HomeMy WebLinkAboutP-104-PLUMBING-FOURTH-FLOOR-PLAN-Rev.2UP
UP
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
C.5
8.6
GA.3
GA
OFFICE
441
OFFICE
440
OFFICE
439
OFFICE
438
MEETING
434
OFFICE
427
OFFICE
426
PATIO
422
OFFICE
442
OFFICE
443
OFFICE
444
OPEN OFFICE
448
OFFICE
445
OFFICE
452
STAIR 1
S1
OPEN OFFICE
457
OFFICE
462
OFFICE
464
OFFICE
465
PRINTING
460
OFFICE
461
MEETING
463
CONFERENCE
417
LOUNGE
415
STAIR 2
S2
OPEN OFFICE
431
WAR ROOM
432
MEN
404
WOMEN
403
JAN
408
HALLWAY
409
LOBBY
402
OPEN OFFICE
466
OFFICE
421
REST.
413
MOTHER'S
ROOM
411
COFFEE HUB
410
LOBBY
401
IT
406
ELEC
407
SERVICE
405
OFFICE
458
OFFICE
455
OFFICE
430
OFFICE
429
REST.
414
OUTDOOR
424
MEETING
425
OFFICE
428
OFFICE
459
OFFICE
420
OFFICE
419
OFFICE
418
OFFICE
446
OFFICE
453
OFFICE
450
OFFICE
451
OFFICE
456
OPEN OFFICE
416
CORRIDOR
423
OFFICE
412
WAR ROOM
437
PRIVATE
435
PRIVATE
433
PHONE
460a
PHONE
460b
WC-1 WC-1 WC-1
WC-2
FD-1
L-1
L-1
FD-1
FD-1
UR-1 UR-2
WC-2
L-1
L-1
EWC-1
MB-1
L-1
FD-1
FD-1
3/4" HWR
2"CW
1"HW
2"CW
1"HW
2"CW
3/4"HW
2"V.
1-1/2"CW
3/4"HW
3/4"HWR
2-1/2"V.
AD-1
ST
B.V.
3"
FD-1
4"W.
SK-1
FD-2
2-1/2"V.
SK-1
WC-1
IB-1
DW-1
IB-1
1/2"CW
1/2"HW
3/4"
SK-1
IM-1
3/4"CW
1/2"HW
1/2"CW
2"CW
1"HW
1-1/2"V.
2"V. 2-1/2"V. 3"V. 2"V.
3"V.
TS-1
FIRE COMBINATION
STANDPIPE / RISER UP
TO FIFTH FLOOR.
F
FS-1
FLOOR CONTROL VALVE
TS-1
FIRE COMBINATION
STANDPIPE / RISER
2
8
3
5
9
10
5
4
13
12
8
11
12
1
12
13
SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT
17105
NOVEMBER 15, 2017
CONSTRUCTION SET
MERCHANTS
CORPORATE
CENTER
CARMEL, IN
P-104
PLUMBING FOURTH
FLOOR PLAN
N
SCALE:
PLUMBING FOURTH FLOOR PLAN
1/8"=1'
GENERAL NOTES
A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION
SYMBOLS AND ABBREVIATIONS.
B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES,
DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS.
COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS.
C. INSTALL ALL PIPING AS HIGH AS POSSIBLE.
D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND
ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25
OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY
CODE.
E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT
LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND
SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE
THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE
OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED.
F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER
SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND
NFPA13 AND NFPA 13R.
G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND
APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE MARSHALL,
ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF
CONSTRUCTION.
H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL
SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN
CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS,
CEILING CLOUD SYSTEMS AND STRUCTURE.
I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS
ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER
SYSTEM.
J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR
ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD.
K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR SHUTOFF
VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED AND DEFINED
ON THE ARCHITECTURAL DRAWINGS.
SHEET KEYNOTES
1. 6" ROOF CONDUCTOR, UP AND DOWN.
2. 3" STORM WATER LINE, UP AND DOWN.
3. 4" SANITARY WASTE STACK.
4. 4" VENT STACK.
5. 2-1/2" COLD WATER RISER.
6. 3/4" COLD WATER LINE DOWN TO FIRST FLOOR LEVEL.
7. 3/4" COLD WATER LINE UP, SEE DRAWING P102 FOR CONTINUATION OF
PIPING.
8. 2" SANITARY WASTE LINE DOWN.
9. 2-1/2" PLUMBING VENT UP FROM BELOW.
10. 3" WASTE STACK SERVING MOP BASINS.
11. 8" ST. ROOF CONDUCTOR.
12. INSULATE ROOF CONDUCTOR PIPING.
13. HOT WATER RETURN BALANCING VALVE: SET TO FLOW 1.0 GPM
05/01/18
Nick Mishler