HomeMy WebLinkAboutP-501-PLUMBING-DETAILS-Rev.2SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT ARCHITECT
17105
NOVEMBER 15, 2017
CONSTRUCTION SET
MERCHANTS
CORPORATE
CENTER
CARMEL, IN
P-501
PLUMBING DETAILS
CARRIER
PIPE
WATER STOP
AND
ANCHOR
COLLAR
WALL
WALL
SLEEVE
MECHANICAL
INTERLOCKING
RUBBER
LINKS TYPE WALL
PENETRATION SEAL
SINK
SHUT-OFF VALVE
REDUCER
GARBAGE
DISPOSAL
5/8" DRAIN
HOSE
1 1/2" VENT
UP IN WALL
2" WASTE DOWN
IN WALL
DISHWASHER
1/2" HW
CW SUPPLY
HW SUPPLY
COUNTERTOP
INSTALL AS HIGH AS
POSSIBLE UNDER
THE COUNTERTOP
P-TRAP
PIPE
SUPPORT NUT
LOCKING NUT
HANGER ROD HANGER ROD
LOCKING NUT
SUPPORT NUT
CLEVIS HANGER
14 GAUGE ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG
PIPE
INSULATION
INSULATION
BLOCKING
NO SCALE
NO SCALE 1 DISHWASHER/DISPOSAL DETAIL
4 PIPE HANGER DETAIL NO SCALE
2 WALL/FLOOR SLEEVE DETAIL
SLOPE
RISER PIPE SAME AS
SEWER
18"x18"x4" THICK CONCRETE
PAD
ROUND FLANGED HOUSING
W/ HEAVY DUTY CAST IRON
CLEANOUT4251 COVER LIKE J.R. SMITH
PLUG
FINISH
GRADE
PAINT PIPING WITH MINIMUM ONE
COAT OF ALKYD BASED RUST
INHIBITED PRIMER AND TWO
COATS
OF ALKYD BASED GLOSS ENAMEL
FLASHING BY
ROOFING
CONTRACTOR
GRAVEL
PIPE PENETRATION
SEAL
ROOF CONSTRUCTION -
REFERENCE
ARCHITECTURAL DRAWINGS.
SUPPORT PIPE FROM BUILDING
STRUCTURE
3/4" CW
THERMOMETER 3/4" HW
DOMESTIC WATER HEATER
(DWH-1 & DWH-2)
FLOOR
3"x2" HUB
DRAIN (HD-1)
DRAIN PAN
TANK DRAIN
ASME APPROVED TEMP. &
PRESSURE RELIEF VALVE,
TERMINATE RELIEF DRAIN
LINE OVER FLOOR DRAIN.
EXPANSION TANK (ET-1)
HEAT TRAPS
TRAP SHALL NOT BE INSTALLED
BELOW FLOOR BUT SHALL
BE ROUGHED IN NOT LESS
THAN 6" AND NOT MORE
THAN 18" ABOVE FLOOR.
NO STANDPIPE RECEPTOR SHALL
EXTEND MORE THAN 30" NOR
LESS THEN 18" ABOVE ITS TRAP.
1 1/2" VENT
1/2"CW
1/2"HW
SHUTOFF VALVE WITH THREADED
HOSE CONNECTION.
2" WASTE
P-TRAP WITH UNION
CONNECTIONS
FLOOR LINE
CLOTHES WASHER RECESSED
WALL BOX WITH FACE PLATE;
EQUAL TO GUY GRAY SERIES
RECESSED WALL BOXES.
TYP. VENT STACK
TYP. VENT STACK
M
M
4"CW TO BOOSTER
PUMP
BFP-1
BFP-2
WATER
METER
TYPICAL
4"CW FLOOR
TYPICAL DRAIN FUNNEL
WITH
AIR GAP, TERMINATE DRAIN
LINE OVER NEAREST
FLOOR
DRAIN
SEE SPECIFICATION FOR
PIPE
SUPPORT REQUIREMENTS
THRUST
BLOCK
INCOMING
SERVICE
GATE
VALVE
REDUCED PRESSURE ZONE
TYPE BACKFLOW
PREVENTER
NOTE:
1. ENTIRE INSTALLATION SHALL BE IN ACCORDANCE
UTILITY WITH COMPANY'S REQUIREMENTS. WATER
FURNISHED METER BY LOCAL UTILITY, CONTRACTOR
INSTALLED.
MAX. MOUNTING
HEIGHT
OF 5'-0" ABOVE FLOOR
PRESSURE
GAUGE
CONTROL
PANEL
AND VFD'S
HYDROPNEUMATIC
TANK
AIR
VENT
TYPICAL
PUMP TYPICAL
FLEXIBLE
CONNECTOR
FLOOR
CONCRETE HOUSEKEEPING
PAD
NORMALLY OPEN
FULL
LINE SIZE BY-PASS
SHUT-OFF VALVE
AND CHECK
VALVE
TYPICAL SHUT OFF
VALVE
TYPICAL CHECK
VALVE
CW TO
BUILDING
SERVICE
CW FROM BFP'S,
AND
WATER METERS
NOTE: REFER TO SCHEDULE AND SPECIFICATIONS FOR ACTUAL QUANTITY AND TYPE OF
PUMPS.
NO SCALE
NO SCALE 7 PIPE THRU ROOF DETAIL
8 WATER HEATER PIPING DETAIL NO SCALE
6 EXTERIOR CLEANOUT DETAIL
NO SCALE
DOMESTIC WATER
NO SCALE 11 SERVICE PIPING DETAIL
DUPLEX DOMESTIC WATER
12 BOOSTER PUMP DETAIL NO SCALE
CLOTHES WASHER BOX
10 PIPING DETAIL
CONCRETE
COLLAR
5
SCALE: NONE
WATER SOFTENER PIPING
DETAIL
NORMALLY CLOSED
FULL LINE SIZE
BY PASS LINE
2" DOMESTIC (SOFT)
COLD WATER
2" DOMESTIC
(UNSOFTENED)
COLD WATER
CONTROL VALVE
ROUTE BACKWASH
DISCHARGE TO
FLOOR DRAIN
FLOOR DRAIN
WATER
SOFTENER
BRINE
TANK
CONCRETE
HOUSEKEEPING
PAD
FLOOR
9 SCALE: NONE
VENT THRU ROOF DETAIL
PENETRATION BOOT & FLASHING TO
MEMBRANE ROOFING BY ROOFING
CONTRACTOR BASED ON CARLISLE U-8-A.
REFER TO MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION.
PROVIDE STAINLESS STEEL
CLAMPING BAND
SURE SEAL WATER CUT-OFF MASTIC
ROOK DECK - SEE ARCHITECTURAL
DRAWINGS FOR CONSTRUCTION.
OPENING IN DECK BY PLUMBING
CONTRACTOR.
SEE DRAWINGS FOR SIZE
INCREASER AS REQUIRED
PIPE SIZE PER DRAWINGS
12"
3
SCALE: NONE
INSTANTANEOUS
WATER HEATER
PIPING DETAIL
FAUCET LAVATORY
HW SUPPLY WITH STOP
THRU WALL TO SECOND
LAVATORY
HW SUPPLY
INSTANTANEOUS
ELECTRIC
WATER HEATER
FLOOR
CW SUPPLY STOP
P-TRAP
05/01/18
Nick Mishler