Loading...
HomeMy WebLinkAboutP-103-PLUMBING-THIRD-FLOOR-PLAN-Rev.2UP UP story wall MAHC 1 MAHC 3 MAHC 2 MAHC 4 IT 8 IT 10 IT 9 IT 11 HR 1 HR 2 HR4 3 HR ACCT 1 ACCT 3 ACCT 2 ACCT 4 ACCT 5 ACCT 7 ACCT 6 ACCT 8 IT 1 IT 2 IT 3 IT 4 IT 5 IT 6 IT 7 IT 8 IT 12 IT 13 IT 14 IT 15 V V V V 1 2 3 4 5 6 7 8 9 A B C D E F C.5 8.6 GA.3 GA OFFICE 331 OFFICE 330 OFFICE 329 INTERVIEW 328 MEETING 327 CONFERENCE 325 OFFICE 322 OFFICE 321 AUDIT 320 MEETING 319 PATIO 318 OFFICE 332 IT OFFICE 333 OFFICE 334 OPEN OFFICE 335 COFFEE HUB 341 WAR ROOM 340 MARKETING 339 IT 338 STAIR 1 S1 OPEN OFFICE 342 OFFICE 343 OFFICE 344 OFFICE 345 OFFICE 346 OFFICE 347 OFFICE 348 CONFERENCE 352 TRAINING 353a TRAINING 353b TABLES 354 SOCIAL HUB 356 LOUNGE 315 STAIR 2 S2 LOUNGE 314 OPEN OFFICE 324 WAR ROOM 323 GATHER 326 MEN 304 WOMEN 303 JAN 308 HALLWAY 309 LOBBY 302 CORRIDOR 355 GATHER 317 LOCKER 4 313 LOCKER 3 312 LOCKER 2 311 LOCKER 1 310 RECEPTION 301 OPEN OFFICE 336 IT 306 ELEC 307 SERVICE 305 BREAKOUT 351 STAGING 337 OPEN OFFICE 349 WC-1 WC-1 WC-1 WC-2 FD-1 L-1 L-1 FD-1 FD-1 UR-1 UR-2 WC-2 L-1 L-1 EWC-1 MB-1 FD-1 FD-1 FD-1 FD-1 FD-1 SK-2 IB-1 L-1 L-1 EWH-2 WC-1 WC-2 L-1 L-1 WC-1 WC-1 FD-1 FD-1 P-1 ET-1 AD-1 FD-2 SK-1 IB-1 FD-1 FD-1 1-1/2"V. 3/4" HWR 3/4"CW 3/4"HW 2"CW 1"HW 2"CW 1"HW 1-1/2"V. 1/2"CW 1/2"HW 2"CW 3/4"HW 2"V. 2"V. 1-1/2"V. 2"V. 2-1/2"V. ST B.V. 3" 4"W SK-1 EWH-1 SH-1 SH-1 SH-1 SH-2 IB-1 IB-1 FD-2 IM-1 IB-1 1/2"HW 3/4"CW 3/4"CW 1-1/2"V. 1/2"CW 1/2"HW 3/4"CW 1/2"CW 1/2"CW 3/4"CW WD-1 2"V. 2-1/2"V. 3"V. 3"V. 2-1/2"V. 2"V. F FS-1 FLOOR CONTROL VALVE TS-1 FIRE COMBINATION STANDPIPE / RISER 4 3 2 5 3 8 6 9 x 12 1 11 10 11 SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN P-103 PLUMBING THIRD FLOOR PLAN N SCALE: PLUMBING THIRD FLOOR PLAN 1/8"=1' GENERAL NOTES A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS. COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS. C. INSTALL ALL PIPING AS HIGH AS POSSIBLE. D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY CODE. E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED. F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND NFPA13 AND NFPA 13R. G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE MARSHALL, ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF CONSTRUCTION. H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS, CEILING CLOUD SYSTEMS AND STRUCTURE. I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER SYSTEM. J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD. K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR SHUTOFF VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED AND DEFINED ON THE ARCHITECTURAL DRAWINGS. SHEET KEYNOTES 1. 6" ROOF CONDUCTOR, UP AND DOWN. 2. 3" STORM WATER LINE, UP AND DOWN. 3. 4" SANITARY WASTE STACK. 4. 4" VENT STACK. 5. 2-1/2" COLD WATER RISER. 6. 3/4" COLD WATER LINE DOWN. 7. 3/4" COLD WATER LINE UP, SEE DRAWING P102 FOR CONTINUATION OF PIPING. 8. 2" WASTE LINE DOWN. 9. 3" WASTE STACK SERVING MOP BASINS. 10. 8" ST. ROOF CONDUCTOR. 11. INSULATED ROOF CONDUCTOR PIPING. 12. HOT WATER RETURN BALANCING VALVE: SET FOR 1.5 GPM FLOW. 05/01/18 Nick Mishler