=1:38.4
0-1-12T1
T2
W9
B1
B2
B3
B4
B5
W3
W4 W5 W6 W5
W8
W7
W1 W21
2
3
4 5 6 7
15 14
13 12 11 10
9 8
16
17
18 19 20
4x6 3x5
3x41.5x4
3x4
3x6
3x4
1.5x4
3x8 1.5x4
3x8
4x10
3x4
3x5
2-6-02-6-0 4-9-102-3-10 9-9-135-0-3 14-10-05-0-3 15-11-41-1-4
-0-9-120-9-12 2-6-02-6-0 4-9-102-3-10 9-9-135-0-3 14-10-05-0-3 15-11-41-1-4
1-1-145-0-35-1-155-0-31-0-010.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [3:0-0-12,0-1-8], [4:0-3-0,0-1-8], [7:0-2-4,0-1-8], [8:0-1-12,0-1-8], [10:0-3-4,0-2-0], [14:0-2-0,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.440.66
0.70
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.04-0.09
0.12
(loc)
1111-12
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 86 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B4: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=624/Mechanical, 15=643/0-6-0(min. 0-1-8)
Max Horz15=200(LC 13)Max Uplift8=-148(LC 13), 15=-72(LC 16)
MaxGrav8=875(LC 35), 15=755(LC 36)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-16=-680/119, 16-17=-650/127, 3-17=-643/134, 3-4=-892/197, 4-18=-687/184,18-19=-687/184, 5-19=-689/184, 7-8=-792/161, 2-15=-780/174
BOT CHORD 14-15=-283/291, 12-13=-393/744, 11-12=-239/916, 10-11=-239/916, 6-10=-401/156
WEBS 4-12=-34/277, 5-12=-282/117, 5-10=-849/165, 7-10=-224/897, 2-14=-34/479
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-9-12 to 2-4-4,Interior(1) 2-4-4 to 4-9-10,Exterior(2) 4-9-10 to 9-0-9zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 15 except(jt=lb)
8=148.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T37
TrussType
HalfHipGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:412018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ofZNpYyk4HVH1uj8SKJynoPk4TSP7v8rqjK7khzaMem
Scale=1:37.9
0-1-12T1
T2
W7
B1
W3 W4
W5 W6 W7 W6
W1
W21
2
3
4 5 6
11 10 9 8 7
12
13
14 15 16 17 18
5x6
3x54x6
3x4
5x6 8x8
1.5x4
8x12MT18H
5x6
4x6
3-0-93-0-9 6-2-73-1-14 10-11-24-8-10 15-11-45-0-2
-0-9-120-9-12 3-0-93-0-9 6-2-73-1-14 10-11-24-8-10 15-11-45-0-2
1-1-146-2-36-3-156-2-310.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [3:0-1-8,0-1-8], [4:0-2-12,0-1-8], [6:0-2-8,0-1-12], [7:Edge,0-3-8], [8:0-3-8,0-4-12], [9:0-3-8,0-4-12], [10:0-3-0,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.770.48
0.82
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.07-0.15
0.01
(loc)
8-98-9
7
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 211 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*W6: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 6-7
REACTIONS.(lb/size)7=5417/Mechanical, 11=4566/0-6-0(min. 0-1-15)Max Horz11=243(LC 11)
Max Uplift7=-865(LC 9), 11=-1242(LC 12)MaxGrav7=5641(LC 31), 11=4751(LC 32)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-5261/1467, 3-12=-5240/1170, 4-12=-5232/1190, 4-13=-3829/626, 5-13=-3831/626,
5-6=-3829/625, 6-7=-4740/805, 2-11=-4652/1290
BOT CHORD 10-11=-291/338, 10-14=-1262/3949, 9-14=-1262/3949, 9-15=-987/3991, 15-16=-987/3991, 8-16=-987/3991
WEBS 3-10=-475/330, 3-9=-297/446, 4-9=-1062/3353, 4-8=-448/500, 5-8=-545/173,6-8=-978/5905, 2-10=-1035/3799
NOTES-1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-6-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply toplyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.8)Provide adequate drainage to preventwater ponding.
9)All plates areMT20 plates unless otherwiseindicated.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.11) Refer to girder(s) for truss to trussconnections.
12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)7=865, 11=1242.Continued on page 2
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
T37
TrussType
HalfHipGirder
Qty
1
Ply
2
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:412018 Page2ID:MhE03fhh87aAfWRhIe2kLHyXQhF-ofZNpYyk4HVH1uj8SKJynoPk4TSP7v8rqjK7khzaMem
NOTES-
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1759 lb down and 1102 lb up at 4-0-0, 1609 lb down and 283 lb up at
6-0-0, 1459 lb down and 190 lb up at 8-0-0, 1233 lb down and 98 lb up at 10-0-0, and 1424 lb down and 129 lb up at 12-0-0, and 1349 lb down and 118 lb up at 14-0-0on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51, 2-4=-51, 4-6=-61, 7-11=-20
Concentrated Loads(lb)Vert: 9=-1609(B) 14=-1658(B) 15=-1459(B) 16=-1233(B) 17=-1424(B) 18=-1349(B)
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V01
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:422018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-Hr7l0uyNrad8f2IL?1qBK0x1gtuasWz_2N4hG7zaMel
Scale=1:37.6
T1
T2
W1
B1
ST2
ST1
1
2
3
4
7 6 5
8
9
10
11
12
3x4
4x4
1.5x4
1.5x41.5x41.5x4
1.5x4
10-7-1410-7-14
6-11-106-11-10 10-7-143-8-4
0-0-45-9-112-8-1310.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.20
0.100.14
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-5
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 38 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 10-7-14.
(lb)-Max Horz1=178(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 6 except 7=-200(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 6=318(LC 29), 7=365(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-7=-326/243
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 6-11-10,Exterior(2) 6-11-10 to
9-11-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 6 except
(jt=lb) 7=200.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V02
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:432018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-l1g7EEz?cul?HBtXZlLQsDU8QGDTb_f8H1pEoZzaMek
Scale=1:31.3
T1
T2
W1
B1
ST1
1
2
3
5 4
6
7
8
9
2x4
4x4
1.5x4
1.5x41.5x4
9-3-29-3-2
5-6-145-6-14 9-3-23-8-4
0-0-44-7-111-6-1310.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.46
0.190.11
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-4
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 30 lb FT= 20%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=173/9-3-2(min. 0-1-8), 4=111/9-3-2(min. 0-1-8), 5=333/9-3-2(min. 0-1-8)
Max Horz1=131(LC 15)
Max Uplift1=-55(LC 17), 4=-81(LC 17), 5=-6(LC 13)MaxGrav1=203(LC 30), 4=154(LC 30), 5=403(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-291/74
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 5-6-14,Exterior(2) 5-6-14 to 8-6-14
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 5.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V03
TrussType
GABLE
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:442018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-DDEVRa_dNCtsuLSj7SsfPR1NigSnKSeHWhZnK0zaMej
Scale=1:22.9
T1 T2
B1
1
2
34
5
6
7
2x4
3x4
2x4
7-10-57-10-5
4-2-14-2-1 7-10-53-8-4
0-0-43-5-110-4-1310.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge], [3:0-2-1,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.230.63
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 20 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=264/7-10-5(min. 0-1-8), 3=264/7-10-5(min. 0-1-8)
Max Horz1=-82(LC 12)
Max Uplift1=-35(LC 16), 3=-34(LC 17)MaxGrav1=298(LC 2), 3=298(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-2-1,Exterior(2) 4-2-1 to 7-2-1zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V04
TrussType
Valley
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:442018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-DDEVRa_dNCtsuLSj7SsfPR1P?gYvKSeHWhZnK0zaMej
Scale=1:16.7
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-50-0-5 5-6-85-6-3
2-9-42-9-4 5-6-82-9-4
0-0-42-3-110-0-410.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.080.24
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 13 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-6-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=168/5-5-14(min. 0-1-8), 3=168/5-5-14(min. 0-1-8)
Max Horz1=52(LC 15)
Max Uplift1=-22(LC 16), 3=-22(LC 17)MaxGrav1=189(LC 2), 3=189(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V05
TrussType
Valley
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:452018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-hQotew?F8V?jWV1vhANuxeZbs4wI3vuRlLILtSzaMei
Scale=1:8.5
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-50-0-5 2-8-142-8-10
1-4-71-4-7 2-8-141-4-7
0-0-41-1-110-0-410.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.010.04
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 6 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-8-14 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=69/2-8-5(min. 0-1-8), 3=69/2-8-5(min. 0-1-8)
Max Horz1=-21(LC 12)
Max Uplift1=-9(LC 16), 3=-9(LC 17)MaxGrav1=77(LC 2), 3=77(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V06
TrussType
Valley
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:462018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-9cMGsG?tvp7Z8fc6Etu7Us6ioU5_oM8az?2uPuzaMeh
Scale=1:23.7
T1 T1
B1
1
2
3
4
5 6
7
2x4
3x4
2x4
0-0-50-0-5 8-8-58-8-1
4-4-34-4-3 8-8-54-4-3
0-0-43-7-80-0-410.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.260.71
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 22 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=279/8-7-12(min. 0-1-8), 3=279/8-7-12(min. 0-1-8)
Max Horz1=86(LC 13)
Max Uplift1=-37(LC 16), 3=-37(LC 17)MaxGrav1=316(LC 2), 3=316(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-4-3,Exterior(2) 4-4-3 to 7-4-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V07
TrussType
Valley
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:462018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-9cMGsG?tvp7Z8fc6Etu7Us6lGUCloM8az?2uPuzaMeh
Scale=1:17.5
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-50-0-5 5-10-125-10-7
2-11-62-11-6 5-10-122-11-6
0-0-42-5-80-0-410.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.100.28
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 14 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-10-12 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=180/5-10-2(min. 0-1-8), 3=180/5-10-2(min. 0-1-8)
Max Horz1=-55(LC 12)
Max Uplift1=-24(LC 16), 3=-24(LC 17)MaxGrav1=204(LC 2), 3=204(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57333-W1
Dansco Engineering, LLC
Date: 3/16/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1801919-12T
Truss
V08
TrussType
Valley
Qty
1
Ply
1
1801919-12TDWHWoodsideWCLot34
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriMar1613:11:472018 Page1ID:MhE03fhh87aAfWRhIe2kLHyXQhF-dowe3c0Vf7FQlpBIoaPM13fxGucXXpOkCfnRxLzaMeg
Scale=1:9.2
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-50-0-5 3-1-23-0-13
1-6-91-6-9 3-1-21-6-9
0-0-41-3-80-0-410.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.020.05
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=81/3-0-9(min. 0-1-8), 3=81/3-0-9(min. 0-1-8)
Max Horz1=25(LC 13)
Max Uplift1=-11(LC 16), 3=-11(LC 17)MaxGrav1=92(LC 2), 3=92(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard