Loading...
HomeMy WebLinkAboutS510-G-BEAM-SCHEDULE-&-DETAILS-Rev.21 1/2" CLR. 48 BAR DIAMETERS CONT. TOP BAR BOTT. BARS USE HORIZ. EXTENSION WHERE POSSIBLE, STD 90 HOOK WHEN NOT STANDARD 90° HOOK EXTEND 2 BOTT. BARS MIN. W/ 90° HOOK AT COL. 2" MAX. 6" MIN. NOTES: 1. IF ADDITIONAL TOP BARS ARE CALLED OUT, THE TOP BAR LENGTH SHALL EXTEND L/3 INTO THE SPAN. IF THE ADDITIONAL TOP BAR CALLOUT IS SCHEDULED AS "F", THE ADDITIONAL TOP BAR SHALL EXTEND TO THE CENTER OF THE BEAM PLUS Ld/2. 2. IF ADDITIONAL BOTTOM BARS ARE CALLED OUT, THE BOTTOM BAR LENGTH SHALL BE 2/3L, IF THE BOTTOM BAR IS SCHEDULED AS "F", THE ADDITIONAL BOTTOM BAR SHALL EXTEND THE FULL LENGTH OF THE BEAM PLUS A MINIMUM OF 6" INTO THE SUPPORT AT EACH END. 3. CAMBER IS DEFINED AS UPWARD MID SPAN DISPLACEMENT ADDED TO THE ELEVATION SET BY THE ARCHITECTURAL DRAWINGS. NOTE THAT WHERE DRAINAGE REQUIREMENTS DICTATE, THE RESULTING NET DISPLACEMENT IN THE BEAM MAY BE DOWNWARD. BEAM SHALL BE CAMBERED AS FOLLOWS: SPAN CAMBER 50'-0" AND GREATER 3/4" > 40'-0" BUT < 50'-0" 1/2" 40'-0" AND LESS NONE CAMBER ELEV. REF. ARCH. 4. AT GIRDER AND BEAM INTERSECTIONS THE BEAM'S BOTTOM REINF. SHALL BE LOCALLY OFFSET TO PASS GIRDER REINF. AND THE GIRDER TOP REINFORCEMENT WILL BE PLACED LOWER THAN THE BEAM TOP REINFORCEMENT, REF DETAIL. 5. MINIMUM BEAM LONGITUDINAL REINF. LAP SPLICES (BASED ON CLASS B LAP. BAR SPACING GREATER THAN THREE BAR DIA. & f'c=5 ksi) SHALL BE AS FOLLOWS: BAR SIZE #4 #5 #6 HARDROCK #7 #8 #9 #10 #11 TOP BOTT. 24" 19" 31" 24" 40" 31" 54" 42" 71" 55" 90" 70" 114" 88" 141" 108" LT. WT. CONC. TOP BOTT. 32" 24" 41" 31" 52" 40" 71" 54" 93" 71" 117" 90" 149" 114" 183" 141" 6. STRESSING: A = FIRST END ONLY B = SECOND END ONLY C = BOTH ENDS D = ONE-END ONLY, ALTERNATE STRESSING ENDS 7. SCHEDULED LEFT AND RIGHT END OF BEAM MEMBERS READ ON PLAN AS SHOWN BELOW. L R L L R R L R 8. ALL HOOKS SHOWN ARE STANDARD HOOKS (90° OR 180°). 9. Ld EQUALS TENSION DEVELOPMENT LENGTH. 10. SPLICES IN SCHEDULED BARS LESS THAN 60'-0" LENGTH ARE NOT PERMITTED. SPLICES IN SCHEDULED BARS MORE THAN 60'-0" LENGTH SHALL BE REFERRED TO ENGINEER FOR APPROVAL. SPAN "L" L/2 L/2 C.G.S. LEFT REF. NOTE 1 ADDNL. TOP BARS CONT. T&B BARS C.G.S. RIGHT REF. SCHEDULE FOR STIRRUP SPACING, TYP. 0' - 2" 0' - 2" L/6 MIN. BOTT. LAP, TYP. ADDNL. BOTT. BARS REF. NOTE 2 REF. NOTE 1 TYP. TOP LAP SPAN "L" L/2 L/2 REF. NOTE 1 ADDNL. TOP BARS CONT. T&B BARS REF. SCHEDULE FOR STIRRUP SPACING, TYP. 0' - 2" 0' - 2" L/6 MIN. BOTT. LAP, TYP. ADDNL. BOTT. BARS REF. NOTE 2 REF. NOTE 1 TYP. TOP LAP C.G.S. RIGHT ADDNL. TOP BARS (MAIN SPAN) RIGHT C.G.S. (CANTILEVER) LEFT C.G.S. CANTILEVER L LEFT C.G.S. TOP REBAR IN SLAB REF. PLAN REF. BEAM SCHED. H BANDED TENDON DISTRIBUTED TENDONS BEAM REINF. 3" MAX. 3" MAX. REF. SCHEDULE REF. PLAN PT SLAB HOOK COL. BARS AT TOP FLOOR ONLY 2/3H TOP REBAR IN SLAB REF. PLAN REF. BEAM SCHED. H BEAM TENDON DISTRIBUTED TENDONS 3" MAX. BEAM REINF. REF. SCHEDULE REF. PLAN PT SLAB HOOK COL. BARS AT TOP FLOOR ONLY 2/3H SCHED. DEPTH SCHED. WIDTH PLAN REF. #4 SUPPORT BAR @ 48" O.C. MAX. A SPANDREL BEAM DETAIL EQ EQ STRAIGHT PT TENDON SCHED. DEPTH SCHED. WIDTH PLAN REF. #4 SUPPORT BAR @ 48" O.C. MAX. SCHED. BOTT. REINF. CHAIR W/ #4 SUPPORT BARS PT TENDON SCHED. TOP RIENF. TO STIRRUPS MIN. 1 1/2" CLR. B TYPICAL BEAM SECTION SCHED. DEPTH SCHED. WIDTH PLAN REF. SUPPORT CHAIR CLR. 1 1 /2" CLR. 1 1 /2" CLR. 1 1/2" 1 2 3 5 4 6 7 9 8 10 1 2 3 5 4 6 7 8 TYP. 1 1/2" CLR. INDICATES NUMBER OF BOTT. ADDED REBAR PLACEMENT SEQUENCE INDICATES NUMBER OF TOP ADDED REBAR PLACEMENT SEQUENCE STIRRUPS, REF. BEAM SCHED. FOR SIZE AND SPACING SCHED. DEPTH SCHED. WIDTH PT TENDONS AT SUPPORT CONDITIONS STIRRUPS, REF. BEAM SCHED. FOR SIZE AND SPACING PLAN REF. SCHED. CONT. TOP BAR (2)-#4 CONT. SUPPORT CHAIR SCHED. CONT. BOTT. BAR PT TENDONS AT LOWPOINT CLR. 1 1 /2" CLR. 1 1 /2" CLR. 1 1/2" NOTES: 1. REF. POST-TENSION BEAM SCHEDULE FOR FORCES. 2. KEEP TENDON GROUPS UNIFORMLY SPACED THROUGHOUT THE LENGTH OF THE BEAM. SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT ARCHITECT MERCHANTS CORPORATE CENTER CARMEL, IN CLIENT # DESCRIPTION DATE NOVEMBER 10, 2017 17104 ISSUED FOR CONSTRUCTION 2017-11-10 S510-G BEAM SCHEDULE & DETAILS POST-TENSIONED BEAM SCHEDULE MARK W X D POST TENSIONING REINFORCING STEEL BEAM CAMBERS (REF. NOTE) REMARKS EFFECTIVE FORCE C.G.S. FROM BOTTOM OF BEAM CONT. TOP CONT. BOTT. ADD. TOP LEFT ADD. BOTT. CENTER ADD. TOP RIGHT STIRRUP SIZE NUMBER OF LEGS STIRRUP CONT. SPACING SKIN REINF. ADDED LEFT ADDED RIGHT LEFT CENTER RIGHT PTB-1 24X38 214K 23.5 10 34 2 #9 2 #9 2 #9 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-2 24X38 214K 34 4 34 2 #9 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-3 24X38 214K 34 4 34 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-4 24X38 214K 34 16 21 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-5 24X38 214K 21.75 10 34 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-6 24X38 214K 34 4 21.75 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-7 24X38 214K 21 12 21 2 #9 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-8 18X38 480K 26.25 4 26.25 2 #9 2 #10 2 #9 2 #9 #3 2/2/2 24@12"/ R@18"/ 24@12" #5 @ 6.25" MAX 2 PTB-9 18X38 267K 21.25 21.25 34 2 #9 2 #10 2 #9 #3 2/2/2 1@3"/R@18"/1@3" #5 @ 6.25" MAX 2 PTB-10 18X38 267K 34 4 26.5 2 #9 2 #10 2 #9 2 #9 #3 2/2/2 16@6"/ R@18"/ 16@6" #5 @ 6.25" MAX 2 PTB-11 18X38 267K 23.25 4 23.25 2 #9 2 #10 #3 2/2/2 8@12"/ R@18"/ 8@12" #5 @ 6.25" MAX 2 S510-G SCALE: NONE 1 BEAM REINFORCEMENT LAYOUT S510-G SCALE: 3/4" = 1'-0" 2 BEAM REINFORCEMENT LAYOUT S510-G SCALE: 3/4" = 1'-0" 3 BEAM REINFORCEMENT LAYOUT S510-G SCALE: 3/4" = 1'-0" 4 TYPICAL FRAME COLUMN/BEAM SECTION S510-G SCALE: 3/4" = 1'-0" 5 TYPICAL BEAM END COLUMN CONNECTION S510-G SCALE: 3/4" = 1'-0" 8 BEAM DETAILS S510-G SCALE: 3/4" = 1'-0" 6 PLACEMENT OF REINFORCEMENT IN POST-TENSION BEAMS S510-G SCALE: 3/4" = 1'-0" 7 PLACEMENT OF TENDONS IN BEAMS 05/01/18 Nick Mishler