Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M001.3
ProductsPlotID Length ProductPlies Net QtyFJ1 28-00-00 11-7/8" BCI® 5000s-1.8 1 12FJ2 24-00-00 11-7/8" BCI® 5000s-1.8 1 4FJ3 18-00-00 11-7/8" BCI® 5000s-1.8 1 12FJ4 16-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ5 14-00-00 11-7/8" BCI® 5000s-1.8 1 2FJ6 12-00-00 11-7/8" BCI® 5000s-1.8 1 12FJ7 6-00-00 11-7/8" BCI® 5000s-1.8 1 3FJ8 4-00-00 11-7/8" BCI® 5000s-1.8 1 1BM1 18-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22BM2 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22BM3 22-00-00 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 3 3BM4 22-00-00 1-3/4" x 24" VERSA-LAM® 2.0 3100 SP 2 2Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 12Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 30PBO1 10-00-00 3-08 x 3-08 Generic Material 1 1Connector SummaryPlotID Qty Manuf ProductHu1 5 USP THF20112Hu2 16 USP THF20112Hu3 12 USP THF20112PBO1BM3BM2BM4BM1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1FJ4FJ8FJ7Hu1Hu2Hu2Hu1Hu1Hu3FJ3FJ6FJ1FJ7FJ5FJ1FJ2FJ6Bk1Bk11-03-061-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-038-0311-001-07-031-07-031-08-101-05-121-07-031-07-031-07-031-07-031-07-031-07-031-07-031-08-101-05-121-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-03Sheet: 1/1DWG:Order #:By:Date: 3/26/2018Scale: NTSBC FRAMER180301103TheGroveSecond FloorNOTE:ALLMEASUREMENTSTO BE VERIFIEDIN THE FIELD.Revisions:BY:cut, notch or drill flangesDO NOTDN01above to bearing below.Solid block all posts fromF0810-10d nails.Nail withFiller block.Install tight to top flange.mount hanger load exceeds 250 lbs.Backer block required where topBacker block (12" wide min.)Nail with 10- 10d nails.Install tight to top flange.Joist hangerF10NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FORDETAILS NOT SHOWNAll I- Joists and Versa-Lam BeamsMust Be Installed per TheBoise Cascade Installation Guide!-----------------------------Todo yo- los Rayos de Viguetas yVersa-Huída Deben Ser Instaladospor La Guía de la Instalación deCascada de Boise!FOR MULTIPLE PLY BEAMCONNECTION SEE THE"CONNECTION DIAGRAM"SUPPLIED WITH JOB PACKAGE