HomeMy WebLinkAboutP-101M-PLUMBING-FIRST-MEZZANINE-FLOOR-PLAN-Rev.2UNIT
ALT.
MEZZ FLOOR
AT 12'
OPEN TO FIRST
FLOOR BELOW
OPEN TO FIRST
FLOOR BELOW
OPEN TO FIRST
FLOOR BELOW
UP
UP
STAIR 1
S1
STAIR 2
S2
LOBBY
101M
GARAGE 2ND LEVEL
115M
AD-1 AD-1 AD-1 AD-1
2"
2"
2" 2"
2"
4"
4" 4"
CO.
WH-1
4"
ST
ST
ST
4"
AD-1
AD-1
AD-1
AD-1
AD-1
FIRE COMBINATION
STANDPIPE / RISER
1
10
7
6
3
8
9
3
5
4
12
14
14
12
12
14 14
13
G1 G2 1 2 3 4 5 6 7 8 8.6 9
11
14
14 14 14
SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT
17105
NOVEMBER 15, 2017
CONSTRUCTION SET
MERCHANTS
CORPORATE
CENTER
CARMEL, IN
P-101M
PLUMBING FIRST
FLOOR MEZZANINE
PLAN
N
SCALE:
PLUMBING FIRST MEZZANINE FLOOR PLAN
1/8"=1'
GENERAL NOTES
A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION
SYMBOLS AND ABBREVIATIONS.
B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES,
DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS.
COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS.
C. INSTALL ALL PIPING AS HIGH AS POSSIBLE.
D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND
ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25
OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY
CODE.
E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT
LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND
SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE
THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE
OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED.
F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER
SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND
NFPA13 AND NFPA 13R.
SHEET KEYNOTES
1. 6" ROOF CONDUCTOR, UP AND DOWN.
2. 3" STORM WATER LINE UP.
3. 4" SANITARY WASTE STACK.
4. 4" VENT STACK.
5. 2-1/2" COLD WATER RISER.
6. 3/4" COLD WATER LINE DOWN TO FIRST FLOOR LEVEL.
7. 3/4" COLD WATER LINE UP, SEE DRAWING P102 FOR CONTINUATION OF
PIPING.
8. 2" WASTE LINE DOWN FROM ABOVE.
9. 3" WASTE STACK SERVING MOP BASINS.
10. 8" ST. ROOF CONDUCTOR.
11. 3" STORM LINE DOWN.
12. 2" SANITARY WASTE PIPING UP TO FLOOR DRAIN.
13. 2" SANITARY WASTE PIPING UP.
14. 3" WASTE LINE UP TO WATER CLOSET.
GENERAL NOTES
G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND
APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE
MARSHALL, ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF
CONSTRUCTION.
H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL
SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN
CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS,
CEILING CLOUD SYSTEMS AND STRUCTURE.
I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS
ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER
SYSTEM.
J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR
ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD.
K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR
SHUTOFF VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED
AND DEFINED ON THE ARCHITECTURAL DRAWINGS.
05/01/18
Nick Mishler