Loading...
HomeMy WebLinkAboutP-104-PLUMBING-FOURTH-FLOOR-PLAN-Rev.2UP UP 1 2 3 4 5 6 7 8 9 A B C D E F C.5 8.6 GA.3 GA OFFICE 441 OFFICE 440 OFFICE 439 OFFICE 438 MEETING 434 OFFICE 427 OFFICE 426 PATIO 422 OFFICE 442 OFFICE 443 OFFICE 444 OPEN OFFICE 448 OFFICE 445 OFFICE 452 STAIR 1 S1 OPEN OFFICE 457 OFFICE 462 OFFICE 464 OFFICE 465 PRINTING 460 OFFICE 461 MEETING 463 CONFERENCE 417 LOUNGE 415 STAIR 2 S2 OPEN OFFICE 431 WAR ROOM 432 MEN 404 WOMEN 403 JAN 408 HALLWAY 409 LOBBY 402 OPEN OFFICE 466 OFFICE 421 REST. 413 MOTHER'S ROOM 411 COFFEE HUB 410 LOBBY 401 IT 406 ELEC 407 SERVICE 405 OFFICE 458 OFFICE 455 OFFICE 430 OFFICE 429 REST. 414 OUTDOOR 424 MEETING 425 OFFICE 428 OFFICE 459 OFFICE 420 OFFICE 419 OFFICE 418 OFFICE 446 OFFICE 453 OFFICE 450 OFFICE 451 OFFICE 456 OPEN OFFICE 416 CORRIDOR 423 OFFICE 412 WAR ROOM 437 PRIVATE 435 PRIVATE 433 PHONE 460a PHONE 460b WC-1 WC-1 WC-1 WC-2 FD-1 L-1 L-1 FD-1 FD-1 UR-1 UR-2 WC-2 L-1 L-1 EWC-1 MB-1 L-1 FD-1 FD-1 3/4" HWR 2"CW 1"HW 2"CW 1"HW 2"CW 3/4"HW 2"V. 1-1/2"CW 3/4"HW 3/4"HWR 2-1/2"V. AD-1 ST B.V. 3" FD-1 4"W. SK-1 FD-2 2-1/2"V. SK-1 WC-1 IB-1 DW-1 IB-1 1/2"CW 1/2"HW 3/4" SK-1 IM-1 3/4"CW 1/2"HW 1/2"CW 2"CW 1"HW 1-1/2"V. 2"V. 2-1/2"V. 3"V. 2"V. 3"V. TS-1 FIRE COMBINATION STANDPIPE / RISER UP TO FIFTH FLOOR. F FS-1 FLOOR CONTROL VALVE TS-1 FIRE COMBINATION STANDPIPE / RISER 2 8 3 5 9 10 5 4 13 12 8 11 12 1 12 13 SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN P-104 PLUMBING FOURTH FLOOR PLAN N SCALE: PLUMBING FOURTH FLOOR PLAN 1/8"=1' GENERAL NOTES A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS. COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS. C. INSTALL ALL PIPING AS HIGH AS POSSIBLE. D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY CODE. E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED. F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND NFPA13 AND NFPA 13R. G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE MARSHALL, ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF CONSTRUCTION. H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS, CEILING CLOUD SYSTEMS AND STRUCTURE. I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER SYSTEM. J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD. K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR SHUTOFF VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED AND DEFINED ON THE ARCHITECTURAL DRAWINGS. SHEET KEYNOTES 1. 6" ROOF CONDUCTOR, UP AND DOWN. 2. 3" STORM WATER LINE, UP AND DOWN. 3. 4" SANITARY WASTE STACK. 4. 4" VENT STACK. 5. 2-1/2" COLD WATER RISER. 6. 3/4" COLD WATER LINE DOWN TO FIRST FLOOR LEVEL. 7. 3/4" COLD WATER LINE UP, SEE DRAWING P102 FOR CONTINUATION OF PIPING. 8. 2" SANITARY WASTE LINE DOWN. 9. 2-1/2" PLUMBING VENT UP FROM BELOW. 10. 3" WASTE STACK SERVING MOP BASINS. 11. 8" ST. ROOF CONDUCTOR. 12. INSULATE ROOF CONDUCTOR PIPING. 13. HOT WATER RETURN BALANCING VALVE: SET TO FLOW 1.0 GPM 05/01/18 Nick Mishler