Loading...
HomeMy WebLinkAboutP-501-PLUMBING-DETAILS-Rev.2SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT 17105 NOVEMBER 15, 2017 CONSTRUCTION SET MERCHANTS CORPORATE CENTER CARMEL, IN P-501 PLUMBING DETAILS CARRIER PIPE WATER STOP AND ANCHOR COLLAR WALL WALL SLEEVE MECHANICAL INTERLOCKING RUBBER LINKS TYPE WALL PENETRATION SEAL SINK SHUT-OFF VALVE REDUCER GARBAGE DISPOSAL 5/8" DRAIN HOSE 1 1/2" VENT UP IN WALL 2" WASTE DOWN IN WALL DISHWASHER 1/2" HW CW SUPPLY HW SUPPLY COUNTERTOP INSTALL AS HIGH AS POSSIBLE UNDER THE COUNTERTOP P-TRAP PIPE SUPPORT NUT LOCKING NUT HANGER ROD HANGER ROD LOCKING NUT SUPPORT NUT CLEVIS HANGER 14 GAUGE ZINC COATED SHEET STEEL SADDLE AT LEAST 12" LONG PIPE INSULATION INSULATION BLOCKING NO SCALE NO SCALE 1 DISHWASHER/DISPOSAL DETAIL 4 PIPE HANGER DETAIL NO SCALE 2 WALL/FLOOR SLEEVE DETAIL SLOPE RISER PIPE SAME AS SEWER 18"x18"x4" THICK CONCRETE PAD ROUND FLANGED HOUSING W/ HEAVY DUTY CAST IRON CLEANOUT4251 COVER LIKE J.R. SMITH PLUG FINISH GRADE PAINT PIPING WITH MINIMUM ONE COAT OF ALKYD BASED RUST INHIBITED PRIMER AND TWO COATS OF ALKYD BASED GLOSS ENAMEL FLASHING BY ROOFING CONTRACTOR GRAVEL PIPE PENETRATION SEAL ROOF CONSTRUCTION - REFERENCE ARCHITECTURAL DRAWINGS. SUPPORT PIPE FROM BUILDING STRUCTURE 3/4" CW THERMOMETER 3/4" HW DOMESTIC WATER HEATER (DWH-1 & DWH-2) FLOOR 3"x2" HUB DRAIN (HD-1) DRAIN PAN TANK DRAIN ASME APPROVED TEMP. & PRESSURE RELIEF VALVE, TERMINATE RELIEF DRAIN LINE OVER FLOOR DRAIN. EXPANSION TANK (ET-1) HEAT TRAPS TRAP SHALL NOT BE INSTALLED BELOW FLOOR BUT SHALL BE ROUGHED IN NOT LESS THAN 6" AND NOT MORE THAN 18" ABOVE FLOOR. NO STANDPIPE RECEPTOR SHALL EXTEND MORE THAN 30" NOR LESS THEN 18" ABOVE ITS TRAP. 1 1/2" VENT 1/2"CW 1/2"HW SHUTOFF VALVE WITH THREADED HOSE CONNECTION. 2" WASTE P-TRAP WITH UNION CONNECTIONS FLOOR LINE CLOTHES WASHER RECESSED WALL BOX WITH FACE PLATE; EQUAL TO GUY GRAY SERIES RECESSED WALL BOXES. TYP. VENT STACK TYP. VENT STACK M M 4"CW TO BOOSTER PUMP BFP-1 BFP-2 WATER METER TYPICAL 4"CW FLOOR TYPICAL DRAIN FUNNEL WITH AIR GAP, TERMINATE DRAIN LINE OVER NEAREST FLOOR DRAIN SEE SPECIFICATION FOR PIPE SUPPORT REQUIREMENTS THRUST BLOCK INCOMING SERVICE GATE VALVE REDUCED PRESSURE ZONE TYPE BACKFLOW PREVENTER NOTE: 1. ENTIRE INSTALLATION SHALL BE IN ACCORDANCE UTILITY WITH COMPANY'S REQUIREMENTS. WATER FURNISHED METER BY LOCAL UTILITY, CONTRACTOR INSTALLED. MAX. MOUNTING HEIGHT OF 5'-0" ABOVE FLOOR PRESSURE GAUGE CONTROL PANEL AND VFD'S HYDROPNEUMATIC TANK AIR VENT TYPICAL PUMP TYPICAL FLEXIBLE CONNECTOR FLOOR CONCRETE HOUSEKEEPING PAD NORMALLY OPEN FULL LINE SIZE BY-PASS SHUT-OFF VALVE AND CHECK VALVE TYPICAL SHUT OFF VALVE TYPICAL CHECK VALVE CW TO BUILDING SERVICE CW FROM BFP'S, AND WATER METERS NOTE: REFER TO SCHEDULE AND SPECIFICATIONS FOR ACTUAL QUANTITY AND TYPE OF PUMPS. NO SCALE NO SCALE 7 PIPE THRU ROOF DETAIL 8 WATER HEATER PIPING DETAIL NO SCALE 6 EXTERIOR CLEANOUT DETAIL NO SCALE DOMESTIC WATER NO SCALE 11 SERVICE PIPING DETAIL DUPLEX DOMESTIC WATER 12 BOOSTER PUMP DETAIL NO SCALE CLOTHES WASHER BOX 10 PIPING DETAIL CONCRETE COLLAR 5 SCALE: NONE WATER SOFTENER PIPING DETAIL NORMALLY CLOSED FULL LINE SIZE BY PASS LINE 2" DOMESTIC (SOFT) COLD WATER 2" DOMESTIC (UNSOFTENED) COLD WATER CONTROL VALVE ROUTE BACKWASH DISCHARGE TO FLOOR DRAIN FLOOR DRAIN WATER SOFTENER BRINE TANK CONCRETE HOUSEKEEPING PAD FLOOR 9 SCALE: NONE VENT THRU ROOF DETAIL PENETRATION BOOT & FLASHING TO MEMBRANE ROOFING BY ROOFING CONTRACTOR BASED ON CARLISLE U-8-A. REFER TO MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION. PROVIDE STAINLESS STEEL CLAMPING BAND SURE SEAL WATER CUT-OFF MASTIC ROOK DECK - SEE ARCHITECTURAL DRAWINGS FOR CONSTRUCTION. OPENING IN DECK BY PLUMBING CONTRACTOR. SEE DRAWINGS FOR SIZE INCREASER AS REQUIRED PIPE SIZE PER DRAWINGS 12" 3 SCALE: NONE INSTANTANEOUS WATER HEATER PIPING DETAIL FAUCET LAVATORY HW SUPPLY WITH STOP THRU WALL TO SECOND LAVATORY HW SUPPLY INSTANTANEOUS ELECTRIC WATER HEATER FLOOR CW SUPPLY STOP P-TRAP 05/01/18 Nick Mishler