Loading...
HomeMy WebLinkAboutEP102-ELECTRICAL-POWER-SECOND-FLOOR-PLAN-Rev.2UP UP 2.1 2RPA-4 2RPA-1 2RPA-1 2RPA-2 2RPA-2 2RPA-3 2RPA-3 2RPA-2 2RPA-2 2RPA-2 2RPA-3 2RPA-3 2RPA-3 2RPA-3 2RPA-7 EWC-1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.21 2.22 2.23 2.24 2.27 2.9 2.25 2.20 2.19 2.18 2.17 2.16 2.15 2.14 2.29 2.30 2.31 2.26 2.13 2.32 2.12 2.11 2.10 2.28 2RPA 2LPA 2RPB T 2RPA-1 BUS RISER 2ELP 2ERP T 15KVA TRANS. +8'-0" A.F.F. 2LPA 100A CB BUS TAP PANEL PLUG 480/277V 75KVA TRANS. +8'-0" A.F.F. 2RPA-4 2RPA-4 2RPA-4 2RPA-4 2RPA-4 2RPA-4 GFCI #10 2LPB-23 #10 2LPB-5 #10 2LPB-4 #10 2LPB-22 #10 2LPB-25 #10 2LPB-3 #10 2LPB-21 #10 2LPB-2 #10 2LPB-1 #10 2LPB-20 #10 2LPB-19 #10 2LPB-29 #10 2LPB-17 #10 2LPB-18 #10 2LPB-16 #10 2LPB-15 #10 2LPB-30 #10 2LPB-14 #10 2LPB-31 #10 2LPB-13 #10 2LPB-32 #10 2LPB-12 #10 2LPB-11 #10 2LPB-10 #10 2LPB-9 #10 2LPB-8 #10 2LPB-7 #10 2LPB-24 #10 2LPB-6 #10 2LPB-27 #10 2LPB-26 #10 2LPB-14 2RPA-5 2RPA-6 EWH-1 2LPB-33 2LPB-35 2ERP-2 2ERP-3 2ERP-4 2ERP-1 STAIR 1 S1 STAIR 2 S2 MEN 204 WOMEN 203 JAN 208 HALLWAY 209 LOBBY 202 IT 206 ELEC 207 SERVICE 205 2RPA-10 (ACCESS CONTROLS) 2RPA-10 (ACCESS CONTROLS) 2RPA-10 (ACCESS CONTROLS) 2RPA-8 (ACCESS CONTROLS) 2RPA-8 (ACCESS CONTROLS) SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN EP102 ELECTRICAL POWER SECOND FLOOR PLAN N SCALE: ELECTRICAL POWER SECOND FLOOR PLAN 1/8"=1' SHEET KEYNOTES 1. 20A, 120V-1PH, CONNECTION FOR AUTOMATIC FLUSH VALVES. 2. 20A, 120V-1PH, CONNECTION FOR AUTOMATIC SINKS. 3. PROVIDE (4) 4" CONDUIT SLEEVES BETWEEN FLOORS FOR TELECOMMUNICATIONS. 4. PROVIDE DISCONNECT AND POWER CIRCUIT TO VAV BOX. GENERAL NOTES A. REFER TO E000 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS. B. ELECTRICAL INSTALLATION SHALL CONFORM TO NFPA 70, INDIANA ELECTRIC CODE AND LOCAL CODES. WHERE THERE IS CONFLICT BETWEEN CODES, THE MOST STRINGENT SHALL APPLY. C. CONNECT ALL RECEPTACLES ON THIS SHEET TO CIRCUIT INDICATED WITH 2#10 AND 1#10 GND. I. EC SHALL COORDINATE EXACT LOCATION AND BOX REQUIREMENTS WITH FINAL "S" SERIES SECURITY DRAWINGS PRIOR TO ROUGH-IN. PROVIDE AND INSTALL ALL BOXES AND CONDUITS WITH PULL-STRING TO NECESSARY LOCATIONS. 1 2 3 4 TYP. 05/01/18 Nick Mishler