HomeMy WebLinkAbout42200051 - JGC 185 - Truss DetailsDE
DANSCO ENGINEERING, LLC
P.O. Box 3400
Apollo Beach, FL 33572
Telephone (813) 645-0166
Facsimile (813) 645-9698
The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my
direct supervision based on the parameters provided by the truss designers.
Job: 1802043-12T
83 truss design(s)
57868-W1
4/11/18
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown
is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J01
TrussType
Jack-Open
Qty
13
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:532018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-We2gnQV9_T2GxWjXxK96Bg35ZFVtMOXJ_4vZbPzRrie
Scale=1:13.7
T1
B11
2
8
9
3
4
2x4
4-5-04-5-0
-0-10-120-10-12 4-5-04-5-0
0-4-12-2-21-9-112-2-25.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.220.19
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.05-0.05
-0.00
(loc)
4-74-7
3
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 12 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-5-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=95/Mechanical, 2=204/0-4-0(min. 0-1-8), 4=54/Mechanical
Max Horz2=87(LC 16)
Max Uplift3=-58(LC 16), 2=-74(LC 12), 4=-21(LC 13)MaxGrav3=111(LC 2), 2=233(LC 2), 4=79(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-4-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 58 lb uplift at joint 3, 74 lb uplift at joint 2
and 21 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J02
TrussType
Jack-Open
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:542018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_rc2?mWnlnA7ZfIjV1gLjtcJiftO5rnSDkf77rzRrid
Scale=1:9.4
T1
B11
2
3
4
2x4
2-3-152-3-15
-0-10-120-10-12 2-3-152-3-15
0-4-11-3-110-11-41-3-115.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MP
0.06
0.040.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.00
-0.00-0.00
(loc)7
73
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 7 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-3-15 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=45/Mechanical, 2=135/0-4-0(min. 0-1-8), 4=26/MechanicalMax Horz2=52(LC 16)
Max Uplift3=-26(LC 16), 2=-56(LC 12), 4=-11(LC 13)
MaxGrav3=52(LC 2), 2=155(LC 2), 4=39(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;
porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 26 lb uplift at joint 3, 56 lb uplift at joint 2and 11 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J03
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:552018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-S1AQC5XPW5I_Bptv2lBaG59Oe29LqI1cSOOggIzRric
Scale=1:14.4
T1
B11
2
8
9
3
10 4
3x4
6-1-76-1-7
-1-3-31-3-3 3-4-43-4-4 6-1-72-9-3
0-4-12-1-111-9-92-1-113.5412
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15NO
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MP
0.44
0.310.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.12
-0.140.00
(loc)4-7
4-72
l/defl>604
>519n/a
L/d240
180n/a
PLATESMT20
Weight: 16 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=142/Mechanical, 2=185/0-5-5(min. 0-1-8), 4=75/MechanicalMax Horz2=78(LC 38)
Max Uplift3=-91(LC 8), 2=-160(LC 10), 4=-27(LC 8)
MaxGrav3=167(LC 2), 2=214(LC 2), 4=112(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;
Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 91 lb uplift at joint 3, 160 lb uplift at joint2 and 27 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 18 lb down and 22 lb up at 3-4-9, and 18 lb down and 22 lb up at 3-4-9 on top chord, and 7 lb down and 24 lb up at 3-4-9, and 7 lb down and 24 lb up at 3-4-9
on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51Concentrated Loads(lb)
Vert: 10=-10(F=-5,B=-5)
Trapezoidal Loads(plf)Vert: 2=0(F=25,B=25)-to-3=-78(F=-13,B=-13), 5=0(F=10,B=10)-to-4=-31(F=-5,B=-5)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J04
TrussType
Jack-Open
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:552018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-S1AQC5XPW5I_Bptv2lBaG59SQ2CVqI1cSOOggIzRric
Scale:1"=1'
T1
B11
2
8
9
3
4
2x4
3-7-03-7-0
-0-10-120-10-12 3-7-03-7-0
0-4-11-9-151-5-91-9-155.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.130.11
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.02-0.02
-0.00
(loc)
4-74-7
3
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 10 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=76/Mechanical, 2=176/0-4-0(min. 0-1-8), 4=43/Mechanical
Max Horz2=73(LC 16)
Max Uplift3=-46(LC 16), 2=-66(LC 12), 4=-17(LC 13)MaxGrav3=88(LC 2), 2=201(LC 2), 4=63(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-6-4zone;cantileverleft exposed ;
endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; LumberDOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 46 lb uplift at joint 3, 66 lb uplift at joint 2
and 17 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J05
TrussType
Jack-Open
Qty
3
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:562018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-wDkpQRX1HOQrozS6cSippIhVeSUYZlHlh28ECkzRrib
Scale=1:24.4
W1
T1
B1
1
2
5
6
7
3
4
4x6
3x4
4-8-04-8-0
-0-10-120-10-12 4-8-04-8-0
2-4-14-3-63-10-154-3-65.0012
PlateOffsets(X,Y)-- [5:0-0-0,0-1-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MR
0.680.38
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.05-0.06
-0.16
(loc)
4-54-5
3
l/defl
>999>919
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 14 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)5=217/0-6-0(min. 0-1-8), 3=104/Mechanical, 4=48/Mechanical
Max Horz5=105(LC 13)Max Uplift5=-13(LC 16), 3=-88(LC 16)
MaxGrav5=248(LC 2), 3=122(LC 2), 4=86(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-7-4zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 13 lb uplift at joint 5 and 88 lb uplift atjoint 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J06
TrussType
Jack-Open
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:572018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OQIBdnYf2iYiQ71IAAE2LWEkEssKICXvvitnkAzRria
Scale=1:20.2
W1
T1
B1
1
2
5
6
3
4
3x4
3x4
2-6-152-6-15
-0-10-120-10-12 2-6-152-6-15
2-4-13-4-155.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.43
0.220.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.01
-0.01-0.06
(loc)4-5
4-53
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 9 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-15 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=148/0-6-0(min. 0-1-8), 3=49/Mechanical, 4=23/Mechanical
Max Horz5=81(LC 13)
Max Uplift5=-15(LC 12), 3=-53(LC 16), 4=-15(LC 13)MaxGrav5=171(LC 2), 3=58(LC 2), 4=45(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-6-3zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 15 lb uplift at joint 5, 53 lb uplift at joint 3
and 15 lb uplift at joint 4.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J07
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:582018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-scrZq7ZHo0gZ2HcUktlHujnt?G8t1fn28MdKGczRriZ
Scale=1:25.3
W1
T1
B1
1
2
5
6
3
7
4
3x4
2x4
6-5-116-5-11
-1-3-31-3-3 3-2-133-2-13 6-5-113-2-13
2-4-14-2-153-10-134-2-153.5412
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15NO
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MR
0.56
0.390.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.13
-0.18-0.20
(loc)4-5
4-53
l/defl>598
>409n/a
L/d240
180n/a
PLATESMT20
Weight: 19 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=204/0-8-2(min. 0-1-8), 3=162/Mechanical, 4=72/Mechanical
Max Horz5=90(LC 9)
Max Uplift5=-111(LC 10), 3=-122(LC 12), 4=-8(LC 9)MaxGrav5=235(LC 2), 3=191(LC 2), 4=125(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 111 lb uplift at joint 5, 122 lb uplift atjoint 3 and 8 lb uplift at joint 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 24 lb down and 49 lb up at
3-8-13, and 24 lb down and 49 lb up at 3-8-13 on top chord, and 10 lb down and 29 lb up at 3-8-13, and 10 lb down and 29 lb up at
3-8-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51
Concentrated Loads(lb)
Vert: 7=-1(F=-0,B=-0)Trapezoidal Loads(plf)
Vert: 2=-2(F=24,B=24)-to-3=-82(F=-16,B=-16), 5=0(F=10,B=10)-to-4=-32(F=-6,B=-6)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J08
TrussType
Jack-Open
Qty
7
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:582018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-scrZq7ZHo0gZ2HcUktlHujnyqGBq1fn28MdKGczRriZ
Scale=1:14.2
T1
B11
2
8
9
3
4
2x4
4-8-04-8-0
-0-10-120-10-12 4-8-04-8-0
0-4-12-3-61-10-152-3-65.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.250.20
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.03-0.06
0.00
(loc)
4-74-7
2
l/defl
>999>937
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 12 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=101/Mechanical, 2=213/0-6-0(min. 0-1-8), 4=57/Mechanical
Max Horz2=91(LC 16)
Max Uplift3=-62(LC 16), 2=-45(LC 16)MaxGrav3=118(LC 2), 2=243(LC 2), 4=84(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-7-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 62 lb uplift at joint 3 and 45 lb uplift at
joint 2.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J09
TrussType
Jack-Open
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:12:592018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-KoPx2TawZJpQfRBhHaGWQxJARgaQm60CN0Mup3zRriY
Scale=1:9.9
T1
B11
2
8
3
4
2x4
2-6-152-6-15
-0-10-120-10-12 2-6-152-6-15
0-4-11-4-155.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MP
0.06
0.050.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.00
-0.000.00
(loc)7
4-72
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 7 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-15 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=51/Mechanical, 2=143/0-6-0(min. 0-1-8), 4=30/MechanicalMax Horz2=56(LC 16)
Max Uplift3=-30(LC 16), 2=-37(LC 16)
MaxGrav3=59(LC 2), 2=164(LC 2), 4=44(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-6-3zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 30 lb uplift at joint 3 and 37 lb uplift atjoint 2.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
J10
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:002018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-p_zJFpbYKdxGHamtrInlz8sDx3rgVZGLbg6RLVzRriX
Scale=1:15.0
T1
B11
2
8
3
9 4
3x4
6-5-116-5-11
-1-3-31-3-3 3-6-63-6-6 6-5-112-11-5
0-4-12-2-151-10-132-2-153.5412
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15NO
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-MP
0.53
0.370.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.09
-0.180.00
(loc)4-7
4-72
l/defl>886
>419n/a
L/d240
180n/a
PLATESMT20
Weight: 17 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=160/Mechanical, 2=198/0-8-2(min. 0-1-8), 4=85/MechanicalMax Horz2=81(LC 8)
Max Uplift3=-93(LC 12), 2=-96(LC 10)
MaxGrav3=188(LC 2), 2=228(LC 2), 4=123(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 93 lb uplift at joint 3 and 96 lb uplift atjoint 2.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 21 lb down and 28 lb up at 3-8-13, and 21 lb down and 28 lb up at 3-8-13 on top chord, and 8 lb down and 5 lb up at 3-8-13, and 8 lb down and 5 lb up at
3-8-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51Concentrated Loads(lb)
Vert: 9=-12(F=-6,B=-6)
Trapezoidal Loads(plf)Vert: 2=0(F=25,B=25)-to-3=-82(F=-16,B=-16), 5=0(F=10,B=10)-to-4=-32(F=-6,B=-6)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB01GE
TrussType
Piggyback
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:012018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HBXiT9bA5x37vkK3P?I_WMPUiTFfE?NUqKr?txzRriW
Scale=1:17.4
0-1-150-1-15T1
T2
T1
B1
ST1
1
2
3 4 5
6
7
8
9 10
3x4 3x4
2x4 2x41.5x4
1.5x4
8-8-28-8-2
1-9-51-9-5 6-10-135-1-7 8-8-21-9-5
0-5-101-10-152-0-140-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [3:0-2-2,0-1-8], [5:0-2-2,0-1-8], [6:0-2-10,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.140.13
0.07
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
77
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 22 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=172/7-7-11(min. 0-1-8), 6=172/7-7-11(min. 0-1-8), 8=281/7-7-11(min. 0-1-8)
Max Horz2=48(LC 15)
Max Uplift2=-35(LC 16), 6=-35(LC 17), 8=-31(LC 13)MaxGrav2=228(LC 39), 6=228(LC 39), 8=422(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 4-8=-327/132
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 6-0-4,Interior(1) 6-0-4 to 6-10-13,Exterior(2) 6-10-13 to 8-5-11
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 35 lb uplift at joint 2, 35 lb uplift at joint 6and 31 lb uplift at joint 8.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB02
TrussType
Piggyback
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:022018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lN54gVcosEB_WuvFzjpD2Zxf9taszT9e3_bYPOzRriV
Scale=1:22.7
0-1-150-1-15T1
T2
T1
B1
ST1
1
2
3 4 5
6
7
8
9 10
3x4 3x4
2x4 2x41.5x4
1.5x4
8-8-28-8-2
3-2-73-2-7 5-5-102-3-3 8-8-23-2-7
0-5-103-6-153-8-140-1-100-5-100-1-103-5-514.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [3:0-2-2,0-1-8], [5:0-2-2,0-1-8], [6:0-2-10,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.160.13
0.04
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.01
0.00
(loc)
77
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 26 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=217/7-7-11(min. 0-1-8), 6=217/7-7-11(min. 0-1-8), 8=162/7-7-11(min. 0-1-8)
Max Horz2=93(LC 15)
Max Uplift2=-74(LC 16), 6=-77(LC 17)MaxGrav2=381(LC 39), 6=381(LC 39), 8=233(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-9=-324/143, 6-10=-324/144
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 74 lb uplift at joint 2 and 77 lb uplift at
joint 6.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB03
TrussType
Piggyback
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:032018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DZfSurdQdYJr82USWQKSbnUnOHxAiw8nIeK5yqzRriU
Scale=1:34.0
T1 T1
B1
ST1
1
2
3
4
5
6
7
8 9
10
4x4
2x4 2x4
1.5x4
8-8-28-8-2
4-4-14-4-1 8-8-24-4-1
0-5-105-0-120-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.320.12
0.06
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.010.02
0.00
(loc)
55
4
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 29 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=186/7-7-11(min. 0-1-8), 4=186/7-7-11(min. 0-1-8), 6=201/7-7-11(min. 0-1-8)
Max Horz2=-132(LC 14)
Max Uplift2=-64(LC 17), 4=-56(LC 17)MaxGrav2=214(LC 2), 4=214(LC 2), 6=233(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 3-2-7,Interior(1) 3-2-7 to 4-4-1,Exterior(2) 4-4-1 to 7-4-1zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 64 lb uplift at joint 2 and 56 lb uplift atjoint 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB04
TrussType
Piggyback
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:042018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hmDq5Ae2OsRimC3e48sh7_1?ehHNRN?xWI4fUGzRriT
Scale=1:34.0
T1 T1
B1
ST1
1
2
3
4
5
6
7
8 9
10
4x4
2x4 2x4
1.5x4
8-8-28-8-2
4-4-14-4-1 8-8-24-4-1
0-5-105-0-120-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.160.06
0.02
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.01
0.00
(loc)
55
4
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 57 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)2=186/7-7-11(min. 0-1-8), 4=186/7-7-11(min. 0-1-8), 6=201/7-7-11(min. 0-1-8)Max Horz2=132(LC 15)Max Uplift2=-64(LC 17), 4=-56(LC 17)
MaxGrav2=214(LC 2), 4=214(LC 2), 6=233(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply toplyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 3-2-7,Interior(1) 3-2-7 to 4-4-1,Exterior(2) 4-4-1 to 7-4-1zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.16) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 64 lb uplift at joint 2 and 56 lb uplift atjoint 4.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB05
TrussType
Piggyback
Qty
13
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:052018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9ynCIWeg99ZZOMeqerNwgCZAJ4c8Apd4lypC0izRriS
Scale=1:41.9
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
6 7
10 9 8
11
12
13 14
15
16
4x4
3x4 3x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
15-11-815-11-8
7-11-127-11-12 15-11-87-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-8], [6:0-2-1,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.170.09
0.12
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
67
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2 except 10=-204(LC 16), 8=-203(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9 except 10=383(LC 30), 8=382(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 3-10=-314/240, 5-8=-314/240
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)
10=204, 8=203.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB05GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:062018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-d8KbWsfJwThQ?VD1CZu9CP6LeUzyvGfD_cZlY9zRriR
Scale=1:40.2
T1 T1
B1
ST3
ST2
ST1
ST3
ST2
ST1
1
2
3
4
5
6
7
8
9
10
11
17 16 15 14 13 12
18 19
3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
15-11-815-11-8
7-11-127-11-12 15-11-87-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-0-0,0-0-0], [6:0-2-0,Edge], [7:0-0-0,0-0-0], [8:0-0-0,0-0-0], [9:0-0-0,0-0-0], [10:0-0-0,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.070.06
0.07
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
1011
10
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 64 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 15, 16, 14 except 17=-115(LC 16), 13=-101(LC 17),12=-114(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 2, 10, 15, 16, 17, 14, 13, 12
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 2-11-12,Interior(1) 2-11-12 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.15) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.7)Gablerequirescontinuous bottomchord bearing.
8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 15, 16, 14
except(jt=lb) 17=115, 13=101, 12=114.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB06
TrussType
Piggyback
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:072018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5LuzjCgxhnpHdfoDlGPOldeM2uE1ehLNCGIJ5bzRriQ
Scale=1:41.9
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
6 7
10 9 8
11
12
13 14
15
1617
4x4
4x4 4x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
15-11-815-11-8
7-11-127-11-12 15-11-87-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-0-4,Edge], [6:0-0-4,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.730.32
0.17
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.02
0.00
(loc)
77
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 6 except 10=-206(LC 16), 8=-296(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 9 except 6=278(LC 2), 10=393(LC 30), 8=830(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 5-16=-130/314, 16-17=-136/279
WEBS 3-10=-321/242, 5-8=-685/321
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6 except(jt=lb)
10=206, 8=296.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 532 lb down and 110 lb up at
13-1-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-4=-51, 4-7=-51, 2-6=-20
Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB06
TrussType
Piggyback
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:072018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5LuzjCgxhnpHdfoDlGPOldeM2uE1ehLNCGIJ5bzRriQ
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 17=-465
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB06GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:082018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-aXSLxYhZS4x8FpNPJzwdIqBhXIe7N9oWRw2sd1zRriP
Scale=1:40.2
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
1
2
3
4
5
6
7
8 9
14 13 12 11 10
15
16
17 18
19
20
4x4
3x4 3x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
15-11-815-11-8
7-11-127-11-12 15-11-87-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-0-0,0-0-0], [8:0-0-0,0-0-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.100.07
0.09
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
99
8
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 63 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 13, 11 except 14=-156(LC 16), 10=-156(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 8, 12, 13, 11 except 14=298(LC 30), 10=299(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
7)Gablerequirescontinuous bottomchord bearing.8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 13, 11 except(jt=lb) 14=156, 10=156.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB07
TrussType
Piggyback
Qty
11
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:092018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2j0j8uiBDO3?szycthRsq2ktxizl6dVgganQ9UzRriO
Scale=1:15.7
T1 T1
B11
2
3
4
5
3x4
2x4 2x4
5-5-15-5-1
2-8-92-8-9 5-5-12-8-9
0-4-132-3-20-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [4:0-2-1,0-1-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.060.18
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.00
(loc)
55
4
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 13 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-5-1 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=167/4-1-10(min. 0-1-8), 4=167/4-1-10(min. 0-1-8)
Max Horz2=-54(LC 14)
Max Uplift2=-29(LC 16), 4=-29(LC 17)MaxGrav2=190(LC 2), 4=190(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB08
TrussType
Piggyback
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:092018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2j0j8uiBDO3?szycthRsq2ks?iwb6dVgganQ9UzRriO
Scale=1:17.4
T1 T1
B11
2
3
4
5
6
7
8 9
10
11
3x4
2x4 2x4
10-4-310-4-3
5-2-25-2-2 10-4-35-2-2
0-4-12-1-140-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.120.38
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.010.01
0.00
(loc)
55
4
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 44 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)2=323/8-1-0(min. 0-1-8), 4=323/8-1-0(min. 0-1-8)
Max Horz2=-35(LC 17)Max Uplift2=-64(LC 16), 4=-64(LC 17)MaxGrav2=367(LC 2), 4=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-339/180, 6-7=-300/185, 7-8=-296/186, 3-8=-273/193, 3-9=-273/193,
9-10=-296/186, 10-11=-300/185, 4-11=-339/180BOT CHORD 2-4=-110/276
NOTES-1) 2-ply truss to be connected together as follows:
Topchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.Bottomchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-2-2,Exterior(2) 5-2-2 to 8-2-2zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.8)Gablerequirescontinuous bottomchord bearing.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB09
TrussType
Piggyback
Qty
5
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:102018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Wwa5MEip_iBsU7XoROy5NFG?o5Avr4lpvEXzhwzRriN
Scale=1:17.4
T1 T1
B11
2
3
4
5
6
7
8 9
10
11
3x4
2x4 2x4
10-4-310-4-3
5-2-25-2-2 10-4-35-2-2
0-4-12-1-140-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.250.76
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.010.03
0.00
(loc)
55
4
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 22 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=323/8-1-0(min. 0-1-8), 4=323/8-1-0(min. 0-1-8)
Max Horz2=-35(LC 17)
Max Uplift2=-64(LC 16), 4=-64(LC 17)MaxGrav2=367(LC 2), 4=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-6=-339/180, 6-7=-300/185, 7-8=-296/186, 3-8=-273/193, 3-9=-273/193,
9-10=-296/186, 10-11=-300/185, 4-11=-339/180BOT CHORD 2-4=-110/276
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-2-2,Exterior(2) 5-2-2 to 8-2-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB10
TrussType
Piggyback
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:112018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_68TZajRl?Jj6H5__6UKvTpBQVelaXDz7uGWEMzRriM
Scale=1:18.0
0-1-100-1-10T1
T2
T1
B1
ST1
1
2
3 4 5
6
7
8
9
10 11
12
3x4 3x4
2x4 2x41.5x4
1.5x4
10-4-310-4-3
4-6-94-6-9 5-9-101-3-1 10-4-34-6-9
0-4-11-10-120-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge], [5:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.190.14
0.05
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.010.02
0.00
(loc)
77
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 23 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=187/8-1-0(min. 0-1-8), 6=187/8-1-0(min. 0-1-8), 8=285/8-1-0(min. 0-1-8)
Max Horz2=-29(LC 21)
Max Uplift2=-63(LC 16), 6=-67(LC 17), 8=-1(LC 12)MaxGrav2=285(LC 39), 6=285(LC 39), 8=326(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 4-6-9,Exterior(2) 4-6-9 to 5-9-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
PB11
TrussType
Piggyback
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:122018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SIisnvk3VJRZjQgAYp?ZSgMHWvvAJ_E6MY04mpzRriL
Scale=1:18.0
0-1-100-1-10T1
T2
T1
B11
2
3 4
5
6
7 8
3x4 3x4
3x5 3x5
10-4-310-4-3
2-6-92-6-9 7-9-105-3-1 10-4-32-6-9
0-4-11-0-120-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-1-8], [3:0-1-12,0-0-15], [4:0-1-12,0-0-15], [5:0-3-0,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-R
0.490.45
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.02
0.01
(loc)
66
5
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 21 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-0-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=349/8-1-0(min. 0-1-8), 5=349/8-1-0(min. 0-1-8)
Max Horz2=-15(LC 21)
Max Uplift2=-75(LC 12), 5=-75(LC 13)MaxGrav2=367(LC 2), 5=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-945/333, 3-7=-912/312, 7-8=-912/312, 4-8=-912/312, 4-5=-945/333
BOT CHORD 2-5=-268/912
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 6-9-8,Interior(1) 6-9-8 to 7-9-10,Exterior(2) 7-9-10 to 9-11-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 5.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T01GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:132018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-wVFE_FliGdZQLaFN6XWo?uuXSJMX2PdFbBldIFzRriK
Scale=1:70.8
T2
T3
B1
W1 HW2
ST2
ST1
ST3
ST4 ST5
W2T1
2
3 4
5
6
7
8
9
10 11
17 16 15 14 13 12
1
184x6
4x6
1.5x4
3x4
4x4
1.5x4
2x4
3x4
2x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
-5-0-05-0-0 11-4-011-4-0
-5-0-05-0-0 5-2-05-2-0 11-4-06-2-0 11-11-120-7-12
0-8-77-8-64-10-60-6-114.0012
PlateOffsets(X,Y)-- [2:0-1-4,0-2-0], [6:Edge,0-1-14]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.160.06
0.18
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.00-0.00
-0.01
(loc)
1716-17
1
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 81 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3: 2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
OTHERS 2x4SPFStudWEDGERight: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 16-17.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 11-4-0 except(jt=length) 1=0-5-8.
(lb)-Max Horz17=324(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 17, 10, 15, 14 except 16=-329(LC 16), 13=-169(LC 17), 12=-140(LC 17), 1=-166(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 15, 16, 14, 13, 12, 1 except
17=445(LC 32), 10=272(LC 17)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 9-10=-394/325, 2-17=-430/143
BOT CHORD 16-17=-315/301, 15-16=-223/306, 14-15=-224/306, 13-14=-224/306, 12-13=-224/306,
10-12=-224/306WEBS2-16=-456/592
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-C Corner(3)-4-9-4 to -1-9-4,Exterior(2)-1-9-4 to 5-2-0, Corner(3) 5-2-0 to 8-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Gablestudsspaced at 2-0-0 oc.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 10, 15, 14except(jt=lb) 16=329, 13=169, 12=140, 1=166.10)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 1.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T01GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:132018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-wVFE_FliGdZQLaFN6XWo?uuXSJMX2PdFbBldIFzRriK
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T02GE
TrussType
PiggybackBase StructuralGableCOMMONllGablelGable
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:152018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-stN_PxmyoEq8auPlDyYG4J_kg6viWB_Y2VEkN7zRriI
Scale=1:69.1
T1
T2
T3
B1
W1
W2 W2
W7
W2 W2
W1
ST5
ST6
ST3
ST4ST2ST1
ST5
ST6
ST3
ST4 ST2 ST1
B1
W5
W5
W6
W3
W4
1
2
3
4 5 6 7 8
9
10
16 15 14 13 12 11
40
38
17
41
39
42
4950
51
52
53 54
55 56
8x8 5x6
3x8
3x6 3x4
3x4
2x4 2x4 8x8
2x42x42x4
2x4
2x4 2x4
2x4
2x48x8
5x6
3-8-85-0-08-11-15
8-11-15
10-4-0
1-4-1
11-4-0
1-0-0
13-4-0
2-0-0
15-4-0
2-0-0
17-8-1
2-4-1
26-8-0
8-11-15
-0-7-120-7-12 4-7-34-7-3 8-11-154-4-12 11-4-02-4-1 13-4-02-0-0 15-4-02-0-0 17-8-12-4-1 22-0-134-4-12 26-8-04-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-1-15], [4:0-5-0,0-1-12], [8:0-2-11,Edge], [10:0-8-0,0-2-3], [11:0-3-8,0-4-8], [13:0-4-0,0-4-8], [15:0-3-0,0-2-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.750.59
0.64
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.17-0.35
0.04
(loc)
1212
10
l/defl
>999>553
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 248 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPF No.2 *Except*W1,W7,W5,W6: 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-10-11 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-16, 4-15, 5-15JOINTS1Brace at Jt(s): 17, 38, 39, 40, 41, 42
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=2001/0-6-0(min. 0-2-2), 2=1717/0-6-0(min. 0-1-13), 15=-111/0-6-0(min. 0-1-8)Max Horz2=301(LC 13)
Max Uplift10=-372(LC 17), 2=-314(LC 17), 15=-511(LC 49)MaxGrav10=2533(LC 39), 2=2212(LC 39), 15=252(LC 12)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-49=-2660/440, 49-50=-2544/454, 3-50=-2397/474, 3-51=-2414/498, 4-51=-2213/535,
4-5=-1664/452, 5-6=-1742/466, 6-7=-1742/466, 7-8=-1712/461, 8-52=-2620/600,
9-52=-2813/563, 9-53=-2798/527, 53-54=-2935/507, 10-54=-3061/493BOT CHORD 2-16=-226/1655, 15-16=-137/1427, 14-15=-159/1697, 13-14=-160/1703, 13-55=-160/1703,
12-55=-160/1703, 11-12=-161/1712, 11-56=-234/1910, 10-56=-234/1910WEBS3-16=-368/268, 4-16=-310/205, 14-40=-97/527, 38-40=-105/559, 5-38=-121/610,8-11=-325/1619, 9-11=-357/267, 4-15=-564/1821, 5-15=-1122/254
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-7-12 to 2-4-4,Interior(1) 2-4-4 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,
Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)10=372, 2=314, 15=511.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T02GE
TrussType
PiggybackBase StructuralGableCOMMONllGablelGable
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:152018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-stN_PxmyoEq8auPlDyYG4J_kg6viWB_Y2VEkN7zRriI
NOTES-
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-4=-51, 4-8=-61, 8-10=-51, 46-55=-20, 43-56=-20
Trapezoidal Loads(plf)Vert: 55=-500(F=-480)-to-56=-20
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T03
TrussType
PiggybackBase
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:162018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-L3xMcHnaZYy?C2_ynf3VcWW_?WG9Fi4iH9_HvazRriH
Scale:3/16"=1'
T1
T2
T3
B1
W1
W2
W3 W3
W2
W1
B1 HW1HW11
2
3
4 5 6
7
8
11 10 9
18
19
20
21 22 23
24
25
4x4 4x4
4x6
4x6
3x43x8
1.5x4
3x4
3x8
1.5x4
8-11-158-11-15 17-8-18-8-2 26-8-08-11-15
-0-7-120-7-12 4-7-34-7-3 8-11-154-4-12 13-4-04-4-1 17-8-14-4-1 22-0-134-4-12 26-8-04-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-0-7], [8:0-6-0,0-0-7]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.390.58
0.39
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.13-0.34
0.04
(loc)
9-149-14
8
l/defl
>999>938
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 139 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W1: 2x4SPFStud
WEDGELeft: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-13 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-11, 5-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)8=987/0-6-0(min. 0-2-0), 2=1020/0-6-0(min. 0-2-1)Max Horz2=301(LC 13)
Max Uplift8=-84(LC 17), 2=-99(LC 16)
MaxGrav8=1282(LC 39), 2=1315(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-18=-1481/208, 18-19=-1376/222, 3-19=-1214/243, 3-20=-1234/281, 4-20=-1027/318,4-21=-669/275, 5-21=-669/275, 5-22=-670/276, 6-22=-670/276, 6-23=-1027/320,
7-23=-1235/283, 7-24=-1214/245, 24-25=-1377/224, 8-25=-1482/210BOT CHORD 2-11=-225/895, 10-11=-125/771, 9-10=-125/771, 8-9=-55/896
WEBS 3-11=-386/276, 4-11=-123/520, 5-11=-289/190, 5-9=-288/189, 6-9=-123/520,
7-9=-387/277
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-7-12 to 2-4-4,Interior(1) 2-4-4 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 2.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T04
TrussType
PiggybackBase
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:172018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pGVlqdoCKr4sqCZ8LMbk9k39kwbO_9KrWpjrR0zRriG
Scale=1:63.3
T1
T2
T1
B1
W1
W2
W3 W3
W2
W1
B1HW1 HW1
1
2
3 4 5
6
7
10 9 8
17
18
19
20 21
22
23
24
4x6
4x4 4x4
4x63x43x8
1.5x4
3x4
3x8
1.5x4
8-11-158-11-15 17-8-18-8-2 26-8-08-11-15
4-7-34-7-3 8-11-154-4-12 13-4-04-4-1 17-8-14-4-1 22-0-134-4-12 26-8-04-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [1:0-6-0,0-0-7], [7:0-6-0,0-0-7]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.390.58
0.39
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.13-0.34
0.04
(loc)
10-1310-13
7
l/defl
>999>938
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 138 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W1: 2x4SPFStud
WEDGELeft: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-13 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-10, 4-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=987/0-6-0(min. 0-2-0), 7=987/0-6-0(min. 0-2-0)Max Horz1=-289(LC 14)
Max Uplift1=-84(LC 16), 7=-84(LC 17)
MaxGrav1=1282(LC 38), 7=1282(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-1482/210, 17-18=-1378/224, 2-18=-1215/245, 2-19=-1235/283, 3-19=-1028/321,3-20=-670/276, 4-20=-670/276, 4-21=-670/276, 5-21=-670/276, 5-22=-1028/321,
6-22=-1235/283, 6-23=-1215/245, 23-24=-1378/224, 7-24=-1482/210BOT CHORD 1-10=-226/896, 9-10=-126/771, 8-9=-126/771, 7-8=-55/896
WEBS 2-10=-387/277, 3-10=-124/520, 4-10=-289/190, 4-8=-289/189, 5-8=-124/520,
6-8=-387/277
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 7.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T05
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:192018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-ledVFJpSsTKa3VjXSndCE98S?kJBS2X8z7CxWvzRriE
Scale=1:65.7
T1
T2
T1
B1
W1 W2
W3 W4 W3 W4 W3
W2 W1
B1
HW1
HW1
1
2
3
4 5 6
7
8
9
14 13 12 11 10
23
24 25
26
27 28 29 30 3132 33 34 35 36 3738
4x4
6x6
8x12MT18H 8x12MT18H
4x4
6x6
3x4
3x6 8x8 8x8
1.5x4
8x8
3x4
3x6
4-5-104-5-10 8-11-154-6-5 13-4-04-4-1 17-8-14-4-1 22-2-64-6-5 26-8-04-5-10
4-5-104-5-10 8-11-154-6-5 13-4-04-4-1 17-8-14-4-1 22-2-64-6-5 26-8-04-5-10
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [1:0-2-1,0-2-7], [1:0-2-9,0-4-0], [3:0-0-12,0-1-8], [4:0-2-11,Edge], [6:0-2-11,Edge], [7:0-0-12,0-1-8], [9:0-2-1,0-2-7], [9:0-2-9,0-4-0], [10:0-4-0,0-1-8],[11:0-3-8,0-4-8], [12:0-4-0,0-4-8], [13:0-3-8,0-4-8], [14:0-4-0,0-1-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.60
0.430.48
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.13
-0.240.06
(loc)10-11
10-119
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 393 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T2: 2x4SPF No.2BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPF No.2 *Except*W1,W2: 2x4SPFStudSLIDERLeft 2x6SPF No.2 1-6-0, Right 2x6SPF No.2 1-6-0
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-9-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)1=8457/0-6-0(min. 0-3-10), 9=7652/0-6-0(min. 0-3-5)
Max Horz1=-281(LC 10)
Max Uplift1=-1454(LC 12), 9=-1309(LC 13)MaxGrav1=8762(LC 34), 9=7957(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-7013/1117, 2-3=-8915/1501, 3-23=-7281/1295, 4-23=-7104/1333, 4-24=-5215/1014,
5-24=-5215/1014, 5-25=-5215/1014, 6-25=-5215/1014, 6-26=-7111/1334,7-26=-7287/1297, 7-8=-8907/1501, 8-9=-6966/1109
BOT CHORD 1-27=-1105/5701, 1-28=-1105/5701, 14-28=-1105/5701, 14-29=-1105/5701,
29-30=-1105/5701, 13-30=-1105/5701, 13-31=-877/4635, 31-32=-877/4635,12-32=-877/4635, 12-33=-795/4640, 33-34=-795/4640, 11-34=-795/4640,
11-35=-891/5693, 35-36=-891/5693, 10-36=-891/5693, 10-37=-891/5693,
37-38=-891/5693, 9-38=-891/5693
WEBS 3-14=-368/2106, 3-13=-1686/503, 4-13=-768/3865, 4-12=-380/1535, 5-12=-501/153,
6-12=-378/1523, 6-11=-771/3880, 7-11=-1667/500, 7-10=-365/2084
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-5-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.7)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T05
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:192018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-ledVFJpSsTKa3VjXSndCE98S?kJBS2X8z7CxWvzRriE
NOTES-
8)All plates areMT20 plates unless otherwiseindicated.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 1=1454, 9=1309.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1094 lb down and 205 lb up at 0-7-4, 1090 lb down and 209 lb up at 2-7-4, 1090 lb down and 209 lb up at 4-7-4, 1090 lb down and 209 lb up at 6-7-4, 1090 lb down and 209 lb up at 8-7-4, 1090 lb down and 209 lb up at 10-7-4, 1090 lbdown and 209 lb up at 12-7-4, 1090 lb down and 209 lb up at 14-7-4, 1090 lb down and 209 lb up at 16-7-4, 1090 lb down and 209 lb up at 18-7-4, 1090 lb down and
209lb up at 20-7-4, and 1090 lb down and 209 lb up at 22-7-4, and 1090 lb down and 209 lb up at 24-7-4 on bottomchord.The design/selection of suchconnectiondevice(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-4=-51, 4-6=-61, 6-9=-51, 15-19=-20
Concentrated Loads(lb)
Vert: 14=-1090(B) 27=-1094(B) 28=-1090(B) 29=-1090(B) 30=-1090(B) 31=-1090(B) 32=-1090(B) 33=-1090(B) 34=-1090(B) 35=-1090(B) 36=-1090(B)37=-1090(B) 38=-1090(B)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T06
TrussType
PiggybackBase
Qty
13
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:202018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DrBtSfq5dmSRhfHj0V8RnMhX07etBUoHCnyV2LzRriD
Scale=1:64.7
T1
T2
W3
B1
W3 W4 W3 W4
W1
W2
B2
1
2 3 4
9 8 7 6 5
10 11 12
8x8
2x41.5x4 3x43x4
1.5x4
3x10
4x4
3x4
3-5-83-5-8 11-5-47-11-12 19-5-07-11-12
3-5-83-5-8 11-5-47-11-12 19-5-07-11-12
8-5-1311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [2:0-4-12,0-1-12], [6:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.970.46
0.54
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.10-0.25
0.00
(loc)
5-65-6
5
l/defl
>999>932
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 132 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 4-5, 2-8, 3-6, 1-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)5=770/Mechanical, 9=742/Mechanical
Max Horz9=114(LC 16)Max Uplift5=-189(LC 13), 9=-74(LC 13)
MaxGrav5=1110(LC 34), 9=921(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-10=-366/79, 2-10=-303/81, 2-11=-531/98, 3-11=-531/98, 3-12=-531/98, 4-12=-531/98, 4-5=-1041/226, 1-9=-906/90
BOT CHORD 7-8=-111/273, 6-7=-111/273
WEBS 2-8=-545/138, 2-6=-88/440, 3-6=-917/271, 4-6=-167/897, 1-8=-69/728
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 7-8-7zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9 except(jt=lb)
5=189.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T06GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:222018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9DIetKsL9Oi9wzR58wAvsnm48xR2fVtaf5Rc7DzRriB
Scale=1:65.6
W1
T1
T2
W3
B1
ST2ST2ST2ST2ST2ST2ST2ST2ST1
B2
W2
1
2
3 4 5 6 7 8 9 10 1112
24 23 222120 19 18 17 16 15 1413
3x4
3x4
3x43x4
19-5-019-5-0
3-5-83-5-8 19-5-015-11-8
8-5-1311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [3:0-2-0,0-1-13]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.100.03
0.12
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
-0.00
(loc)
--
13
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 187 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2OTHERS2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 1-24, 12-13, 11-14, 10-15, 9-16, 8-17, 7-18
, 6-19, 5-20, 4-22, 2-23, 1-23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 19-5-0.
(lb)-Max Horz24=114(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 13, 14, 15, 16, 17, 18, 19, 20, 22 except 24=-122(LC 14), 23=-512(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 13, 14, 15, 16, 17, 18, 19, 20, 22 except 24=467(LC 16), 23=376(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-24=-454/329
WEBS 1-23=-341/432
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 3-5-8, Corner(3) 3-5-8 to 6-4-12zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.5) Unbalancedsnowloads have been considered for this design.
6)Provide adequate drainage to preventwater ponding.7)All plates are 1.5x4MT20 unless otherwiseindicated.8)Gablerequirescontinuous bottomchord bearing.
9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).10)Gablestudsspaced at 2-0-0 oc.
11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 13, 14, 15, 16,17, 18, 19, 20, 22 except(jt=lb) 24=122, 23=512.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T07
TrussType
PiggybackBase
Qty
3
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:242018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6cQOI0tbh?yt9GbUFLDNxCsDwl0y7COt7PwiB6zRri9
Scale=1:74.8
T1
T2
T3
B1
B2
B3
B2
B4
W3
W5
W4 W6 W7 W6
W9
W8
W3W10 W3
W11
W12
W1
W2
W14
W13
1
2 3 4 5 6 7
8
9
10
21 20 19
18 17 16
15 14 13 12 11
22 23 24
25
26
27
28 29
4x8 4x4
3x4 1.5x4
3x4 3x4
1.5x4 3x43x8
5x8
3x8
1.5x4
5x6
5x8
3x10
3x8
3x4
3x4
4x4
6x8
3-5-83-5-8 6-6-03-0-8 10-10-04-4-0 15-2-04-4-0 16-9-01-7-0 19-5-02-8-0 24-8-55-3-6 29-4-04-7-11
3-5-83-5-8 6-6-03-0-8 10-10-04-4-0 15-2-04-4-0 16-9-01-7-0 19-5-02-8-0 24-8-55-3-6 29-4-04-7-11 30-2-120-10-12
8-5-1311-4-63-1-31-0-011-4-610.0012
PlateOffsets(X,Y)-- [1:0-0-12,0-1-8], [2:0-6-4,0-2-0], [7:0-2-0,0-1-13], [8:0-1-8,0-1-8], [9:0-3-8,Edge], [14:0-3-0,0-3-0], [16:0-5-8,0-4-8], [18:0-5-8,0-4-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.910.39
0.95
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.06-0.09
0.06
(loc)
12-1316-17
11
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 255 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W5,W9,W12,W13: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:9-6-11 oc bracing: 20-21
6-0-0 oc bracing: 19-20,15-16.1 Row at midpt 3-18, 5-16WEBS1 Row at midpt 2-20, 4-17, 7-13, 8-13, 1-21
2 Rows at 1/3 pts 6-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)21=669/Mechanical, 11=1161/0-4-0(min. 0-1-8), 14=1717/0-6-0(min. 0-3-4)
Max Horz21=-413(LC 12)Max Uplift21=-110(LC 12), 11=-374(LC 12), 14=-507(LC 12)
MaxGrav21=801(LC 38), 11=1465(LC 39), 14=2072(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-22=-363/256, 2-22=-320/258, 2-3=-381/241, 3-23=-406/248, 4-23=-406/248,4-5=-406/248, 6-7=-277/299, 7-25=-286/314, 25-26=-497/337, 8-26=-527/341,8-27=-653/400, 27-28=-715/413, 28-29=-1071/637, 9-29=-1115/635, 1-21=-771/221,
9-11=-1422/821BOT CHORD 20-21=-367/371, 3-18=-432/226, 17-18=-223/441, 5-16=-863/236, 12-13=-278/549
WEBS 2-20=-535/121, 18-20=-221/345, 2-18=-97/586, 4-17=-468/137, 5-17=-139/578,14-16=-257/270, 6-16=-231/789, 6-14=-1831/718, 6-13=-421/617, 8-13=-555/438,1-20=-173/580, 9-12=-223/529
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-7-15,
Interior(1) 23-7-15 to 30-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed;C-Cformembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T07
TrussType
PiggybackBase
Qty
3
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:242018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6cQOI0tbh?yt9GbUFLDNxCsDwl0y7COt7PwiB6zRri9
NOTES-
9)Bearing at joint(s) 11 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverifycapacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 21=110, 11=374, 14=507.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 557 lb down and 342 lb up at 28-2-0, and 557 lb down and 342 lb up
at 16-6-8 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51, 2-24=-61, 9-28=-51, 9-10=-51, 19-21=-20, 16-18=-20, 11-15=-20Concentrated Loads(lb)Vert: 24=-465 28=-465
Trapezoidal Loads(plf)Vert: 24=-60-to-7=-76, 7=-66-to-28=-111
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:252018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-ao_mVMuDSJ4jnQAgp2kcUQOOn8OHse60L3fGjYzRri8
Scale=1:65.4
T1
T2
T3
B1
W3 W4 W3 W5 W3 W6 W3
W7
W8
W1
W2
W10
W9
B2
1
2 3 4 5
6
78
16 15 14 13 12 11 10 9
17 18 19 20
21
22
23
24 25
5x8 5x6
1.5x4 3x43x43x8
2x4 3x8
1.5x4
3x8
3x4
3x4
3x4
3x5
6x8
3-5-83-5-8 10-1-46-7-12 16-9-06-7-12 19-5-02-8-0 24-8-55-3-6 29-4-04-7-11
3-5-83-5-8 10-1-46-7-12 16-9-06-7-12 19-5-02-8-0 24-8-55-3-6 29-4-04-7-11 30-2-120-10-12
8-5-1311-4-63-1-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [2:0-2-8,0-2-12], [5:0-3-0,0-2-1], [6:0-1-8,0-1-8], [7:0-3-8,Edge], [9:Edge,0-3-8], [12:0-2-4,0-0-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.900.32
0.92
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.05-0.10
0.01
(loc)
10-1114-15
9
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 217 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x6SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W8,W9: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 2-15, 3-14, 4-12, 5-11, 6-11, 1-16
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)16=766/Mechanical, 12=1491/0-6-0(min. 0-2-13), 9=1291/0-4-0(min. 0-2-8)Max Horz16=-274(LC 12)
Max Uplift16=-126(LC 12), 12=-424(LC 12), 9=-441(LC 12)MaxGrav16=923(LC 38), 12=1786(LC 38), 9=1581(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-17=-373/151, 2-17=-311/154, 2-18=-522/260, 3-18=-524/259, 3-19=-522/259,
19-20=-522/259, 4-20=-522/259, 4-5=-373/368, 5-21=-406/383, 21-22=-630/405,
6-22=-660/409, 6-23=-754/465, 23-24=-814/479, 24-25=-1172/702, 7-25=-1216/699,1-16=-903/268, 7-9=-1536/856
BOT CHORD 15-16=-279/296, 14-15=-173/318, 13-14=-135/271, 12-13=-135/271, 11-12=-135/271,10-11=-302/626WEBS2-15=-534/204, 2-14=-206/498, 3-14=-745/225, 4-14=-89/522, 4-12=-1656/739,
4-11=-316/479, 6-11=-508/400, 1-15=-151/701, 7-10=-250/618
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-7-15,Interior(1) 23-7-15 to 30-2-12zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
16=126, 12=424, 9=441.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:262018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2?Y8jivrCcCaPaltNlFr0dxZXYkWb5MAajPpG?zRri7
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 527 lb down and 342 lb up at 16-6-8, and 527 lb down and 342 lb up
at 28-2-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-2=-51, 2-20=-61, 7-24=-51, 7-8=-51, 9-16=-20
Concentrated Loads(lb)Vert: 20=-465 24=-465
Trapezoidal Loads(plf)Vert: 20=-60-to-5=-76, 5=-66-to-24=-111
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T08GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:272018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WB6Xw2vUzwKR0kK3wTm4ZrTwSy8tKjqJpN8NoRzRri6
Scale=1:69.4
T1
T2
T3
B1
W1
W3ST6
ST5
ST4
ST1
ST2ST3ST3ST3ST3ST3ST3ST3ST2
ST1
B2
W2
1 2
3 4 5 6 7 8 9 10 11
12
13
14
15
16 17
33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18
34 35
36
37
3x4
3x4
4x4
5x6
4x4
29-4-029-4-0
3-5-83-5-8 19-5-015-11-8 29-4-09-11-0 30-2-120-10-12
8-5-1311-4-63-1-311-4-610.0012
PlateOffsets(X,Y)-- [3:0-2-0,0-1-13], [11:0-2-0,0-1-13], [16:0-1-8,0-1-8], [26:0-3-0,0-3-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.190.05
0.20
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.00-0.01
0.01
(loc)
1717
18
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 240 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W1: 2x4SPF No.2
OTHERS 2x4SPF No.2 *Except*ST6,ST5: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 18-19.
WEBS 1 Row at midpt 1-33, 12-22, 11-23, 10-24, 9-25, 8-26, 7-27, 6-28, 5-29, 4-30, 3-31, 2-32
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.All bearings 29-4-0.(lb)-Max Horz33=-275(LC 12)Max UpliftAll uplift 100 lb orless at joint(s) 33, 20, 21, 22, 23, 24, 25, 26, 27,
28, 29, 30, 32 except 18=-367(LC 15), 19=-528(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 33, 20, 21, 23, 24, 25, 26, 27,
28, 29, 30, 31, 32 except 18=607(LC 17), 19=459(LC 49), 22=251(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 15-37=-308/218, 16-37=-315/203, 16-18=-597/399BOT CHORD 32-33=-281/296, 31-32=-281/296, 30-31=-281/296, 29-30=-281/296, 28-29=-281/296,27-28=-281/296, 26-27=-281/296, 25-26=-281/296, 24-25=-281/296, 23-24=-281/296,
22-23=-281/296, 21-22=-281/296, 20-21=-281/296, 19-20=-281/296WEBS16-19=-450/526
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-5-4,
Interior(1) 23-5-4 to 30-2-12zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.9)Gablerequirescontinuous bottomchord bearing.10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T08GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:272018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WB6Xw2vUzwKR0kK3wTm4ZrTwSy8tKjqJpN8NoRzRri6
NOTES-
11)Gablestudsspaced at 2-0-0 oc.
12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 33, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 32 except(jt=lb) 18=367, 19=528.
14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T09
TrussType
PiggybackBase
Qty
6
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:292018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SaDHLjxkVXa9G2TS2uoYeGZ3JmjaoYfcGhdTsJzRri4
Scale=1:71.2
T1
T2
T3
B1
W3 W4
W5 W6 W5
W4
W3
W7 W8
W1
W2
T4
B2
1
2
3 4
5
6
7
8 9
16 15 14 13 12 11 10
20
21
2223
24 25 26 27
28
29
30
31
4x4
4x8 4x6
3x5
3x4 3x4
3x4
3x5 3x4 3x8
3x4
4x4
3x6
3x5
3x4
3-8-23-8-2 9-7-85-11-6 15-0-95-5-1 21-0-05-11-6 26-11-65-11-6 27-2-00-2-10
28-2-0
1-0-0
3-8-2
3-8-2
9-7-8
5-11-6
15-0-9
5-5-1
21-0-0
5-11-6
26-11-6
5-11-6
28-2-0
1-2-10
29-0-12
0-10-12
3-4-211-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-2-0], [2:0-1-8,0-1-8], [3:0-6-4,0-2-0], [4:0-3-4,0-2-4], [6:0-1-8,0-1-8], [7:0-2-8,0-1-8], [10:0-3-0,0-1-8], [15:0-2-4,0-1-8], [16:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
1.000.49
0.56
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.05-0.14
0.04
(loc)
11-1211-12
10
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 160 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3,T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except*
W4,W5,W6: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-14, 4-12, 6-12
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)16=1194/0-6-0(min. 0-1-9), 10=2076/0-5-4(min. 0-3-14)
Max Horz16=-344(LC 14)Max Uplift16=-142(LC 16), 10=-355(LC 17)
MaxGrav16=1589(LC 39), 10=2469(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-20=-1167/187, 20-21=-1001/207, 2-21=-989/211, 2-22=-1396/288, 22-23=-1289/296,3-23=-1188/329, 3-24=-1087/347, 24-25=-1087/347, 25-26=-1087/347, 26-27=-1087/347,
4-27=-1087/347, 4-28=-1061/327, 28-29=-1419/370, 5-29=-1586/355, 5-6=-1720/353,
6-30=-1744/302, 30-31=-1975/295, 7-31=-2169/294, 1-16=-1563/231BOT CHORD 15-16=-271/316, 14-15=-193/944, 13-14=-121/916, 12-13=-121/916, 11-12=-96/1513,
10-11=-21/278, 8-10=-21/278WEBS2-15=-660/171, 2-14=-130/289, 3-12=-185/488, 6-12=-642/278, 7-11=-132/1309,7-10=-2365/560, 1-15=-152/1151
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-7-8,Exterior(2) 9-7-8 to 19-3-8,
Interior(1) 19-3-8 to 29-0-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 16 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
16=142, 10=355.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T09
TrussType
PiggybackBase
Qty
6
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:292018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SaDHLjxkVXa9G2TS2uoYeGZ3JmjaoYfcGhdTsJzRri4
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 509 lb down and 94 lb up at 26-8-0, and 509 lb down and 94 lb up at
16-0-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-3=-51, 3-4=-61, 4-28=-51, 7-9=-51, 16-17=-20
Concentrated Loads(lb)Vert: 7=-425 28=-425
Trapezoidal Loads(plf)Vert: 28=-51-to-7=-112
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T09GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:312018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OyL1mPz_19rtVLdq9Jr0jhec5ZU_GY_vk?6axCzRri2
Scale=1:69.8
T1
T2
T3
B1
W1
ST7ST6
ST5
ST4
ST3
ST2
ST1
ST7 ST6
ST5
ST4
ST3
ST2
ST1
T4
B2
12
3
4
5
6
78 9 10 11
12
13
1415
16
17
18
19
20
3635 34 33 32 31 30 29 28 27 26 25 24 23 22 21
37
38
39 40 41
42
43
2x4
3x4 3x4
3x4
2x4 3x4
3x4
30-0-030-0-0
11-5-811-5-8 16-10-95-5-1 30-0-013-1-7 30-10-120-10-12
1-9-1311-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [8:0-2-0,0-1-13], [11:0-2-0,0-1-13]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.140.11
0.19
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.000.00
0.01
(loc)
1920
19
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 193 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStudOTHERS2x4SPF No.2 *Except*
ST3,ST2,ST1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 9-29, 7-30, 6-31, 10-27, 12-26, 13-25
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 30-0-0.(lb)-Max Horz36=-322(LC 12)
Max UpliftAll uplift 100 lb orless at joint(s) 29, 32, 33, 34, 27, 26, 24, 23, 22 except 36=-119(LC 14), 31=-112(LC 16), 35=-202(LC 16), 25=-108(LC 17),21=-130(LC 17), 19=-144(LC 13)
MaxGravAllreactions 250 lb orless at joint(s) 36, 29, 30, 31, 32, 33, 34, 35, 27, 26, 25, 24, 23, 22, 21 except 19=255(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 5-6=-266/267, 6-7=-348/365, 7-8=-248/258, 8-39=-284/311, 9-39=-284/311,
9-40=-284/311, 10-40=-284/311, 10-41=-284/311, 11-41=-284/311, 11-12=-249/262,12-13=-358/388, 13-14=-275/328, 14-15=-190/278, 15-16=-213/270, 16-17=-235/257,17-42=-249/261, 18-42=-264/247, 18-43=-291/299, 19-43=-308/279
BOT CHORD 35-36=-234/265, 34-35=-234/265, 33-34=-234/265, 32-33=-234/265, 31-32=-234/265,30-31=-234/265, 29-30=-234/265, 28-29=-234/265, 27-28=-234/265, 26-27=-234/265,
25-26=-234/265, 24-25=-234/265, 23-24=-234/265, 22-23=-234/265, 21-22=-234/265,19-21=-234/265
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-2-1,Interior(1) 3-2-1 to 11-5-8,Exterior(2) 11-5-8 to 21-2-1,Interior(1) 21-2-1 to 30-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.7)Provide adequate drainage to preventwater ponding.8)All plates are 1.5x4MT20 unless otherwiseindicated.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T09GE
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:312018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OyL1mPz_19rtVLdq9Jr0jhec5ZU_GY_vk?6axCzRri2
NOTES-
9)Gablerequirescontinuous bottomchord bearing.
10)Gablestudsspaced at 2-0-0 oc.
11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 29, 32, 33, 34, 27, 26, 24, 23, 22 except(jt=lb) 36=119,
31=112, 35=202, 25=108, 21=130, 19=144.13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T10
TrussType
PiggybackBase
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:322018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-t8vQzlzcoSzk7VC0j0MFGuBb6zlj?uj2yfs8TezRri1
Scale=1:71.2
T1
T2
T3
B1
W3 W4 W3
W5
W6
W7 W8
W1
W2 T4
B2
1
2 3
4
5
6
7 8
14 13 12 11 10 9
18 19 20 21
22
23
24
25
26
4x8 4x6
3x4
3x4 3x43x4 4x8
3x4
4x4
3x5
3x5
4x4
3x4
3-5-83-5-8 8-10-95-5-1 14-10-05-11-6 20-9-65-11-6 21-0-00-2-10
22-0-0
1-0-0
3-5-8
3-5-8
8-10-9
5-5-1
14-10-0
5-11-6
20-9-6
5-11-6
22-0-0
1-2-10
22-10-12
0-10-12
8-5-1311-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-0-12,0-1-8], [2:0-6-4,0-2-0], [3:0-3-4,0-2-4], [5:0-1-8,0-1-8], [6:0-2-0,0-1-8], [9:0-2-12,0-1-8], [13:0-1-12,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.960.40
0.61
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.04-0.11
0.02
(loc)
10-1110-11
9
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 139 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T3,T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W6,W7,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-6 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-9 oc bracing.WEBS 1 Row at midpt 2-13, 3-11, 5-11, 1-14
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)14=1047/0-6-0(min. 0-1-15), 9=1785/0-5-4(min. 0-3-5)Max Horz14=-414(LC 14)
Max Uplift14=-166(LC 17), 9=-314(LC 17)MaxGrav14=1246(LC 39), 9=2098(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-18=-539/283, 2-18=-496/285, 2-19=-692/293, 19-20=-692/293, 20-21=-692/293,
3-21=-692/293, 3-22=-590/261, 22-23=-895/305, 23-24=-931/304, 4-24=-1067/289,
4-5=-1200/287, 5-25=-1272/244, 25-26=-1502/236, 6-26=-1696/235, 1-14=-1216/288BOT CHORD 13-14=-371/367, 12-13=-136/452, 11-12=-136/452, 10-11=-21/1152, 9-10=-18/264,
7-9=-18/264WEBS2-13=-688/294, 2-11=-232/851, 3-11=-252/160, 5-11=-689/285, 6-10=-91/963,6-9=-2011/521, 1-13=-233/840
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 13-1-8,
Interior(1) 13-1-8 to 22-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
14=166, 9=314.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 509 lb down and 94 lb up at 9-11-0, and 509 lb down and 94 lb up at 20-6-0 on top chord.The design/selection of suchconnection device(s)is theresponsibility of others.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T10
TrussType
PiggybackBase
Qty
4
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:322018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-t8vQzlzcoSzk7VC0j0MFGuBb6zlj?uj2yfs8TezRri1
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51, 2-3=-61, 3-22=-51, 6-8=-51, 14-15=-20
Concentrated Loads(lb)Vert: 6=-425 22=-425Trapezoidal Loads(plf)
Vert: 22=-51-to-6=-112
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T11
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:352018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HjbYbn0V5NLJ_zxbO8vyuWpB9AmZCAKVfd4o4zzRri_
Scale=1:80.2
T2
T3
T4
B1
W3 W4
W5 W6
W7
W8 W9
W10
W9 W10 W9
W8 W7
W1
W2
W12
W11
T1
B1B2
1
2
3
4 5
6 7 8
9
10
20 19 18 17 16 15 14 13 12 11
21
22
23 24
25 26 27 28 29 30 31 32 33 34 35 36 37
4x8
8x8
6x12MT18H 6x12MT18H
4x4
8x10
8x8
4x4
10x10
5x6
10x10
6x8
10x10
2x4
8x8
6x6
8x8
6x12MT18H
3x8
8x8
5-4-85-4-8 11-1-115-9-3 16-0-64-10-11 21-11-145-11-8 27-2-05-2-2 32-4-25-2-2 38-3-95-11-7 41-0-02-8-7
5-4-85-4-8 11-1-115-9-3 16-0-64-10-11 21-11-145-11-8 27-2-05-2-2 32-4-25-2-2 38-3-95-11-7 41-0-02-8-7
2-4-111-6-07-10-1111-6-05.0012
PlateOffsets(X,Y)-- [1:0-4-0,0-2-0], [5:0-2-8,0-2-8], [6:0-5-4,0-2-12], [8:0-5-12,0-4-0], [9:0-2-12,0-2-4], [10:0-4-0,0-3-0], [11:Edge,0-5-8], [12:0-2-12,0-3-4], [13:0-3-8,0-4-12],[14:0-4-12,0-6-0], [15:0-3-8,0-5-4], [16:0-3-8,0-6-0], [18:0-3-8,0-6-0], [19:0-3-8,0-4-4], [20:0-0-2,0-3-12]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.59
0.450.94
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.29
-0.600.10
(loc)15-16
15-1611
l/defl>999
>803n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 731 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2
BOT CHORD2x8SP 2400F 2.0EWEBS2x4SPF No.2 *Except*
W3,W4,W5: 2x4SPFStud,W1: 2x8SP 2400F 2.0EW2: 2x4SPF 1650F 1.5E,W12: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-10 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-15, 6-14, 8-13, 9-12, 10-11
REACTIONS.(lb/size)20=9951/0-6-0(min. 0-4-3), 11=7902/0-6-0(min. 0-3-6)Max Horz20=261(LC 57)
Max Uplift20=-1079(LC 12), 11=-934(LC 9)
MaxGrav20=10139(LC 34), 11=8101(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-12690/1354, 2-21=-14141/1526, 3-21=-14080/1539, 3-4=-12923/1420,4-22=-12811/1436, 5-22=-12794/1440, 5-6=-10200/1188, 6-7=-8168/1035,
7-23=-8169/1036, 23-24=-8169/1036, 8-24=-8169/1036, 8-9=-6467/829, 9-10=-2591/313,1-20=-9141/1009, 10-11=-7895/917
BOT CHORD 20-25=-369/852, 25-26=-369/852, 19-26=-369/852, 19-27=-1484/11632,
27-28=-1484/11632, 28-29=-1484/11632, 18-29=-1484/11632, 18-30=-1560/13021,17-30=-1560/13021, 16-17=-1560/13021, 16-31=-1383/11858, 31-32=-1383/11858,
15-32=-1383/11858, 15-33=-1052/9400, 33-34=-1052/9400, 14-34=-1052/9400,
14-35=-687/5866, 35-36=-687/5866, 13-36=-687/5866, 13-37=-267/2308,
12-37=-267/2308
WEBS 2-19=-1696/281, 2-18=-143/1694, 3-18=-129/1659, 3-16=-1921/294, 5-16=-402/4095,5-15=-4344/580, 6-15=-641/6188, 6-14=-2924/337, 7-14=-427/180, 8-14=-599/5348,
8-13=-2738/333, 9-13=-726/6182, 9-12=-6699/843, 1-19=-1192/11520, 10-12=-817/7058
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc.Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.6) Unbalancedsnowloads have been considered for this design.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T11
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:352018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HjbYbn0V5NLJ_zxbO8vyuWpB9AmZCAKVfd4o4zzRri_
NOTES-
7)Provide adequate drainage to preventwater ponding.
8)All plates areMT20 plates unless otherwiseindicated.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=1079, 11=934.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 901 lb down and 94 lb up at 2-0-12, 901 lb down and 94 lb up at 4-0-12, 901 lb down and 94 lb up at 6-0-12, 901 lb down and 94 lb up at 8-0-12, 901 lb down and 94 lb up at 10-0-12, 901 lb down and 94 lb up at 12-0-12, 901 lb down
and 94 lb up at 14-0-12, 901 lb down and 94 lb up at 16-0-12, 901 lb down and 94 lb up at 18-0-12, 901 lb down and 94 lb up at 20-0-12, 901 lb down and 94 lb up at 22-0-12, 901 lb down and 94 lb up at 24-0-12, 901 lb down and 94 lb up at 26-0-12, 765 lb down and 124 lb up at 28-0-12, 765 lb down and 124 lb up at 30-0-12, and
765lb down and 124 lb up at 32-0-12, and 874 lb down and 134 lb up at 34-0-12 on bottomchord.The design/selection of suchconnection device(s)is theresponsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-6=-51, 6-8=-61, 8-10=-51, 11-20=-20Concentrated Loads(lb)
Vert: 17=-901(B) 16=-901(B) 15=-901(B) 13=-765(B) 25=-901(B) 26=-901(B) 27=-901(B) 28=-901(B) 29=-901(B) 30=-901(B) 31=-901(B) 32=-901(B) 33=-901(B)
34=-901(B) 35=-765(B) 36=-765(B) 37=-874(B)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T12
TrussType
PiggybackBase
Qty
3
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:362018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lw8wp707shTAc7WoysQBQkLGma2SxeSetGqLbPzRrhz
Scale=1:82.9
T2
T3
T4
B1
W3
W4 W5
W6 W7
W8
W7 W8 W7
W9
W1
W2
W11
W10T1
B1B2
1
2
3 4
5 6 7
8
9
18 17 16 15 14 13 12 11 10
19
20
21
22
23 24 25 26
27
3x8
5x8
3x4
3x4 3x6
3x4
4x8 3x4
3x4
3x4
5x12MT18H
1.5x4
4x8 3x4
3x4
4x6
3x53x6
7-2-07-2-0 13-10-46-8-4 21-11-148-1-11 27-2-05-2-2 32-4-25-2-2 41-0-08-7-14
7-2-07-2-0 13-10-46-8-4 21-11-148-1-11 27-2-05-2-2 32-4-25-2-2 36-5-154-1-13 41-0-04-6-1
2-4-111-6-07-10-1111-6-05.0012
PlateOffsets(X,Y)-- [5:0-8-0,0-1-12], [7:0-5-12,0-2-8], [10:0-2-4,0-1-8], [17:0-3-0,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.980.66
0.88
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.17-0.44
0.10
(loc)
10-1110-11
10
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 238 lb FT= 14%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except*
W3,W1,W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.
BOT CHORD Rigidceiling directly applied or 8-2-4 oc bracing.
WEBS 1 Row at midpt 2-16, 3-14, 5-12, 6-12, 7-11, 9-10, 8-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)18=1476/0-6-0(min. 0-2-10), 10=1510/0-6-0(min. 0-2-11)
Max Horz18=314(LC 13)Max Uplift18=-238(LC 16), 10=-203(LC 13)
MaxGrav18=1664(LC 38), 10=1711(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-2268/305, 2-19=-2205/323, 2-20=-2341/360, 3-20=-2171/387, 3-4=-1776/357,4-21=-1751/361, 21-22=-1649/376, 5-22=-1630/395, 5-23=-1333/394, 6-23=-1333/394,
6-24=-1333/394, 24-25=-1333/394, 25-26=-1333/394, 7-26=-1333/394, 7-8=-1148/344,
1-18=-1595/275BOT CHORD 17-18=-361/333, 16-17=-513/2035, 15-16=-478/2094, 14-15=-478/2094, 13-14=-359/1513,
12-13=-359/1513, 11-12=-241/996, 10-11=-206/684WEBS2-17=-451/153, 3-16=0/303, 3-14=-810/263, 5-14=-91/706, 5-12=-538/141,6-12=-496/163, 7-12=-197/847, 7-11=-574/191, 8-11=-89/821, 1-17=-229/2044,
8-10=-1624/347
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 21-11-14,Exterior(2) 21-11-14 to36-6-10,Interior(1) 36-6-10 to 40-10-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers
and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.
6)All plates areMT20 plates unless otherwiseindicated.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
18=238, 10=203.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T13
TrussType
PiggybackBase
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:382018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hIGhEo2NOIjtrQfA4HTfV9RkTOlZPWJxLaJSgIzRrhx
Scale=1:105.0
T3
T4
T5
B1
B4
B5
W1
W2 W3 W4 W5
W6 W7
W8
W7
W8 W7
W9
W11
W10
W12
W13 W14 W16
W15
T1
T6
B3B2
B6
T2
F2
F112
3
4
5
6 7 89
10
11
12
13
14
28 27 26 25 24 23 22 21 20
19
18
17 16 15
32
33
34
35
36373839
40
41 42
43
8x8 10x12
4x6
5x8 8x10
8x8 4x6
8x8
3x6 4x6
4x4
8x8
4x6 4x8
3x6
6x6
3x6
8x8
4x4
6x8
4x4
5x6 3x5
5x8
6x8
2x4
6-7-56-7-5 10-11-104-4-5 15-8-54-8-11 21-11-146-3-9 27-2-05-2-2 32-4-05-2-0 32-4-20-0-2
32-10-0
0-5-14
39-10-137-0-13 46-8-66-9-9 54-4-07-7-10
-0-10-120-10-12 6-7-56-7-5 10-11-104-4-5 15-8-54-8-11 21-11-146-3-9 27-2-05-2-2 32-4-25-2-2 32-10-00-5-14 39-10-137-0-13 46-8-66-9-9 54-4-07-7-10 55-2-120-10-12
0-4-19-6-011-6-02-4-12-0-011-6-05.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-2-14], [5:0-4-0,0-4-8], [6:0-1-12,0-4-4], [8:0-1-15,0-4-4], [15:0-2-4,0-2-4], [16:0-2-8,0-2-4], [17:0-3-0,0-2-8], [19:0-4-0,0-5-0], [20:0-5-8,0-5-12],[21:0-3-0,0-3-12], [25:0-3-8,0-6-0], [25:0-0-0,0-3-10]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.39
0.620.98
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.24
-0.560.19
(loc)24-26
24-2615
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 431 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x8SP 2400F 2.0E*Except*
B4: 2x4SPF No.2, B5,B6: 2x6SP 2400F 2.0E,F2: 2x4SPFStudWEBS2x4SPF No.2 *Except*W1,W2,W3,W4,W5,W14,F1: 2x4SPFStud,W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-4 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
10-0-0 oc bracing: 19-20WEBS1 Row at midpt 5-24, 6-22, 7-22, 8-22, 9-21
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2016/0-6-0(min. 0-1-14), 15=2015/0-6-0(min. 0-1-14)Max Horz2=150(LC 20)Max Uplift2=-296(LC 16), 15=-296(LC 17)
MaxGrav2=2285(LC 39), 15=2283(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-32=-5212/649, 3-32=-5157/671, 3-33=-4902/654, 4-33=-4856/671, 4-34=-4407/637,5-34=-4269/654, 5-35=-3612/599, 6-35=-3505/619, 6-36=-3304/621, 36-37=-3305/621,
7-37=-3305/621, 7-38=-3305/621, 38-39=-3304/621, 8-39=-3303/621, 8-9=-3320/639,9-40=-3631/623, 10-40=-3759/605, 10-11=-3260/542, 11-41=-3262/539, 41-42=-3357/526, 12-42=-3440/514, 12-43=-3160/455, 13-43=-3237/424, 13-15=-2189/399
BOT CHORD 2-28=-582/4761, 27-28=-584/4755, 26-27=-509/4516, 25-26=-439/4011, 24-25=-439/4011, 23-24=-314/3250, 22-23=-314/3250, 21-22=-306/3318, 20-21=-280/3016, 9-20=-42/504,
16-17=-328/2917WEBS3-27=-374/149, 4-27=-30/323, 4-26=-687/175, 5-26=-48/567, 5-24=-1088/271,6-24=-120/913, 6-22=-98/432, 7-22=-473/152, 8-22=-208/371, 8-21=-135/513,
17-20=-320/3091, 10-20=0/526, 10-17=-941/176, 12-16=-604/167, 13-16=-286/2808
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 21-11-14,Exterior(2) 21-11-14 to36-7-0,Interior(1) 36-7-0 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T13
TrussType
PiggybackBase
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:382018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hIGhEo2NOIjtrQfA4HTfV9RkTOlZPWJxLaJSgIzRrhx
NOTES-
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=296, 15=296.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T14
TrussType
PiggybackBase
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:402018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6typsq4GgD5SiuOllP0M7n3Eibr2cxTN1YX6HezRrhu
Scale=1:102.1
T3
T4
T5
B1
B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5
W6
W5
W6 W5W7
W9
W8
W10
W12
W11 W13 W14
W15
W17
W16
W18T1
T6
B3B2
T2
F2
F112
3
4 5
6 7 89
10
11
12
13 14
15
30 2928 27 26 25 24
23 22 21
20 19 18
1716
34
35
36
37
3839 4041 42
43
44
4x6
8x8 8x8
8x8
5x8 6x8
3x4
8x8 3x4
8x10
5x6
3x4
3x6
4x6
8x8
4x4
4x6 4x8
3x6
10x14MT18H
3x6
5x12
4x10
4x4
5x6
4x6
6x8
5x6
6x8
2x4
8-3-138-3-13 14-11-76-7-10 21-11-147-0-7 27-2-05-2-2 32-4-05-2-0 32-4-20-0-2
32-10-0
0-5-14
37-2-64-4-6 40-10-03-7-10 46-7-05-9-0 52-4-05-9-0 53-2-40-10-4
54-4-0
1-1-12
-0-10-12
0-10-12
8-3-13
8-3-13
14-11-7
6-7-10
21-11-14
7-0-7
27-2-0
5-2-2
32-4-2
5-2-2
32-10-0
0-5-14
37-2-6
4-4-6
40-10-0
3-7-10
46-7-0
5-9-0
52-4-0
5-9-0
53-2-4
0-10-4
54-4-0
1-1-12
55-2-12
0-10-12
0-4-19-6-011-6-02-4-12-0-011-6-05.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-2-14], [6:0-1-12,0-4-4], [8:0-5-4,0-4-0], [10:0-3-10,0-2-0], [11:0-4-0,Edge], [14:0-2-12,0-2-4], [18:0-5-8,0-2-4], [20:0-2-12,0-4-0], [22:0-6-0,0-2-0], [23:0-4-0,0-5-0], [24:0-8-0,0-5-0], [24:0-2-4,0-1-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.46
0.380.77
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.25
-0.590.26
(loc)27
27-2916
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 443 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x8SP 2400F 2.0E*Except*
B4,B6: 2x4SPF No.2, B5,B7,B9: 2x6SP 2400F 2.0EB8,F2: 2x4SPFStudWEBS2x4SPF No.2 *Except*
W1,W2,W3,W13,W14,W15,F1: 2x4SPFStud,W18: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 17-18.10-0-0 oc bracing: 23-24WEBS1 Row at midpt 4-27, 6-25, 7-25, 8-25, 10-22
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=2013/0-6-0(min. 0-1-14), 16=2011/0-6-0(min. 0-1-14)Max Horz2=150(LC 20)
Max Uplift2=-298(LC 16), 16=-299(LC 17)MaxGrav2=2282(LC 39), 16=2279(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-34=-5154/642, 3-34=-5141/675, 3-35=-4523/629, 35-36=-4511/632, 4-36=-4347/658,
4-5=-3620/590, 5-37=-3529/600, 6-37=-3497/620, 6-38=-3314/629, 38-39=-3315/628,7-39=-3315/628, 7-40=-3315/628, 40-41=-3315/629, 8-41=-3314/629, 8-9=-3383/640,9-42=-3498/629, 10-42=-3585/612, 10-11=-3846/646, 11-43=-3779/589, 43-44=-3811/577,
12-44=-3895/564, 12-13=-3990/541, 13-14=-2331/318, 14-16=-2234/365BOT CHORD 2-30=-556/4696, 29-30=-559/4688, 28-29=-458/4116, 27-28=-458/4116, 26-27=-320/3242,
25-26=-320/3242, 24-25=-303/3220, 21-22=-46/312, 11-20=-359/159, 19-20=-411/3635,18-19=-298/2211, 13-18=-1168/206WEBS3-30=0/320, 3-29=-676/224, 4-29=-13/510, 4-27=-1159/283, 6-27=-108/857,
6-25=-106/466, 7-25=-487/159, 8-25=-95/494, 8-24=-161/706, 22-24=-315/3119,10-24=-21/687, 10-22=-1954/257, 20-22=-260/2753, 10-20=-245/1349, 12-19=-253/120,
13-19=-139/1478, 14-18=-317/2404
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 21-11-14,Exterior(2) 21-11-14 to
36-7-0,Interior(1) 36-7-0 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T14
TrussType
PiggybackBase
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:412018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6typsq4GgD5SiuOllP0M7n3Eibr2cxTN1YX6HdzRrhu
NOTES-
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=298, 16=299.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T15
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:432018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2G3aHW6WCrLAxBY8sq2qCC8Z5PU_4oJgUs0DLWzRrhs
Scale=1:108.3
0-1-100-1-10T2
T3
T4
B1
B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5
W6
W7
W6 W5
W8
W10
W9
W11
W13
W12 W14 W15
W16 W19
T1
T5
B3B2
W18
W17
F2
F11
2
3
4
5 6 7 8
9
10
11
12 13 14
30 29 28 27 26 25 2423
22 21 20
19 18 17
1615
34
35
36
37
38 39 40 41
42
43
44
8x12MT18H
8x8 8x8
4x8 5x6
3x4
8x8 3x4
8x8
8x10
5x6
3x4
2x4
4x4
4x4
4x4 4x8
3x6
2x4
6x10
2x4
5x12
4x10
4x4
5x6
5x6
4x6
4x6
6x82x4
7-11-67-11-6 15-2-157-3-9 22-6-87-3-9 27-2-04-7-8 31-9-84-7-8 32-4-00-6-8
32-10-0
0-6-0
37-2-64-4-6 40-10-03-7-10 46-7-05-9-0 52-4-05-9-0 54-4-02-0-0
-0-10-12
0-10-12
7-11-6
7-11-6
15-2-15
7-3-9
22-6-8
7-3-9
27-2-0
4-7-8
31-9-8
4-7-8
32-10-0
1-0-8
37-2-6
4-4-6
40-10-0
3-7-10
46-7-0
5-9-0
52-4-0
5-9-0
54-4-0
2-0-0
55-2-12
0-10-12
0-4-19-7-211-8-122-4-12-0-011-7-25.0012
PlateOffsets(X,Y)-- [2:0-1-9,0-0-4], [5:0-4-0,0-3-4], [7:0-2-8,0-3-4], [9:0-3-10,0-2-0], [10:0-4-0,Edge], [13:0-2-12,0-2-4], [17:0-5-8,0-2-4], [19:0-3-0,0-4-0], [21:0-6-0,0-2-0],[22:0-4-0,0-5-0], [23:0-3-12,0-2-12]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.53
0.480.87
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.28
-0.670.31
(loc)27-29
27-2915
l/defl>999
>965n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 421 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E*Except*
B4,B6: 2x4SPF No.2, B8,F2: 2x4SPFStudWEBS2x4SPF No.2 *Except*W1,W3,W14,W15,W16,F1: 2x4SPFStud,W19: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-9 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 16-17.10-0-0 oc bracing: 22-23WEBS1 Row at midpt 4-27, 5-25, 6-25, 7-25, 9-21
JOINTS 1Brace at Jt(s): 23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)2=2007/0-6-0(min. 0-1-14), 15=2019/0-6-0(min. 0-1-15)
Max Horz2=152(LC 20)Max Uplift2=-298(LC 16), 15=-302(LC 17)
MaxGrav2=2291(LC 39), 15=2306(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-5333/649, 3-34=-5274/679, 3-35=-4582/621, 35-36=-4494/633, 4-36=-4398/650,4-37=-3677/595, 5-37=-3551/614, 5-38=-3336/619, 38-39=-3339/618, 6-39=-3339/617,6-40=-3340/618, 40-41=-3340/619, 7-41=-3337/619, 7-8=-3529/646, 8-42=-3611/623,
9-42=-3692/610, 9-10=-3919/639, 10-43=-3831/582, 43-44=-3882/569, 11-44=-3961/557,11-12=-4042/534, 12-13=-2361/315, 13-15=-2260/363
BOT CHORD 2-30=-594/4869, 29-30=-596/4859, 28-29=-449/4166, 27-28=-449/4166, 26-27=-310/3274, 25-26=-310/3274, 24-25=-289/3257, 23-24=-289/3262, 20-21=-45/317, 10-19=-356/159,18-19=-406/3683, 17-18=-300/2240, 12-17=-1185/207
WEBS 3-30=0/359, 3-29=-805/250, 4-29=-9/537, 4-27=-1163/291, 5-27=-120/892,5-25=-107/459, 6-25=-508/151, 7-25=-107/484, 7-24=-12/326, 7-23=-185/549,
21-23=-305/3196, 9-23=-22/733, 9-21=-2056/257, 19-21=-256/2819, 9-19=-246/1341,
11-18=-257/119, 12-18=-136/1497, 13-17=-320/2436
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 22-6-8,Exterior(2) 22-6-8 to 36-0-7,Interior(1) 36-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T15
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:432018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2G3aHW6WCrLAxBY8sq2qCC8Z5PU_4oJgUs0DLWzRrhs
NOTES-
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=298, 15=302.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:442018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WSdyUs78z8T1ZL7KQXa3lQhkxpqGpDcpjWmmtyzRrhr
Scale=1:105.1
0-1-100-1-10T2
T3
T4
B1 B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5 W6 W7 W8 W9
W10
W11
W13
W12
W14 W15
W16 W19
T1
T5
B3B2
W18
W17
F2F1
1
2
3
4
5 6 7 8
9
10
11 12
13
27 26 25 24 23 22 21
20 19
18 17 16
1514
32
33
34
35
36 373839
40
41
8x8
8x8 8x8
8x8
4x8 5x6 8x8
3x4
8x8
5x6
3x4
2x4
4x4
4x4
4x4 4x8
3x6
6x10
2x4
5x8
4x4
5x6
5x6
4x6
6x10
4x6
2x4
2x4
7-10-0
7-10-0
14-2-4
6-4-4
20-6-8
6-4-4
26-8-4
6-1-12
32-4-0
5-7-12
33-9-8
1-5-8
35-9-8
2-0-0
40-10-0
5-0-8
46-7-0
5-9-0
52-4-0
5-9-0
54-4-0
2-0-0
-0-10-12
0-10-12
7-10-0
7-10-0
14-2-4
6-4-4
20-6-8
6-4-4
26-8-4
6-1-12
33-9-8
7-1-5
35-9-8
1-11-15
40-10-0
5-0-8
46-7-0
5-9-0
52-4-0
5-9-0
54-4-0
2-0-0
55-2-12
0-10-12
0-4-18-9-210-10-122-4-12-0-010-9-25.0012
12.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [5:0-4-0,0-3-4], [7:0-4-0,0-3-4], [8:0-4-0,0-2-0], [9:0-4-0,Edge], [12:0-2-12,0-2-8], [16:0-5-8,0-2-0], [18:0-2-8,0-4-0], [20:0-7-12,0-3-8],[20:0-1-4,0-2-4], [21:0-5-12,0-4-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.52
0.481.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.26
-0.660.34
(loc)21-22
21-2214
l/defl>999
>986n/a
L/d240
180n/a
PLATESMT20
Weight: 426 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x6SP 2400F 2.0E*Except*
T3: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E*Except*
B6: 2x4SPF No.2, B8: 2x4SP 2400F 2.0E,F2: 2x4SPFStudWEBS2x4SPF No.2 *Except*W1,W2,W3,W14,W15,W16,W18,W17,F1: 2x4SPFStud
W19: 2x6SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 15-16.WEBS 1 Row at midpt 4-242 Rows at 1/3 pts 8-20
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=2027/0-6-0(min. 0-1-14), 14=2039/0-6-0(min. 0-1-14)Max Horz2=137(LC 20)
Max Uplift2=-280(LC 16), 14=-283(LC 17)MaxGrav2=2247(LC 39), 14=2259(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-32=-5220/672, 32-33=-5161/699, 3-33=-5080/701, 3-34=-4514/653, 4-34=-4419/678,
4-35=-3701/625, 5-35=-3597/644, 5-36=-3591/667, 36-37=-3594/665, 6-37=-3594/665,6-38=-3595/665, 38-39=-3592/666, 7-39=-3591/667, 7-8=-3541/656, 8-40=-3718/677,9-40=-3802/668, 9-41=-3734/600, 10-41=-3830/584, 10-11=-3954/550, 11-12=-2287/320,
12-14=-2200/365BOT CHORD 2-27=-587/4764, 26-27=-590/4755, 25-26=-484/4100, 24-25=-484/4100, 23-24=-360/3321,
22-23=-360/3321, 21-22=-330/3271, 20-21=-394/3791, 19-20=-38/317, 9-18=-452/194,17-18=-415/3601, 16-17=-287/2194, 11-16=-1140/205WEBS3-27=0/340, 3-26=-740/230, 4-26=-25/488, 4-24=-1053/259, 5-24=-108/833,
5-22=-108/649, 6-22=-744/233, 7-22=-106/673, 7-21=-160/906, 8-21=-164/1956,8-20=-2986/350, 18-20=-258/2549, 8-18=-262/1278, 11-17=-142/1459, 12-16=-297/2314
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 20-6-8,Exterior(2) 20-6-8 to 38-0-7,Interior(1) 38-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:442018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WSdyUs78z8T1ZL7KQXa3lQhkxpqGpDcpjWmmtyzRrhr
NOTES-
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=280, 14=283.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:462018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SrlivY8OVmklofHjYycXqrm6BcXdHAs6AqFtyqzRrhp
Scale=1:107.2
0-1-100-1-10T2
T3 T5
B1
B4
B5
W1 W2
W3 W4 W5 W6W7 W8 W7 W6
W10
W9
W11 W12 W13
W14 W15
W17W16
T1
T4
T6
B3B2
B6F2
1
2
3
4
5 6 7 8 9
10 11
12
13
14
28 27 26 25 24 23 22 21
20 19
18
17 16 15
33
34
35
36
37 38 39
40
41 42
8x8
6x6 8x10 4x6
4x8 5x6
3x4
8x8 4x6
2x4 4x4
4x4
4x4
8x12MT18H
2x4
2x4
10x10
8x8
6x8
4x4
4x4
4x4
4x6 3x5
5x6
2x4
2x4
6-3-1
6-3-1
13-1-15
6-10-14
18-6-8
5-4-8
22-5-15
3-11-8
28-10-8
6-4-9
32-4-0
3-5-8
32-10-0
0-6-0
35-9-8
2-11-8
42-1-8
6-3-15
48-1-5
5-11-13
54-4-0
6-2-11
-0-10-120-10-12 6-3-16-3-1 13-1-156-10-14 18-6-85-4-8 22-5-153-11-8 28-10-86-4-9 32-10-03-11-8 35-9-82-11-8 42-1-86-3-15 48-1-55-11-13 54-4-06-2-11 55-2-120-10-12
0-4-17-11-210-0-122-4-12-0-09-11-25.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [7:0-2-4,0-4-8], [9:0-4-8,0-3-4], [13:0-2-12,0-2-4], [16:0-2-0,0-2-0], [19:0-3-0,0-2-0], [20:0-4-0,0-5-0], [21:0-2-12,0-4-4], [23:0-0-0,0-2-12],[24:0-1-12,0-0-0], [24:0-3-0,0-4-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.41
0.420.82
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.27
-0.670.26
(loc)22-24
22-2415
l/defl>999
>964n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 393 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3,T4: 2x6SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E*Except*
B4: 2x4SPF No.2, F2: 2x4SPFStudWEBS2x4SPF No.2 *Except*W1,W2,W3,W4,W13,W14,W15,F1: 2x4SPFStud
W17: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-10 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
6-0-0 oc bracing: 20-21WEBS1 Row at midpt 4-25, 7-24, 7-21, 9-19, 11-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2046/0-6-0(min. 0-1-13), 15=2059/0-6-0(min. 0-1-14)Max Horz2=122(LC 20)Max Uplift2=-262(LC 12), 15=-270(LC 13)
MaxGrav2=2218(LC 2), 15=2232(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-33=-5200/704, 33-34=-5170/710, 3-34=-5114/724, 3-35=-4467/673, 4-35=-4386/701,4-36=-3876/658, 5-36=-3808/680, 5-6=-3823/696, 6-37=-3821/695, 7-37=-3821/695,
7-38=-3698/674, 8-38=-3698/674, 8-9=-3692/674, 9-39=-2999/590, 10-39=-3033/571,10-11=-3082/565, 11-40=-3178/556, 12-40=-3264/531, 12-41=-2803/445,41-42=-2864/442, 13-42=-2927/426, 13-15=-2150/400
BOT CHORD 2-28=-622/4772, 27-28=-625/4763, 26-27=-521/4068, 25-26=-521/4068, 24-25=-410/3518, 23-24=-458/3931, 22-23=-458/3931, 21-22=-455/3937, 18-19=-345/2933,
17-18=-345/2933, 16-17=-325/2643WEBS3-28=0/300, 3-27=-764/220, 4-27=0/445, 4-25=-983/236, 5-25=-123/788, 5-24=-145/852, 6-24=-474/156, 7-24=-336/88, 7-22=0/254, 7-21=-598/97, 19-21=-347/3257,
9-21=-327/2628, 9-19=-1592/209, 11-19=-423/199, 12-17=-36/476, 12-16=-719/175,13-16=-301/2622
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 18-6-8,Exterior(2) 18-6-8 to 40-0-7,Interior(1) 40-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:462018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SrlivY8OVmklofHjYycXqrm6BcXdHAs6AqFtyqzRrhp
NOTES-
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=262, 15=270.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:482018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-PDtTKDAf1N_T2zQ5fNe?vGrTAQD6l27Pe8k_0jzRrhn
Scale=1:107.5
0-1-100-1-10T2
T3 T5
B1
B4
B5
W1 W2
W3 W4
W5 W6 W7 W8 W7 W6
W10
W9
W11 W12 W13
W14 W15
W17W16
T1
T4
T6
B3B2
B6F2
1
2
3
4
5 6 7 8 9 10
1112
13
14 15
29 28 27 26 2524 23 22
21 20
19
18 17 16
34 35
36
37
38 39 40 41 42
43 44 45
8x8
8x8 6x8 4x6
4x8 5x12MT18H
3x6
8x8 7x14MT18H
2x4 4x4
4x4
4x4
4x4
4x6
4x4
4x6
8x12MT18H
8x8
4x4
4x4
4x4
4x6 3x6
5x6
5x12MT18H
2x4
2x4
5-11-65-11-6 10-10-04-10-10 16-6-85-8-8 21-10-155-4-8 27-5-85-6-9 32-4-04-10-832-10-00-6-0 37-9-84-11-8 43-5-155-8-7 48-3-04-9-0 54-4-06-1-0
-0-10-120-10-12 5-11-65-11-6 10-10-04-10-10 16-6-85-8-8 21-10-155-4-8 27-5-85-6-9 32-10-05-4-8 37-9-84-11-8 43-5-155-8-7 48-3-04-9-0 54-4-06-1-0 55-2-120-10-12
0-4-17-1-29-2-122-4-12-0-09-1-25.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [5:0-4-0,0-3-4], [10:0-5-4,0-2-8], [14:0-2-12,0-2-4], [17:0-2-0,0-2-0], [19:0-4-8,0-4-8], [19:0-0-0,0-2-12], [20:0-1-12,0-0-0], [21:0-4-0,0-5-0], [22:0-3-12,0-3-4], [27:0-2-0,0-2-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.38
0.420.90
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in-0.27
-0.670.25
(loc)23
2316
l/defl>999
>969n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 399 lb FT= 14%
GRIP197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3,T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E*Except*
B4: 2x4SPF No.2, F2: 2x4SPFStudWEBS2x4SPFStud*Except*W6,W8,W10,W9,W11,W12,W16: 2x4SPF No.2, W17: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-8 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
10-0-0 oc bracing: 21-22WEBS1 Row at midpt 7-22, 10-20, 12-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2066/0-6-0(min. 0-1-13), 16=2079/0-6-0(min. 0-1-14)Max Horz2=108(LC 20)Max Uplift2=-287(LC 12), 16=-295(LC 13)
MaxGrav2=2218(LC 2), 16=2232(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-5152/728, 34-35=-5112/735, 35-36=-5104/736, 3-36=-5059/747, 3-4=-4679/740,4-37=-4110/684, 5-37=-4053/703, 5-38=-4488/762, 6-38=-4493/761, 6-39=-4712/777,
7-39=-4712/777, 7-8=-4394/744, 8-40=-4394/744, 9-40=-4394/744, 9-41=-4391/745,10-41=-4387/746, 10-42=-3087/598, 11-42=-3116/579, 11-12=-3151/576,12-13=-3204/560, 13-43=-2746/453, 43-44=-2787/441, 44-45=-2788/440,
14-45=-2866/434, 14-16=-2147/405BOT CHORD 2-29=-645/4719, 28-29=-647/4709, 27-28=-581/4300, 26-27=-581/4300, 25-26=-464/3748,
24-25=-553/4487, 23-24=-553/4487, 22-23=-593/4712, 9-22=-502/160, 19-20=-356/2911, 18-19=-356/2911, 17-18=-328/2573WEBS3-28=-573/163, 4-28=-8/364, 4-26=-908/218, 5-26=-69/689, 5-25=-203/1179,
6-25=-816/224, 6-23=-63/398, 7-22=-517/82, 20-22=-355/3010, 10-22=-356/2573,10-20=-1119/189, 12-20=-303/221, 12-18=-279/94, 13-18=-54/555, 13-17=-732/172,
14-17=-307/2538
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 16-6-8,Exterior(2) 16-6-8 to 42-0-7,
Interior(1) 42-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:482018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-PDtTKDAf1N_T2zQ5fNe?vGrTAQD6l27Pe8k_0jzRrhn
NOTES-
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=287, 16=295.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:502018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Lc?DlvBvZ_EAHGaUnogT?hwr2DuZDyGi5SD45czRrhl
Scale=1:101.0
0-1-100-1-10T1
T3
T5
B1
B4
B5
W1 W2 W3 W4 W5 W6 W7 W8 W7 W8 W7 W6
W10
W9
W11
W12 W13
HW1
W15W14
T4
B3B2
B6
T2
T6
F2
1 2
3
4
5
6 7 8 9 10 11 12
13
14
15 16
30 29 28 27 26 25 24 23 22
21 20 19 18 17
3637
3839 4041
42
4344 45
10x10
8x8 6x8
6x8
6x10
3x5
5x8
6x8
3x6
8x8 6x8
3x6 4x6
4x6
4x6
4x6
4x6
4x8
3x6
3x6
4x8
10x14MT18H
8x8
6x8
4x6
5x6 4x6
6x6
6x12MT18H
2x4
3x6
6-3-14
6-3-14
10-2-2
3-10-4
14-6-8
4-4-6
19-1-6
4-6-14
23-8-4
4-6-14
28-3-2
4-6-14
32-4-0
4-0-14
32-10-0
0-6-0
39-9-8
6-11-8
47-0-4
7-2-12
54-4-0
7-3-12
-0-10-120-10-12 6-3-146-3-14 10-2-23-10-4 14-6-84-4-6 19-1-64-6-14 23-8-44-6-14 28-3-24-6-14 32-10-04-6-14 39-9-86-11-8 47-0-47-2-12 54-4-07-3-12 55-2-120-10-12
0-4-16-3-28-4-122-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-4-12,0-6-8], [15:0-2-8,0-3-0], [17:0-3-12,0-2-0], [18:0-2-12,0-2-8], [19:0-3-0,0-2-8], [21:0-4-0,0-5-12], [25:0-5-4,0-3-0], [32:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.220.42
0.92
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.29-0.67
0.22
(loc)
2323-24
17
l/defl
>999>964
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 471 lb FT= 14%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x8SP 2400F 2.0E*Except*
T1: 2x4SP 2400F 2.0E
BOT CHORD2x8SP 2400F 2.0E*Except*B4: 2x4SPF No.2, F2: 2x4SPFStud
WEBS 2x4SPFStud*Except*W10,W9,W11,W12,W14: 2x4SPF No.2, W15: 2x6SP 2400F 2.0ESLIDERLeft 2x4SPFStud 2-7-1
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-2 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:10-0-0 oc bracing: 21-22
WEBS 1 Row at midpt 14-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=2091/0-6-0(min. 0-1-13), 17=2090/0-6-0(min. 0-1-13)
Max Horz2=93(LC 20)Max Uplift2=-319(LC 12), 17=-319(LC 13)MaxGrav2=2223(LC 2), 17=2222(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-36=-3724/484, 2-37=-3647/504, 3-37=-3614/504, 3-4=-4930/759, 4-5=-4729/763,
5-6=-4559/743, 6-38=-5089/836, 7-38=-5089/835, 7-39=-5560/903, 8-39=-5560/903,8-9=-5560/903, 9-10=-5361/890, 10-11=-5361/890, 11-40=-5356/890, 40-41=-5355/890,
12-41=-5355/891, 12-42=-3334/594, 13-42=-3372/575, 13-14=-3397/574,14-43=-3015/508, 43-44=-3047/489, 44-45=-3080/484, 15-45=-3113/479,15-17=-2105/412
BOT CHORD 2-30=-638/4550, 29-30=-639/4539, 28-29=-608/4416, 27-28=-519/4223, 26-27=-519/4223, 25-26=-664/5087, 24-25=-664/5087, 23-24=-769/5684, 22-23=-769/5684,
11-22=-514/176, 18-19=-376/2783, 17-18=-59/340WEBS4-30=0/251, 4-29=-383/133, 5-29=-16/255, 5-28=-686/171, 6-28=-67/607,6-26=-232/1381, 7-26=-986/236, 7-24=-123/753, 8-24=-377/124, 9-22=-504/78,
19-22=-400/3121, 12-22=-422/2857, 12-19=-959/213, 14-19=-87/495, 14-18=-557/182,15-18=-330/2525
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-14,Interior(1) 2-1-14 to 14-6-8,Exterior(2) 14-6-8 to 44-0-7,Interior(1) 44-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:502018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Lc?DlvBvZ_EAHGaUnogT?hwr2DuZDyGi5SD45czRrhl
NOTES-
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=319, 17=319.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T20
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:522018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-H?6zAbD95cUuWaksuDjx4604S1YFhuI?ZmiB9UzRrhj
Scale=1:99.1
0-1-100-1-10T1
T2
T1
B1
B5
B4
W1 W2
W3 W4 W5 W6 W5 W6 W5
W7
W9
W8
W10W11 W12
W13 W14
W16W15
T3
B3B2
B6
1 2
3
4 5 6 7 8 9 10 11
12
13 14
29 28 27 26 25 24 23
22
21 20 1918 17 16 15
33
34
35
3637 38 39 40
41
42 43 44
5x6 3x6
4x6 3x6
3x4
3x4 3x6
3x5
2x4 3x5 3x10
2x4 4x8
2x4 5x6
3x6
3x5
5x8
3x8
3x8
3x5
3x5 3x4
4x6
5x6
3x6
6-8-96-8-9 12-6-85-9-15 18-9-56-2-13 25-0-36-2-13 31-3-06-2-13 32-10-01-7-0 37-6-84-8-8 41-9-84-3-0 47-4-155-7-6 54-4-06-11-1
-0-10-120-10-12 6-8-96-8-9 12-6-85-9-15 18-9-56-2-13 25-0-36-2-13 31-3-06-2-13 32-10-01-7-0 37-6-84-8-8 41-9-84-3-0 47-4-155-7-6 54-4-06-11-1 55-2-120-10-12
0-4-15-5-27-6-122-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-3-0,0-1-12], [8:0-2-12,0-1-8], [13:0-2-0,0-2-0], [22:0-2-8,0-2-0], [23:0-3-0,0-3-0], [26:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.680.53
0.82
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.14-0.25
0.07
(loc)
26-2826-28
23
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 264 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B5: 2x4SPFStudWEBS2x4SPFStud*Except*
W4,W6,W11: 2x4SPF No.2, W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 5-7-4 oc bracing.Except:10-0-0 oc bracing: 20-22
WEBS 1 Row at midpt 6-23, 10-22JOINTS1Brace at Jt(s): 22
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=1007/0-4-0(min. 0-1-14), 23=2644/0-6-0(min. 0-4-10), 15=605/0-6-0(min. 0-1-8)Max Horz2=80(LC 20)Max Uplift2=-409(LC 12), 23=-850(LC 13), 15=-169(LC 17)
MaxGrav2=1198(LC 39), 23=2941(LC 38), 15=872(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-2085/1204, 3-34=-1990/1229, 3-35=-1476/937, 4-35=-1406/956, 4-36=-1233/804,36-37=-1234/803, 5-37=-1236/803, 5-6=-1233/802, 6-38=-599/1289, 7-38=-599/1289,
7-39=-599/1289, 8-39=-599/1289, 8-9=-538/944, 9-40=-532/931, 10-40=-532/931,10-11=-375/203, 11-41=-401/188, 12-41=-502/166, 12-42=-797/185, 42-43=-885/158,13-43=-895/155, 13-15=-808/205
BOT CHORD 2-29=-1093/1837, 28-29=-1093/1837, 27-28=-745/1292, 26-27=-745/1292,25-26=-109/310, 24-25=-109/310, 23-24=-109/310, 22-23=-1289/792, 18-19=-187/367,
17-18=-187/367, 16-17=-114/736WEBS3-28=-783/378, 4-28=-317/473, 4-26=-486/175, 5-26=-587/196, 6-26=-660/1196,6-23=-2070/1124, 8-23=-1446/319, 8-22=-193/1140, 19-22=-210/395, 10-22=-1266/541,
10-17=-227/697, 12-17=-532/161, 13-16=-64/625
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 12-6-8,Exterior(2) 12-6-8 to 46-0-7,Interior(1) 46-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T20
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:522018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-H?6zAbD95cUuWaksuDjx4604S1YFhuI?ZmiB9UzRrhj
NOTES-
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=409, 23=850, 15=169.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T21
TrussType
Roof Special
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:532018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lBgMNxEnrvcl8kJ3SwEAcJYCERu3QL98nQRliwzRrhi
Scale=1:99.1
0-1-100-1-10T1
T2 T4
T5
B1
B5
B4
W1 W2
W3 W4 W5 W6 W5 W6 W5
W7
W9
W8
W10
W11
W12
W13 W14
W16W15
T3
B3B2
B6
1 2
3
4 5 6 7 8 9 10
11
12
13 14
28 27 26 25 24 23 22
21
20 19 18 17 16 15
3233
34
3536 37 38 39 40
41
42
5x6 3x6
5x6
4x6 3x6
3x4
3x4 5x10
3x5
2x4 3x5 3x10
2x4
4x8
2x4 5x6
3x6
5x8
6x8
3x8
3x5
3x5 3x4
4x6
3x6
5-7-45-7-4 10-6-84-11-4 17-5-56-10-13 24-4-36-10-13 31-3-06-10-13 32-10-01-7-0 38-10-86-0-8 41-4-02-5-8 47-8-46-4-4 54-4-06-7-12
-0-10-120-10-12 5-7-45-7-4 10-6-84-11-4 17-5-56-10-13 24-4-36-10-13 31-3-06-10-13 32-10-01-7-0 38-10-86-0-8 41-4-02-5-8 47-8-46-4-4 54-4-06-7-12 55-2-120-10-12
0-4-14-7-25-9-17-9-12-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-3-0,0-1-12], [6:0-4-0,0-1-12], [8:0-2-12,0-1-8], [10:0-2-12,0-2-0], [13:0-2-12,0-2-0], [18:0-2-12,0-3-0], [21:0-2-4,0-2-0], [22:0-3-0,0-3-0], [25:0-2-8,0-1-8]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15YESIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.87
0.560.78
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.19
-0.330.08
(loc)25-27
25-2722
l/defl>999
>999n/a
L/d240
180n/a
PLATESMT20
Weight: 258 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*B5: 2x4SPFStud
WEBS 2x4SPFStud*Except*W4,W6,W12,W13: 2x4SPF No.2, W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-9-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 5-5-13 oc bracing.Except:
10-0-0 oc bracing: 19-21WEBS1 Row at midpt 4-25, 6-22, 10-21JOINTS1Brace at Jt(s): 21
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=1031/0-4-0(min. 0-1-14), 22=2604/0-6-0(min. 0-4-9), 15=610/0-6-0(min. 0-1-8)Max Horz2=84(LC 20)
Max Uplift2=-425(LC 12), 22=-819(LC 12), 15=-169(LC 17)MaxGrav2=1181(LC 42), 22=2907(LC 41), 15=853(LC 24)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-32=-2111/1244, 32-33=-2094/1245, 3-33=-2050/1264, 3-34=-1729/1064,
4-34=-1686/1078, 4-35=-1736/1023, 35-36=-1736/1022, 5-36=-1739/1022,5-37=-1736/1021, 6-37=-1736/1021, 6-38=-681/1476, 7-38=-681/1476, 7-8=-681/1476,8-9=-614/1083, 9-39=-602/1052, 10-39=-601/1054, 10-11=-443/208, 11-40=-444/182,
12-40=-571/168, 12-41=-809/186, 41-42=-887/170, 13-42=-943/165, 13-15=-793/202BOT CHORD 2-28=-1139/1893, 27-28=-1139/1893, 26-27=-894/1585, 25-26=-894/1585,
24-25=-293/635, 23-24=-293/635, 22-23=-293/635, 21-22=-1476/841, 9-21=-267/95,17-18=-76/330, 16-17=-119/819WEBS3-27=-601/264, 4-27=-270/397, 4-25=-273/180, 5-25=-640/218, 6-25=-682/1298,
6-23=-165/272, 6-22=-2487/1296, 8-22=-1399/289, 8-21=-179/1076, 18-21=-83/332,10-21=-1322/550, 10-17=-206/423, 12-17=-512/157, 13-16=-77/791
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-8,Exterior(2) 10-6-8 to 13-6-8,Interior(1) 38-10-8 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C for
members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T21
TrussType
Roof Special
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:532018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lBgMNxEnrvcl8kJ3SwEAcJYCERu3QL98nQRliwzRrhi
NOTES-
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=425, 22=819, 15=169.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T22
TrussType
HalfHip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:542018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DNEkbHEQcDkcmuuF0elP9X5NnrCy9rdI04BIENzRrhh
Scale=1:44.6
0-1-10T1
T2
W5
B1
W3 W4 W5 W4 W5
W4
W1 W2
T3
B2
1
2 3 4 5 6
12 11 10 9 8 7
13
14
15 16 17
6x6 3x4 3x8
3x63x63x43x84x4
3x4 1.5x4
5x10
3x6
4-10-04-10-0 11-5-66-7-7 18-2-96-9-3 25-1-86-10-15
4-10-04-10-0 11-5-66-7-7 18-2-96-9-3 25-1-86-10-15
1-10-93-9-23-10-123-9-25.0012
PlateOffsets(X,Y)-- [11:0-3-8,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.820.65
0.58
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.15-0.28
0.05
(loc)
9-118-9
7
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 104 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 4-11-13 oc bracing.WEBS 1 Row at midpt 6-8
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)7=999/0-6-0(min. 0-2-0), 12=961/MechanicalMax Horz12=84(LC 13)
Max Uplift7=-449(LC 12), 12=-397(LC 12)MaxGrav7=1270(LC 34), 12=1061(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-13=-1407/883, 13-14=-1402/893, 2-14=-1361/904, 2-15=-2318/1355, 15-16=-2319/1354,
3-16=-2322/1354, 3-4=-1909/1088, 4-5=-1909/1088, 5-17=-1909/1088, 6-17=-1909/1088,
6-7=-1205/630, 1-12=-1024/674BOT CHORD 10-11=-872/1302, 9-10=-872/1302, 8-9=-1353/2319
WEBS 2-11=-336/129, 2-9=-563/1152, 3-9=-406/167, 3-8=-460/307, 5-8=-605/209,6-8=-1191/2091, 1-11=-807/1343
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 4-10-0,Exterior(2) 4-10-0 to 9-0-14zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)7=449, 12=397.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T23
TrussType
HalfHip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:552018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hao6ocF2NXsTN1TRZLGeikecnEW1uEhRFkwrmpzRrhg
Scale=1:44.5
0-1-10T1
T2
W5
B1
W3 W4 W5 W4 W5 W4 W5 W4W1W2
T3
B2
1
2 3 4 5 6 7
14 13 12 11 10 9 8
15 16
6x6 3x6 3x10
3x63x64x63x83x8
3x4 1.5x4
3x10
3x5
4x8
4x4
2-10-02-10-0 8-3-25-5-2 13-10-05-6-14 19-4-145-6-14 25-1-85-8-10
2-10-02-10-0 8-3-25-5-2 13-10-05-6-14 19-4-145-6-14 25-1-85-8-10
1-10-92-11-23-0-122-11-25.0012
PlateOffsets(X,Y)-- [9:0-3-8,0-2-0], [12:0-3-8,0-1-8], [13:0-3-8,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.550.72
0.85
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.20-0.41
0.07
(loc)
10-1210-12
8
l/defl
>999>727
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 102 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-11-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 4-8-3 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)8=1002/0-6-0(min. 0-2-0), 14=978/Mechanical
Max Horz14=61(LC 13)Max Uplift8=-450(LC 12), 14=-419(LC 12)
MaxGrav8=1286(LC 34), 14=1155(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-1181/728, 2-15=-2730/1557, 3-15=-2733/1556, 3-4=-3063/1703, 4-5=-3063/1703,5-6=-3063/1703, 6-16=-2209/1220, 7-16=-2209/1220, 7-8=-1230/638, 1-14=-1142/720
BOT CHORD 12-13=-708/1128, 11-12=-1555/2730, 10-11=-1555/2730, 9-10=-1220/2209
WEBS 2-13=-606/269, 2-12=-946/1788, 3-12=-684/234, 3-10=-176/369, 4-10=-452/155,6-10=-540/945, 6-9=-909/369, 7-9=-1318/2388, 1-13=-776/1292
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-0-14,Interior(1) 7-0-14 to 24-11-12zone;cantileverleft
exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; LumberDOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)8=450, 14=419.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T24
TrussType
HalfHipGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:592018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-aL1de_IYRlMvsfmDoBLasaoMSs_fq6l1AMu3vazRrhc
Scale=1:51.4
0-1-10T1
T2
W3
B1
W1 W2 W3 W2 W3 W2 W3 W2 W3 W2 W3 W2
T3
B212
3 4 5 6 78 9 10
18 17 16 15 14 13 12 11
2122 23 24 25 26 27 28
29 30 31 32 33 34 35 36
8x8 8x8 5x6
2x43x85x12MT18H2x44x4
4x6
4x4
4x6
4x8
3x6
4x4
4x6
4x6
4-5-04-5-0 8-4-13-11-1 12-4-144-0-13 16-5-124-0-13 20-6-94-0-13 24-7-74-0-13 28-10-04-2-9
-0-10-120-10-12 4-5-04-5-0 8-4-13-11-1 12-4-144-0-13 16-5-124-0-13 20-6-94-0-13 24-7-74-0-13 28-10-04-2-9
0-4-12-0-82-2-22-0-85.0012
PlateOffsets(X,Y)-- [2:0-9-13,0-1-8], [3:0-4-0,0-1-0], [7:0-4-0,0-6-0], [7:0-0-0,0-3-10], [9:0-2-12,0-2-0], [10:0-2-12,0-2-8], [11:Edge,0-3-8], [12:0-2-12,0-1-8], [13:0-1-12,0-1-8],[15:0-2-12,0-2-8], [17:0-1-12,0-2-0]
LOADING (psf)TCLL
TCDLBCLLBCDL
20.0
10.00.010.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncrCode
2-0-01.15
1.15NOIBC2012/TPI2007
CSI.TC
BCWBMatrix-MSH
0.31
0.360.58
DEFL.Vert(LL)
Vert(TL)Horz(TL)
in0.32
-0.590.09
(loc)14-16
14-1611
l/defl>999
>580n/a
L/d240
180n/a
PLATESMT20
MT18H
Weight: 372 lb FT= 14%
GRIP197/144
244/190
LUMBER-
TOP CHORD2x8SP 2400F 2.0E*Except*
T1: 2x4SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)11=1919/0-6-0(min. 0-1-8), 2=2876/0-4-0(min. 0-1-8)Max Horz2=72(LC 9)
Max Uplift11=-809(LC 8), 2=-1202(LC 8)
MaxGrav11=2115(LC 31), 2=2925(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-7249/2918, 3-21=-9212/3613, 21-22=-9215/3613, 4-22=-9223/3614,4-23=-10258/3962, 5-23=-10258/3962, 5-24=-9840/3769, 6-24=-9840/3769,
6-25=-9840/3769, 7-25=-9840/3769, 7-8=-9840/3769, 8-26=-7905/3014, 9-26=-7905/3014, 9-27=-4644/1772, 27-28=-4644/1772, 10-28=-4644/1772, 10-11=-1962/753
BOT CHORD 2-29=-2696/6738, 18-29=-2696/6738, 18-30=-2646/6610, 17-30=-2646/6610,
17-31=-3576/9209, 16-31=-3576/9209, 16-32=-3930/10258, 15-32=-3930/10258,14-15=-3930/10258, 14-33=-2982/7905, 13-33=-2982/7905, 13-34=-1742/4644,
12-34=-1742/4644
WEBS 3-18=-599/1541, 3-17=-1021/2838, 4-17=-1097/427, 4-16=-377/1118, 5-14=-516/240,
6-14=-406/185, 8-14=-805/2064, 8-13=-1067/439, 9-13=-1325/3478, 9-12=-1551/621,
10-12=-1799/4761
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T24
TrussType
HalfHipGirder
Qty
1
Ply
2
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:13:592018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-aL1de_IYRlMvsfmDoBLasaoMSs_fq6l1AMu3vazRrhc
NOTES-
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)All plates areMT20 plates unless otherwiseindicated.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=809, 2=1202.12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 183 lb down and 163 lb up at 4-5-0, 91 lb down and 67 lb up at
6-5-12, 91 lb down and 67 lb up at 8-5-12, 91 lb down and 67 lb up at 10-5-12, 91 lb down and 67 lb up at 12-5-12, 91 lb down and 67 lb up at 14-5-12, 91 lb down and67lb up at 16-5-12, 91 lb down and 67 lb up at 18-5-12, 91 lb down and 67 lb up at 20-5-12, 91 lb down and 67 lb up at 22-5-12, 91 lb down and 67 lb up at 24-5-12,
and 91 lb down and 67 lb up at 26-5-12, and 97 lb down and 64 lb up at 28-3-4 on top chord, and 1367 lb down and 557 lb up at 3-7-12, 95 lb down and 110 lb up at 4-5-0, 39 lb down and 41 lb up at 6-5-12, 39 lb down and 41 lb up at 8-5-12, 39 lb down and 41 lb up at 10-5-12, 39 lb down and 41 lb up at 12-5-12, 39 lb down and 41lb up at 14-5-12, 39 lb down and 41 lb up at 16-5-12, 39 lb down and 41 lb up at 18-5-12, 39 lb down and 41 lb up at 20-5-12, 39 lb down and 41 lb up at 22-5-12, 39 lb
down and 41 lb up at 24-5-12, and 39 lb down and 41 lb up at 26-5-12, and 51 lb down and 35 lb up at 28-3-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-10=-61, 2-11=-20Concentrated Loads(lb)
Vert: 3=-121(F) 7=-39(F) 18=-82(F) 17=-34(F) 4=-39(F) 16=-34(F) 5=-39(F) 14=-34(F) 6=-39(F) 13=-34(F) 9=-39(F) 12=-34(F) 22=-39(F) 23=-39(F) 24=-39(F)25=-39(F) 26=-39(F) 27=-39(F) 28=-57(F) 29=-1367(B) 30=-34(F) 31=-34(F) 32=-34(F) 33=-34(F) 34=-34(F) 35=-34(F) 36=-40(F)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T25
TrussType
FlatGirder
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:002018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2Xb?rKJAC3UmUpLPMuspPoLXuFKqZTiAO?ecS0zRrhb
Scale=1:13.4
W1
T1
W1
B1
W2 W1 W2
1 2 3
6
5 4
7
8 9 10
3x6 3x6
7x14MT18H
4x8 1.5x4 4x8
2-11-42-11-4 5-10-82-11-4
2-11-42-11-4 5-10-82-11-4
1-9-15PlateOffsets(X,Y)-- [5:0-7-0,0-4-12]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MP
0.270.36
0.99
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.03-0.05
-0.00
(loc)
55-6
4
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 30 lb FT= 20%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-4-1 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)6=1387/Mechanical, 4=1376/Mechanical
Max Uplift6=-537(LC 8), 4=-542(LC 8)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-1001/394, 1-7=-1701/647, 2-7=-1701/647, 2-3=-1701/647, 3-4=-1015/404WEBS1-5=-729/1918, 3-5=-729/1918
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.3) Unbalancedsnowloads have been considered for this design.
4)Provide adequate drainage to preventwater ponding.5)All plates areMT20 plates unless otherwiseindicated.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
6=537, 4=542.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 63 lb down and 37 lb up at
0-7-4, and 66 lb down and 40 lb up at 5-8-12 on top chord, and 34 lb down and 32 lb up at 0-7-4, 1135 lb down and 439 lb up at 1-11-4, and 1041 lb down and 417 lb up at 3-11-4, and 40 lb down and 29 lb up at 5-8-12 on bottomchord.The design/selection
ofsuchconnection device(s)is the responsibility of others.11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-61, 4-6=-20Concentrated Loads(lb)
Vert: 4=-32(B) 3=-42(B) 7=-33(B) 8=-29(B) 9=-1135(F) 10=-1041(F)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T26
TrussType
Roof Special
Qty
2
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:012018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Wk9N3gKpzNcd5ywbwcN2x?ug7fdEI1NKdfNA_TzRrha
Scale=1:50.4
T1 T2
B1
B2
B3
W1 W2
W3 W4
W6
W5
W7
W9
W8
1
2
3
4
5
6 7
13 12 11
10 9 8
17
18 19 20 21
22
3x5
4x4
3x4
1.5x4 2x4
3x4
1.5x4 3x8
6x8
3x4
4x4
4x8
7-5-137-5-13 13-0-05-6-3 15-6-02-6-0 20-5-24-11-2 26-0-05-6-14
7-5-137-5-13 13-0-05-6-3 15-6-02-6-0 20-5-24-11-2 26-0-05-6-14 26-10-120-10-12
0-4-15-9-17-9-12-4-12-0-05.0012
PlateOffsets(X,Y)-- [1:0-0-14,Edge], [6:0-1-12,0-2-0], [11:0-5-12,0-4-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.430.54
0.51
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.08-0.22
0.10
(loc)
12-1312-13
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 116 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-9-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)1=928/0-6-0(min. 0-1-10), 8=956/0-6-0(min. 0-1-11)
Max Horz1=-79(LC 17)Max Uplift1=-153(LC 16), 8=-172(LC 17)
MaxGrav1=1048(LC 2), 8=1083(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-1958/247, 2-17=-1880/268, 2-18=-1381/225, 18-19=-1323/234, 3-19=-1307/248,3-4=-1335/265, 4-20=-1583/279, 20-21=-1605/277, 5-21=-1694/259, 5-22=-1122/197,
6-22=-1183/181, 6-8=-1030/235
BOT CHORD 1-13=-197/1735, 12-13=-197/1735, 11-12=-138/1508, 4-11=-49/414WEBS2-13=0/254, 2-12=-620/198, 3-12=-100/781, 4-12=-572/169, 9-11=-141/1109,
5-11=-23/515, 5-9=-736/171, 6-9=-102/1053
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 13-0-0,Exterior(2) 13-0-0 to 16-0-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)1=153, 8=172.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T27
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:022018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_wjlG0LRkglTj6VnUJuHUDQp83wr1SmTsJ7jWvzRrhZ
Scale=1:51.0
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W3
W4
W5
W7
W6
W8
W10
W9
1
2
3 4
5
6
7 8
14 13 12
11 10 9
18
19 20
21 22 23
24
25
3x5
4x4 4x6
1.5x4
1.5x4 2x4
3x4
1.5x4 3x8
5x8
3x4
4x6
4x8
6-10-66-10-6 12-8-05-9-9 13-4-00-8-1 15-6-02-2-0 20-5-24-11-2 26-0-05-6-14
6-10-66-10-6 12-8-05-9-9 13-4-00-8-1 15-6-02-2-0 20-5-24-11-2 26-0-05-6-14 26-10-120-10-12
0-4-15-5-127-7-62-4-12-0-07-5-125.0012
PlateOffsets(X,Y)-- [1:0-0-6,Edge], [4:0-3-0,0-0-12], [9:0-2-0,0-1-4], [10:0-4-0,0-1-12], [12:0-2-8,0-2-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.540.64
0.63
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.13-0.27
0.12
(loc)
13-1413-14
9
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 122 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-7 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)1=929/0-6-0(min. 0-2-2), 9=961/0-6-0(min. 0-2-3)
Max Horz1=-75(LC 17)Max Uplift1=-150(LC 16), 9=-170(LC 17)
MaxGrav1=1345(LC 39), 9=1379(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-18=-2584/292, 2-18=-2485/310, 2-19=-1843/248, 19-20=-1834/251, 20-21=-1794/255,3-21=-1742/274, 3-4=-1607/293, 4-5=-2016/344, 5-22=-1987/296, 22-23=-1993/287,
6-23=-2079/277, 6-24=-1443/217, 7-24=-1528/201, 7-9=-1324/244
BOT CHORD 1-14=-247/2294, 13-14=-247/2294, 12-13=-114/1576WEBS2-13=-763/196, 3-13=-12/281, 4-13=-98/265, 4-12=-172/645, 10-12=-140/1404,
6-12=-29/566, 6-10=-922/167, 7-10=-109/1347
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 12-8-0,Exterior(2) 12-8-0 to 13-4-0,Interior(1) 17-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)1=150, 9=170.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T28
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:042018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-xIrWhhMhGI?BzQfAbkwlZeWAntdLUNMmJdcqbozRrhX
Scale=1:46.1
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W3 W4
W6
W5
W7
W9
W8
1
2
3 4
5
6 7
13 12 11
10 9 8
17
18
19
20 21
22
23
24
3x5
4x4 6x6
1.5x4 2x4
3x4
1.5x4 3x8 6x8
3x4
4x4
4x8
5-9-15-9-1 10-8-04-10-15 15-6-04-10-0 20-5-14-11-1 26-0-05-6-15
5-9-15-9-1 10-8-04-10-15 15-4-04-8-1 20-5-15-1-1 26-0-05-6-15 26-10-120-10-12
0-4-14-7-126-9-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-2-0,0-2-1], [6:0-1-8,0-2-0], [8:0-2-0,0-1-0], [9:0-4-0,0-1-12], [11:0-6-0,0-4-0]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.460.58
0.56
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.10-0.25
0.11
(loc)
12-1311-12
8
l/defl
>999>999
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 114 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-5 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)1=947/0-6-0(min. 0-1-15), 8=983/0-6-0(min. 0-2-0)
Max Horz1=-62(LC 17)Max Uplift1=-133(LC 16), 8=-153(LC 17)
MaxGrav1=1232(LC 39), 8=1294(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-2393/358, 17-18=-2311/358, 2-18=-2244/371, 2-19=-1804/316, 3-19=-1718/336,3-20=-1583/346, 20-21=-1583/346, 4-21=-1581/346, 4-22=-1789/338, 5-22=-1883/317,
5-23=-1226/251, 23-24=-1302/248, 6-24=-1385/235, 6-8=-1241/258
BOT CHORD 1-13=-313/2133, 12-13=-313/2133, 11-12=-191/1618, 4-11=-31/497WEBS2-12=-606/169, 3-12=0/363, 9-11=-158/1302, 5-11=-47/513, 5-9=-878/187,
6-9=-142/1217
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 10-8-0,Exterior(2) 10-8-0 to 19-6-15,Interior(1) 19-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)1=133, 8=153.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T29
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:052018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-PVPuu1NJ1b72aaEM9SS_6r2GMGyBDllvYHLN7EzRrhW
Scale=1:46.4
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W4
W3
W5
W6 W8W7
1
2 3 4
5
6 7
12 11
10 9 8
16
17
18
19 2021
22
23
3x8
4x6 5x63x5
1.5x4
3x4 8x10
4x8
4x4
1.5x4
3x5
8-8-08-8-0 15-6-06-10-0 17-4-01-10-0 26-0-08-8-0
8-8-08-8-0 15-6-06-10-0 17-4-01-10-0 21-11-54-7-5 26-0-04-0-11 26-10-120-10-12
0-4-13-9-125-11-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [1:0-4-2,0-1-8], [3:0-2-4,0-1-8], [4:0-3-0,0-0-12], [5:0-1-12,0-2-0], [6:0-2-0,0-0-8], [9:0-2-12,0-1-8], [11:0-5-12,0-6-4]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.790.67
0.87
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.14-0.38
0.16
(loc)
8-98-9
8
l/defl
>999>822
n/a
L/d
240180
n/a
PLATES
MT20
Weight: 108 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T1: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2 *Except*B2: 2x4SPFStud
WEBS 2x4SPFStud*Except*W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=976/0-6-0(min. 0-1-13), 8=995/0-6-0(min. 0-1-13)Max Horz1=-46(LC 17)
Max Uplift1=-118(LC 16), 8=-144(LC 13)
MaxGrav1=1137(LC 39), 8=1170(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1874/289, 16-17=-1821/296, 17-18=-1789/302, 2-18=-1775/321, 2-19=-1633/347,19-20=-1633/347, 20-21=-1633/347, 3-21=-1635/347, 3-4=-1999/399, 4-22=-1182/277,
5-22=-1192/256BOT CHORD 1-12=-232/1644, 11-12=-297/2059, 3-11=-389/159, 8-9=-159/920
WEBS 2-12=0/382, 3-12=-540/108, 9-11=-180/1705, 4-11=-333/2027, 4-9=-1312/231,
5-9=0/301, 5-8=-1219/238
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 8-8-0,Exterior(2) 8-8-0 to 21-6-15,Interior(1) 21-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)1=118, 8=144.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T30
TrussType
Hip
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:062018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-thyG6NOxovFvCkoZj9zDe3bPSgHmyDO3nx5xfgzRrhV
Scale:1/4"=1'0-1-100-1-10T1
T2
T1
B1 B2
B3
W1 W2 W3 W2
W5
W4
W6
W8W7
1 2
3 4 5 6
7 8
14 13 12
11 10 9
18
19 20
21 22 23
24 25
26
4x4 5x6
3x8
1.5x4
1.5x4 3x4
3x4
3x8
1.5x4
8x8
5x12MT18H
4x8
6-8-06-8-0 11-1-04-5-0 15-6-04-5-0 19-4-03-10-0 26-0-06-8-0
-0-10-120-10-12 6-8-06-8-0 11-1-04-5-0 15-6-04-5-0 19-4-03-10-0 26-0-06-8-0 26-10-120-10-12
0-4-12-11-125-1-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-4-2,0-1-8], [6:0-3-0,0-1-12], [7:0-3-0,0-1-12], [12:0-2-8,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.900.71
0.78
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
-0.17-0.38
0.15
(loc)
12-1312-13
9
l/defl
>999>809
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 109 lb FT= 14%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-4-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-11 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)2=1036/0-6-0(min. 0-1-12), 9=1019/0-6-0(min. 0-1-11)
Max Horz2=52(LC 15)Max Uplift2=-168(LC 12), 9=-170(LC 13)
MaxGrav2=1102(LC 2), 9=1083(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-19=-2130/325, 19-20=-2114/330, 3-20=-2091/349, 3-21=-1908/360, 4-21=-1911/359,4-22=-2652/446, 5-22=-2652/446, 5-23=-2621/443, 6-23=-2619/443, 6-24=-1224/262,
24-25=-1237/243, 7-25=-1262/242, 7-9=-1020/269
BOT CHORD 2-14=-274/1938, 13-14=-388/2730, 12-13=-388/2730, 5-12=-387/122WEBS3-14=-20/573, 4-14=-955/165, 10-12=-166/1261, 6-12=-275/1819, 6-10=-822/194,
7-10=-123/1131
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-8-0,Exterior(2) 6-8-0 to 23-6-15,Interior(1) 23-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=168, 9=170.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T31
TrussType
HIPGIRDER
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:082018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-p441X3PCJWVdR1yxqa?hjUgrzU0gQ72MEFa1kZzRrhT
Scale:1/4"=1'0-1-100-1-10T1
T2
T1
B1 B2
B3
W1 W2 W3 W2
W5
W4
W6 W7 W8
W10W9
T3
1 2
3 4 5 6 7 8
9 10
17 16 15
14 13 12 11
20 21 22 23 24 25 26 27 2829
30 31 32 33 34 35
36 37
8x8 4x6
4x6
3x4
2x4 4x6
2x4 4x6
4x4
5x6
6x16MT18H
4x12
4x6
5x8
5x6
4-8-04-8-0 10-1-05-5-0 15-6-05-5-0 18-10-63-4-6 21-4-02-5-10 26-0-04-8-0
-0-10-120-10-12 4-8-04-8-0 10-1-05-5-0 15-6-05-5-0 18-10-63-4-6 21-4-02-5-10 26-0-04-8-0 26-10-120-10-12
0-4-12-1-124-3-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-1-0,0-0-2], [3:0-4-2,Edge], [7:0-5-4,0-1-12], [11:Edge,0-3-8], [12:0-2-0,0-2-8], [15:0-7-8,0-3-12], [16:0-2-4,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
NOIBC2012/TPI2007
CSI.
TCBC
WBMatrix-MSH
0.520.49
0.77
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.28-0.66
0.20
(loc)
15-1615-16
11
l/defl
>999>469
n/a
L/d
240180
n/a
PLATES
MT20MT18H
Weight: 162 lb FT= 14%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*
T2,T3: 2x6SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*B2: 2x4SP 2400F 2.0E,B3: 2x6SPF No.2
WEBS 2x4SPFStud*Except*W2: 2x4SPF No.2, W5: 2x6SP 2400F 2.0E,W4: 2x6SPF No.2W10: 2x4SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:8-8-14 oc bracing: 15-16
9-3-4 oc bracing: 12-13.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=1633/0-6-0(min. 0-1-8), 11=1591/0-6-0(min. 0-2-11)
Max Horz2=51(LC 57)Max Uplift2=-361(LC 8), 11=-450(LC 9)MaxGrav2=1757(LC 2), 11=1708(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-4247/882, 3-20=-6365/1460, 20-21=-6368/1460, 21-22=-6370/1460,
22-23=-6371/1461, 4-23=-6376/1461, 4-24=-6368/1576, 24-25=-6368/1576,25-26=-6368/1576, 5-26=-6368/1576, 5-6=-6218/1554, 6-27=-6218/1554,
7-27=-6218/1554, 7-28=-1686/515, 28-29=-1680/512, 8-29=-1675/514, 8-9=-1879/540,9-11=-1638/463BOT CHORD 2-17=-794/3911, 17-30=-802/3883, 30-31=-802/3883, 31-32=-802/3883, 16-32=-802/3883,
16-33=-1424/6369, 33-34=-1424/6369, 34-35=-1424/6369, 15-35=-1424/6369,5-15=-381/198, 13-37=-635/2420, 12-37=-635/2420
WEBS 3-17=0/432, 3-16=-656/2735, 4-16=-702/347, 13-15=-704/2702, 7-15=-1000/4290,7-13=-1302/418, 7-12=-1342/306, 8-12=-1/446, 9-12=-470/1785
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)2=361, 11=450.Continued on page 2
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
T31
TrussType
HIPGIRDER
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:082018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-p441X3PCJWVdR1yxqa?hjUgrzU0gQ72MEFa1kZzRrhT
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 214 lb down and 177 lb up at 4-8-0, 78 lb down and 71 lb up at 5-3-5
, 78 lb down and 71 lb up at 7-3-5, 78 lb down and 71 lb up at 9-3-5, 78 lb down and 71 lb up at 11-3-5, 78 lb down and 71 lb up at 13-3-5, 78 lb down and 71 lb up at 15-3-5, 80 lb down and 96 lb up at 17-3-5, and 80 lb down and 96 lb up at 19-3-5, and 218 lb down and 230 lb up at 21-4-0 on top chord, and 110 lb down at 4-8-0, 44
lb down at 5-3-5, 44 lb down at 7-3-5, 44 lb down at 9-3-5, 44 lb down at 11-3-5, 44 lb down at 13-3-5, 44 lb down at 15-3-5, 46 lb down at 17-3-5, and 46 lb down at 19-3-5, and 114 lb down and 30 lb up at 21-3-5 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)Vert: 1-3=-51, 3-8=-61, 8-9=-51, 9-10=-51, 2-15=-20, 11-14=-20
Concentrated Loads(lb)Vert: 3=-149(F) 17=-96(F) 12=-72(F) 8=-154(F) 20=-48(F) 22=-46(F) 23=-46(F) 24=-46(F) 25=-46(F) 26=-46(F) 27=-49(F) 28=-49(F) 30=-37(F) 31=-37(F) 32=-37(F)
33=-37(F) 34=-37(F) 35=-37(F) 36=-28(F) 37=-28(F)
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V01
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:092018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HGePkPQq4qdU3BX8OHWwGhD7ruQs9mLVTvJbG?zRrhS
Scale=1:21.8
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-30-0-3 5-4-85-4-5
2-8-42-8-4 5-4-82-8-4
0-0-43-1-100-0-414.0012
PlateOffsets(X,Y)-- [2:Edge,0-3-1]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.120.24
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 15 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=168/5-4-1(min. 0-1-8), 3=168/5-4-1(min. 0-1-8)
Max Horz1=75(LC 13)
Max Uplift1=-23(LC 17), 3=-23(LC 16)MaxGrav1=190(LC 2), 3=190(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V02
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:092018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HGePkPQq4qdU3BX8OHWwGhD8TuT19mLVTvJbG?zRrhS
Scale=1:10.2
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-30-0-3 2-6-32-6-0
1-3-21-3-2 2-6-31-3-2
0-0-41-5-100-0-414.0012
PlateOffsets(X,Y)-- [2:Edge,0-3-1]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.020.03
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 6 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-3 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=67/2-5-13(min. 0-1-8), 3=67/2-5-13(min. 0-1-8)
Max Horz1=-30(LC 14)
Max Uplift1=-9(LC 17), 3=-9(LC 16)MaxGrav1=75(LC 2), 3=75(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and rightexposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V03
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:102018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lSCnylRSr8lLhL6Ky?19ovlHlHpCuBFeiZ38oRzRrhR
Scale=1:65.5
T2
W1
B1
ST5
ST4
ST3
ST2
ST1
T1
1
2
3
4
5
6
7
8
14 13 12 11 10 9
15
1617
3x4
1.5x4
1.5x4
3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
12-10-412-10-4
12-10-412-10-4
0-0-410-8-910.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-SH
0.11
0.040.15
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-9
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 74 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
OTHERS 2x4SPFStud*Except*ST5: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 8-9, 7-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.All bearings 12-10-4.
(lb)-Max Horz1=418(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 9, 1, 10, 11, 12, 13 except 14=-118(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 9, 10, 11, 12, 13, 14 except 1=303(LC 16)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-500/414, 2-15=-396/300, 3-15=-389/309, 3-4=-383/323, 4-5=-311/257
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 12-8-8zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 1, 10, 11, 12,13 except(jt=lb) 14=118.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V04
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:112018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Dfm995S4cRtCIVhWViZOL6IN3h6VddWowDoiKuzRrhQ
Scale=1:50.5
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
10-0-1010-0-10
0-0-48-4-910.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.40
0.230.21
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 40 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-4
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.REACTIONS.(lb/size)1=161/10-0-10(min. 0-1-8), 4=79/10-0-10(min. 0-1-8), 5=433/10-0-10(min. 0-1-8)
Max Horz1=323(LC 16)Max Uplift4=-51(LC 16), 5=-275(LC 16)
MaxGrav1=219(LC 31), 4=105(LC 22), 5=542(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-6=-333/263, 6-7=-314/301, 2-7=-294/306WEBS2-5=-469/349
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 9-10-14zone;cantileverleft exposed; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
5=275.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V05
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:122018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-irKXMQSiNl?3wfGi3Q4duKrWw5UhM6vx9tYFtKzRrhP
Scale=1:38.3
T1 W1
B1
ST1
1
2
3
5 4
6
7
2x4
1.5x4
1.5x41.5x4
1.5x4
7-3-17-3-1
0-0-46-0-910.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.52
0.100.08
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-4
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 27 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=64/7-3-1(min. 0-1-8), 4=109/7-3-1(min. 0-1-8), 5=302/7-3-1(min. 0-1-8)
Max Horz1=223(LC 13)
Max Uplift1=-38(LC 12), 4=-62(LC 13), 5=-192(LC 16)MaxGrav1=140(LC 30), 4=154(LC 29), 5=378(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-362/341, 2-6=-345/346
WEBS 2-5=-334/248
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-3-1,Interior(1) 3-3-1 to 7-1-5zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)
5=192.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V06
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:132018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-A1uwamTK837wYorvd7bsQXNlhVp65aL5OXHoPmzRrhO
Scale=1:21.5
T1
W1
B1
1
2
3
4
2x4
1.5x4
1.5x4
4-5-74-5-7
0-0-43-8-910.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.26
0.150.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 15 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-5-7 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=138/4-5-7(min. 0-1-8), 3=138/4-5-7(min. 0-1-8)
Max Horz1=130(LC 13)
Max Uplift1=-4(LC 16), 3=-61(LC 16)MaxGrav1=160(LC 30), 3=183(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-3-11zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V07
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:132018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-A1uwamTK837wYorvd7bsQXNn9Vq?5aL5OXHoPmzRrhO
Scale=1:18.4
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
3-8-63-8-6
0-0-43-0-1510.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.17
0.100.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 12 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-6 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=111/3-8-1(min. 0-1-8), 3=111/3-8-1(min. 0-1-8)
Max Horz1=104(LC 15)
Max Uplift1=-4(LC 16), 3=-49(LC 16)MaxGrav1=129(LC 30), 3=148(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V08
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:142018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-eERIn6UyvMFm9yQ5Br65zlwrqv5nq1bEdB1MxDzRrhN
Scale=1:34.2
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-5-156-5-15
0-0-45-4-1510.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.62
0.380.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 22 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=211/6-5-15(min. 0-1-8), 3=211/6-5-15(min. 0-1-8)
Max Horz1=197(LC 13)
Max Uplift1=-7(LC 16), 3=-93(LC 16)MaxGrav1=244(LC 30), 3=279(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-295/237
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 6-4-3zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V09
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:152018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6Q?g?SVbggNdn6?HkYdKVyT5bIUKZSWNrrmvTfzRrhM
Scale=1:48.6
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
9-3-99-3-9
0-0-47-8-1510.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.30
0.170.15
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 36 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=137/9-3-9(min. 0-1-8), 4=91/9-3-9(min. 0-1-8), 5=391/9-3-9(min. 0-1-8)
Max Horz1=297(LC 16)
Max Uplift4=-58(LC 16), 5=-249(LC 16)MaxGrav1=196(LC 31), 4=114(LC 29), 5=490(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-312/249, 6-7=-293/282, 2-7=-279/287
WEBS 2-5=-426/315
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 9-1-13zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)5=249.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V10
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:152018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6Q?g?SVbggNdn6?HkYdKVyT65IVBZQGNrrmvTfzRrhM
Scale=1:59.4
W1
T1 W3
B1
ST2
ST1
W2
1 2
3
4
5
9 8 7 6
10
11
3x5
3x4
1.5x4
1.5x41.5x4
1.5x4
3x4
1.5x4
-0-10-120-10-12 9-11-09-11-0
1-9-1310-0-1510.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [9:0-2-12,0-1-8]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.200.11
0.29
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
0.00-0.00
-0.00
(loc)
11
6
l/defl
n/rn/r
n/a
L/d
120120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W3: 2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 9-10-4 oc bracing.WEBS 1 Row at midpt 5-6
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 9-11-0.(lb)-Max Horz9=335(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 6 except 9=-166(LC 14), 7=-207(LC16), 8=-439(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 6 except 9=528(LC 16), 7=406(LC
30), 8=362(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-9=-530/415, 2-3=-401/361, 3-10=-282/244, 4-10=-252/249BOT CHORD 8-9=-362/322
WEBS 4-7=-352/262, 3-8=-257/164, 2-8=-434/487
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 1-11-0,Interior(1) 1-11-0 to 9-9-4zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6 except(jt=lb)9=166, 7=207, 8=439.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V11
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:162018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-acZ2CoVDR_VUPGZUIF8Z2A?CfisMIxFX4VWT05zRrhL
Scale=1:38.6
T1 W1
B1
ST2
ST1
1
2
3
4
7 6 5
8
9
2x4
1.5x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
7-3-127-3-12
0-0-46-1-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.53
0.050.05
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-5
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 32 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 7-3-12.
(lb)-Max Horz1=224(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 6 except 7=-135(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 6 except 7=264(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-8=-353/313, 2-8=-335/335
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-3-12,Interior(1) 3-3-12 to 7-2-0zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverifycapacity of bearingsurface.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 6 except(jt=lb) 7=135.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V12
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:172018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2p7QQ8WrCHdL0Q8gszfobNYMg67t1OKgJ9F0YXzRrhK
Scale=1:33.3
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-3-126-3-12
0-0-45-3-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.58
0.360.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 21 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=204/6-3-12(min. 0-1-8), 3=204/6-3-12(min. 0-1-8)
Max Horz1=191(LC 13)
Max Uplift1=-7(LC 16), 3=-90(LC 16)MaxGrav1=237(LC 30), 3=270(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-287/232
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 6-2-0zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V13
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:172018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2p7QQ8WrCHdL0Q8gszfobNYPc69l1OKgJ9F0YXzRrhK
Scale=1:26.7
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-3-125-3-12
0-0-44-5-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.39
0.240.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 18 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-12 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=169/5-3-12(min. 0-1-8), 3=169/5-3-12(min. 0-1-8)
Max Horz1=158(LC 13)
Max Uplift1=-5(LC 16), 3=-75(LC 16)MaxGrav1=196(LC 30), 3=223(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 5-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V14
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:182018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-W?hpdUXTzbmCeajsQgB17b5dkWWSmraqXp?Z4_zRrhJ
Scale=1:21.0
T1
W1
B1
1
2
3
4
2x4
1.5x4
1.5x4
4-3-124-3-12
0-0-43-7-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.24
0.140.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 14 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-3-12 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=133/4-3-12(min. 0-1-8), 3=133/4-3-12(min. 0-1-8)
Max Horz1=125(LC 13)
Max Uplift1=-4(LC 16), 3=-59(LC 16)MaxGrav1=155(LC 30), 3=176(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V15
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:192018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_BFBqqY5kvu3GjI3zOiGgodpEwtmVIqzmTk7dQzRrhI
Scale=1:16.8
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
3-3-123-3-12
0-0-42-9-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.13
0.070.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 10 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-12 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=98/3-3-7(min. 0-1-8), 3=98/3-3-7(min. 0-1-8)
Max Horz1=92(LC 13)
Max Uplift1=-3(LC 16), 3=-43(LC 16)MaxGrav1=114(LC 30), 3=130(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V16
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:192018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_BFBqqY5kvu3GjI3zOiGgodrQwuTVIqzmTk7dQzRrhI
Scale=1:12.6
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
2-3-122-3-12
0-0-41-11-210.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.05
0.030.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 7 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-3-12 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=62/2-3-7(min. 0-1-8), 3=62/2-3-7(min. 0-1-8)
Max Horz1=59(LC 13)
Max Uplift1=-2(LC 16), 3=-28(LC 16)MaxGrav1=72(LC 30), 3=83(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V17
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:202018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-TNpZ2AYjVC0wtttFX5DVC0AzgJ5WEk47?7Ug9szRrhH
Scale:3/4"=1'
T1 T1
B1
1
2
34
5 6
7
2x4
3x4
2x4
0-0-100-0-10 8-10-08-9-7
4-5-04-5-0 8-10-04-5-0
0-0-41-10-10-0-45.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-P
0.210.62
0.00
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20
Weight: 19 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=259/8-8-13(min. 0-1-8), 3=259/8-8-13(min. 0-1-8)
Max Horz1=27(LC 20)
Max Uplift1=-43(LC 16), 3=-43(LC 17)MaxGrav1=293(LC 2), 3=293(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-4=-318/182, 4-5=-284/187, 2-5=-257/194, 2-6=-257/194, 6-7=-284/187, 3-7=-318/182
BOT CHORD 1-3=-131/262
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 4-5-0,Exterior(2) 4-5-0 to 7-5-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)Gablerequirescontinuous bottomchord bearing.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V18
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:212018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-xaMxFVZLFW8nV1SR5pkklDj1AjSszALGEnDDhJzRrhG
Scale=1:27.0
T1 T1
B1
ST1
B2
1
2
3
5 4
6
7
8 9
10
11
3x5
8x12MT18H
3x53x51.5x4
0-0-100-0-10 16-10-016-9-7
8-5-08-5-0 16-10-08-5-0
0-0-43-6-10-0-45.0012
PlateOffsets(X,Y)-- [1:0-0-6,Edge], [3:0-2-6,Edge]
LOADING (psf)
TCLLTCDL
BCLLBCDL
20.010.0
0.010.0
SPACING-
PlateGrip DOLLumber DOL
RepStressIncrCode
2-0-0
1.151.15
YESIBC2012/TPI2007
CSI.
TCBC
WBMatrix-SH
0.680.48
0.13
DEFL.
Vert(LL)Vert(TL)
Horz(TL)
in
n/an/a
0.00
(loc)
--
3
l/defl
n/an/a
n/a
L/d
999999
n/a
PLATES
MT20MT18H
Weight: 41 lb FT= 14%
GRIP
197/144197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=235/16-8-13(min. 0-1-15), 3=235/16-8-13(min. 0-1-15), 4=615/16-8-13(min. 0-1-15)
Max Horz1=-56(LC 21)
Max Uplift1=-61(LC 16), 3=-71(LC 17), 4=-55(LC 16)MaxGrav1=275(LC 33), 3=275(LC 34), 4=692(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-4=-438/152
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 8-5-0,Exterior(2) 8-5-0 to 11-5-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.14) Unbalancedsnowloads have been considered for this design.
5)All plates areMT20 plates unless otherwiseindicated.6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3, 4.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V19
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:222018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-PmwJTra_0qGe7B1dfWFzIRFMt7vDieZPSRznDlzRrhF
Scale=1:8.2
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
2-7-02-7-0
0-0-41-0-155.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.04
0.020.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 6 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-7-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=60/2-6-6(min. 0-1-8), 3=60/2-6-6(min. 0-1-8)
Max Horz1=31(LC 13)
Max Uplift1=-11(LC 16), 3=-17(LC 16)MaxGrav1=67(LC 2), 3=67(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V20
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:222018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-PmwJTra_0qGe7B1dfWFzIRFE_7qDieZPSRznDlzRrhF
Scale=1:17.6
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-7-06-7-0
0-0-42-8-155.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.54
0.340.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 17 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=201/6-6-6(min. 0-1-8), 3=201/6-6-6(min. 0-1-8)
Max Horz1=104(LC 13)
Max Uplift1=-37(LC 16), 3=-58(LC 16)MaxGrav1=227(LC 2), 3=227(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 6-5-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V21
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:232018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-tyUhgBbcn7OVkLcqCEmCqeoR_XC3R4NZh4iKmBzRrhE
Scale=1:27.3
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
10-7-010-7-0
0-0-44-4-155.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.40
0.240.09
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-4
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 31 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=166/10-7-0(min. 0-1-8), 4=76/10-7-0(min. 0-1-8), 5=443/10-7-0(min. 0-1-8)
Max Horz1=177(LC 13)
Max Uplift1=-4(LC 16), 4=-22(LC 13), 5=-150(LC 16)MaxGrav1=188(LC 2), 4=98(LC 22), 5=501(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-375/229
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 10-5-4zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)5=150.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V22
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:242018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-L924uXcEYRWMMVB0mxHRNsLe6xZ8AXoiwkSuIdzRrhD
Scale=1:26.1
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
9-11-09-11-0
0-0-44-1-95.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.31
0.190.08
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-4
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 29 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=146/9-11-0(min. 0-1-8), 4=87/9-11-0(min. 0-1-8), 5=406/9-11-0(min. 0-1-8)
Max Horz1=165(LC 13)
Max Uplift1=-1(LC 16), 4=-23(LC 13), 5=-137(LC 16)MaxGrav1=165(LC 2), 4=107(LC 22), 5=458(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-344/219
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 9-9-4zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)5=137.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V23
TrussType
GABLE
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:242018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-L924uXcEYRWMMVB0mxHRNsLVYxTaAY3iwkSuIdzRrhD
Scale=1:21.0
T1 W1
B1
1
2
3
4
5
2x4
1.5x4
1.5x4
7-11-07-11-0
0-0-43-3-95.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.86
0.540.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a-0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 21 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-7-8 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=248/7-11-0(min. 0-1-8), 3=248/7-11-0(min. 0-1-8)
Max Horz1=128(LC 13)
Max Uplift1=-46(LC 16), 3=-72(LC 16)MaxGrav1=281(LC 2), 3=281(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 7-9-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V24
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:252018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pLcS5tcsJkeD_elCKepgv3tnEKtCv?Js8OBRq4zRrhC
Scale=1:15.8
T1
W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-11-05-11-0
0-0-42-5-95.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.42
0.260.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 15 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-11-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=178/5-10-6(min. 0-1-8), 3=178/5-10-6(min. 0-1-8)
Max Horz1=92(LC 13)
Max Uplift1=-33(LC 16), 3=-51(LC 16)MaxGrav1=201(LC 2), 3=201(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 5-9-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V25
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:262018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HXAqIDdU42m3boKPuMKwSHQ?KkGAeSZ?N2x_MWzRrhB
Scale=1:10.9
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
3-11-03-11-0
0-0-41-7-95.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.14
0.090.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 9 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=107/3-10-6(min. 0-1-8), 3=107/3-10-6(min. 0-1-8)
Max Horz1=55(LC 13)
Max Uplift1=-20(LC 16), 3=-31(LC 16)MaxGrav1=121(LC 2), 3=121(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 57868-W1
Dansco Engineering, LLC
Date: 4/11/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional
information.
Job
1802043-12T
Truss
V26
TrussType
Valley
Qty
1
Ply
1
1802043-12TDWH Jackson'sGrantLot185
Job Reference (optional)
Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.Wed Apr1109:14:262018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HXAqIDdU42m3boKPuMKwSHQ1GkHPeSZ?N2x_MWzRrhB
Scale=1:6.7
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
1-11-01-11-0
0-0-40-9-95.0012
LOADING (psf)TCLL
TCDLBCLL
BCDL
20.0
10.00.0
10.0
SPACING-PlateGrip DOL
Lumber DOLRepStressIncr
Code
2-0-01.15
1.15YES
IBC2012/TPI2007
CSI.TC
BCWB
Matrix-P
0.01
0.010.00
DEFL.Vert(LL)
Vert(TL)Horz(TL)
inn/a
n/a0.00
(loc)-
-3
l/defln/a
n/an/a
L/d999
999n/a
PLATESMT20
Weight: 4 lb FT= 14%
GRIP197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-11-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=36/1-10-6(min. 0-1-8), 3=36/1-10-6(min. 0-1-8)
Max Horz1=19(LC 13)
Max Uplift1=-7(LC 16), 3=-10(LC 16)MaxGrav1=41(LC 2), 3=41(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.13) Unbalancedsnowloads have been considered for this design.4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.6)Bearing at joint(s) 3 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard