HomeMy WebLinkAboutC902-STORMWATER-POLLUTION-&-PREVENTION-DETAILS-Rev.28
A
B
7 6 5 4 3 2 1
C
D
E
F
G
H
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
NO DATE DESCRIPTION
REVISION RECORD
1 11/10/17 ISSUED FOR CONSTRUCTION
2 12/08/2017RESUBMITTAL REVISIONS
3 12/22/2017RESUBMITTAL REVISIONS
4 01/15/2018RESUBMITTAL REVISIONS
530 E. Ohio Street · Suite G - Indianapolis, IN 46204 5 01/22/2018BICYCLE STORAGE RESPONSE
317-655-7777 · 877-746-0749
www.cecinc.com
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:
SHEET OF
DRAWING NO.:
172-019
JANUARY 23, 2018
39
DILLON CONSTRUCTION GROUP
MIDTOWN WEST
BARRETT & STOKELY / MERCHANTS BANK
2ND STREET & 3RD AVENUE SW
CARMEL, INDIANA
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
I
N
D
I
A
N
A
A
A
R
O
N
C
.
H
U
R
T
PE10300058
STATE OF
-
N o
R
E
G
I
S
T
E
R
E
D
* HAND SIGNATURE ON FILE
6 01/23/2018RESUBMITTAL REVISIONS
(13) MATERIAL HANDLING AND SPILL PREVENTION
(4) POST CONSTRUCTION STORMWATER QUALITY (5) POST CONSTRUCTION MAINTENANCE GUIDELINES
(3) STORMWATER QUALITY IMPLEMENTATION
(1) POTENTIAL LANDUSE POLLUTANTS
EROSION CONTROL MAINTENANCE REQUIREMENTS
(2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION
DETAILS OF EACH STORMWATER QUALITY MEASURE
(10) LOCATION OF PROPOSED SOIL STOCKPILES
(12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTS
SWPPP FOR POST CONSTRUCTION- CITY OF CARMEL
(7) POTENTIAL CONSTRUCTION POLLUTANTS
(6) SOIL MAP
(8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURES
C. CONCENTRATED FLOW SEDIMENT CONTROL
B. SHEET FLOW SEDIMENT CONTROL
A. CONSTRUCTION ENTRANCE INFORMATION
(11-B) PERMANENT SURFACE STABILIZATION
(11-A) TEMPORARY SURFACE STABILIZATION
DESCRIPTION MEASURES:
D. INLET PROTECTION LOCATIONS AND SPECS.
E. RUNOFF CONTROL MEASURES
F. OUTLET PROTECTION SPECIFICATIONS
G. GRADE STABILIZATION MEASURES
H. STORMWATER QUALITY DETAILS
I. TEMPORARY SURFACE STABILIZATION
J. PERMANENT SURFACE STABILIZATION
(9) GENERAL CONSTRUCTION SEQUENCE
(3) ESTIMATED PEAK DISCHARGE
(2) RECEIVING WATERS
(1) HYDROLOGIC UNIT CODE
(5) LOCATION WHERE STORMWATER MAY BE DIRECTLY
DISCHARGED INTO GROUNDWATER
(4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER
DISCHARGE LEAVING THE SITE
STORMWATER POLLUTION &
PREVENTION NOTES
C902
38
JCB
GLR
DRAFT
NONE
05/01/18
Nick Mishler