Loading...
HomeMy WebLinkAboutP-100-PLUMBING-FOUNDATION-PLAN-Rev.2AD-1 AD-1 AD-1 AD-1 CO. CO. SAN SAN SAN SAN SAN SAN SAN SAN ST ST ST ST 4" FIRE TEST 4" FIRE LINE 4" WATER SERVICE 6" FIRE SERVICE CO. CO. CO. CO. CO. 18" EXISTING STORM WATER LINE 6" STORM 6" 6" 6" 6" 4" 3" 4" 4" 6" 3" 3" 3" 3" 3" F.F.E. @ 833.20' F.F.E. @ 833.10' 4" STORM CO. INV. ELEV. @ 830.70' INV. ELEV. @ 828.00' INV. ELEV. @ 827.50' INV. ELEV. @ 830.70' INV. ELEV. @ 800.00' 2" CO. CO. 4" FD-2 2" 3" 4" 8" STORM CO. 2" 2" 2" 2" 2" 2" 2" 4" 4" FIRE PUMP TEST CONNECTION 4" FIRE LINE SHUT-OFF VA. TO FDC IN PIT PIV 6" 6" 4" 6" CO. 6" 6" 12" 12" 6" ST ST 6" 4" 6" 6" 6" 18" EXISTING STORM WATER LINE AD-1 AD-1 AD-1 AD-1 4" 18" EXISTING STORM WATER LINE 6" 6" 6" 6" 6" ST ST ST ST ST ST 4" 4" 4" 6" 6" 6" 6" 4" 1 5 7 2 17 17 17 17 4 4 6 5 9 9 10 10 10 10 11 9 12 13 14 15 9 9 9 9 5 8 G1 G2 1 2 3 4 5 6 7 8 8.6 9 16 17 SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN P-100 PLUMBING FOUNDATION PLAN N SCALE: PLUMBING FOUNDATION PLAN 1/8"=1' GENERAL NOTES A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS. COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS. C. INSTALL ALL PIPING AS HIGH AS POSSIBLE. D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY CODE. E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED. F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND NFPA13 AND NFPA 13R. G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE MARSHALL, ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF CONSTRUCTION. H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS, CEILING CLOUD SYSTEMS AND STRUCTURE. I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER SYSTEM. J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD. K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR SHUTOFF VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED AND DEFINED ON THE ARCHITECTURAL DRAWINGS. SHEET KEYNOTES 1. 4" STORM WATER LINE UP, SEE DRAWING P101 FOR CONTINUATION OF PIPING. 2. 6" ROOF CONDUCTOR UP. 3. 4" ST. LINE UP. 4. NOT USED. 5. 3" WASTE LINE UP TO MOP BASIN. 6. 2" WASTE LINE UP. 7. 8" ST. ROOF CONDUCTOR UP. 8. CONNECT 12" STORM LINE AND 6" STORM LINE TO EXISTING 18" STORM LINE AT THIS POINT. 9. 2" SANITARY WASTE LINE UP TO FLOOR DRAIN. 10. 3" SANITARY WASTE LINE UP TO FLOOR DRAIN. 11. 2" SANITARY WASTE LINE UP TO SINK, 12. 2" SANITARY WASTE LINE UP TO EWC. 13. 2" SANITARY WASTE LINE UP TO LAVATORIES. 14. 2" SANITARY WASTE LINE UP TO URINAL, 15. 2" PLUMBING VENT UP. 16. CONNECT 8" STORM LINE AND 4" STORM LINE TO EXISTING 18" STORM LINE AT THIS POINT. 17. 6" ST. LINE UP. 05/01/18 Nick Mishler