Loading...
HomeMy WebLinkAboutC3012 2.1 3 4.8 5 5.9 6 6.9 7 7.9 8 8.9 9 10 10.1 11 11.1 12 12.1 13 13.8 14 14.6 15 15.1 15.2 15.9 16 17 17.2 17.9 18 19 P.1 N M 2.4 2.8 4 P N.9 MONON TRAIL 20+00 18+00 19+00 18+00 19+00 20+00 S F IRST FLOOR EL: -1' - 6" FIRST FLOOR EL: 0' - 0" UP UP VAN MERCHANTS BUILDING F.F.E.=833.20 PARKING DECK (BELOW) F.F.E.=833.10 F.F.E.=831.20 8 A B 7 6 5 4 3 2 1 C D E F G H 8 7 6 5 4 3 2 1 A B C D E F G H NO DATE DESCRIPTION REVISION RECORD 3 12/22/2017 RESUBMITTAL REVISIONS 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO: SHEET OF DRAWING NO.: 163-974 JANUARY 15, 2018 36 DILLON CONSTRUCTION GROUP MIDTOWN WEST BARRETT & STOKELY / MERCHANTS BANK 2ND STREET & 3RD AVENUE SW CARMEL, INDIANA P R O F E S S I O N A L E N G I N E E R I N D I A N A A A R O N C . H U R T PE10300058 STATE OF - N o R E G I S T E R E D * HAND SIGNATURE ON FILE 2 12/08/2017 RESUBMITTAL REVISIONS 1 11/10/17 ISSUED FOR CONSTRUCTION 4 01/15/2018 RESUBMITTAL REVISIONS NORTH C301 Ò NOTES: BENCHMARKS: PROPOSED GRADING AND DRAINAGE LEGEND: GENERAL GRADING NOTES: BEB ACH DRAFT 1"=20' GRADING PLAN 10 APPROVAL PENDING NOT FOR CONSTRUCTION 04/25/18 Nick Mishler