Loading...
HomeMy WebLinkAboutEP101M-ELECTRICAL-POWER-FIRST-MEZZANINE-FLOOR-PLAN-Rev.2UNIT ALT. MEZZ FLOOR AT 12' OPEN TO FIRST FLOOR BELOW OPEN TO FIRST FLOOR BELOW OPEN TO FIRST FLOOR BELOW UP UP STAIR 1 S1 STAIR 2 S2 LOBBY 101M GARAGE 2ND LEVEL 115M EF-3 1LPB-1 EF-4 1LPB-3 EH-4 EH-5 EH-6 EH-7 EH-8 POWERED OVERHEAD DOOR POWERED OVERHEAD DOOR M.1 1LPA-18 #10 1RPA-32/34/36 1RPA-43/45/47 1RPA-49/51/53 1RPA-32/34/36 1RPA-32/34/36 1RPB-5 1RPB-5 1RPB-5 1RPB-5 1RPB-5 1LPB-2 1LPB-4 1RPB-13 (ACCESS CONTROL) 1RPB-13 (ACCESS CONTROL) SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN EP101M ELECTRICAL POWER FIRST FLOOR MEZZANINE PLAN N SCALE: ELECTRICAL POWER FIRST MEZZANINE FLOOR PLAN 1/8"=1' SHEET KEYNOTES 1. GENERAL NOTES A. REFER TO E000 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS. B. PANELBOARDS WITH AN "E" DESIGNATION SHALL BE BACKED BY STANDBY GENERATOR. C. CONNECT ALL RECEPTACLES ON THIS SHEET TO CIRCUIT INDICATED WITH 2#10 AND 1#10 GND. 05/01/18 Nick Mishler