Loading...
HomeMy WebLinkAboutP-105-PLUMBING-FIFTH-FLOOR-PLAN-Rev.2DN DN 1 2 3 4 5 6 7 8 9 A B C D E F C.5 8.6 GA.3 GA OFFICE 542 OFFICE 541 OFFICE 540 OFFICE 539 MEETING 532 OFFICE 528 OFFICE 527 PATIO 524 OFFICE 543 OFFICE 544 OFFICE 545 OPEN OFFICE 546 COFFEE HUB 548 OFFICE 551 STAIR 1 S1 OPEN OFFICE 555 BOARD ROOM 519 LOUNGE 520 STAIR 2 S2 OPEN OFFICE 524 WAR ROOM 533 MEN 504 WOMEN 503 JAN 508 HALLWAY 509 LOBBY 502 CORRIDOR 515 REST. 522 MEETING 510 LOBBY 501 IT 506 ELEC 507 SERVICE 505 OFFICE 557 OFFICE 547 OFFICE 531 OFFICE 530 REST. 521 OUTDOOR 525 FILE STORAGE 526 OFFICE 529 OFFICE 558 OFFICE 552 OFFICE OFFICE 553 550 OFFICE 554 CORRIDOR 523 GATHER 513 WAR ROOM 537 PRIVATE 536 PRIVATE 535 PHONE 555a PHONE 555b PRINT 538 MEETING 561 OFFICE 559 OFFICE 560 PHONE 511 MOTHER'S ROOM 512 OFFICE 516 OFFICE 517 OFFICE 518 PHONE 514a PHONE 514b OPEN OFFICE 514 WC-1 WC-1 WC-1 WC-2 FD-1 L-1 L-1 FD-1 FD-1 UR-1 UR-2 WC-2 L-1 L-1 EWC-1 FD-2 L-1 FD-1 FD-1 3/4" HWR 2"CW 1"HW 2"CW 1"HW 2"V. 1-1/2"CW 3/4"HW 3/4"HWR MB-1 AD-1 VTR VTR B.V. SK-1 EWH-1 2"V. VTR 1-1/2"V. 3"V. 2-1/2"V. 2-1/2"V. 4"V. 1"CW SK-2 1-1/2" V. SK-1 L-1 WC-1 WC-1 3"V. 2"CW 3/4"HW 6" ST. 6" ST. 6" ST. 6" ST. 6" ST. 6" ST. IB-1 DW-1 6" ST. DOWN. 8" ST. DOWN. 3/4"CW 2"CW 2"CW 3/4"HW 3/4" 1/2" IB-1 1-1/2"CW 3/4"HW FS-1 FLOOR CONTROL VALVE TS-1 FIRE COMBINATION STANDPIPE / RISER 5 2 10 6 3 8 9 11 1 8 7 7 7 7 7 8 13 14 4 13 12 14 SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN P-105 PLUMBING FIFTH FLOOR PLAN N SCALE: PLUMBING FIFTH FLOOR PLAN 1/8"=1' GENERAL NOTES A. REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B. PROVIDE CEILING ACCESS PANELS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC... LOCATED ABOVE NON ACCESSIBLE CEILINGS. COORDINATE ALL ACCESS PANELS WITH THE ARCHITECTURAL DRAWINGS. C. INSTALL ALL PIPING AS HIGH AS POSSIBLE. D. ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND ADHESIVES ARE TO HAVE PLENUM RATING WITH A FLAME-SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 50 OR LESS AS REQUIRED BY CODE. E. COORDINATE ALL SANITARY PIPING SIZES, INVERT ELEVATIONS AND EXACT LOCATIONS WHERE PIPING EXITS THE BUILDING WITH THE CIVIL DRAWINGS AND SITE CONTRACTOR PRIOR TO THE START OF WORK. FAILURE TO COORDINATE THIS WORK AHEAD OF TIME WILL RESULT IN THE CONTRACTORS ACCEPTANCE OF ALL COSTS RELATED TO WORK THAT MUST BE REWORKED. F. FIRE PROTECTION CONTRACTOR SHALL DESIGN A COMPLETE SPRINKLER SYSTEM ACCORDING TO THE CRITERIA OUTLINED ON THE DRAWINGS AND NFPA13 AND NFPA 13R. G. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS AND APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE STATE FIRE MARSHALL, ALL AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF CONSTRUCTION. H. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH ALL SPRINKLER HEAD LOCATIONS. ALL HEADS TO BE LAID OUT NEATLY WITHIN CEILING SYSTEM AND BE COORDINATED WITH ALL BULKHEADS, CEILINGS, CEILING CLOUD SYSTEMS AND STRUCTURE. I. ALL PIPING, SIZES, ZONES, MAINS AND EQUIPMENT SHOWN ON THE DRAWINGS ARE FOR DESIGN INTENT ONLY. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR PROPER COVERAGE AND CAPACITY OF THE SPRINKLER SYSTEM. J. NO SPRINKLER PIPING IS TO ROUTED THROUGH ANY TECHNOLOGY OR ELECTRICAL ROOM. PROVIDE SIDEWALL SPRINKLER HEADS WITH GUARD. K. CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL CORRIDOR SHUTOFF VALVES WITH EXACT LOCATION OF ACCESS PANELS AS LOCATED AND DEFINED ON THE ARCHITECTURAL DRAWINGS. SHEET KEYNOTES 1. 6" INSULATED ROOF CONDUCTOR DOWN. 2. 8" INSULATED ROOF CONDUCTOR DOWN. 3. 4" SANITARY WASTE STACK. 4. 4" VENT STACK. 5. 2-1/2" COLD WATER RISER. 6. 3/4" COLD WATER LINE UP TO ROOF HYDRANT. 7. TYPICAL ROOF AND OVER-FLOW DRAINS. 8. SINK: 1/2" HOT WATER, 1/2" COLD WATER, 1-1/2" WASTE DOWN, 1-1/2" VENT UP. 9. 3/4" COLD WATER DOWN. 10. 2" WASTE LINE DOWN, 2" VENT UP. 11. 3" WASTE STACK SERVING MOP BASINS. 12. 2" HOT WATER RISER 13. 1" HOT WATER RETURN RISER. 14. HOT WATER RETURN BALANCING VALVE: SET TO FLOW 1.5 GPM 05/01/18 Nick Mishler