Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A310
SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CONSTRUCTION MANAGER ARCHITECT 17104 DECEMBER 8, 2017 ISSUED FOR CONSTRUCTION MIDTOWN WEST CARMEL, IN CLIENT # DESCRIPTION DATE BARRETT AND STOKELY, INC INDIANAPOLIS, IN D I L L O N CONSTRUCTION G R O U P A310 ENLARGED ELEVATIONS AND SECTIONS SCALE: 01 PARTIAL ELEVATION ENLARGED 1/4" = 1'-0" 10'-8" 10'-8" 10'-8" 2'-0" SECOND FLOOR EL: 16'-8" THIRD FLOOR EL: 27'-4" FOURTH FLOOR EL: 38'-0" 2 A310 3 A310 SCALE: 02 SECTION WALL SCALE: 1/4" = 1'-0" 05 SECTION WALL 1/4" = 1'-0" T.O. PARAPET EL: 40'-0" T.O. PARAPET EL: 39'-0" 10'-8" 10'-8" 9'-0 1 2" 3'-7 1 2" SECOND FLOOR EL: 16'-8" THIRD FLOOR EL: 27'-4" ROOF PLATE EL: 36'-4 1/2" T.O. FOOTING EL: 3'-4" (835.33') T.O. PARAPET EL: 40'-0" 2'-8" FIRST FLOOR RESIDENTIAL EL: 6'-0" (838') FIFTH FLOOR EL: 48'-8" T,O. CORNICE EL: 60'-8" 10'-8" 10'-8" 9'-0 1 2" SECOND FLOOR EL: 16'-8" THIRD FLOOR EL: 27'-4" ROOF PLATE EL: 36'-4 1/2" LEASING F.F. EL: 0'-0" (832.0') T.O. PARAPET EL: 39'-0" 6'-0" FIRST FLOOR RESIDENTIAL EL: 6'-0" R1 F1 F2 EW1 EW2 EW2 EW2 EW1 EW2 EW2 EW2 R1 F1 F2 18 A355 09 A352 SIM 09 A352 SIM 17 A355 16 A355 04 A353 SIM 2'-0" 2'-0" 2'-0" 2'-0" 04 A353 SIM 15 A355 H2 H2 H2 H1 H2 H1 B5 H3 S4 S5 H2 H2 H2 H1 H1 B6 B1 CASCADE BRICK DARK RED WIRE CUT .75 GREYSTONE SPEKTRA BLACK WIRECUT WALNUT WHITESTONE HARDIE- MONTEREY TAUPE HARDIE- IRON GREY HARDIE- TRADITIONAL RED METAL ROOF STANDING SEAM 4" TALL STONE COPING/BANDING/SILL "LIMESTONE" 5" TALL STONE BANDING/SILL "LIMESTONE" 4" TALL STONE CAP "BUFF" 4" TALL STONE SILL "BUFF" 5" TALL STONE BANDING/SILL "BUFF" B3 B2 B4 B5 B6 H1 H2 H3 S1 S2 S3 S4 S5 M1 T.O. FOOTING EL: 3'-4" (835.33') 2'-8" FIRST FLOOR RESIDENTIAL EL: 6'-0" (838') 04/25/18 Nick Mishler