HomeMy WebLinkAboutEP101M-ELECTRICAL-POWER-FIRST-MEZZANINE-FLOOR-PLAN-Rev.2UNIT
ALT.
MEZZ FLOOR
AT 12'
OPEN TO FIRST
FLOOR BELOW
OPEN TO FIRST
FLOOR BELOW
OPEN TO FIRST
FLOOR BELOW
UP
UP
STAIR 1
S1
STAIR 2
S2
LOBBY
101M
GARAGE 2ND LEVEL
115M
EF-3
1LPB-1
EF-4
1LPB-3
EH-4
EH-5
EH-6
EH-7
EH-8
POWERED
OVERHEAD
DOOR
POWERED
OVERHEAD
DOOR
M.1
1LPA-18
#10
1RPA-32/34/36
1RPA-43/45/47 1RPA-49/51/53
1RPA-32/34/36
1RPA-32/34/36
1RPB-5
1RPB-5
1RPB-5
1RPB-5 1RPB-5
1LPB-2
1LPB-4
1RPB-13
(ACCESS
CONTROL)
1RPB-13
(ACCESS
CONTROL)
SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT
17105
NOVEMBER 15, 2017
CONSTRUCTION SET
MERCHANTS
CORPORATE
CENTER
CARMEL, IN
EP101M
ELECTRICAL POWER
FIRST FLOOR
MEZZANINE PLAN
N
SCALE:
ELECTRICAL POWER FIRST MEZZANINE FLOOR PLAN
1/8"=1'
SHEET KEYNOTES
1.
GENERAL NOTES
A. REFER TO E000 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
B. PANELBOARDS WITH AN "E" DESIGNATION SHALL BE BACKED BY STANDBY GENERATOR.
C. CONNECT ALL RECEPTACLES ON THIS SHEET TO CIRCUIT INDICATED WITH 2#10 AND 1#10
GND.
05/01/18
Nick Mishler