Loading...
HomeMy WebLinkAbout18040017 Truss DetailsDE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my direct supervision based on the parameters provided by the truss designers. Job: 1801946-12T 86 truss design(s) 57279-W1 3/15/18 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2007 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J01 TrussType JACK-OPEN Qty 6 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:092018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-oAuvz2mEjuPH1U?163aACUq1pnWoI6hNnzZpF5zay2i Scale=1:16.9 W1 T1 B1 1 2 5 6 3 4 3x4 3x4 2-0-0 2-0-0 -1-5-12 1-5-12 2-0-0 2-0-0 1-7-1 2-9-1 2-4-2 2-9-1 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J02 TrussType Jack-OpenGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:102018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-GNSIAOnsUBX8feaDfn5PkiMB0AsT1ZwX0dINoXzay2h Scale=1:16.6 W1 T1 B1 1 2 5 6 3 4 2x4 2x4 2-3-11 2-3-11 -1-8-8 1-8-8 2-3-11 2-3-11 1-7-1 2-8-5 5.7412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J03 TrussType Jack-Open Qty 25 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:112018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-kZ0gOkoUFVf?Ho9PDUceHvvGMa6Qm0AgEH2wKzzay2g Scale=1:34.2 W1 T1 B1 1 2 5 6 7 8 3 4 5x12MT18H 3x4 5-1-0 5-1-0 -0-11-12 0-11-12 5-1-0 5-1-0 1-7-1 5-9-14 5-4-1 5-9-14 10.0012 PlateOffsets(X,Y)-- [5:0-8-8,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J04 TrussType Jack-Open Qty 3 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:122018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Cla2b4p60pnruykbnC8tq7SWv_S_VTQpTwnTsPzay2f Scale=1:34.5 W1 T1 B1 B2 B3 1 2 3 8 7 6 9 10 4 5 3x4 3x4 1.5x4 3x5 5x6 2-6-0 2-6-0 5-1-0 2-7-0 -0-11-12 0-11-12 2-6-0 2-6-0 5-1-0 2-7-0 1-7-1 5-9-14 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J05 TrussType Jack-Open Qty 2 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:132018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-hy8QpQqkn6viW5JoLvf6MK_hdOsQEwgziaX1Oszay2e Scale=1:23.5 W1 T1 B1 1 2 5 6 3 3x4 4 3x4 0-2-0 0-2-0 2-11-8 2-9-8 -0-11-12 0-11-12 2-11-8 2-11-8 1-7-1 4-0-10 3-6-13 4-0-10 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J06 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:132018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-hy8QpQqkn6viW5JoLvf6MK_iUOs7EwgziaX1Oszay2e Scale=1:20.6 W1 T1 B1 1 2 5 3 3x4 4 3x4 0-2-0 0-2-0 2-3-3 2-1-3 -0-11-12 0-11-12 2-3-3 2-3-3 1-7-1 3-5-11 2-11-14 3-5-11 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J07 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:142018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-98ho0mqNYQ1Z8Fu_udALvYXuFoDFzNw6wEGaxIzay2d Scale=1:16.2 W1 T1 B1 1 2 5 3 4 3x4 2x4 0-2-0 0-2-0 1-2-9 1-0-9 -0-11-12 0-11-12 1-2-9 1-2-9 1-7-1 2-7-3 2-1-6 2-7-3 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J08 TrussType DiagonalHipGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:152018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-dKFAD6r?Jk9QlPTASKhaRl40vBXwipAG9u08Tkzay2c Scale=1:22.8 W1 T1 B1 1 2 5 6 7 8 9 3 10 11 12 3x4 4 3x4 0-2-0 0-2-0 4-11-12 4-9-12 -1-8-8 1-8-8 4-11-12 4-11-12 1-7-1 3-11-10 0-4-10 3-7-0 3-11-10 5.7412 LOADING (psf) TCLL TCDL BCLL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J08 TrussType DiagonalHipGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:152018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-dKFAD6r?Jk9QlPTASKhaRl40vBXwipAG9u08Tkzay2c LOADCASE(S) Standard Trapezoidal Loads(plf) Vert: 2=-2(F=24,B=24)-to-3=-63(F=-6,B=-6), 5=0(F=10,B=10)-to-4=-25(F=-2,B=-2) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J09 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:162018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-5WpZRSsd31HHNZ2N01Cp_zcD7bvyRGQPOYlh?Bzay2b Scale=1:14.7 W1 T1 B1 1 2 5 3 4 3x4 2x4 0-2-0 0-2-0 1-3-2 1-1-2 -1-5-12 1-5-12 1-3-2 1-3-2 1-7-1 2-3-14 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J10 TrussType Jack-Open Qty 23 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:172018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ZjNxeotFqLP8?jcZalj2XA9Jj?BWAjfZdCVEXdzay2a Scale=1:30.5 W1 T1 B1 1 2 5 6 7 3 4 5x6 3x4 4-8-0 4-8-0 -0-11-12 0-11-12 4-8-0 4-8-0 1-7-1 5-5-12 0-5-13 4-11-15 5-5-12 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J11 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:182018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-1vxJs7ttbfX?dtBl7SEH3OiXBPYrvAvirsEo43zay2Z Scale=1:25.1 W1 T1 B1 1 2 5 6 7 3 4 4x4 3x4 3-4-1 3-4-1 -0-11-12 0-11-12 3-4-1 3-4-1 1-7-1 4-4-7 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J12 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:192018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-V5Vh3TuVMyfsE0myhAmWcbEk6pvged9r4W_LcVzay2Y Scale=1:19.3 W1 T1 B1 1 2 5 3 4 3x4 3x4 1-11-4 1-11-4 -0-11-12 0-11-12 1-11-4 1-11-4 1-7-1 3-2-7 0-5-13 2-8-10 3-2-7 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J13 TrussType DiagonalHipGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:202018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-zI33Hpv77GnjsAL8FtHl8pnqLC97N4P?JAju8yzay2X Scale=1:31.4 W1 T1 B1 1 2 5 6 7 8 9 3 10 11 12 4 3x6 4x4 7-11-9 7-11-9 -1-8-8 1-8-8 3-11-12 3-11-12 7-11-9 3-11-12 1-7-1 5-4-11 0-6-13 4-9-15 5-4-12 5.7412 LOADING (psf) TCLL TCDL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J13 TrussType DiagonalHipGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:202018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-zI33Hpv77GnjsAL8FtHl8pnqLC97N4P?JAju8yzay2X LOADCASE(S) Standard Trapezoidal Loads(plf) Vert: 2=-3(F=24,B=24)-to-3=-101(F=-25,B=-25), 5=-0(F=10,B=10)-to-4=-40(F=-10,B=-10) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss J14 TrussType Jack-Open Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:212018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-SUdSU9wmuavaUKwKpbo_h0K3McaD6Xf8XqTSgOzay2W Scale=1:21.8 W1 T1 B1 1 2 5 6 7 8 3 4 3x4 3x4 3-8-7 3-8-7 -1-5-12 1-5-12 3-8-7 3-8-7 1-7-1 3-9-0 3-4-1 3-9-0 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB01 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:222018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wgAqiVxOft1R5UVWMIJDEEsF?0xYrzUImUC?Dqzay2V Scale=1:18.4 0-1-12 0-1-12 T1 T2 T1 B1 W1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 1.5x4 2x4 1.5x4 10-6-3 10-6-3 10-6-3 10-6-3 0-4-13 1-3-5 1-5-1 0-1-10 0-4-13 0-1-10 10.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB02 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:232018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-OtkCvrx0QBAIje4jw?qSmRPSnQHnaRCR?8yZlHzay2U Scale=1:18.4 0-1-12 0-1-12 T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 1.5x4 2x4 1.5x4 10-6-3 10-6-3 3-1-4 3-1-4 7-4-14 4-3-10 10-6-3 3-1-4 0-4-13 2-5-5 2-7-1 0-1-10 0-4-13 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB03 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:242018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-s3Ia6ByeBUI8LofvUjLhJfxaXqc0JutbEoh6Hjzay2T Scale=1:23.0 0-1-12 0-1-12 T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 1.5x4 2x4 1.5x4 10-6-3 10-6-3 4-6-1 4-6-1 6-0-1 1-6-0 10-6-3 4-6-1 0-4-13 3-7-5 3-9-1 0-1-10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB04 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:252018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-KFsyKXzGyoQ?yxE52QswrsUmeDzg2KMkSSRfp9zay2S Scale=1:58.1 0-1-15 0-1-15 T1 T2 T1 B1 ST1 ST1 ST1 ST1 ST1 ST1 T3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 2-5-6 2-5-6 29-7-10 27-2-4 32-1-1 2-5-6 0-4-5 1-1-9 1-5-2 0-1-10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB05 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:272018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Ge_jlC_WUPgjCFNU9rvOxHZ5M1fBWEj1wmwmu2zay2Q Scale=1:58.1 0-1-15 0-1-15 T1 T2 T1 B1 ST1 ST2 ST2 ST2 ST2 ST2 ST1 T3 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 26 27 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 5-3-11 5-3-11 26-9-6 21-5-11 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB06 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:282018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-kqY5yY?9FjoapPygjZQdTV6FQR?SFgzA8QfKQUzay2P Scale=1:56.9 0-1-15 0-1-15 T1 T2 T1 B1 ST2 ST3 ST3 ST1 ST3 ST2 ST1 1 B1 2 3 4 5 6 7 8 9 10 11 18 17 16 15 14 13 12 19 20 21 22 23 24 25 26 3x4 5x6 6x6 6x6 3x4 32-1-1 32-1-1 8-1-15 8-1-15 23-11-1 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB07 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:292018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-D15TAu0n01wRRZXtHGxs0ifRSrLf_5GKN4Ptzwzay2O Scale=1:57.4 0-1-15 0-1-15 T1 T2 T1 B1 ST3 ST3 ST2 ST1 ST3 ST2 ST1 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 2425 2627 28 29 30 3x4 3x4 3x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB08 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:312018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-9PDEaa11XeA9gshFOhzK57kn4e05S?icrOu_1pzay2M Scale=1:58.5 0-1-15 0-1-15 T2 T3 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 T1 B1 T1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 22 21 20 19 18 17 16 23 24 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB09 TrussType Piggyback Qty 4 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:322018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-dbncow2fIyI0I0GRyOVZeLHzZ2MNBTZm32eXZFzay2L Scale=1:62.5 T2 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 B1 T1 T1 1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 3x4 4x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB10 TrussType Piggyback Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:332018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-5oL_?G3H3FQtwAreW60oAYp9lSjKwyevIiN46hzay2K Scale=1:62.5 T2 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 T1 T1 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 3x4 4x4 3x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB10 TrussType Piggyback Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:342018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Z_vMDc4wqZYkXKQq3pX1jmMKVs3ZfPu3XM7ee8zay2J LOADCASE(S) Standard DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB11 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:352018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-1ATkQx5Ybtgb9U_0dX2GFzvT3FO1OneCl?sBAazay2I Scale=1:57.4 0-1-15 0-1-15 T1 T2 T1 B1 ST3 ST4 ST2 ST1 ST3 ST2 ST1 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 27 28 3x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB12 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:362018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-WN17eH5AMAoSneZDBEZVoBRemfkH7GNM_fcli0zay2H Scale=1:56.9 0-1-15 0-1-15 T1 T2 T1 B1 ST3 ST3 ST2 ST1 ST3 ST2 ST1 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 2324 2526 27 28 3x4 3x4 3x4 5x6 3x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB13 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:382018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Sl8t2z7Quo290xjbIfbztcX_8TPobBfeSz5rnvzay2F Scale=1:58.1 0-1-15 0-1-15 T1 T2 T1 B1 ST2 ST2 ST2 ST1 ST2 ST2 ST1 T3 1 B1 2 3 45 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 7-8-14 7-8-14 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB14 TrussType Piggyback Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:392018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wyiFGJ82f5B0e5IosN7CQp39Ltl0KflogdqPJLzay2E Scale=1:58.1 0-1-15 0-1-15 T1 T2 T1 B1 ST1 ST2 ST2 ST2 ST2 ST2 ST1 T3 1 B1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 26 27 3x4 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 4-10-9 4-10-9 27-2-4 22-3-10 32-0-15 4-10-11 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss PB15 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:412018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-sKq0h?9JBjRktPSA_n9gVE9VbgRPoZK58xJWOEzay2C Scale=1:58.1 0-1-15 0-1-15 T1 T2 T1 ST1 B1 ST1 ST1 ST1 ST1 ST1 T3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 3x8 3x8 3x8 10x10 3x8 3x8 3x8 3x4 32-0-15 32-0-15 2-0-5 2-0-5 30-0-8 28-0-3 32-0-15 2-0-7 0-4-5 0-10-11 1-2-4 0-1-10 0-4-5 0-1-10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T01 TrussType Common Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:422018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-KXOOuLAxy0ZbVZ1MXVgv1ShZ64fUX_cEMb33wgzay2B Scale=1:56.7 T1 T1 B1 W3 W2 W2 W1 W1 B1 1 2 3 4 5 8 7 6 9 10 11 12 13 14 8x8 4x4 8x8 4x6 5x8 1.5x4 1.5x4 4x6 9-6-0 9-6-0 19-0-0 9-6-0 4-10-12 4-10-12 9-6-0 4-7-4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T01GE TrussType Common SupportedGable Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:432018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ojym6hBZiKhS6jcZ5CB8afEp7U5uGQPNbFocS6zay2A Scale=1:60.5 W1 T1 T1 W1 B1 ST5 ST4 ST3 ST2 ST1 ST4 ST3 ST2 ST1 B2 W2 1 2 3 4 5 6 7 8 9 10 11 12 13 24 23 22 21 20 19 18 17 16 15 14 26 25 27 3x4 3x5 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T02 TrussType Roof SpecialGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:452018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-l63WWMCpExxAM0lxDdDcf4J1hHeNkCag3ZHjX?zay28 Scale=1:64.9 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W9 W8 W7 W1 W2 W1 B2 W10 1 2 3 4 5 6 7 8 9 17 16 15 14 13 12 11 10 18 19 20 21 22 23 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T02 TrussType Roof SpecialGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:452018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-l63WWMCpExxAM0lxDdDcf4J1hHeNkCag3ZHjX?zay28 NOTES- 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 136 lb down and 144 lb up at 1-4-13, 73 lb down and 35 lb up at 3-5-14, 73 lb down and 35 lb up at 5-5-14, 73 lb down and 35 lb up at 7-5-14, and 73 lb down and 35 lb up at 9-5-14, and 73 lb down and 35 lb up at 10-5-4 on top chord, and 37 lb down and 46 lb up at 1-4-13, 20 lb down and 20 lb up at 3-5-14, 20 lb down and 20 lb up at 5-5-14, 20 lb down and 20 lb up at 7-5-14, and 20 lb down and 20 lb up at 9-5-14, and 20 lb down and 20 lb up at 10-5-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-3=-51, 3-5=-61, 5-7=-51, 7-9=-51, 10-17=-20 Concentrated Loads(lb) Vert: 3=26(B) 16=3(B) 27=1(B) 28=1(B) 29=1(B) 30=1(B) 31=1(B) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T03 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:472018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-hUBHx2E3mZBubKvKK2G4kVOLJ5HwC65zWtmqbuzay26 Scale=1:60.0 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W1 W2 W1 W10 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 22 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T04 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:482018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-9glf9OFiXsJlDUUWumnJHjxanVcOxaP7lXWN8Kzay25 Scale=1:63.0 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W1 W2 W1 W9 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T05 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:492018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-dtJ1MkFKIARbre3jSTIYqwUlcv?Jg1kGzBFxgmzay24 Scale=1:63.0 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W1 W2 W1 W9 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 25 15 16 17 18 19 20 21 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T06 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:512018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ZFRnnQHaqnhJ4xD5ZuK0vLZ28iit8xNZRVk1kfzay22 Scale=1:63.0 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W1 W2 W11 W10 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 1819 20 21 22 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T07 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:522018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-2S_A_lICb5pAi5oH7brFRZ6Ik627tNeig9UbH5zay21 Scale=1:60.0 0-1-12 0-1-12 T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W10 W1 W2 W1 W11 B2 1 2 3 4 5 6 7 8 9 15 14 13 12 11 10 16 17 18 19 20 21 22 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T08 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:532018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-WeYYC5JqMPx1JFNUhJNU_meRkWNwcvHsupD8pXzay20 Scale=1:60.2 0-1-12 0-1-12 T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 23 24 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T09 TrussType PiggybackBase Qty 2 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:552018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-S1gIdnK5u0ClZZWsokPy3BkoMJ3K4gY9M7iFtQzay2_ Scale=1:59.9 T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 23 4x4 4x4 3x4 3x8 3x5 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T10 TrussType PiggybackBase Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:562018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wDEgq7LjfKKcAi53MRwBcPGzHjOSo8SIbnSoPszay1z Scale=1:59.4 T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W7 W6 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 4x4 4x4 1.5x4 3x8 3x6 4x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T11 TrussType Common Qty 3 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:572018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-OPo32TMLPdSTosgFw8RQ8cp837oRXmzRpRBMxIzay1y Scale=1:45.5 T1 T2 B1 W2 W3 1 W1 W4 2 3 4 5 9 8 7 6 10 11 12 13 14 15 4x6 4x6 4x4 4x4 1.5x4 1.5x4 1.5x4 3x6 0-8-0 0-8-0 0-10-0 0-2-0 6-6-0 5-8-0 12-11-8 6-5-8 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T11GE TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:582018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-scMRFpMzAxaKQ0FRTsyfhqMLGXBhGD?b25xvTlzay1x Scale=1:45.8 T1 T2 B1 W2 W3 W1 W4 ST2 ST1 ST2 ST1 1 2 3 4 5 13 12 11 10 9 8 7 6 18 19 20 21 22 23 4x6 3x5 3x4 3x4 3x4 0-8-0 0-8-0 0-10-0 0-2-0 6-6-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T12 TrussType MonopitchGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:592018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-KovpS9NbxFiB1Aqe1ZUuE1uWBxSY?avkHkgT?Bzay1w Scale=1:20.1 T1 W5 B1 W3 W4 W1 W2 1 2 3 4 7 6 5 8 9 10 1.5x4 2x4 8x8 4x4 3x5 4x4 3-10-0 3-10-0 7-8-0 3-10-0 -1-10-12 1-10-12 3-10-0 3-10-0 7-8-0 3-10-0 1-1-10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T12 TrussType MonopitchGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:38:592018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-KovpS9NbxFiB1Aqe1ZUuE1uWBxSY?avkHkgT?Bzay1w LOADCASE(S) Standard Concentrated Loads(lb) Vert: 6=-397(B) 9=-397(B) 10=-397(B) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T13 TrussType Jack-Closed Qty 6 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:002018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-p_TBgVODiYq2fKPqbH?7mFRcXKsVk8PuVOQ0Ydzay1v Scale=1:23.5 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 10 4x4 6x6 3x4 1.5x4 6x6 3x4 6-0-1 6-0-1 9-10-0 3-9-15 -1-10-12 1-10-12 6-0-1 6-0-1 9-10-0 3-9-15 1-1-10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T14 TrussType MonopitchGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:012018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-HB1ZtqPrTsyuHU_09_WMJS_vIk4STUP1k29Z44zay1u Scale=1:53.0 T1 W5 B1 W3 W4 W1 W2 1 2 3 6 5 4 7 8 9 10 11 3x5 1.5x4 2x4 4x4 5x6 8x8 4-5-10 4-5-10 9-4-1 4-10-7 4-5-10 4-5-10 9-4-1 4-10-7 3-1-0 8-6-6 7.0012 PlateOffsets(X,Y)-- [5:0-3-8,0-4-12] LOADING (psf) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T14 TrussType MonopitchGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:012018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-HB1ZtqPrTsyuHU_09_WMJS_vIk4STUP1k29Z44zay1u LOADCASE(S) Standard Uniform Loads(plf) Vert: 1-3=-51, 4-6=-20 Concentrated Loads(lb) Vert: 5=-1338(F) 8=-1059(F) 9=-1061(F) 10=-1342(F) 11=-1345(F) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T15 TrussType Roof SpecialGirder Qty 1 Ply 3 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:132018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wUm6PxYNeYTCjKuKsWkBo_T?JaIxHttoVw3CVNzay1i Scale=1:102.7 W1 T1 W1 B1 B2 B3 B2 B4 W3 W2 W4 W5 W4 W7 W6 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 T2 T2 T2 B5 B5 B5 T2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T15 TrussType Roof SpecialGirder Qty 1 Ply 3 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:132018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wUm6PxYNeYTCjKuKsWkBo_T?JaIxHttoVw3CVNzay1i NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone; cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 35=2446, 18=2477. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 140 lb down and 135 lb up at 2-4-13, 130 lb down and 103 lb up at 4-4-13, 130 lb down and 103 lb up at 6-4-13, 130 lb down and 103 lb up at 8-4-13, 140 lb down and 135 lb up at 10-4-13, 140 lb down and 135 lb up at 12-4-13, 140 lb down and 135 lb up at 14-4-13, 140 lb down and 135 lb up at 16-4-13, 140 lb down and 135 lb up at 18-4-13, 140 lb down and 135 lb up at 20-4-13, 140 lb down and 135lb up at 22-4-13, 140 lb down and 135 lb up at 24-4-13, 140 lb down and 135 lb up at 26-4-13, 140 lb down and 135 lb up at 28-4-13, 140 lb down and 135 lb up at 30-4-13, 140 lb down and 135 lb up at 32-4-13, 140 lb down and 135 lb up at 34-4-13, 140 lb down and 135 lb up at 36-4-13, 140 lb down and 135 lb up at 38-4-13, 140 lb down and 135 lb up at 40-4-13, 140 lb down and 135 lb up at 42-4-13, 140 lb down and 135 lb up at 44-4-13, 140 lb down and 135 lb up at 46-4-13, 140 lb down and 135lb up at 48-4-13, 140 lb down and 135 lb up at 50-4-13, 140 lb down and 135 lb up at 52-4-13, and 140 lb down and 135 lb up at 54-4-13, and 140 lb down and 135 lb up at 56-4-13 on top chord, and 56 lb down and 33 lb up at 2-4-4, 65 lb down and 65 lb up at 4-4-13, 65 lb down and 65 lb up at 6-4-13, 65 lb down and 65 lb up at 8-4-13, 56 lb down and 33 lb up at 10-3-12, 56 lb down and 33 lb up at 12-4-13, 56 lb down and 33 lb up at 14-4-13, 56 lb down and 33 lb up at 16-4-13, 56 lb down and 33 lb up at 18-4-13, 56 lb down and 33 lb up at 20-4-13, 56 lb down and 33 lb up at 22-4-13, 56 lb down and 33 lb up at 24-4-13, 56 lb down and 33 lb up at 26-4-13, 56 lb down and 33 lb up at 28-4-13, 56 lb down and 33 lb up at 30-4-13, 56 lb down and 33 lb up at 32-4-13, 56 lb down and 33 lb up at 34-4-13, 56 lb down and 33 lb up at 36-4-13, 56 lb down and 33 lb up at 38-4-13, 56 lb down and 33 lb up at 40-4-13, 56 lb down and 33 lb up at 42-4-13, 56 lb down and 33 lb up at 44-4-13, 56 lb down and 33 lb up at 46-4-13, 56 lb down and 33 lb up at 48-4-13, 56 lb down and 33 lb up at 50-4-13, 56 lb down and 33 lb up at 52-4-13, and 56 lb down and 33 lb up at 54-4-13, and 56 lb down and 33 lb up at 56-4-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T16 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:152018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-sttspdadA9jvyd2izwmftPZC2Nytlke5yEYJaGzay1g Scale=1:110.5 0-1-15 0-1-15 T1 T2 T5 B1 B2 B3 B4 B5 W5 W4 W8W7 W9 W11 W10 W12 W13 W12 W14 W12W15W12 W14 W12 W13 W16 W17 W18 W1 W2 HW2 T3 T4 B6 B6 B7 W6 1 23 4 5 6 7 8 9 10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T16 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:152018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-sttspdadA9jvyd2izwmftPZC2Nytlke5yEYJaGzay1g NOTES- 7)All plates are 4x6MT20 unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=300, 34=383. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T17 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:162018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-L3RE1zaGxTrmandvXeHuQd5LqnHVUCMEBuIs6izay1f Scale=1:107.3 0-1-15 0-1-15 T1 T2 T4 B2 W3 W4 W5 W4 W5 W4 W5 W4 W5 W4 W3 W6 W7 W1 W2 HW2 T3 T2 T5 B1 B3 B3 B1 1 2 3 4 5 6 7 8 9 10 11 12 13 25 24 23 22 21 20 19 18 17 16 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T17 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:162018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-L3RE1zaGxTrmandvXeHuQd5LqnHVUCMEBuIs6izay1f LOADCASE(S) Standard DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T18 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:182018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-HSZ?SecWT45Up5nHe3JMV2Bhlbxby5xXeCnzAbzay1d Scale=1:108.5 0-1-15 0-1-15 T1 T2 T4 T5 B1 W3 W4 W5 W6 W7 W6 W7 W6 W7 W6 W7 W6 W5 W8 W9 W10 W11 W1 W2 W12 W13 T3 T2 B2 B1 B1 B1 1 2 3 4 5 6 7 8 9 10 11 12 13 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T18 TrussType Hip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:182018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-HSZ?SecWT45Up5nHe3JMV2Bhlbxby5xXeCnzAbzay1d NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=230, 14=210. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T19 TrussType PiggybackBase Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:202018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-DqhltKdm?iLC3OxgmUMqaTG1QObSQ?dq6WG4FTzay1b Scale=1:106.2 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W12 W11 T3 T2 B2 B1 B1 B1 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T19 TrussType PiggybackBase Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:202018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-DqhltKdm?iLC3OxgmUMqaTG1QObSQ?dq6WG4FTzay1b NOTES- 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=244, 14=444. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 13-41=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-224, 12=-224-to-41=-231 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T20 TrussType PiggybackBase Qty 3 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:222018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-9DoWH0f0XJbwIi42tvOIfuLO_CIduuS7ZplAJMzay1Z Scale=1:102.1 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W11 W12 T3 T2 B2 B1 B1 B1 1 2 3 4 5 6 7 8 9 10 11 1213 28 27 26 25 24 23 22 21 20 19 18 17 16 1514 29 31 30 32 33 34 3536 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T20 TrussType PiggybackBase Qty 3 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:222018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-9DoWH0f0XJbwIi42tvOIfuLO_CIduuS7ZplAJMzay1Z NOTES- 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=232, 14=438. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-225, 12=-225-to-13=-231 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T21 TrussType PiggybackBase Qty 2 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:242018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-6cwGiihH3wreX0ER?JQmkJRlv013MpxQ17EHOEzay1X Scale=1:99.4 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W11 W12 T3 T2 B2 B1 B1 B1 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 24 23 22 21 20 19 18 17 16 1514 29 31 30 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T21 TrussType PiggybackBase Qty 2 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:242018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-6cwGiihH3wreX0ER?JQmkJRlv013MpxQ17EHOEzay1X NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=191, 16=416, 14=152. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-225, 12=-225-to-13=-231 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T22 TrussType PiggybackBase Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:262018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-2_207OiXaY6LnJOq6kTEqkW4ZpfOqjtjURjOS7zay1V Scale=1:84.5 T1 T2 T4 B1 W3 W4 W5 W6 W5 W6 W5 W7 W5 W6 W5 W6 W5 W1 W2 W9 W8 T3 T2 B2 B1 1 2 3 4 5 6 7 8 9 10 11 22 21 20 19 18 17 16 15 14 13 12 23 24 25 26 27 28 29 30 31 5x8 3x6 5x8 3x4 3x6 3x5 4x6 3x5 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T23 TrussType PiggybackBaseGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:282018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-_NAnY3kn69M30dYCE9Viv9bL1dQfIez?xlCVX?zay1T Scale=1:84.2 T1 T2 T4 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W1 W2 W8 W7 T3 T2 B2 B1 1 2 3 4 5 6 7 8 9 10 11 12 24 23 22 21 20 19 18 17 16 15 14 13 25 26 27 28 29 8x8 6x8 4x8 6x10 3x10MT18H 6x8 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T23 TrussType PiggybackBaseGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:282018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-_NAnY3kn69M30dYCE9Viv9bL1dQfIez?xlCVX?zay1T NOTES- 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 24=2250, 13=715. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 979 lb down and 165 lb up at 1-0-12, 766 lb down and 233 lb up at 3-0-12, 1126 lb down and 251 lb up at 5-0-12, and 1116 lb down and 269 lb up at 7-0-12, and 8571 lb down and 1621 lb up at 9-1-8 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-11=-61, 11-12=-51, 13-24=-20 Concentrated Loads(lb) Vert: 22=-8571(B) 26=-979(B) 27=-766(B) 28=-1126(B) 29=-1116(B) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T24 TrussType PiggybackBase Qty 7 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:292018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-SZj9lPkPtTUwen7Pot0xRM8YN1il17z9APx23Szay1S Scale=1:66.9 W1 T1 T3 B1 W2 W3 W2 W3 W2 W3 W2 W3 W5 W4 T2 T1 B2 B1 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 19 3x4 5x6 3x4 8x12MT18H 5x6 3x4 5x8 1.5x4 3x4 4x6 6x6 2x4 5x6 3x4 3x4 8-1-2 8-1-2 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T25 TrussType Flat Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:302018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-wmHXzll2emcnFxibLaXA_aghFQ1QmevIP3hccuzay1R Scale=1:69.9 W1 T1 W1 B1 W2 W1 W2 W1 W2 W1 W2 T2 T1 B2 B1 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 3x4 4x6 3x5 4x6 3x4 3x4 4x6 3x4 3x8 1.5x4 3x4 4x6 3x5 3x4 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T26 TrussType Flat Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:312018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-OyrvA5mgP4ket5GnvH2PXnDtLqMHV?3SejQ98Kzay1Q Scale=1:61.6 W1 T1 W1 B1 W2 W1 W2 W1 W2 W1 W2 T2 T1 B2 B1 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 3x4 4x6 3x5 4x6 4x6 3x4 3x4 3x4 3x8 1.5x4 3x4 4x6 3x5 3x4 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T27 TrussType HalfHipGirder Qty 1 Ply 3 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:342018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-pXX2p7oYi?6DkY?MaQc68QrWD2SoiJFuKhfplfzay1N Scale=1:90.5 0-1-15 T1 T2 W5 B1 W1 W2 W3 W4W5 W6 W7 W8 W5 W8 W5 W8 W5 W9 W5 W10 W5 W8 W5 W8 T3 T2 B2 B3 B3 1 HW1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 28 27 26 25 24 23 22 21 20 19 18 17 16 32 33 34 35 36 37 3839 40 41 10x10 6x8 6x6 12x12 5x6 8x8 8x8 6x6 12x12 4x10 6x8 6x8 6x10 6x10 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T27 TrussType HalfHipGirder Qty 1 Ply 3 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:342018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-pXX2p7oYi?6DkY?MaQc68QrWD2SoiJFuKhfplfzay1N NOTES- 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)Provide adequate drainage to preventwater ponding. 9)All plates areMT20 plates unless otherwiseindicated. 10)All plates are 3x6MT20 unless otherwiseindicated. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 16=1063, 2=2172. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 900 lb down and 128 lb up at 2-0-12, 779 lb down and 137 lb up at 4-0-12, 856 lb down and 150 lb up at 6-0-12, 978 lb down and 167 lb up at 8-0-12, 766 lb down and 233 lb up at 10-0-12, 1040 lb down and 189 lb up at 12-0-12, and 954lb down and 148 lb up at 14-0-12, and 7763 lb down and 1449 lb up at 16-1-8 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-4=-51, 4-15=-61, 16-29=-20 Concentrated Loads(lb) Vert: 26=-1040(F) 25=-7763(F) 36=-900(F) 37=-779(F) 38=-856(F) 39=-978(F) 40=-766(F) 41=-954(F) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T28 TrussType HalfHipGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:462018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-SrFaKDy4thdWAOwgHxpwdyLdWta6Wm1f4YZSAzzay1B Scale=1:91.8 0-1-15 T1 T2 W7 B1 W3 W4 W5 W6 W7 W8 W7 W6 W7 W8 W7 W9 W7 W8 W7 W6 W7 W8 W7 W6 W1 W2 T3 T2 B2 B3 B1 T2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 32 33 34 35 37 36 38 39 40 41 42 43 44 45 46 47 4849 5051 52 53 5455 56 5758 59 60 61 62 63 6465 5x6 3x4 3x10 4x8 6x6 4x8 2x4 4x8 2x4 4x8 2x4 2x4 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T28 TrussType HalfHipGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:462018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-SrFaKDy4thdWAOwgHxpwdyLdWta6Wm1f4YZSAzzay1B NOTES- 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone; cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)Provide adequate drainage to preventwater ponding. 9)All plates are 4x6MT20 unless otherwiseindicated. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=2181, 31=1876. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 396 lb down and 456 lb up at 6-8-0, 131 lb down and 142 lb up at 8-11-4, 131 lb down and 142 lb up at 10-11-4, 131 lb down and 142 lb up at 12-11-4, 131 lb down and 142 lb up at 14-11-4, 131 lb down and 142 lb up at 16-11-4, 131 lb down and 142 lb up at 18-11-4, 131 lb down and 142 lb up at 20-11-4, 131 lb down and 142 lb up at 22-11-4, 131 lb down and 142 lb up at 24-11-4, 131 lb down and 142lb up at 26-11-4, 131 lb down and 142 lb up at 28-11-4, 131 lb down and 142 lb up at 30-11-4, 131 lb down and 142 lb up at 32-11-4, 131 lb down and 142 lb up at 34-11-4, 131 lb down and 142 lb up at 36-11-4, 131 lb down and 142 lb up at 38-11-4, 131 lb down and 142 lb up at 40-11-4, 131 lb down and 142 lb up at 42-11-4, 131 lb down and 142 lb up at 44-11-4, 131 lb down and 142 lb up at 46-11-4, and 131 lb down and 142 lb up at 48-11-4, and 118 lb down and 138 lb up at 50-10-4 on top chord, and 104 lb down and 38 lb up at 6-8-0, 51 lb down and 34 lb up at 6-11-4, 51 lb down and 34 lb up at 8-11-4, 51 lb down and 34 lb up at 10-11-4, 51 lb down and 34lb up at 12-11-4, 51 lb down and 34 lb up at 14-11-4, 51 lb down and 34 lb up at 16-11-4, 51 lb down and 34 lb up at 18-11-4, 51 lb down and 34 lb up at 20-11-4, 51lb down and 34 lb up at 22-11-4, 51 lb down and 34 lb up at 24-11-4, 51 lb down and 34 lb up at 26-11-4, 51 lb down and 34 lb up at 28-11-4, 51 lb down and 34 lb up at 30-11-4, 51 lb down and 34 lb up at 32-11-4, 51 lb down and 34 lb up at 34-11-4, 51 lb down and 34 lb up at 36-11-4, 51 lb down and 34 lb up at 38-11-4, 51 lb down and 34 lb up at 40-11-4, 51 lb down and 34 lb up at 42-11-4, 51 lb down and 34 lb up at 44-11-4, 51 lb down and 34 lb up at 46-11-4, and 51 lb down and 34 lb up at 48-11-4, and 67 lb down and 23 lb up at 50-10-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 4-16=-61, 17-31=-20 Concentrated Loads(lb) Vert: 4=-242(B) 16=-80(B) 17=-40(B) 29=-67(B) 5=-47(B) 28=-30(B) 8=-47(B) 25=-30(B) 22=-30(B) 11=-47(B) 19=-30(B) 14=-47(B) 13=-47(B) 10=-47(B) 20=-30(B) 24=-30(B) 32=-47(B) 34=-47(B) 35=-47(B) 36=-47(B) 38=-47(B) 39=-47(B) 40=-47(B) 41=-47(B) 42=-47(B) 43=-47(B) 44=-47(B) 46=-47(B) 47=-47(B) 48=-47(B) 49=-47(B) 50=-30(B) 51=-30(B) 52=-30(B) 53=-30(B) 54=-30(B) 55=-30(B) 56=-30(B) 57=-30(B) 58=-30(B) 59=-30(B) 60=-30(B) 61=-30(B) 62=-30(B) 63=-30(B) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T30GE TrussType Roof Special SupportedGable Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:472018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-w1pyXZyie?lNoYVsrfL9A9tj5HzYFPSoJCI?iPzay1A Scale=1:38.8 T1 T2 B1 B2 B3 W2 W3 W4 W3 W2 W1 W5 ST4 ST3 ST5 ST2 ST1 ST6 ST7 ST8 ST9 1 ST10 2 3 4 5 18 17 16 15 14 13 12 11 10 9 8 7 6 29 30 31 32 3x5 4x4 3x5 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T31 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:482018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-PDNLlvzKPItEQi42PMsOjNQvThCM_lTyYs2YErzay19 Scale=1:45.8 0-1-12 0-1-12 W1 T1 T2 T2 T3 B1 W7 B2 B3 W2 W3 W4 W5 W5 W4 W3 W6 1 2 3 4 5 6 7 11 10 9 8 12 13 14 3x5 1.5x4 6x6 4x6 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T32 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:502018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-LcV5Ab?bxw7yf?DRWnusooVFAUuMSg0F?AXfJkzay17 Scale=1:45.8 0-1-12 0-1-12 W1 T1 T2 T2 T3 W7 B1 B2 B3 W2 W3 W4 W5 W5 W4 W3 W6 1 2 3 4 5 6 7 11 10 9 8 12 13 14 15 16 17 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T33 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:522018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-H_craG0rTXNfuJNpeCwKtCbU_IaewapXTU0mNczay15 Scale=1:45.8 0-1-12 0-1-12 W1 T1 T2 T2 T3 W6 B1 B2 B3 W2 W3 W4 W4 W3 W5 1 2 3 4 5 9 8 7 6 10 11 12 13 14 15 16 17 4x6 4x4 5x12MT18H 4x6 5x12MT18H 4x4 5x6 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T34 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:532018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-lBAEoc1TDrVWWTy0BvSZQQ7hmiqCf?Ihh8lJw3zay14 Scale=1:45.8 0-1-12 0-1-12 W1 T1 T2 T2 T3 W8 B1 B2 B3 W2 W3 W4 W5 W6 W5 W4 W3 W7 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 17 18 19 20 3x5 3x4 4x8 4x6 4x8 3x4 3x5 5x6 5x6 3x10 3x4 3x6 3x4 3x10 6-7-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T35 TrussType Roof Special Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:542018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-DNkc?y25_8dN8dXCldzoydguQ6GTOULqwoVtSVzay13 Scale=1:43.4 W1 T1 W6 B1 B2 B3 W2 W3 W4 W3 W5 T2 1 2 3 4 5 9 8 7 6 10 11 3x5 3x4 3x4 3x4 3x5 5x6 5x12 3x8 3x4 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 7-3-5 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T36 TrussType HalfHip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:552018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-hZI_DI3jlSlEln6OJKU1VrD0?VdM7wE_9SEQ_xzay12 Scale=1:49.7 0-1-12 T1 T2 W8 B1 B2 B3 W3 W4 W5 W6 W5 W7 W1 W2 T3 1 2 3 4 5 6 11 10 9 8 7 12 13 4x6 5x6 5x8 3x8 3x4 3x4 5x6 5x12 3x5 3x4 1-5-13 1-5-13 6-7-0 5-1-3 13-3-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T37 TrussType HalfHip Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:562018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-AmsMQe3LWmt5Nxhbt2?G12lBVvz5sLd7O6__WOzay11 Scale=1:59.0 0-1-12 T1 T2 W7 B1 B2 B3 W3 W4 W5 W4 W6 W1 W2 T3 1 2 3 4 5 6 10 9 8 7 11 12 3x4 5x6 3x4 3x8 3x4 3x5 5x6 5x12 3x4 1.5x4 2-10-10 2-10-10 6-7-0 3-8-6 13-3-0 6-8-0 19-9-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T38 TrussType HalfHipGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:572018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-eyQke_4_H3?y?4GnQlWVaGIL5JKrbjGHcmjX3qzay10 Scale=1:62.5 0-1-12 T1 T2 W7 B1 W3 W4 W5 W4 W5 W6 W1 W2 B2 1 2 3 4 5 11 10 9 8 7 6 12 13 14 15 16 17 18 19 6x6 3x10MT18H 10x10 6x8 10x10 5x8 3x4 1.5x4 12x12 8x8 6x6 4-3-6 4-3-6 9-3-8 5-0-2 14-5-6 5-1-14 19-9-0 5-3-10 4-3-6 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T38 TrussType HalfHipGirder Qty 1 Ply 2 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:572018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-eyQke_4_H3?y?4GnQlWVaGIL5JKrbjGHcmjX3qzay10 NOTES- 13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1372 lb down and 310 lb up at 1-11-4, 1372 lb down and 310 lb up at 3-11-4, 1661 lb down and 319 lb up at 5-11-4, 1661 lb down and 319 lb up at 7-11-4, 1661 lb down and 319 lb up at 9-11-4, 1661 lb down and 319 lb up at 11-11-4, 1661lb down and 319 lb up at 13-11-4, and 1661 lb down and 319 lb up at 15-11-4, and 1661 lb down and 319 lb up at 17-11-4 on bottomchord.The design/selection ofsuchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-5=-61, 6-11=-20 Concentrated Loads(lb) Vert: 9=-1661(B) 10=-1372(B) 13=-1372(B) 14=-1661(B) 15=-1661(B) 16=-1661(B) 17=-1661(B) 18=-1661(B) 19=-1661(B) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T39 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:582018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-68_7rK5c2N8pcErz_S1k7TrdUjibKNfQrQT4bGzay1? Scale=1:26.6 0-1-15 W1 T1 T2 W5 B1 W2 W3 W4 1 2 3 4 7 6 5 8 9 1.5x4 1.5x4 4x4 3x5 3x4 5x6 0-2-0 0-2-0 4-2-11 4-0-11 7-6-0 3-3-5 -1-5-12 1-5-12 4-2-11 4-2-11 7-6-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T39 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:582018 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-68_7rK5c2N8pcErz_S1k7TrdUjibKNfQrQT4bGzay1? LOADCASE(S) Standard Uniform Loads(plf) Vert: 1-2=-51, 2-3=-51, 3-4=-61, 5-7=-20 Concentrated Loads(lb) Vert: 4=-29(F) 6=0(F) 5=-18(F) 8=-4(F) 9=-8(F) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T40 TrussType Jack-Closed Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:39:592018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-aLXV2g6EphGgEOPAYAYzfhNpZ71d3qbZ44Ce7izay1_ Scale=1:36.0 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 3x4 3x5 3x6 1.5x4 3x6 3x5 0-2-0 0-2-0 3-3-13 3-1-13 7-1-0 3-9-3 7-6-0 0-5-0 -1-5-12 1-5-12 3-3-13 3-3-13 7-1-0 3-9-3 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T41 TrussType Jack-Closed Qty 11 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:002018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-2X5tG06sa_OXsY_M6t4CCuwzDWMioHzjIkyBe9zay0z Scale=1:37.5 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 3x4 3x5 1.5x4 1.5x4 3x4 3x5 0-2-0 0-2-0 3-3-13 3-1-13 7-6-0 4-2-2 -1-5-12 1-5-12 3-3-13 3-3-13 7-6-0 4-2-2 1-7-1 5-11-9 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T42 TrussType Common Qty 4 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:012018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-WjfFTL7ULIWOTiZYfbbRk6TCcwkBXmcsXOhlBbzay0y Scale=1:21.1 T1 T1 B1 W1 1 2 3 4 5 6 13 14 2x4 2x4 1.5x4 4x4 2-11-0 2-11-0 5-10-0 2-11-0 -0-10-12 0-10-12 2-11-0 2-11-0 5-10-0 2-11-0 6-8-12 0-10-12 0-5-13 2-11-0 0-5-13 10.0012 PlateOffsets(X,Y)-- [2:0-4-0,0-0-6], [4:0-4-0,0-0-6] LOADING (psf) DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss T42GE TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:022018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-_wDdhh866ceF5s8kDI6gHJ?MYK4lGDE0m2RIj1zay0x Scale=1:20.7 T1 T1 B1 ST1 1 2 3 4 5 6 4x4 2x4 1.5x4 2x4 5-10-0 5-10-0 -0-10-12 0-10-12 2-11-0 2-11-0 5-10-0 2-11-0 6-8-12 0-10-12 0-5-13 2-11-0 0-5-13 10.0012 PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V01 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:032018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-S6n0u19ktvm5j?jxn0dvqXYVxkIQ?gv9?iArFUzay0w Scale=1:22.6 T1 T1 B1 1 2 3 4 5 6 7 2x4 3x4 2x4 7-11-7 7-11-7 4-1-7 4-1-7 7-11-7 3-10-0 0-0-4 3-5-3 0-2-14 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V02 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:032018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-S6n0u19ktvm5j?jxn0dvqXYXCkOZ?gv9?iArFUzay0w Scale=1:16.5 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 5-5-4 5-4-15 2-8-10 2-8-10 5-5-4 2-8-10 0-0-4 2-3-3 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V03 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:042018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xILO6NANeDuyK9I7Lj88Mk5j08nsk79JDMwPnwzay0v Scale=1:8.3 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 2-7-11 2-7-6 1-3-13 1-3-13 2-7-11 1-3-13 0-0-4 1-1-3 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V04 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:052018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-PVvmJjA?PX0pyJtJuQfNvydpsX59TYCSS0fyKMzay0u Scale=1:37.1 T1 T2 W1 B1 ST2 ST1 1 2 3 4 5 8 7 6 9 10 11 3x4 3x4 2x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 14-0-1 14-0-1 6-3-15 6-3-15 14-0-1 7-8-2 0-0-4 1-7-0 6-0-12 3.0012 7.0012 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V05 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:062018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-thT8W3BdAq8gaTSWS8AcR9AzuxQvC?AbhgPVsozay0t Scale=1:35.8 T1 W1 B1 ST1 1 2 3 5 4 6 7 8 2x4 1.5x4 1.5x4 1.5x4 1.5x4 9-8-6 9-8-6 0-0-4 5-7-14 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V06 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:062018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-thT8W3BdAq8gaTSWS8AcR9AvUxMQC0ebhgPVsozay0t Scale=1:25.5 T1 W1 B1 1 2 3 4 5 6 2x4 1.5x4 1.5x4 6-10-2 6-10-2 0-0-4 3-11-14 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V07 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:072018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Lt0WkPCFw8GXBd1i0rir_NiCoLnOxTulvK83OFzay0s Scale=1:14.5 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 3-11-13 3-11-13 0-0-4 2-3-14 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V08 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:082018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-p3auxlDthSOOpnbuaZD4XaFLRl59gw8u8_ucwhzay0r Scale=1:26.7 W1 T1 T2 B1 1 2 3 4 5 6 7 3x4 3x4 3x4 3x4 5-7-8 5-7-8 1-0-8 1-0-8 5-7-8 4-7-0 3-0-0 3-10-7 0-0-10 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V09 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:082018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-p3auxlDthSOOpnbuaZD4XaFMdl6wgw8u8_ucwhzay0r Scale=1:23.5 W1 T1 T2 B1 1 2 3 4 5 6 2x4 3x4 3x4 3x4 5-1-1 5-1-1 1-0-8 1-0-8 5-1-1 4-0-8 2-6-0 3-4-7 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V10 TrussType GABLE Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:092018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-HG8H95DVSlWFRwA57GkJ3ooZU9TKPNO2NddAT7zay0q Scale=1:14.7 W1 T1 T2 B1 1 2 3 4 1.5x4 2x4 3x4 2x4 3-10-10 3-10-10 1-0-8 1-0-8 3-10-10 2-10-2 1-6-0 2-4-7 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V11 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:102018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-lSifMQE7D3e624lHh_FYc?KlSYq68qeBcHNj?azay0p Scale=1:8.8 T1 T2 B1 1 2 3 2x4 3x4 2x4 2-5-13 2-5-13 1-0-8 1-0-8 2-5-13 1-5-5 0-4-0 1-2-7 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V12 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:112018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-DeG1amFm_NmzgEKTFhmn8Dtv4y77tHuKqx6GX0zay0o Scale=1:16.9 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 5-7-9 5-7-4 2-9-12 2-9-12 5-7-9 2-9-12 0-0-4 2-4-2 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL DE Job # 57279-W1 Dansco Engineering, LLC Date: 3/15/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801946-12T Truss V13 TrussType Valley Qty 1 Ply 1 1801946-12TDWHWoodsideWCLot 7 Job Reference (optional) Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedMar1418:40:112018 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-DeG1amFm_NmzgEKTFhmn8DtwDyANtHuKqx6GX0zay0o Scale=1:8.7 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 2-9-15 2-9-10 1-5-0 1-5-0 2-9-15 1-5-0 0-0-4 1-2-2 0-0-4 10.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-9-15 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=72/2-9-6(min. 0-1-8), 3=72/2-9-6(min. 0-1-8) Max Horz1=22(LC 13) Max Uplift1=-9(LC 16), 3=-9(LC 17) MaxGrav1=81(LC 2), 3=81(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.09 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 14 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-7-9 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=171/5-6-15(min. 0-1-8), 3=171/5-6-15(min. 0-1-8) Max Horz1=52(LC 13) Max Uplift1=-23(LC 16), 3=-23(LC 17) MaxGrav1=193(LC 2), 3=193(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.02 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-5-13 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=74/2-5-13(min. 0-1-8), 3=74/2-5-13(min. 0-1-8) Max Horz1=-23(LC 12) Max Uplift1=-10(LC 16), 3=-10(LC 17) MaxGrav1=83(LC 2), 3=83(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.09 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 4=118/3-10-10(min. 0-1-8), 3=118/3-10-10(min. 0-1-8) Max Horz4=-71(LC 12) Max Uplift4=-26(LC 17), 3=-14(LC 17) MaxGrav4=133(LC 2), 3=133(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.23 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 15 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 4=161/5-1-1(min. 0-1-8), 3=161/5-1-1(min. 0-1-8) Max Horz4=-111(LC 12) Max Uplift4=-44(LC 17), 3=-17(LC 17) MaxGrav4=187(LC 30), 3=182(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-0-8,Interior(1) 4-0-8 to 4-8-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.30 0.20 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 18 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-7-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 4=182/5-7-8(min. 0-1-8), 3=182/5-7-8(min. 0-1-8) Max Horz4=-130(LC 12) Max Uplift4=-53(LC 17), 3=-18(LC 17) MaxGrav4=215(LC 30), 3=206(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-0-8,Interior(1) 4-0-8 to 5-3-7zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.17 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-11-13 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=117/3-11-6(min. 0-1-8), 3=117/3-11-6(min. 0-1-8) Max Horz1=77(LC 13) Max Uplift1=-16(LC 16), 3=-39(LC 16) MaxGrav1=132(LC 2), 3=144(LC 29) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.65 0.41 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=218/6-10-2(min. 0-1-8), 3=218/6-10-2(min. 0-1-8) Max Horz1=143(LC 13) Max Uplift1=-30(LC 16), 3=-74(LC 16) MaxGrav1=246(LC 2), 3=269(LC 29) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-6-8 to 3-6-8,Interior(1) 3-6-8 to 6-8-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.44 0.19 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 32 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=146/9-8-6(min. 0-1-8), 4=87/9-8-6(min. 0-1-8), 5=405/9-8-6(min. 0-1-8) Max Horz1=209(LC 13) Max Uplift4=-34(LC 13), 5=-175(LC 16) MaxGrav1=179(LC 30), 4=116(LC 29), 5=485(LC 29) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-6=-267/241, 6-7=-252/268, 2-7=-239/272 WEBS 2-5=-373/244 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-6-8 to 3-6-8,Interior(1) 3-6-8 to 9-6-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 5=175. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.33 0.16 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 43 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 14-0-1. (lb)-Max Horz1=230(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 6, 8 except 7=-128(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 1, 6 except 7=361(LC 29), 8=396(LC 22) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-253/221 WEBS 4-7=-287/172, 2-8=-276/121 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 1-3-0 to 4-3-0,Interior(1) 4-3-0 to 13-10-5zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 6, 8 except (jt=lb) 7=128. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-7-11 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=65/2-7-1(min. 0-1-8), 3=65/2-7-1(min. 0-1-8) Max Horz1=-20(LC 12) Max Uplift1=-9(LC 16), 3=-9(LC 17) MaxGrav1=73(LC 2), 3=73(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.08 0.23 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-5-4 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=164/5-4-11(min. 0-1-8), 3=164/5-4-11(min. 0-1-8) Max Horz1=-50(LC 14) Max Uplift1=-22(LC 16), 3=-22(LC 17) MaxGrav1=185(LC 2), 3=185(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.23 0.62 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 1=262/7-11-7(min. 0-1-8), 3=262/7-11-7(min. 0-1-8) Max Horz1=-81(LC 14) Max Uplift1=-35(LC 16), 3=-34(LC 17) MaxGrav1=296(LC 2), 3=296(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-1-7,Exterior(2) 4-1-7 to 7-1-7zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.14 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 2=169/5-10-0(min. 0-1-8), 4=169/5-10-0(min. 0-1-8), 6=167/5-10-0(min. 0-1-8) Max Horz2=-83(LC 14) Max Uplift2=-57(LC 16), 4=-67(LC 17) MaxGrav2=195(LC 2), 4=195(LC 2), 6=184(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-12 to 2-1-4,Exterior(2) 2-1-4 to 2-11-0, Corner(3) 2-11-0 to 5-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.09 0.09 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 6-9 6-9 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 2=252/0-4-0(min. 0-1-8), 4=252/0-4-0(min. 0-1-8) Max Horz2=-83(LC 14) Max Uplift2=-48(LC 16), 4=-48(LC 17) MaxGrav2=287(LC 2), 4=287(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-11-0,Exterior(2) 2-11-0 to 5-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.32 0.24 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.06 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=347/0-3-8(min. 0-1-8), 5=246/0-6-0(min. 0-1-8) Max Horz7=186(LC 16) Max Uplift7=-17(LC 16), 5=-141(LC 16) MaxGrav7=397(LC 2), 5=277(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-324/203 WEBS 3-5=-263/308 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 7-4-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb) 5=141. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 7-6-0 0-5-0 1-7-1 5-8-6 5-6-11 7.0012 PlateOffsets(X,Y)-- [4:0-2-14,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.31 0.23 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.05 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=344/0-3-8(min. 0-1-8), 5=243/0-6-0(min. 0-1-8) Max Horz7=234(LC 13) Max Uplift7=-60(LC 16), 5=-97(LC 16) MaxGrav7=394(LC 2), 5=274(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-322/268 BOT CHORD 6-7=-337/314, 5-6=-337/314 WEBS 3-5=-292/331 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 7-3-4zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 5. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 3-3-5 1-7-1 3-10-11 4-0-10 3-10-11 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.34 0.15 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 -0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 38 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=357/0-3-8(min. 0-1-8), 5=326/0-6-0(min. 0-1-8) Max Horz7=157(LC 11) Max Uplift7=-202(LC 12), 5=-392(LC 9) MaxGrav7=529(LC 32), 5=391(LC 67) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-498/223, 2-3=-304/208 WEBS 3-5=-274/268 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=202, 5=392. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 136 lb down and 157 lb up at 4-2-11, and 95 lb down and 94 lb up at 5-4-13, and 80 lb down and 95 lb up at 7-4-4 on top chord, and 73 lb down and 99 lb up at 4-2-11, and 20 lb down and 50 lb up at 5-4-13, and 33 lb down and 44 lb up at 7-4-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Continued on page 2 4-3-6 9-3-8 5-0-2 14-5-6 5-1-14 19-9-0 5-3-10 7-4-4 10-9-5 10-11-1 10-9-5 10.0012 PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-3-15,Edge], [7:0-6-0,0-6-4], [8:0-3-8,0-6-0], [10:0-3-8,0-6-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.82 0.31 0.97 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.20 0.01 (loc) 7-8 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 381 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x8SP 2400F 2.0E WEBS 2x4SPF No.2 *Except* W7: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-8-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-6, 1-11 REACTIONS. (lb/size) 6=8255/Mechanical, 11=7639/Mechanical Max Horz11=137(LC 12) Max Uplift6=-1601(LC 9), 11=-1429(LC 9) MaxGrav6=8591(LC 30), 11=7783(LC 30) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-3668/710, 2-12=-4348/835, 3-12=-4351/835, 3-4=-3454/648, 4-5=-3454/648, 5-6=-7189/1370, 1-11=-7252/1329 BOT CHORD 9-10=-589/2832, 9-14=-589/2832, 8-14=-589/2832, 8-15=-834/4350, 15-16=-834/4350, 16-17=-834/4350, 7-17=-834/4350 WEBS 2-10=-1098/191, 2-8=-643/3486, 3-8=-392/1529, 3-7=-2005/419, 4-7=-502/166, 5-7=-1451/7742, 1-10=-1031/5647 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-5-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)Provide adequate drainage to preventwater ponding. 8)All plates areMT20 plates unless otherwiseindicated. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10) Refer to girder(s) for truss to trussconnections. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 6=1601, 11=1429. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 6-6-0 2-10-10 2-10-10 6-7-0 3-8-6 13-3-0 6-8-0 19-9-0 6-6-0 7-4-4 9-7-5 9-9-1 9-7-5 2-0-0 7-7-5 10.0012 4.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.75 0.34 0.68 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.17 0.05 (loc) 9-10 9-10 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 123 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-3-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-10-6 oc bracing. WEBS 1 Row at midpt 6-7, 3-8, 2-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=784/Mechanical, 10=761/Mechanical Max Horz10=364(LC 13) Max Uplift7=-249(LC 13), 10=-128(LC 12) MaxGrav7=1136(LC 34), 10=974(LC 34) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-689/235, 3-11=-731/135, 4-11=-731/135, 4-5=-717/132, 5-12=-717/132, 6-12=-717/132, 6-7=-1078/314 BOT CHORD 9-10=-431/563, 8-9=-426/698 WEBS 2-9=-115/895, 3-9=-570/252, 4-8=-713/224, 6-8=-331/1075, 2-10=-1005/183 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-1-8,Interior(1) 7-1-8 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=249, 10=128. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 6-8-0 19-9-0 6-6-0 1-5-13 1-5-13 6-7-0 5-1-3 13-3-0 6-8-0 19-9-0 6-6-0 7-4-4 8-5-5 8-7-1 8-5-5 2-0-0 6-5-5 10.0012 4.0012 PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-3-0,0-2-1], [4:0-1-12,0-0-0], [5:0-4-0,Edge], [5:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.73 0.38 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.19 0.06 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 122 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W5: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-1-8 oc bracing. WEBS 1 Row at midpt 6-7, 2-10, 1-11 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=786/Mechanical, 11=773/Mechanical Max Horz11=317(LC 13) Max Uplift7=-231(LC 13), 11=-169(LC 12) MaxGrav7=1146(LC 34), 11=1060(LC 34) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-281/226, 2-12=-845/240, 3-12=-847/240, 3-4=-877/155, 4-5=-860/150, 5-13=-860/150, 6-13=-860/150, 6-7=-1088/281, 1-11=-1035/203 BOT CHORD 10-11=-377/404, 9-10=-365/457, 8-9=-408/860 WEBS 2-10=-971/237, 2-9=-162/1042, 3-9=-616/244, 4-8=-698/216, 6-8=-306/1177, 1-10=-102/959 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-8-11,Interior(1) 5-8-11 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=231, 11=169. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 2-0-0 5-3-5 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.53 0.42 0.47 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.20 0.08 (loc) 8-9 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 102 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W2,W4,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-9-13 oc bracing. WEBS 1 Row at midpt 2-9, 4-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 9=786/Mechanical, 6=786/Mechanical Max Horz9=-272(LC 14) Max Uplift9=-213(LC 12), 6=-213(LC 13) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-736/190, 3-4=-736/190 BOT CHORD 8-9=-436/861, 7-8=-399/782, 6-7=-336/808 WEBS 2-9=-1090/259, 2-8=-64/454, 4-7=-80/454, 4-6=-1088/368 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=213, 6=213. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 6-7-0 8-8-0 2-1-0 9-11-0 1-3-0 11-2-0 1-3-0 13-3-0 2-1-0 19-9-0 6-6-0 6-7-0 6-7-0 8-8-0 2-1-0 9-11-0 1-3-0 11-2-0 1-3-0 13-3-0 2-1-0 19-9-0 6-6-0 6-1-5 6-11-13 6-1-5 2-0-0 4-1-5 7.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.65 0.80 0.58 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.23 0.16 (loc) 12-13 13-14 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 110 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W2,W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-6-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-8-7 oc bracing. WEBS 1 Row at midpt 2-14, 6-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=774/Mechanical, 8=774/Mechanical Max Horz14=-247(LC 14) Max Uplift14=-147(LC 16), 8=-146(LC 17) MaxGrav14=998(LC 40), 8=997(LC 40) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-260/78, 2-17=-1092/224, 3-17=-1088/224, 3-4=-1153/247, 4-5=-1154/265, 5-18=-1088/230, 6-18=-1092/230, 7-8=-257/77 BOT CHORD 13-14=-454/1296, 12-13=-413/1189, 11-12=-345/1073, 10-11=-345/1073, 9-10=-332/1179, 8-9=-358/1285 WEBS 2-14=-1602/249, 2-13=-119/571, 3-12=-287/56, 4-11=-163/855, 5-10=-291/79, 6-9=-30/563, 6-8=-1594/365 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 11-2-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=147, 8=146. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 4x10 4x10 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 6-8-0 6-8-0 9-11-0 3-3-0 13-2-0 3-3-0 19-9-0 6-7-0 4-11-5 6-11-13 4-11-5 2-0-0 2-11-5 7.0012 4.0012 PlateOffsets(X,Y)-- [2:0-10-0,0-1-4], [4:0-9-12,0-1-4], [5:Edge,0-3-8], [6:0-2-12,Edge], [7:0-3-12,0-1-8], [8:0-3-12,0-1-8], [9:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.78 0.51 0.47 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.31 0.18 (loc) 7-8 7-8 6 l/defl >999 >761 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 93 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W2,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-5 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-5-0 oc bracing. WEBS 1 Row at midpt 2-9, 4-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 9=754/Mechanical, 6=753/0-6-0(min. 0-1-8) Max Horz9=-233(LC 14) Max Uplift9=-130(LC 16), 6=-130(LC 17) MaxGrav9=876(LC 40), 6=874(LC 40) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-295/90, 2-12=-1605/443, 12-13=-1590/452, 3-13=-1577/461, 3-14=-1563/362, 14-15=-1576/354, 4-15=-1591/344, 5-6=-291/90 BOT CHORD 8-9=-484/1416, 7-8=-281/842, 6-7=-385/1404 WEBS 2-9=-1602/310, 3-8=-295/992, 3-7=-168/972, 4-6=-1594/380 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-2-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=130, 6=130. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 4x6 3x4 6x6 4x6 6x6 3x4 5x6 5x12 5x12 1.5x4 1.5x4 4-8-0 4-8-0 6-7-0 1-11-0 13-3-0 6-8-0 15-2-0 1-11-0 19-9-0 4-7-0 4-8-0 4-8-0 6-7-0 1-11-0 9-11-0 3-4-0 13-3-0 3-4-0 15-2-0 1-11-0 19-9-0 4-7-0 3-9-5 6-11-13 3-9-5 2-0-0 1-9-5 7.0012 4.0012 PlateOffsets(X,Y)-- [8:0-2-12,Edge], [11:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.36 0.49 0.49 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.30 0.18 (loc) 9-10 9-10 8 l/defl >999 >790 n/a L/d 240 180 n/a PLATES MT20 Weight: 91 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-2-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-11-11 oc bracing. WEBS 1 Row at midpt 2-11, 6-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 11=734/Mechanical, 8=733/0-6-0(min. 0-1-8) Max Horz11=-219(LC 14) Max Uplift11=-117(LC 16), 8=-117(LC 17) MaxGrav11=799(LC 40), 8=801(LC 40) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-13=-1789/315, 3-13=-1758/326, 3-14=-1811/383, 4-14=-1743/397, 4-15=-1733/334, 5-15=-1801/320, 5-16=-1748/276, 6-16=-1779/264 BOT CHORD 10-11=-421/1507, 9-10=-211/985, 8-9=-320/1489 WEBS 2-11=-1793/307, 4-10=-224/895, 4-9=-171/880, 6-8=-1781/335 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4, Interior(1) 15-2-0 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=117, 8=117. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 6x6 1.5x4 3x5 5x12 5x12 1.5x4 1.5x4 2-8-0 2-8-0 6-7-0 3-11-0 13-3-0 6-8-0 17-2-0 3-11-0 19-9-0 2-7-0 2-8-0 2-8-0 6-7-0 3-11-0 9-11-0 3-4-0 13-3-0 3-4-0 17-2-0 3-11-0 19-9-0 2-7-0 2-7-5 6-11-13 2-7-5 2-0-0 0-7-5 7.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.37 0.46 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.28 0.17 (loc) 9-10 9-10 8 l/defl >999 >833 n/a L/d 240 180 n/a PLATES MT20 Weight: 88 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-2 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 11=714/Mechanical, 8=713/0-6-0(min. 0-1-8) Max Horz11=-205(LC 14) Max Uplift11=-108(LC 16), 8=-107(LC 17) MaxGrav11=920(LC 40), 8=924(LC 40) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-2035/270, 3-13=-2035/352, 4-13=-1954/369, 4-14=-1943/335, 5-14=-2024/318, 5-6=-2023/246 BOT CHORD 10-11=-321/1367, 9-10=-133/1073, 8-9=-238/1333 WEBS 2-11=-1774/275, 2-10=0/394, 3-10=-343/182, 4-10=-206/1059, 4-9=-208/1042, 5-9=-342/182, 6-9=0/416, 6-8=-1749/283 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-8-0,Interior(1) 2-8-0 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4, Interior(1) 17-2-0 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=108, 8=107. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 5x6 5x6 3x5 3x8 3x5 6-7-0 6-7-0 9-11-0 3-4-0 13-3-0 3-4-0 19-9-0 6-6-0 6-7-0 6-7-0 9-11-0 3-4-0 13-3-0 3-4-0 19-9-0 6-6-0 1-2-6 6-11-13 1-3-0 2-0-0 7.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.41 0.05 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.01 (loc) 18 16 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 92 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 19-9-0. (lb)-Max Horz18=191(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 14, 10, 12 except 18=-102(LC 16), 6=-123(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 18, 6, 6, 13, 15, 16, 17, 11, 9, 8, 7 except 14=256(LC 33), 10=256(LC 34), 12=305(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-18=-259/158, 5-6=-258/156 WEBS 2-12=-257/230, 4-12=-250/226 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)All plates are 1.5x4MT20 unless otherwiseindicated. 7)Gablestudsspaced at 2-0-0 oc. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 14, 10, 12 except (jt=lb) 18=102, 6=123. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 64=-30(B) 65=-30(B) 4x8 2x4 4x8 2x4 4x10 2x4 4x10 5x8 5x6 3-5-8 3-5-8 6-8-0 3-2-8 10-10-6 4-2-5 16-6-13 5-8-8 20-10-15 4-4-1 26-7-6 5-8-8 30-9-2 4-1-12 36-5-10 5-8-8 40-9-11 4-4-1 46-6-3 5-8-8 51-0-0 4-5-13 -1-5-12 1-5-12 3-5-8 3-5-8 6-8-0 3-2-8 10-10-6 4-2-5 16-6-13 5-8-8 20-10-15 4-4-1 26-7-6 5-8-8 30-9-2 4-1-12 36-5-10 5-8-8 40-9-11 4-4-1 46-6-3 5-8-8 51-0-0 4-5-13 1-7-1 5-3-13 5-5-12 5-3-13 7.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-4-4], [20:0-2-6,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.14 0.26 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.43 -0.56 0.13 (loc) 23-25 23-25 17 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 749 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0E BOT CHORD2x6SP 2400F 2.0E WEBS 2x4SPFStud*Except* W1: 2x6SP 2400F 2.0E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-9-15 oc bracing. REACTIONS. (lb/size) 17=3113/0-6-0(min. 0-1-8), 31=3063/0-6-0(min. 0-1-8) Max Horz31=208(LC 9) Max Uplift17=-2181(LC 9), 31=-1876(LC 9) MaxGrav17=3386(LC 71), 31=3259(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-3655/2246, 3-4=-4430/2837, 4-32=-3823/2490, 32-33=-3825/2491, 5-33=-3826/2491, 5-34=-7480/4838, 34-35=-7480/4838, 6-35=-7480/4838, 6-36=-7480/4838, 36-37=-7480/4838, 7-37=-7480/4838, 7-38=-7480/4838, 8-38=-7480/4838, 8-39=-8493/5476, 39-40=-8493/5476, 9-40=-8493/5476, 9-10=-8493/5476, 10-41=-8493/5476, 11-41=-8493/5476, 11-42=-6934/4473, 42-43=-6934/4473, 12-43=-6934/4473, 12-44=-6934/4473, 13-44=-6934/4473, 13-45=-6934/4473, 14-45=-6934/4473, 14-46=-2779/1784, 46-47=-2779/1784, 15-47=-2779/1784, 2-31=-3130/1836 BOT CHORD 30-31=-426/475, 29-30=-2032/3070, 29-50=-3806/5719, 50-51=-3806/5719, 28-51=-3806/5719, 28-52=-3806/5719, 27-52=-3806/5719, 27-53=-3806/5719, 26-53=-3806/5719, 26-54=-5411/8216, 54-55=-5411/8216, 25-55=-5411/8216, 25-56=-5411/8216, 24-56=-5411/8216, 23-24=-5411/8216, 23-57=-5326/8112, 57-58=-5326/8112, 22-58=-5326/8112, 22-59=-5326/8112, 59-60=-5326/8112, 21-60=-5326/8112, 20-21=-3542/5389, 20-61=-3542/5389, 19-61=-3542/5389, 19-62=-3542/5389, 62-63=-3542/5389, 18-63=-3542/5389, 18-64=-1792/2747, 64-65=-1792/2747, 17-65=-1792/2747 WEBS 3-30=-1107/739, 3-29=-891/1279, 4-29=-871/1589, 5-29=-2941/1889, 5-28=0/319, 5-26=-1492/2288, 6-26=-474/393, 8-26=-1151/770, 8-25=-6/305, 8-23=-222/324, 9-23=-423/384, 11-23=-355/541, 11-22=-0/290, 11-21=-1588/1050, 12-21=-462/411, 14-21=-1477/2272, 14-19=-6/299, 14-18=-3520/2298, 15-18=-1472/2500, 15-17=-4079/2616, 2-30=-1718/2855 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. Continued on page 2 6x10 6x8 6x12MT18H 8x8 4-9-8 4-9-8 9-4-2 4-6-10 11-9-14 2-5-12 16-1-8 4-3-10 20-9-8 4-8-0 25-4-8 4-7-0 29-11-9 4-7-0 36-0-6 6-0-13 41-8-3 5-7-13 46-3-4 4-7-0 51-0-0 4-8-12 -1-5-12 1-5-12 4-9-8 4-9-8 9-4-2 4-6-10 11-9-14 2-5-12 16-1-8 4-3-10 20-9-8 4-8-0 25-4-8 4-7-0 29-11-9 4-7-0 36-0-6 6-0-13 41-8-3 5-7-13 46-3-4 4-7-0 51-0-0 4-8-12 1-7-1 6-10-9 7-0-8 6-10-9 7.0012 PlateOffsets(X,Y)-- [2:0-0-12,0-0-7], [2:0-9-13,0-0-14], [2:Edge,0-6-7], [25:0-6-0,0-8-8], [26:0-3-8,0-3-8], [27:0-3-8,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.36 0.35 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.27 -0.58 0.12 (loc) 23-25 23-25 16 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 1599 lbFT= 20% GRIP 197/144 244/190 LUMBER- TOP CHORD2x8SP 2400F 2.0E*Except* T1: 2x10SP 2400F 2.0E BOT CHORD2x10SP 2400F 2.0E WEBS 2x4SPFStud*Except* W7: 2x6SP 2400F 2.0E,W9,W10: 2x4SPF No.2 WEDGE Left: 2x8SP 2400F 2.0E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS. (lb/size) 16=5500/0-6-0(min. 0-1-9), 2=12626/0-6-0(min. 0-3-8) Max Horz2=253(LC 11) Max Uplift16=-1063(LC 9), 2=-2172(LC 9) MaxGrav16=5747(LC 31), 2=12626(LC 1) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-17594/3117, 3-4=-18932/3456, 4-5=-19332/3552, 5-33=-22833/4193, 6-33=-22833/4193, 6-34=-22840/4196, 7-34=-22840/4196, 7-8=-18451/3422, 8-9=-18451/3422, 9-10=-18451/3422, 10-11=-11817/2194, 11-12=-11817/2194, 12-35=-11817/2194, 13-35=-11817/2194, 13-14=-3984/772, 14-15=-3984/772, 15-16=-5555/1046 BOT CHORD 2-36=-2737/14400, 36-37=-2737/14400, 28-37=-2737/14400, 28-38=-2737/14400, 38-39=-2737/14400, 27-39=-2737/14400, 27-40=-3185/16765, 26-40=-3185/16765, 26-41=-3655/19332, 25-41=-3655/19332, 24-25=-3989/21020, 23-24=-3989/21020, 22-23=-3989/21020, 21-22=-3046/15797, 20-21=-3046/15797, 19-20=-3046/15797, 18-19=-1513/7752, 17-18=-1513/7752 WEBS 3-28=-585/206, 3-27=-697/3071, 4-27=-253/1287, 4-26=-1315/6906, 5-26=-4375/895, 5-25=-1204/6260, 6-25=-366/179, 7-25=-969/3262, 7-23=-57/621, 7-22=-4348/942, 10-22=-804/4459, 10-19=-5694/1080, 11-19=-341/169, 13-19=-1152/6110, 13-18=0/255, 13-17=-6332/1213, 14-17=-425/145, 15-17=-1237/6664 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x10- 2 rowsstaggered at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x10- 2 rowsstaggered at 0-6-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 3 rowsstaggered at 0-4-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 Continued on page 2 8-9-2 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 8-9-1 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.84 0.66 0.83 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.39 0.04 (loc) 13-14 13-14 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 179 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-14, 7-8, 2-13, 4-11, 6-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1392/Mechanical, 8=1392/0-6-0(min. 0-2-3) Max Uplift14=-290(LC 12), 8=-290(LC 12) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-1316/332, 1-15=-1132/236, 2-15=-1132/236, 2-3=-1469/305, 3-4=-1469/305, 4-5=-1469/305, 5-6=-1469/305, 6-16=-1132/236, 7-16=-1132/236, 7-8=-1316/332 BOT CHORD 12-13=-236/1132, 11-12=-236/1132, 10-11=-236/1132, 9-10=-236/1132 WEBS 1-13=-325/1561, 2-13=-907/343, 2-11=-98/472, 4-11=-497/235, 6-11=-98/472, 6-9=-907/343, 7-9=-325/1561 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 34-7-4zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=290, 8=290. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 34-9-0 8-9-2 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 10-5-1 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.99 0.64 0.44 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.39 0.03 (loc) 8-9 8-9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 194 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-14, 7-8, 1-13, 2-13, 4-11, 6-9, 7-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1392/Mechanical, 8=1392/0-6-0(min. 0-2-3) Max Uplift14=-290(LC 12), 8=-290(LC 12) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-1317/332, 1-15=-947/197, 2-15=-947/197, 2-3=-1227/255, 3-4=-1227/255, 4-5=-1227/255, 5-6=-1227/255, 6-16=-947/197, 7-16=-947/197, 7-8=-1317/332 BOT CHORD 12-13=-197/947, 11-12=-197/947, 10-11=-197/947, 9-10=-197/947 WEBS 1-13=-299/1439, 2-13=-909/344, 2-11=-90/434, 4-11=-496/234, 6-11=-90/434, 6-9=-909/344, 7-9=-299/1439 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 34-7-4zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=290, 8=290. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 16-0-7 7-11-6 23-11-13 7-11-6 32-0-15 8-1-2 34-9-0 2-8-1 8-1-2 8-1-2 16-0-7 7-11-6 23-11-13 7-11-6 32-0-15 8-1-2 34-9-0 2-8-1 11-0-12 9-6-1 11-0-12 7.0012 PlateOffsets(X,Y)-- [7:0-8-8,0-2-0], [13:0-3-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.87 0.54 0.67 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.30 0.04 (loc) 14-15 14-15 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 222 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF 1650F 1.5E*Except* T3: 2x6SPF No.2, T2: 2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W1: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-15, 1-14, 2-14, 4-13, 6-11, 7-11, 7-10, 8-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 15=1391/Mechanical, 9=1368/0-6-0(min. 0-2-7) Max Horz15=-65(LC 17) Max Uplift15=-299(LC 12), 9=-236(LC 12) MaxGrav15=1681(LC 34), 9=1567(LC 34) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-15=-1610/338, 1-16=-976/181, 2-16=-976/181, 2-17=-1257/249, 3-17=-1257/249, 3-4=-1257/249, 4-5=-1261/251, 5-18=-1261/251, 6-18=-1261/251, 6-19=-1159/228, 7-19=-1159/228, 7-8=-439/84, 8-9=-1562/232 BOT CHORD 13-14=-175/976, 12-13=-200/1159, 11-12=-200/1159, 10-11=-55/383 WEBS 1-14=-301/1617, 2-14=-1133/348, 2-13=-115/510, 4-13=-458/216, 6-11=-864/296, 7-11=-245/1291, 7-10=-1244/279, 8-10=-207/1422 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 32-0-15,Exterior(2) 32-0-15 to 34-7-4 zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)All plates areMT20 plates unless otherwiseindicated. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 15=299, 9=236. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 6x6 12x12 12x12 5x6 4x4 5x6 4x4 2x4 6x8 5x6 6x6 6x6 6x8 6x6 3x6 6x8 4x8 6x8 4-3-14 4-3-14 9-2-14 4-11-0 14-8-4 5-5-5 19-11-13 5-3-9 25-3-7 5-3-9 30-7-0 5-3-9 35-10-10 5-3-9 41-3-15 5-5-5 44-0-0 2-8-1 4-3-14 4-3-14 9-2-14 4-11-0 14-8-4 5-5-5 19-11-13 5-3-9 25-3-7 5-3-9 30-7-0 5-3-9 35-10-10 5-3-9 41-3-15 5-5-5 44-0-0 2-8-1 5-8-1 11-0-12 9-6-1 11-0-12 7.0012 PlateOffsets(X,Y)-- [1:0-3-8,0-2-4], [3:0-5-4,0-2-12], [11:0-7-4,0-2-12], [14:0-2-4,0-3-0], [15:0-3-8,0-3-0], [22:0-3-8,0-8-0], [23:0-3-8,0-6-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.98 0.27 0.79 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.34 0.05 (loc) 21-22 21-22 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 936 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x10SP 2400F 2.0E WEBS 2x4SPF No.2 *Except* W3: 2x4SPFStud,W1,W8: 2x6SPF No.2, W2: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-23, 4-19, 5-18, 9-16, 10-15, 11-14, 12-13 REACTIONS. (lb/size) 24=12064/0-6-0(min. 0-5-0), 13=3897/0-6-0(min. 0-1-11) Max Horz24=388(LC 11) Max Uplift24=-2250(LC 9), 13=-715(LC 9) MaxGrav24=12113(LC 33), 13=4131(LC 33) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-7166/1414, 2-3=-9591/1870, 3-25=-7927/1541, 4-25=-7927/1541, 4-5=-6941/1334, 5-6=-5791/1098, 6-7=-5791/1098, 7-8=-5791/1098, 8-9=-5791/1098, 9-10=-4465/873, 10-11=-2906/604, 11-12=-1205/328, 1-24=-11309/2135, 12-13=-4028/710 BOT CHORD 24-26=-374/312, 26-27=-374/312, 23-27=-374/312, 23-28=-1453/6118, 28-29=-1453/6118, 22-29=-1453/6118, 21-22=-1804/8332, 20-21=-1695/7927, 19-20=-1695/7927, 18-19=-1488/6941, 17-18=-971/4465, 16-17=-971/4465, 15-16=-647/2906, 14-15=-260/951 WEBS 2-23=-4460/766, 2-22=-754/3840, 3-22=-1267/5630, 3-21=-1497/1047, 4-21=-872/2010, 4-19=-2395/686, 5-19=-473/2067, 5-18=-2543/528, 7-18=-316/154, 9-18=-615/2944, 9-16=-2966/695, 10-16=-716/3445, 10-15=-3631/811, 11-15=-836/4232, 11-14=-3348/739, 1-23=-1777/9675, 12-14=-678/3485 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc. Bottomchordsconnected as follows: 2x10- 4 rowsstaggered at 0-2-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)Provide adequate drainage to preventwater ponding. 8)All plates areMT20 plates unless otherwiseindicated. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 4x6 3x5 3x5 3x5 2x4 4x8 3x5 5x6 5x6 5x6 3x4 4x6 3x6 3x6 4-9-3 4-9-3 9-2-14 4-5-11 15-5-13 6-2-15 21-7-0 6-1-3 28-11-13 7-4-13 35-1-0 6-1-3 41-3-15 6-2-15 46-2-0 4-10-1 4-9-3 4-9-3 9-2-14 4-5-11 15-5-13 6-2-15 21-7-0 6-1-3 28-11-13 7-4-13 35-1-0 6-1-3 41-3-15 6-2-15 46-2-0 4-10-1 5-8-1 11-0-12 8-2-14 11-0-12 7.0012 PlateOffsets(X,Y)-- [3:0-5-8,0-2-0], [10:0-5-12,0-2-0], [11:0-3-0,0-1-8], [12:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.66 0.64 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.43 0.11 (loc) 16-17 16-17 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 301 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W1,W2: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-0-3 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-0-1 oc bracing. WEBS 1 Row at midpt 2-21, 3-20, 4-19, 5-17, 5-16, 8-16, 9-14, 10-13, 1-22, 11-12 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 22=1769/0-6-0(min. 0-2-14), 12=1800/0-6-0(min. 0-3-2) Max Horz22=382(LC 13) Max Uplift22=-188(LC 13), 12=-231(LC 12) MaxGrav22=1835(LC 2), 12=1981(LC 37) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-23=-1172/240, 2-23=-1128/255, 2-3=-1629/354, 3-24=-1997/400, 24-25=-1997/400, 4-25=-1997/400, 4-26=-2195/436, 5-26=-2195/436, 5-6=-2069/429, 6-7=-2069/429, 7-8=-2069/429, 8-27=-2069/429, 9-27=-2069/429, 9-28=-1663/379, 28-29=-1663/379, 10-29=-1663/379, 10-30=-944/293, 30-31=-1000/267, 11-31=-1007/265, 1-22=-1791/307, 11-12=-1942/333 BOT CHORD 21-22=-352/331, 20-21=-404/985, 19-20=-426/1373, 18-19=-515/1997, 17-18=-515/1997, 16-17=-538/2195, 15-16=-382/1663, 14-15=-382/1663, 13-14=-204/829 WEBS 2-21=-1060/240, 2-20=-213/803, 3-20=-587/248, 3-19=-305/1243, 4-19=-956/336, 4-17=-170/470, 5-17=-270/231, 8-16=-416/197, 9-16=-213/843, 9-14=-1322/374, 10-14=-354/1664, 10-13=-1275/322, 1-21=-228/1509, 11-13=-278/1629 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-2-14,Exterior(2) 9-2-14 to 45-6-14, Interior(1) 45-6-14 to 46-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 22=188, 12=231. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 32 33 34 3536 37 38 39 40 6x8 6x8 8x8 3x4 5x6 4x4 4x4 4x4 4x4 2x4 4x8 4x4 5x6 5x6 5x6 5x6 5x8 3x4 8x8 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 45-11-0 4-7-1 53-10-2 7-11-2 55-0-1 1-1-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 45-11-0 4-7-1 53-10-2 7-11-2 55-0-1 1-1-15 5-8-1 3-9-2 11-0-12 3-5-10 11-0-12 7.0012 3.0012 PlateOffsets(X,Y)-- [3:0-5-4,0-3-0], [10:0-5-12,0-3-0], [12:0-6-12,0-5-0], [13:0-4-0,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.60 0.44 0.92 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.28 0.07 (loc) 21-22 21-22 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 422 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SPF No.2 *Except* T4: 2x6SP 2400F 2.0E BOT CHORD2x6SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W10,W2,W11: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 16-18. WEBS 1 Row at midpt 2-27, 3-26, 4-24, 6-22, 6-21, 7-21, 9-19, 10-18, 11-16, 12-16 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 28=1711/0-6-0(min. 0-2-13), 16=2988/0-6-0(min. 0-4-13), 14=767/0-6-0(min. 0-1-8) Max Horz28=-345(LC 12) Max Uplift28=-191(LC 13), 16=-416(LC 12), 14=-152(LC 17) MaxGrav28=1777(LC 39), 16=3063(LC 39), 14=918(LC 50) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-979/211, 29-30=-949/227, 2-30=-932/231, 2-31=-1596/327, 3-31=-1523/345, 3-32=-1956/404, 4-32=-1956/404, 4-33=-2107/419, 5-33=-2107/419, 5-6=-2107/419, 6-7=-1963/391, 7-8=-1963/391, 8-34=-1963/391, 9-34=-1963/391, 9-35=-1538/338, 35-36=-1538/338, 10-36=-1538/338, 10-37=-832/253, 11-37=-856/228, 11-38=-83/568, 38-39=-86/550, 12-40=-371/62, 12-13=-389/88, 1-28=-1737/275, 13-14=-823/64 BOT CHORD 27-28=-270/300, 26-27=-314/820, 25-26=-350/1340, 24-25=-350/1340, 23-24=-444/1956, 22-23=-444/1956, 21-22=-464/2107, 20-21=-317/1538, 19-20=-317/1538, 18-19=-134/619, 15-16=-90/418 WEBS 2-27=-1119/250, 2-26=-202/875, 3-26=-567/232, 3-24=-295/1177, 4-24=-879/330, 4-22=-147/365, 6-21=-282/85, 7-21=-372/177, 9-21=-201/850, 9-19=-1359/377, 10-19=-350/1757, 10-18=-1272/291, 11-18=-268/1566, 11-16=-2687/530, 12-16=-571/177, 12-15=-1141/355, 1-27=-218/1443, 13-15=-213/1193 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. Continued 7)This truss on has page been 2 designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 37 38 39 40 6x8 6x8 6x8 3x4 6x6 5x6 4x4 4x4 4x4 2x4 4x8 4x4 4x4 4x4 5x6 8x8 6x8 6x12MT18H 8x8 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 55-0-1 1-1-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 55-0-1 1-1-15 5-8-1 3-9-2 11-0-12 3-5-10 11-0-12 7.0012 3.0012 PlateOffsets(X,Y)-- [3:0-5-12,0-3-0], [10:0-5-4,0-3-0], [12:0-6-0,0-3-0], [13:0-4-0,0-3-8], [14:0-5-8,Edge], [15:0-3-0,0-3-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.69 0.63 0.98 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.46 0.15 (loc) 21 21-22 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 410 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W8,W9,W10,W2: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-5-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-11-12 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 4-24, 6-22, 7-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 28=2197/0-6-0(min. 0-3-9), 14=3269/0-6-0(min. 0-5-4) Max Horz28=-345(LC 12) Max Uplift28=-232(LC 13), 14=-438(LC 12) MaxGrav28=2274(LC 39), 14=3361(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1258/259, 29-30=-1248/275, 2-30=-1214/278, 2-31=-2083/411, 3-31=-2018/429, 3-32=-2684/527, 4-32=-2684/527, 4-33=-3132/593, 5-33=-3132/593, 5-6=-3132/593, 6-7=-3288/615, 7-8=-3288/615, 8-34=-3288/615, 9-34=-3288/615, 9-35=-3158/598, 35-36=-3158/598, 10-36=-3158/598, 10-37=-2961/561, 37-38=-2969/541, 11-38=-3158/547, 11-39=-2996/499, 39-40=-3048/526, 12-40=-3308/553, 12-13=-1162/232, 1-28=-2230/353, 13-14=-3078/498 BOT CHORD 27-28=-268/300, 26-27=-334/1058, 25-26=-385/1764, 24-25=-385/1764, 23-24=-504/2684, 22-23=-504/2684, 21-22=-549/3132, 20-21=-452/3158, 19-20=-452/3158, 18-19=-335/2561, 17-18=-438/2639, 16-17=-438/2639, 15-16=-182/941 WEBS 2-27=-1474/305, 2-26=-244/1188, 3-26=-814/265, 3-24=-374/1758, 4-24=-1375/398, 4-22=-225/933, 6-22=-672/268, 6-21=-103/345, 7-21=-380/179, 9-21=-151/344, 9-19=-848/338, 10-19=-310/1141, 10-18=-97/594, 11-18=-686/275, 11-16=-904/237, 12-16=-300/1994, 12-15=-2775/534, 1-27=-283/1863, 13-15=-454/2695 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)All plates are 4x6MT20 unless otherwiseindicated. Continued 8)This truss on has page been 2 designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 24 23 22 21 20 19 18 17 16 15 14 29 31 30 32 33 34 35 36 37 38 39 40 41 6x8 4x6 6x8 6x6 4x6 4x6 6x6 4x6 6x6 4x8 2x4 4x6 8x8 6x8 3x10MT18H 8x8 4x6 5x6 5x6 4x6 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 57-2-1 3-3-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 57-2-1 3-3-15 5-8-1 3-9-2 11-0-12 2-11-2 11-0-12 7.0012 3.0012 PlateOffsets(X,Y)-- [3:0-6-0,0-3-0], [10:0-5-4,0-3-0], [12:0-3-0,0-3-4], [14:0-5-0,0-2-0], [15:0-3-8,0-4-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.76 0.74 0.94 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.54 0.18 (loc) 21 19-21 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 418 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W8,W9,W10,W2: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-10-6 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-3-15 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 3-24, 4-24, 6-22, 7-21, 9-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 28=2325/0-6-0(min. 0-3-12), 14=3329/0-6-0(min. 0-5-6) Max Horz28=-348(LC 12) Max Uplift28=-244(LC 13), 14=-444(LC 17) MaxGrav28=2406(LC 2), 14=3437(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1330/275, 29-30=-1319/291, 2-30=-1284/295, 2-31=-2208/441, 3-31=-2144/459, 3-32=-2868/571, 4-32=-2868/571, 4-33=-3392/654, 5-33=-3392/654, 5-6=-3392/654, 6-7=-3624/694, 7-8=-3624/694, 8-34=-3624/694, 9-34=-3624/694, 9-35=-3570/696, 35-36=-3570/696, 10-36=-3570/696, 10-37=-3522/693, 37-38=-3531/674, 11-38=-3719/686, 11-39=-4152/758, 39-40=-4203/766, 12-40=-4463/801, 12-41=-3039/553, 13-41=-3115/559, 1-28=-2360/374, 13-14=-3348/637 BOT CHORD 27-28=-237/302, 26-27=-309/1118, 25-26=-364/1872, 24-25=-364/1872, 23-24=-490/2868, 22-23=-490/2868, 21-22=-542/3392, 20-21=-470/3570, 19-20=-470/3570, 18-19=-417/3051, 17-18=-630/3639, 16-17=-630/3639, 15-16=-591/3104 WEBS 2-27=-1564/320, 2-26=-255/1268, 3-26=-877/274, 3-24=-394/1906, 4-24=-1501/415, 4-22=-245/1086, 6-22=-803/285, 6-21=-123/498, 7-21=-380/179, 9-19=-720/326, 10-19=-297/992, 10-18=-156/932, 11-18=-1199/365, 12-16=-46/672, 12-15=-2474/519, 1-27=-301/1970, 13-15=-693/3819 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. Continued 7)All plates on are page 4x4MT20 2 unless otherwiseindicated. 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 29 30 3132 33 34 35 36 37 38 39 40 41 6x6 6x6 4x4 6x6 6x6 4x4 4x8 2x4 4x4 4x4 4x4 6x6 4x4 4x4 5x8 6x8 6x8 5x6 3-9-9 3-9-9 8-10-0 5-0-8 15-3-15 6-5-15 21-11-9 6-7-11 28-7-4 6-7-11 35-2-15 6-7-11 41-8-13 6-5-15 48-5-15 6-9-2 53-10-2 5-4-4 58-4-1 4-5-15 3-9-9 3-9-9 8-10-0 5-0-8 15-3-15 6-5-15 21-11-9 6-7-11 28-7-4 6-7-11 35-2-15 6-7-11 41-8-13 6-5-15 48-5-15 6-9-2 53-10-2 5-4-4 58-4-1 4-5-15 5-8-1 10-7-15 3-9-2 10-9-14 2-7-10 10-7-15 7.0012 3.0012 PlateOffsets(X,Y)-- [3:0-3-12,0-2-8], [12:0-5-0,0-2-12], [14:Edge,0-2-0], [15:0-3-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.71 0.64 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.54 0.17 (loc) 21 21-23 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 418 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W9,W10,W11,W2: 2x4SPFStud,W1,W13: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 4-24, 6-23, 7-23, 7-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 28=2236/0-6-0(min. 0-3-10), 14=2191/0-6-0(min. 0-3-10) Max Horz28=-340(LC 12) Max Uplift28=-230(LC 13), 14=-210(LC 17) MaxGrav28=2317(LC 39), 14=2315(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1282/282, 2-29=-1238/286, 2-30=-2054/402, 3-30=-1996/429, 3-31=-2791/540, 31-32=-2791/540, 4-32=-2793/539, 4-33=-3310/613, 5-33=-3310/613, 5-6=-3310/613, 6-7=-3310/613, 7-8=-3505/640, 8-34=-3505/640, 9-34=-3505/640, 9-35=-3372/620, 35-36=-3371/620, 10-36=-3370/621, 10-37=-3159/577, 11-37=-3204/552, 11-38=-3393/535, 38-39=-3402/516, 39-40=-3426/510, 12-40=-3447/508, 12-41=-2902/415, 13-41=-2946/409, 1-28=-2271/362, 13-14=-2237/358 BOT CHORD 27-28=-211/295, 26-27=-276/1078, 25-26=-328/1785, 24-25=-328/1785, 23-24=-450/2791, 22-23=-470/3505, 21-22=-470/3505, 20-21=-393/3370, 19-20=-393/3370, 18-19=-313/2739, 17-18=-401/2945, 16-17=-401/2945, 15-16=-399/2762 WEBS 2-27=-1510/301, 2-26=-242/1257, 3-26=-922/272, 3-24=-374/1881, 4-24=-1454/398, 4-23=-223/1025, 6-23=-398/188, 7-23=-406/98, 9-21=-176/369, 9-19=-865/360, 10-19=-331/1178, 10-18=-81/558, 11-18=-605/233, 12-16=-18/305, 12-15=-1332/257, 1-27=-288/1896, 13-15=-419/3051 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 8-10-0,Exterior(2) 8-10-0 to 45-11-12, Interior(1) 45-11-12 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. Continued 7)This truss on has page been 2 designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 15 14 30 31 32 33 34 35 36 37 38 39 6x8 6x6 5x6 5x6 6x6 4x10 2x4 4x4 4x4 4x4 6x6 3x4 4x4 2x4 5x12 5x6 5x6 5-11-11 5-11-11 13-7-6 7-7-10 21-4-12 7-9-6 29-2-2 7-9-6 36-11-8 7-9-6 44-7-2 7-7-10 51-3-14 6-8-12 58-4-1 7-0-4 5-11-11 5-11-11 13-7-6 7-7-10 21-4-12 7-9-6 29-2-2 7-9-6 36-11-8 7-9-6 44-7-2 7-7-10 51-3-14 6-8-12 58-4-1 7-0-4 5-8-1 8-11-15 9-1-14 1-1-11 8-11-15 7.0012 PlateOffsets(X,Y)-- [2:0-3-4,0-2-4], [13:0-7-1,0-0-3], [22:0-2-7,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.74 0.49 0.89 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.26 -0.63 0.16 (loc) 19 19-20 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 401 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SP 2400F 2.0E WEBS 2x4SPF No.2 *Except* W7: 2x4SPFStud,W1: 2x6SPF No.2 SLIDER Right 2x6SPF No.2 2-6-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-8-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-24, 2-23, 3-23, 5-20, 6-20, 6-19, 8-17 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 25=2277/0-6-0(min. 0-2-0), 13=2224/0-6-0(min. 0-1-15) Max Horz25=-290(LC 14) Max Uplift25=-305(LC 13), 13=-242(LC 12) MaxGrav25=2395(LC 37), 13=2324(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-30=-1776/327, 30-31=-1746/335, 2-31=-1701/352, 2-32=-3090/559, 32-33=-3091/559, 3-33=-3093/559, 3-34=-3874/677, 4-34=-3874/677, 4-5=-3874/677, 5-6=-3874/677, 6-7=-4164/730, 7-35=-4164/730, 8-35=-4164/730, 8-36=-3947/685, 9-36=-3945/685, 9-10=-3344/591, 10-37=-3395/570, 11-37=-3428/566, 11-38=-3518/545, 38-39=-3535/524, 12-39=-3572/514, 12-13=-1173/110, 1-25=-2350/385 BOT CHORD 23-24=-328/1539, 22-23=-557/3091, 21-22=-557/3091, 20-21=-557/3091, 19-20=-647/4164, 18-19=-517/3945, 17-18=-517/3945, 16-17=-315/2959, 15-16=-315/2959, 14-15=-368/2969, 13-14=-368/2969 WEBS 2-24=-1277/306, 2-23=-467/2335, 3-23=-1590/444, 3-20=-265/1276, 5-20=-465/221, 6-20=-455/98, 8-19=-193/494, 8-17=-969/390, 9-17=-391/1483, 9-15=-43/467, 11-15=-489/242, 1-24=-315/2070 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 5-11-11,Exterior(2) 5-11-11 to 48-10-0,Interior(1) 48-10-0 to 58-4-1zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 25=305, 13=242. Continued 9)This trussis on page designedin 2 accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11 12 13 14 15 16 17 343332 31 30 29 28 27 26 25 2423 22 21 20 19 18 39 40 41 42 43 44 45 8x8 8x8 6x8 5x12 5x6 5x6 3x4 3x6 8x10 6x6 8x10 2x4 6x8 3x6 6x12 8x12MT18H 4x4 4x4 4x4 5x6 8x8 4x4 2x4 6x8 6x6 1-4-12 1-4-12 2-6-0 1-1-4 3-1-7 0-7-7 6-4-11 3-3-4 10-2-0 3-9-5 16-3-6 6-1-6 21-6-3 5-2-13 29-6-15 8-0-11 34-3-10 4-8-11 42-4-5 8-0-11 47-5-6 5-1-1 52-9-0 5-3-9 58-4-1 5-7-1 1-4-12 1-4-12 2-6-0 1-1-4 3-1-7 0-7-7 6-4-11 3-3-4 10-2-0 3-9-5 16-3-6 6-1-6 21-6-3 5-2-13 29-6-15 8-0-11 34-3-10 4-8-11 42-4-5 8-0-11 47-5-6 5-1-1 52-9-0 5-3-9 58-4-1 5-7-1 5-8-1 7-3-15 7-5-14 1-1-11 1-0-0 7-3-15 7.0012 PlateOffsets(X,Y)-- [1:0-2-8,0-2-4], [4:0-6-0,0-3-4], [17:0-4-12,0-0-2], [26:0-2-12,0-4-8], [28:0-8-4,0-4-8], [29:0-3-0,0-2-4], [31:0-3-12,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.61 0.38 0.92 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.29 -0.72 0.27 (loc) 24-25 24-25 17 l/defl >999 >969 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 525 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x8SP 2400F 2.0E BOT CHORD2x6SP 2400F 2.0E*Except* B2,B4: 2x4SP 2400F 2.0E WEBS 2x4SPFStud*Except* W8,W11,W10,W13,W14,W15: 2x4SPF No.2 W1: 2x4SP 2400F 2.0E SLIDER Right 2x6SP 2400F 2.0E 2-6-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 31-32. WEBS 1 Row at midpt 2-33, 6-29, 7-28, 9-26, 10-25, 13-21, 4-31 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 17=2244/0-6-0(min. 0-1-15), 34=2302/0-6-0(min. 0-2-1) Max Horz34=-241(LC 14) Max Uplift17=-300(LC 12), 34=-383(LC 13) MaxGrav17=2318(LC 2), 34=2456(LC 37) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-728/211, 2-3=-1057/264, 3-4=-1023/256, 4-5=-2455/493, 5-39=-2453/492, 6-39=-2453/492, 6-40=-3614/701, 7-40=-3614/701, 7-8=-4169/779, 8-9=-4169/779, 9-10=-4746/908, 10-11=-5073/975, 11-12=-5073/975, 12-41=-4982/943, 13-41=-4982/943, 13-42=-4168/761, 42-43=-4167/761, 14-43=-4165/761, 14-44=-3510/609, 15-44=-3525/584, 15-45=-3360/529, 16-45=-3462/506, 16-17=-1002/157, 1-34=-2612/457 BOT CHORD 32-33=-84/373, 30-31=-296/1146, 29-30=-295/1143, 28-29=-722/3623, 6-28=-202/1337, 26-27=-91/537, 25-26=-897/4746, 24-25=-903/5073, 23-24=-835/4982, 22-23=-835/4982, 21-22=-619/4166, 20-21=-416/3084, 19-20=-416/3084, 18-19=-373/2808, 17-18=-373/2808 WEBS 2-33=-1912/332, 31-33=-175/385, 2-31=-313/1789, 4-29=-495/2679, 5-29=-395/107, 6-29=-2088/434, 26-28=-721/3677, 7-28=-899/226, 7-26=-11/365, 9-26=-1068/229, 9-25=0/490, 10-25=-428/87, 12-24=-118/315, 12-22=-644/279, 13-22=-318/1197, 13-21=-1326/422, 14-21=-412/1811, 14-19=-97/263, 15-19=-237/406, 1-33=-346/2140, 4-31=-1832/322 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-4-5,Interior(1) 7-4-5 to 47-5-6,Exterior(2) 47-5-6 to 51-8-5 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. Continued 6)All plates on areMT20 page 2 plates unless otherwiseindicated. 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-17=-61, 34-35=-20, 31-33=-20, 18-30=-20 Concentrated Loads(lb) Vert: 34=-35(F) 2=-59(F) 4=-59(F) 28=-35(F) 32=-45(F) 3=-49(F) 31=-35(F) 13=-59(F) 22=-35(F) 14=-59(F) 11=-59(F) 8=-59(F) 21=-35(F) 25=-35(F) 36=-49(F) 37=-49(F) 38=-59(F) 39=-59(F) 40=-59(F) 41=-59(F) 42=-59(F) 43=-59(F) 44=-59(F) 45=-59(F) 46=-59(F) 47=-59(F) 48=-59(F) 49=-59(F) 50=-59(F) 51=-59(F) 52=-59(F) 53=-59(F) 54=-59(F) 55=-59(F) 56=-59(F) 57=-45(F) 58=-45(F) 59=-35(F) 60=-35(F) 61=-35(F) 62=-35(F) 63=-35(F) 64=-35(F) 65=-35(F) 66=-35(F) 67=-35(F) 68=-35(F) 69=-35(F) 70=-35(F) 71=-35(F) 72=-35(F) 73=-35(F) 74=-35(F) 75=-35(F) 76=-35(F) 77=-35(F) 67 68 69 70 71 72 73 74 75 76 77 8x8 5x6 4x6 5x6 3x10 3x6 5x6 5x6 4x6 6x8 8x8 5x8 2x4 6x6 8x10 4x8 4x8 2x4 4x8 3x6 2x4 4x8 3x6 4x8 2x4 4x8 3x6 4x8 2x4 6x8 4x6 4x6 4x6 6x8 6x8 2-6-0 2-6-0 6-4-0 3-10-0 10-2-0 3-10-0 15-4-8 5-2-8 20-8-11 5-4-4 26-0-15 5-4-4 31-5-3 5-4-4 36-9-6 5-4-4 42-1-10 5-4-4 47-5-14 5-4-4 52-10-2 5-4-4 58-4-1 5-6-0 2-6-0 2-6-0 6-4-0 3-10-0 10-2-0 3-10-0 15-4-8 5-2-8 20-8-11 5-4-4 26-0-15 5-4-4 31-5-3 5-4-4 36-9-6 5-4-4 42-1-10 5-4-4 47-5-14 5-4-4 52-10-2 5-4-4 58-4-1 5-6-0 5-7-15 1-0-0 PlateOffsets(X,Y)-- [31:0-7-8,0-6-4], [33:0-5-8,0-4-4], [35:Edge,0-5-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.11 0.35 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.45 -0.58 0.14 (loc) 24-26 24-26 18 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 1449 lbFT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0E BOT CHORD2x8SP 2400F 2.0E*Except* B2: 2x4SP 2400F 2.0E WEBS 2x4SPFStud*Except* W1: 2x4SP 2400F 2.0E,W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS. (lb/size) 35=3648/0-6-0(min. 0-1-8), 18=3669/0-6-0(min. 0-1-8) Max Horz35=-196(LC 10) Max Uplift35=-2446(LC 8), 18=-2477(LC 9) MaxGrav35=3811(LC 2), 18=3835(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-35=-3720/2490, 1-2=-2136/1482, 2-36=-5241/3482, 3-36=-5241/3482, 3-37=-5241/3482, 4-37=-5241/3482, 4-5=-8289/5474, 5-38=-8289/5474, 38-39=-8289/5474, 6-39=-8289/5474, 6-40=-10020/6536, 40-41=-10020/6536, 41-42=-10020/6536, 7-42=-10020/6536, 7-8=-10020/6536, 8-43=-10020/6536, 9-43=-10020/6536, 9-44=-10893/7097, 44-45=-10893/7097, 45-46=-10893/7097, 10-46=-10893/7097, 10-47=-10893/7097, 11-47=-10893/7097, 11-48=-10893/7097, 12-48=-10893/7097, 12-49=-8783/5741, 49-50=-8783/5741, 13-50=-8783/5741, 13-51=-8783/5741, 14-51=-8783/5741, 14-15=-8783/5741, 15-52=-3693/2446, 52-53=-3693/2446, 53-54=-3693/2446, 16-54=-3693/2446, 16-55=-3693/2446, 55-56=-3693/2446, 17-56=-3693/2446, 17-18=-3717/2446 BOT CHORD 2-33=-3361/2279, 33-57=-1621/2252, 32-57=-1619/2240, 32-58=-5567/8299, 31-58=-5569/8306, 4-31=-1761/2837, 30-59=-700/1058, 59-60=-700/1058, 29-60=-700/1058, 28-29=-5655/8518, 28-61=-5655/8518, 61-62=-5655/8518, 27-62=-5655/8518, 27-63=-7172/10866, 63-64=-7172/10866, 26-64=-7172/10866, 26-65=-7172/10866, 65-66=-7172/10866, 25-66=-7172/10866, 24-25=-7172/10866, 24-67=-6748/10239, 67-68=-6748/10239, 68-69=-6748/10239, 23-69=-6748/10239, 23-70=-6748/10239, 70-71=-6748/10239, 22-71=-6748/10239, 21-22=-4377/6630, 21-72=-4377/6630, 20-72=-4377/6630, 20-73=-4377/6630, 73-74=-4377/6630, 74-75=-4377/6630, 19-75=-4377/6630 WEBS 1-33=-2788/4172, 2-32=-2863/4374, 3-32=-411/320, 4-32=-4401/2880, 29-31=-5123/7712, 6-31=-335/243, 6-29=-1833/1355, 6-27=-1362/2080, 7-27=-472/431, 9-27=-1172/789, 9-26=-34/370, 10-24=-473/432, 12-24=-591/907, 12-23=-24/359, 12-22=-2017/1336, 13-22=-482/442, 15-22=-1948/2982, 15-20=-32/359, 15-19=-4069/2667, 16-19=-532/494, 17-19=-3308/5074 Continued on page 2 TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.24 0.84 0.59 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.11 0.01 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 119 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud*Except* W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-4 REACTIONS. (lb/size) 6=3291/0-6-0(min. 0-2-10), 4=3495/0-6-0(min. 0-2-12) Max Horz6=182(LC 9) Max Uplift6=-293(LC 12), 4=-486(LC 12) MaxGrav6=3312(LC 2), 4=3523(LC 18) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-1957/139, 1-6=-2119/153 BOT CHORD 5-10=-275/1665, 10-11=-275/1665, 4-11=-275/1665 WEBS 2-5=-244/2581, 2-4=-2499/413, 1-5=-130/1977 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-5-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 6=293, 4=486. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1149 lb down and 145 lb up at 0-6-12, 1147 lb down and 151 lb up at 2-6-12, 1338 lb down and 126 lb up at 4-6-12, and 1342 lb down and 123 lb up at 6-6-12, and 1345 lb down and 119 lb up at 8-6-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Continued on page 2 3-7-2 3.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.76 0.38 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.08 -0.11 0.01 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 36 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-8-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=465/0-4-0(min. 0-1-8), 5=454/0-6-0(min. 0-1-8) Max Horz7=110(LC 12) Max Uplift7=-253(LC 12), 5=-251(LC 12) MaxGrav7=532(LC 2), 5=512(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-444/315, 2-8=-466/368, 8-9=-452/382, 3-9=-380/383 BOT CHORD 6-7=-434/399, 5-6=-434/399 WEBS 3-5=-447/488 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-10-12 to 1-1-4,Interior(1) 1-1-4 to 9-8-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=253, 5=251. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 181 lb down and 164 lb up at 8-9-12 on top chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Concentrated Loads(lb) Vert: 10=-140 3-0-10 3.0012 PlateOffsets(X,Y)-- [6:0-3-8,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.41 0.61 0.59 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.01 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 38 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-9-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 7=963/0-4-0(min. 0-1-12), 5=853/0-6-0(min. 0-1-8) Max Horz7=90(LC 8) Max Uplift7=-275(LC 8), 5=-204(LC 8) MaxGrav7=1098(LC 2), 5=967(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-1406/217, 2-7=-877/244 BOT CHORD 6-10=-257/1333, 5-10=-257/1333 WEBS 3-6=-81/746, 3-5=-1470/283, 2-6=-164/1363 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=275, 5=204. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 451 lb down and 69 lb up at 1-11-4, and 451 lb down and 69 lb up at 3-11-4, and 451 lb down and 69 lb up at 5-11-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Continued on page 2 5-8-0 12-11-8 6-5-8 -0-11-12 0-11-12 0-10-0 0-10-0 6-6-0 5-8-0 12-11-8 6-5-8 1-7-1 7-0-1 1-7-8 10.0012 PlateOffsets(X,Y)-- [6:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.49 0.27 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 6-7 6-7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 66 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 12-3-8 except(jt=length) 12=0-4-0, 12=0-4-0. (lb)-Max Horz12=208(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 10, 8, 7 except 6=-178(LC 16), 12=-219(LC 17), 11=-147(LC 13) MaxGravAllreactions 250 lb orless at joint(s) 10, 11, 8, 7 except 6=251(LC 30), 12=401(LC 31), 12=332(LC 1), 9=307(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-18=-267/200, 5-23=-251/201, 5-6=-300/213 WEBS 3-12=-463/388, 4-9=-266/0 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 6-6-0,Exterior(2) 6-6-0 to 9-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 8, 7 except (jt=lb) 6=178, 12=219, 11=147. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard -0-11-12 0-11-12 0-10-0 0-10-0 6-6-0 5-8-0 12-11-8 6-5-8 1-7-1 7-0-1 1-7-8 10.0012 PlateOffsets(X,Y)-- [6:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.58 0.46 0.23 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.12 -0.19 0.01 (loc) 6-7 6-7 6 l/defl >999 >760 n/a L/d 240 180 n/a PLATES MT20 Weight: 48 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 6=417/Mechanical, 8=537/0-4-0(min. 0-1-8) Max Horz8=208(LC 13) Max Uplift6=-49(LC 17), 8=-81(LC 16) MaxGrav6=471(LC 2), 8=610(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-250/139, 3-10=-407/304, 10-11=-361/320, 11-12=-301/324, 4-12=-275/343, 4-13=-258/332, 13-14=-279/309, 14-15=-281/307, 5-15=-406/306, 5-6=-381/283 WEBS 3-8=-451/332, 4-7=-256/197 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 6-6-0,Exterior(2) 6-6-0 to 9-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 8. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 3x4 3x8 3x4 3x4 3x6 3x5 9-5-15 9-5-15 20-0-1 10-6-3 28-8-0 8-7-15 -0-11-12 0-11-12 3-11-15 3-11-15 9-5-15 5-6-0 14-9-0 5-3-1 20-0-1 5-3-1 25-6-1 5-6-0 28-8-0 3-1-15 1-7-1 9-6-0 2-3-6 9-6-0 10.0012 PlateOffsets(X,Y)-- [4:0-2-4,0-2-0], [6:0-2-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.58 0.77 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.44 0.05 (loc) 12-13 12-13 9 l/defl >999 >778 n/a L/d 240 180 n/a PLATES MT20 Weight: 149 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-3 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 13=1114/0-6-0(min. 0-2-3), 9=1058/0-6-0(min. 0-2-1) Max Horz13=283(LC 13) Max Uplift13=-126(LC 16), 9=-94(LC 17) MaxGrav13=1383(LC 39), 9=1302(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-15=-1251/235, 15-16=-1163/242, 4-16=-1121/275, 4-17=-865/273, 17-18=-865/273, 5-18=-865/273, 5-19=-829/270, 19-20=-829/270, 6-20=-829/270, 6-21=-1075/267, 21-22=-1173/228, 7-22=-1195/223, 2-13=-269/128 BOT CHORD 12-13=-254/944, 11-12=-169/1013, 10-11=-169/1013, 9-10=-144/767 WEBS 4-12=-35/417, 5-12=-305/195, 5-10=-378/192, 6-10=-31/391, 7-10=-102/283, 3-13=-1341/189, 7-9=-1354/254 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-5-15,Exterior(2) 9-5-15 to 24-3-0, Interior(1) 24-3-0 to 28-6-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9 except(jt=lb) 13=126. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 4x4 3x4 3x8 4x4 3x4 3x6 3x6 9-5-15 9-5-15 20-0-1 10-6-3 29-6-0 9-5-15 -0-11-12 0-11-12 3-11-15 3-11-15 9-5-15 5-6-0 14-9-0 5-3-1 20-0-1 5-3-1 25-6-1 5-6-0 29-6-0 3-11-15 1-7-1 9-6-0 1-7-1 9-6-0 10.0012 PlateOffsets(X,Y)-- [4:0-2-4,0-2-0], [6:0-2-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.59 0.76 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.18 -0.45 0.06 (loc) 9-10 9-10 9 l/defl >999 >780 n/a L/d 240 180 n/a PLATES MT20 Weight: 151 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-2-6 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 13=1145/0-6-0(min. 0-2-4), 9=1085/Mechanical Max Horz13=273(LC 13) Max Uplift13=-128(LC 16), 9=-103(LC 17) MaxGrav13=1421(LC 39), 9=1362(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-15=-1302/242, 15-16=-1266/242, 4-16=-1162/281, 4-17=-896/280, 17-18=-896/280, 5-18=-896/280, 5-19=-897/279, 19-20=-897/279, 6-20=-897/279, 6-21=-1163/284, 21-22=-1281/245, 7-22=-1304/240, 2-13=-270/127 BOT CHORD 12-13=-243/976, 11-12=-156/1062, 10-11=-156/1062, 9-10=-150/983 WEBS 4-12=-39/443, 5-12=-342/194, 5-10=-341/195, 6-10=-42/444, 3-13=-1388/198, 7-9=-1401/242 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-5-15,Exterior(2) 9-5-15 to 24-3-0, Interior(1) 24-3-0 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=128, 9=103. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 25 5x6 5x6 2x4 3x8 3x5 4x4 3x4 3x8 4x4 2x4 3x6 3x6 9-9-10 9-9-10 19-8-7 9-10-13 29-6-0 9-9-10 -0-11-12 0-11-12 4-0-8 4-0-8 9-9-10 5-9-2 14-9-0 4-11-7 19-8-7 4-11-7 25-5-9 5-9-2 29-6-0 4-0-8 1-7-1 9-7-5 9-9-1 1-7-1 9-7-5 10.0012 PlateOffsets(X,Y)-- [4:0-3-0,0-2-1], [6:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.67 0.76 0.40 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.18 -0.45 0.06 (loc) 9-10 9-10 9 l/defl >999 >771 n/a L/d 240 180 n/a PLATES MT20 Weight: 151 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-9-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10, 3-13, 7-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 13=1142/0-6-0(min. 0-2-4), 9=1082/Mechanical Max Horz13=277(LC 13) Max Uplift13=-131(LC 16), 9=-106(LC 17) MaxGrav13=1417(LC 39), 9=1358(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-16=-1328/241, 16-17=-1225/249, 4-17=-1133/282, 4-18=-869/283, 18-19=-869/282, 5-19=-870/282, 5-20=-871/281, 20-21=-870/281, 6-21=-869/281, 6-22=-1134/285, 22-23=-1227/245, 7-23=-1330/244 BOT CHORD 12-13=-239/998, 11-12=-146/1025, 10-11=-146/1025, 9-10=-151/1004 WEBS 4-12=-38/431, 5-12=-325/193, 5-10=-323/193, 6-10=-41/432, 3-13=-1426/199, 7-9=-1436/243 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-9-10,Exterior(2) 9-9-10 to 23-11-5, Interior(1) 23-11-5 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=131, 9=106. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 23 24 25 5x6 5x6 4x4 2x4 3x4 3x4 4x4 3x8 1.5x4 3x10 4x4 2x4 3x5 3x6 8-4-13 8-4-13 13-7-13 5-3-0 18-10-13 5-3-0 20-0-0 1-1-3 29-6-0 9-6-0 -0-11-12 0-11-12 3-7-3 3-7-3 8-4-13 4-9-10 13-7-13 5-3-0 18-10-13 5-3-0 20-0-0 1-1-3 25-10-2 5-10-2 29-6-0 3-7-15 1-7-1 8-5-5 9-6-1 1-7-1 8-5-5 10.0012 PlateOffsets(X,Y)-- [4:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.55 0.66 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.51 0.05 (loc) 10-11 10-11 10 l/defl >999 >682 n/a L/d 240 180 n/a PLATES MT20 Weight: 164 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W10,W1,W2,W11: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-13, 6-11 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 15=1149/0-6-0(min. 0-2-2), 10=1081/Mechanical Max Horz15=272(LC 13) Max Uplift15=-221(LC 16), 10=-131(LC 16) MaxGrav15=1345(LC 41), 10=1167(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-18=-1245/269, 4-18=-1205/292, 4-19=-1206/305, 19-20=-1206/305, 5-20=-1207/305, 5-21=-1207/305, 21-22=-1206/305, 6-22=-1205/305, 6-7=-1149/305, 7-23=-1121/262, 23-24=-1122/239, 8-24=-1207/234, 2-15=-294/129 BOT CHORD 14-15=-246/842, 13-14=-120/931, 12-13=-77/1029, 11-12=-77/1029, 10-11=-144/843 WEBS 4-14=-13/260, 4-13=-158/508, 5-13=-620/183, 6-13=-112/327, 6-11=-1252/344, 7-11=-275/1359, 3-15=-1249/221, 8-10=-1217/249 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 8-4-13,Exterior(2) 8-4-13 to 11-4-13, Interior(1) 18-10-13 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 15=221, 10=131. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 23 24 5x6 4x4 1.5x4 3x4 4x4 3x8 3x4 1.5x4 5x6 3x10 4x4 4x8 3x6 7-0-0 7-0-0 13-0-5 6-0-5 17-6-0 4-5-11 20-0-0 2-6-0 29-6-0 9-6-0 -0-11-12 0-11-12 7-0-0 7-0-0 13-0-5 6-0-5 17-6-0 4-5-11 20-0-0 2-6-0 25-10-2 5-10-2 29-6-0 3-7-15 1-7-1 7-3-5 9-6-1 1-7-1 7-3-5 10.0012 PlateOffsets(X,Y)-- [2:0-2-8,0-1-12], [3:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.86 0.67 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.52 0.05 (loc) 9-10 9-10 9 l/defl >999 >677 n/a L/d 240 180 n/a PLATES MT20 Weight: 154 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W6,W7,W8: 2x4SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1155/0-6-0(min. 0-2-1), 9=1073/Mechanical Max Horz14=273(LC 13) Max Uplift14=-222(LC 16), 9=-130(LC 16) MaxGrav14=1313(LC 41), 9=1164(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1310/204, 15-16=-1277/213, 16-17=-1246/228, 3-17=-1240/251, 3-18=-1385/302, 18-19=-1385/302, 4-19=-1387/302, 4-20=-1387/302, 5-20=-1385/302, 5-21=-1123/285, 6-21=-1056/299, 6-22=-1081/268, 22-23=-1088/245, 7-23=-1202/239, 2-14=-1251/264 BOT CHORD 13-14=-313/491, 12-13=-156/963, 11-12=-140/1223, 10-11=-140/1223, 9-10=-147/842 WEBS 3-12=-139/648, 4-12=-633/193, 5-12=-86/302, 5-10=-1198/327, 6-10=-242/1257, 2-13=-122/881, 7-9=-1218/255 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 7-0-0,Exterior(2) 7-0-0 to 10-0-0, Interior(1) 17-6-0 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=222, 9=130. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 22 23 24 5x6 5x6 4x4 1.5x4 3x4 3x4 4x8 3x5 1.5x4 3x8 4x4 6x6 3x6 5-7-3 5-7-3 10-10-3 5-3-0 16-1-3 5-3-0 20-0-0 3-10-13 29-6-0 9-6-0 -0-11-12 0-11-12 5-7-3 5-7-3 10-10-3 5-3-0 16-1-3 5-3-0 20-0-0 3-10-13 25-10-2 5-10-2 29-6-0 3-7-15 1-7-1 6-1-5 9-6-1 1-7-1 6-1-5 10.0012 PlateOffsets(X,Y)-- [2:0-2-12,0-1-8], [3:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.67 0.80 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.46 0.05 (loc) 9-10 9-10 9 l/defl >999 >768 n/a L/d 240 180 n/a PLATES MT20 Weight: 146 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-0-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1159/0-6-0(min. 0-2-0), 9=1071/0-6-0(min. 0-1-13) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1276(LC 41), 9=1167(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1323/216, 15-16=-1277/221, 3-16=-1273/244, 3-17=-1581/308, 17-18=-1581/308, 4-18=-1583/308, 4-19=-1583/308, 5-19=-1581/308, 5-20=-1168/260, 20-21=-1099/266, 6-21=-1031/283, 6-22=-1089/265, 22-23=-1097/242, 7-23=-1211/236, 2-14=-1222/256 BOT CHORD 13-14=-283/349, 12-13=-186/988, 11-12=-220/1487, 10-11=-220/1487, 9-10=-146/847 WEBS 3-12=-120/889, 4-12=-620/189, 5-10=-1254/342, 6-10=-210/1196, 2-13=-90/953, 7-9=-1233/248 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 5-7-3,Exterior(2) 5-7-3 to 8-7-3, Interior(1) 16-1-3 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 22 23 24 25 26 5x6 6x6 4x4 1.5x4 2x4 3x5 4x10 4x6 1.5x4 3x8 4x4 4x6 4x4 4-2-6 4-2-6 9-5-6 5-3-0 14-8-6 5-3-0 20-0-0 5-3-10 29-6-0 9-6-0 -0-11-12 0-11-12 4-2-6 4-2-6 9-5-6 5-3-0 14-8-6 5-3-0 20-0-0 5-3-10 25-10-0 5-10-0 29-6-0 3-8-0 1-7-1 4-11-5 9-6-1 1-7-1 4-11-5 10.0012 PlateOffsets(X,Y)-- [2:0-2-14,0-2-0], [3:0-3-0,0-2-1], [5:0-2-1,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.68 0.97 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.24 -0.67 0.06 (loc) 10-12 10-12 9 l/defl >999 >524 n/a L/d 240 180 n/a PLATES MT20 Weight: 140 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-6-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 2-2-0 oc bracing: 10-12. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1164/0-6-0(min. 0-1-15), 9=1066/0-6-0(min. 0-1-13) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1245(LC 40), 9=1167(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1281/210, 15-16=-1249/216, 3-16=-1214/232, 3-17=-1848/317, 17-18=-1848/317, 4-18=-1850/317, 4-19=-1850/317, 5-19=-1848/317, 5-20=-1201/239, 20-21=-1103/240, 21-22=-1066/248, 6-22=-1038/262, 6-23=-1008/258, 23-24=-1095/237, 24-25=-1100/235, 7-25=-1214/230, 2-14=-1204/253 BOT CHORD 13-14=-265/287, 12-13=-209/976, 11-12=-316/1830, 10-11=-316/1830, 9-10=-141/847 WEBS 3-13=-262/67, 3-12=-123/1168, 4-12=-620/189, 5-12=-330/112, 5-10=-1427/382, 6-10=-173/1117, 2-13=-75/997, 7-9=-1239/234 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 4-2-6,Exterior(2) 4-2-6 to 7-2-6, Interior(1) 14-8-6 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 23 5x6 5x8 4x6 2x4 1.5x4 3x5 4x12 4x6 1.5x4 3x10 4x4 3x5 3x5 2-9-10 2-9-10 8-0-0 5-2-6 13-3-10 5-3-10 20-0-0 6-8-7 29-6-0 9-6-0 -0-11-12 0-11-12 2-9-10 2-9-10 8-0-0 5-2-6 13-3-10 5-3-10 20-0-0 6-8-7 25-10-0 5-10-0 29-6-0 3-8-0 1-7-1 3-9-5 9-6-1 1-7-1 3-9-5 10.0012 PlateOffsets(X,Y)-- [3:0-3-0,0-2-1], [5:0-4-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.92 0.92 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.40 -1.08 0.08 (loc) 10-12 10-12 9 l/defl >883 >325 n/a L/d 240 180 n/a PLATES MT20 Weight: 135 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF 1650F 1.5E WEBS 2x4SPFStud*Except* W7,W8: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 2-2-0 oc bracing. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 14=1169/0-6-0(min. 0-2-0), 9=1061/0-6-0(min. 0-1-13) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1280(LC 40), 9=1167(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1149/201, 3-15=-1106/211, 3-16=-2230/335, 4-16=-2232/335, 4-17=-2232/335, 5-17=-2230/335, 5-18=-1277/214, 18-19=-1094/218, 6-19=-1048/241, 6-20=-1013/255, 20-21=-1105/232, 21-22=-1105/229, 7-22=-1219/226, 2-14=-1246/253 BOT CHORD 13-14=-253/259, 12-13=-225/905, 11-12=-454/2384, 10-11=-454/2384, 9-10=-136/846 WEBS 3-13=-446/69, 3-12=-160/1599, 4-12=-616/191, 5-12=-633/158, 5-10=-1827/477, 6-10=-136/1040, 2-13=-104/1002, 7-9=-1246/218 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 2-9-10,Exterior(2) 2-9-10 to 5-9-10, Interior(1) 13-3-10 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 24 25 26 27 28 29 3031 4x8 6x6 4x4 3x5 3x6 3x5 4x4 5x12 1.5x4 5x6 4x10 3x10 3x5 3x4 4x6 1.5x4 1-4-13 1-4-13 6-7-13 5-3-0 11-10-13 5-3-0 13-10-13 2-0-0 20-0-0 6-1-3 26-1-4 6-1-4 29-6-0 3-4-13 -0-11-12 0-11-12 1-4-13 1-4-13 6-7-13 5-3-0 11-10-13 5-3-0 13-10-13 2-0-0 20-0-0 6-1-3 26-1-4 6-1-4 29-6-0 3-4-13 1-7-1 2-7-5 9-6-1 1-7-1 2-7-5 10.0012 PlateOffsets(X,Y)-- [2:0-2-14,0-2-0], [3:0-4-0,0-1-4], [5:0-2-1,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.80 0.74 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.25 -0.56 0.09 (loc) 14-15 14-15 10 l/defl >999 >629 n/a L/d 240 180 n/a PLATES MT20 Weight: 139 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except* B1: 2x4SPF 1650F 1.5E WEBS 2x4SPFStud*Except* W4,W9: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-6-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 6-12 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 17=1143/0-6-0(min. 0-2-0), 10=1054/0-6-0(min. 0-1-13) Max Horz17=272(LC 9) Max Uplift17=-408(LC 12), 10=-166(LC 12) MaxGrav17=1284(LC 36), 10=1163(LC 59) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-806/262, 3-18=-2841/724, 18-19=-2841/724, 4-19=-2843/724, 4-20=-2843/724, 20-21=-2841/724, 21-22=-2841/724, 5-22=-2841/724, 5-6=-2855/581, 6-23=-1286/262, 23-24=-1075/273, 7-24=-1032/297, 7-25=-1022/315, 25-26=-1075/291, 8-26=-1196/286, 8-9=-1153/205, 2-17=-1303/403, 9-10=-1138/177 BOT CHORD 16-17=-261/250, 16-27=-344/838, 27-28=-344/838, 15-28=-344/838, 15-29=-847/3436, 29-30=-847/3436, 30-31=-847/3436, 14-31=-847/3436, 13-14=-509/2188, 12-13=-509/2188, 11-12=-121/871 WEBS 3-16=-713/194, 3-15=-533/2357, 4-15=-622/204, 5-15=-1167/165, 5-14=-2177/522, 6-14=-336/1789, 6-12=-1640/521, 7-12=-229/1025, 8-11=-267/112, 2-16=-264/1058, 9-11=-123/931 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=408, 10=166. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 4x4 3x5 3x4 3x4 19-0-0 19-0-0 -0-11-12 0-11-12 9-6-0 9-6-0 19-0-0 9-6-0 19-11-12 0-11-12 1-7-1 9-6-1 1-7-1 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.29 0.16 0.30 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.01 (loc) 13 13 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 109 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 18-19. JOINTS 1Brace at Jt(s): 25, 26, 27 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 19-0-0. (lb)-Max Horz24=-281(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 22, 16 except 24=-157(LC 12), 14=-142(LC 13), 21=-143(LC 16), 23=-287(LC 16), 17=-144(LC 17), 15=-283(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 21, 22, 18, 17, 16 except 24=302(LC 31), 14=290(LC 30), 19=252(LC 30), 23=275(LC 14), 15=264(LC 15) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-0-11-12 to 2-0-4,Exterior(2) 2-0-4 to 9-6-0, Corner(3) 9-6-0 to 12-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 22, 16 except (jt=lb) 24=157, 14=142, 21=143, 23=287, 17=144, 15=283. 12) Non Standard bearingcondition. Reviewrequired. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 14-1-4 4-7-4 19-0-0 4-10-12 1-7-1 9-6-1 1-7-1 10.0012 PlateOffsets(X,Y)-- [1:0-1-9,0-1-12], [5:0-1-9,0-1-12], [6:Edge,0-2-0], [7:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.69 0.62 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.19 -0.43 0.02 (loc) 7 6-7 6 l/defl >999 >518 n/a L/d 240 180 n/a PLATES MT20 Weight: 80 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W3: 2x4SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-0-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 8=656/0-6-0(min. 0-1-8), 6=656/0-6-0(min. 0-1-8) Max Horz8=-257(LC 12) Max Uplift8=-78(LC 16), 6=-78(LC 17) MaxGrav8=742(LC 2), 6=742(LC 2) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-756/143, 2-9=-615/161, 2-10=-589/168, 10-11=-561/174, 3-11=-551/191, 3-12=-552/191, 12-13=-561/174, 4-13=-589/168, 4-14=-615/160, 5-14=-756/143, 1-8=-621/152, 5-6=-621/152 BOT CHORD 7-8=-117/555, 6-7=-66/467 WEBS 3-7=-115/450 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-6-0,Exterior(2) 9-6-0 to 12-6-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 6. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 7.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [7:0-1-12,0-0-0], [12:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 13 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 74 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=24(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=324(LC 1), 19=396(LC 38), 20=457(LC 38), 21=405(LC 38), 17=396(LC 38), 16=457(LC 38), 15=404(LC 38) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-19=-316/115, 5-20=-377/119, 4-21=-322/105, 9-17=-316/114, 10-16=-377/119, 11-15=-321/104 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 6-3-3,Interior(1) 6-3-3 to 30-0-8,Exterior(2) 30-0-8 to 31-9-4zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)Gablerequirescontinuous bottomchord bearing. 9)Gablestudsspaced at 4-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 0-4-5 2-6-11 2-10-4 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.21 0.09 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 14 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 88 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=68(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=442(LC 38), 19=441(LC 38), 20=446(LC 38), 21=361(LC 39), 17=441(LC 38), 16=445(LC 38), 15=360(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-362/115, 7-19=-361/115, 5-20=-365/117, 3-21=-265/103, 9-17=-361/116, 10-16=-365/119, 12-15=-265/95 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 4-10-9,Exterior(2) 4-10-9 to 31-2-12, Interior(1) 31-2-12 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 24-3-15 16-7-1 32-0-15 7-9-0 0-4-5 4-2-11 4-6-4 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.24 0.09 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 13 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 99 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-111(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 17, 16, 13 except 21=-127(LC 16), 15=-125(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=430(LC 38), 19=464(LC 38), 20=344(LC 38), 21=450(LC 39), 17=465(LC 38), 16=343(LC 38), 15=450(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-350/111, 6-19=-384/131, 5-20=-264/102, 3-21=-362/166, 9-17=-384/128, 10-16=-263/79, 12-15=-362/164 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 7-8-14,Exterior(2) 7-8-14 to 28-6-14, Interior(1) 28-6-14 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 17, 16, 13 except(jt=lb) 21=127, 15=125. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 32-0-15 32-0-15 10-7-3 10-7-3 21-5-11 10-10-8 32-0-15 10-7-4 0-4-5 5-10-11 6-2-4 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [5:0-2-0,Edge], [9:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.09 0.26 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 12 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 106 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=155(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 17, 18, 16, 15 except 19=-102(LC 16), 20=-128(LC 16), 14=-128(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=463(LC 38), 18=383(LC 38), 19=417(LC 39), 20=440(LC 39), 16=382(LC 38), 15=417(LC 39), 14=439(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-383/130, 6-18=-303/104, 4-19=-339/152, 3-20=-350/167, 8-16=-302/91, 10-15=-339/148, 11-14=-350/168 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 10-7-3,Exterior(2) 10-7-3 to 25-8-9, Interior(1) 25-8-9 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 18, 16, 15 except(jt=lb) 19=102, 20=128, 14=128. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 3x4 3x4 5x6 3x4 32-0-15 32-0-15 13-5-7 13-5-7 18-7-6 5-1-15 32-0-15 13-5-9 0-4-5 7-6-11 7-10-4 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [6:0-2-0,Edge], [8:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.35 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 111 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=198(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 17, 18, 16, 12 except 19=-134(LC 16), 20=-121(LC 16), 15=-136(LC 17), 14=-120(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=399(LC 38), 18=379(LC 39), 19=459(LC 39), 20=409(LC 39), 16=380(LC 39), 15=459(LC 39), 14=409(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-319/99, 5-18=-299/110, 4-19=-380/184, 3-20=-324/160, 9-16=-300/98, 10-15=-380/186, 11-14=-324/159 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 13-5-7,Exterior(2) 13-5-7 to 22-10-5, Interior(1) 22-10-5 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 17, 18, 16, 12 except(jt=lb) 19=134, 20=121, 15=136, 14=120. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 3x4 5x6 3x4 32-1-1 32-1-1 16-0-8 16-0-8 32-1-1 16-0-8 0-4-5 9-2-11 9-4-5 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.09 0.05 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 12 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 228 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-240(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2 except 18=-135(LC 16), 19=-121(LC 16), 20=-124(LC 16), 16=-134(LC 17), 15=-121(LC 17), 14=-124(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=293(LC 33), 18=358(LC 30), 19=336(LC 30), 20=338(LC 30), 16=357(LC 31), 15=336(LC 31), 14=337(LC 31) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-18=-278/182, 4-19=-257/170, 3-20=-251/164, 8-16=-277/182, 10-15=-257/171, 11-14=-250/163 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 16-0-8,Exterior(2) 16-0-8 to 19-0-8 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 18=135, 19=121, 20=124, 16=134, 15=121, 14=124. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. Continued on page 2 3x4 3x4 5x6 3x4 32-1-1 32-1-1 16-0-8 16-0-8 32-1-1 16-0-8 0-4-5 9-2-11 9-4-5 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.18 0.09 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 12 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 114 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-17 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-240(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2 except 18=-135(LC 16), 19=-120(LC 16), 20=-124(LC 16), 16=-134(LC 17), 15=-121(LC 17), 14=-124(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 12, 2 except 17=293(LC 33), 18=358(LC 30), 19=336(LC 30), 20=338(LC 30), 16=357(LC 31), 15=336(LC 31), 14=337(LC 31) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-18=-278/182, 4-19=-257/170, 3-20=-251/164, 8-16=-277/182, 10-15=-257/171, 11-14=-250/163 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 16-0-8,Exterior(2) 16-0-8 to 19-0-8 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)All plates are 1.5x4MT20 unless otherwiseindicated. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 18=135, 19=120, 20=124, 16=134, 15=121, 14=124. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 25 26 27 28 3x4 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 13-10-9 13-10-9 18-2-8 4-3-15 32-1-1 13-10-9 0-4-5 7-9-9 8-1-2 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [7:0-2-0,Edge], [9:0-2-0,Edge], [19:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.28 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 15 15 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 112 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-205(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 19, 20, 18 except 21=-132(LC 16), 22=-122(LC 16), 17=-134(LC 17), 16=-121(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 14 except 19=364(LC 38), 20=389(LC 39), 21=460(LC 39), 22=396(LC 47), 18=389(LC 39), 17=460(LC 39), 16=396(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-19=-284/85, 6-20=-308/125, 4-21=-380/182, 3-22=-313/160, 10-18=-308/116, 12-17=-380/184, 13-16=-313/160 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 13-10-9,Exterior(2) 13-10-9 to 18-2-8, Interior(1) 22-5-7 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 19, 20, 18 except(jt=lb) 21=132, 22=122, 17=134, 16=121. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 5x6 3x4 32-1-1 32-1-1 11-0-4 11-0-4 21-0-13 10-0-9 32-1-1 11-0-4 0-4-5 6-1-9 6-5-2 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [5:0-2-0,Edge], [9:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.24 0.09 0.28 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 107 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-161(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 17, 18, 16 except 19=-111(LC 16), 20=-126(LC 16), 15=-107(LC 17), 14=-127(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=467(LC 38), 18=371(LC 38), 19=432(LC 39), 20=436(LC 39), 16=371(LC 38), 15=432(LC 39), 14=436(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-387/133, 6-18=-291/104, 4-19=-354/161, 3-20=-347/165, 8-16=-291/85, 10-15=-354/157, 11-14=-347/166 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 11-0-4,Exterior(2) 11-0-4 to 25-3-11, Interior(1) 25-3-11 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 18, 16 except(jt=lb) 19=111, 20=126, 15=107, 14=127. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 15-9-2 32-1-1 8-1-15 0-4-5 4-5-9 4-9-2 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [15:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.26 0.09 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 10 11 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 100 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-118(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 15, 16, 17, 14, 13, 10 except 18=-139(LC 16), 12=-138(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 10 except 15=430(LC 38), 16=467(LC 38), 17=293(LC 39), 18=473(LC 39), 14=467(LC 38), 13=294(LC 39), 12=473(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-15=-350/111, 5-16=-387/128, 3-18=-387/180, 7-14=-387/128, 9-12=-387/179 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 8-1-15,Exterior(2) 8-1-15 to 28-0-8, Interior(1) 28-0-8 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 15, 16, 17, 14, 13, 10 except(jt=lb) 18=139, 12=138. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 32-1-1 5-3-11 0-4-5 2-9-9 3-1-2 0-1-10 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.21 0.09 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 14 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 90 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=-74(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=440(LC 38), 19=445(LC 38), 20=430(LC 38), 21=368(LC 39), 17=445(LC 38), 16=430(LC 38), 15=368(LC 39) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-360/115, 7-19=-365/117, 5-20=-349/111, 3-21=-274/114, 9-17=-365/117, 10-16=-349/111, 12-15=-274/107 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 5-3-11,Exterior(2) 5-3-11 to 31-2-14, Interior(1) 31-2-14 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 0-4-5 0-1-10 7.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [12:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 13 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 76 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. All bearings 30-4-12. (lb)-Max Horz2=31(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=324(LC 1), 19=408(LC 38), 20=457(LC 38), 21=392(LC 38), 17=408(LC 38), 16=457(LC 38), 15=392(LC 38) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-19=-328/115, 5-20=-377/121, 4-21=-312/104, 9-17=-328/114, 10-16=-377/121, 11-15=-312/103 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 6-8-5,Interior(1) 6-8-5 to 29-7-10,Exterior(2) 29-7-10 to 31-9-6 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)Gablestudsspaced at 4-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 14)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 0-4-13 0-1-10 3-5-11 10.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.31 0.19 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.02 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 29 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 2=254/9-2-12(min. 0-1-11), 6=254/9-2-12(min. 0-1-11), 8=202/9-2-12(min. 0-1-11) Max Horz2=-91(LC 14) Max Uplift2=-90(LC 16), 6=-97(LC 17) MaxGrav2=437(LC 39), 6=437(LC 39), 8=261(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-9=-384/143, 6-10=-384/143 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 4-6-1,Exterior(2) 4-6-1 to 6-0-1zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 0-1-10 10.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.12 0.19 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 27 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 2=233/9-2-12(min. 0-1-8), 6=233/9-2-12(min. 0-1-8), 8=272/9-2-12(min. 0-1-8) Max Horz2=60(LC 15) Max Uplift2=-64(LC 16), 6=-64(LC 17), 8=-7(LC 13) MaxGrav2=346(LC 39), 6=346(LC 39), 8=375(LC 38) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-9=-303/122, 6-10=-303/122 WEBS 4-8=-259/100 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.25 0.19 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 24 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 2=195/9-2-12(min. 0-1-8), 6=195/9-2-12(min. 0-1-8), 8=375/9-2-12(min. 0-1-8) Max Horz2=30(LC 15) Max Uplift2=-33(LC 16), 6=-34(LC 17), 8=-53(LC 13) MaxGrav2=219(LC 39), 6=219(LC 39), 8=534(LC 38) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-272/116, 5-6=-273/116 WEBS 4-8=-418/155 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 5-11-6,Interior(1) 5-11-6 to 8-9-11,Exterior(2) 8-9-11 to 10-3-5 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S) Standard 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.31 0.19 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.04 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-7 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=225/0-6-0(min. 0-1-8), 3=71/Mechanical, 4=33/Mechanical Max Horz5=97(LC 16) Max Uplift5=-14(LC 16), 3=-78(LC 16), 4=-4(LC 16) MaxGrav5=260(LC 2), 3=99(LC 30), 4=65(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 3-7-11zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.52 0.57 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.22 -0.35 -0.13 (loc) 4-5 4-5 3 l/defl >417 >260 n/a L/d 240 180 n/a PLATES MT20 Weight: 30 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=303/0-9-6(min. 0-1-8), 3=262/Mechanical, 4=102/Mechanical Max Horz5=168(LC 12) Max Uplift5=-148(LC 16), 3=-293(LC 12), 4=-3(LC 12) MaxGrav5=347(LC 2), 3=349(LC 44), 4=162(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-5=-289/175 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 5=148, 3=293. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 85 lb down and 67 lb up at 3-5-7, and 122 lb down and 87 lb up at 4-7-0, and 110 lb down and 112 lb up at 5-10-12 on top chord, and 23 lb down and 32 lb up at 3-5-7, and 25 lb down and 23 lb up at 4-7-0, and 34 lb down and 36 lb up at 5-10-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Concentrated Loads(lb) Vert: 9=-7(B) 10=0(B) 11=-1(F) 12=-8(B) Continued on page 2 PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.23 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.02 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-11-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=138/0-6-0(min. 0-1-8), 3=30/Mechanical, 4=15/Mechanical Max Horz5=80(LC 13) Max Uplift3=-66(LC 16), 4=-22(LC 16) MaxGrav5=160(LC 2), 3=54(LC 30), 4=38(LC 14) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.37 0.24 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 -0.05 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-4-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=178/0-6-0(min. 0-1-8), 3=68/Mechanical, 4=32/Mechanical Max Horz5=120(LC 16) Max Uplift3=-101(LC 16), 4=-17(LC 16) MaxGrav5=205(LC 2), 3=102(LC 30), 4=60(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 3-3-5zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 3=101. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.54 0.37 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.05 -0.07 -0.11 (loc) 4-5 4-5 3 l/defl >999 >733 n/a L/d 240 180 n/a PLATES MT20 Weight: 15 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=222/0-6-0(min. 0-1-8), 3=101/Mechanical, 4=49/Mechanical Max Horz5=165(LC 16) Max Uplift3=-134(LC 16), 4=-14(LC 16) MaxGrav5=254(LC 2), 3=145(LC 30), 4=86(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 4-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 3=134. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.21 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-3-2 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 3=-22/Mechanical, 4=0/Mechanical, 5=182/0-3-8(min. 0-1-8) Max Horz5=61(LC 13) Max Uplift3=-69(LC 22), 4=-33(LC 13), 5=-19(LC 16) MaxGrav3=11(LC 12), 4=20(LC 14), 5=253(LC 22) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4, 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.37 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.08 0.06 -0.11 (loc) 4-5 4-5 3 l/defl >704 >882 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-11-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=154/0-6-1(min. 0-1-8), 3=75/Mechanical, 4=34/Mechanical Max Horz5=92(LC 16) Max Uplift5=-184(LC 16), 3=-128(LC 16), 4=-59(LC 9) MaxGrav5=183(LC 18), 3=98(LC 53), 4=78(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 5=184, 3=128. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 77 lb down and 131 lb up at 1-7-4, and 82 lb down and 38 lb up at 2-2-5, and 83 lb down and 77 lb up at 4-0-4 on top chord, and 45 lb down and 37 lb up at 1-7-4, and 43 lb down and 45 lb up at 2-2-5, and 12 lb down and 45 lb up at 4-0-4 on bottomchord.The design/selection of such connection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Concentrated Loads(lb) Vert: 6=43(B) 10=1(B) 11=1(F) 12=0(F) Continued on page 2 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.17 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-2-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 3=2/Mechanical, 4=5/Mechanical, 5=125/0-3-8(min. 0-1-8) Max Horz5=66(LC 13) Max Uplift3=-44(LC 16), 4=-40(LC 13), 5=-4(LC 12) MaxGrav3=28(LC 14), 4=28(LC 14), 5=162(LC 22) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4, 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.24 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-3-3 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=146/0-3-8(min. 0-1-8), 3=38/Mechanical, 4=19/Mechanical Max Horz5=86(LC 13) Max Uplift3=-73(LC 16), 4=-34(LC 13) MaxGrav5=168(LC 2), 3=64(LC 30), 4=39(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.29 0.19 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.01 -0.04 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-11-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=166/0-3-8(min. 0-1-8), 3=58/Mechanical, 4=28/Mechanical Max Horz5=107(LC 16) Max Uplift3=-91(LC 16), 4=-34(LC 13) MaxGrav5=191(LC 2), 3=88(LC 30), 4=52(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 2-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 4-9-14 5-4-1 1-0-0 10.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.29 0.39 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.09 -0.11 -0.08 (loc) 6 6 4 l/defl >685 >552 n/a L/d 240 180 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 8=236/0-6-0(min. 0-1-8), 4=102/Mechanical, 5=64/Mechanical Max Horz8=179(LC 16) Max Uplift4=-112(LC 16), 5=-45(LC 16) MaxGrav8=270(LC 2), 4=140(LC 30), 5=86(LC 30) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-3-2,Interior(1) 2-3-2 to 5-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5 except(jt=lb) 4=112. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.60 0.42 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.07 -0.10 0.14 (loc) 4-5 4-5 3 l/defl >803 >577 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 16 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=236/0-6-0(min. 0-1-8), 3=111/Mechanical, 4=55/Mechanical Max Horz5=179(LC 16) Max Uplift3=-144(LC 16), 4=-13(LC 16) MaxGrav5=270(LC 2), 3=158(LC 30), 4=94(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 5-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)All plates areMT20 plates unless otherwiseindicated. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 3=144. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.32 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.02 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-3-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=155/0-9-6(min. 0-1-8), 3=-6/Mechanical, 4=0/Mechanical Max Horz5=67(LC 11) Max Uplift5=-42(LC 12), 3=-54(LC 16), 4=-13(LC 27) MaxGrav5=229(LC 18), 3=31(LC 8), 4=26(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S) Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Trapezoidal Loads(plf) Vert: 2=-2(F=24,B=24)-to-3=-36(F=7,B=7), 5=0(F=10,B=10)-to-4=-14(F=3,B=3) PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.22 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS. (lb/size) 5=184/0-6-0(min. 0-1-8), 3=18/Mechanical, 4=11/Mechanical Max Horz5=71(LC 13) Max Uplift5=-15(LC 16), 3=-42(LC 16), 4=-11(LC 13) MaxGrav5=228(LC 22), 3=36(LC 30), 4=32(LC 7) FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 1-11-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S) Standard