HomeMy WebLinkAbout324635 04/25/18 ♦ut,CAgM
CITY OF CARMEL, INDIANA VENDOR: 171000
® ONE CIVIC SQUARE JONES &HENRY ENGINEER INC CHECK AMOUNT: $****31,573.23*
r ro: CARMEL, INDIANA 46032 3103 EXECUTIVE PARKWAY#300 CHECK NUMBER: 324635
TOLEDO OH 43606 CHECK DATE: 04/25/18
4 iON�
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
659 5023990 68748 12,202.00 OTHER EXPENSES
660 5023990 68748 1,724.00 OTHER EXPENSES
609 5023990 68750 5,124.00 OTHER EXPENSES
601 5023990 68751 i a 2,668.00 OTHER EXPENSES
660 5023990 68752 6,029.23 OTHER EXPENSES
659 5023990 68753 2,526.00 OTHER EXPENSES
651 5023990 68754 1,300.00 OTHER EXPENSES
VOUCHER NO. 185365 WARRANT N0. ALLOWED 20 Prescribed by State Board of Accounts City Form No.201(Rev 1995)
Vendor # 171000 IN SUM OF$ ACCOUNTS PAYABLE VOUCHER
JONES&HENRY ENGINEER INC CITY OF CARMEL
3103 EXECUTIVE PARKWAY An invoice or bill to be properly itemized must show: kind of service,where performed,
SUITE 300 dates service rendered, by whom, rates per day, number of hours, rate per hour,
TOLEDO, OH 43606 numbers of units, price per unit, etc.
Payee
$23,781.23 171000 Purchase Order No.
ON ACCOUNT OF APPROPRATION FOR JONES&HENRY ENGINEER INC Terms
Carmel Wasterwater Utility 3103 EXECUTIVE PARKWAY Due Date
BOARD MEMBERS SUITE 300
I hereby certify that that attached invoice(s), TOLEDO, OH 43606
or bill(s)is(are)true and correct and that
PO# ACCT# the materials or services itemized thereon for DATE INVOICE# Description
DEPT# INVOICE# Fund# AMOUNT which charge is made were ordered and DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
68747 06-1050-97r24 pp and received except 4/23/2018 68747
$1,724.00
yailabllity
�(r 1
68748 07-1050-96 12�2aZk 4/23/2018 68748 $12,202.00
C-onmection '"
68752 06=f420r=00"" 4/23/2018 68752 $6,029.23
ai a:ility
68753 07-1050-99 $2;526$00 ;• 4/23/2018 68753 $2,526.00
^onnection ' '�.�9 '""
68754 01-7310-08 $1;300.00-r '- 4/23/2018 68754 $1,300.00
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited
same in accordance with IC 5-11-10-1.6
Cost distribution ledger classification if claim paid motor vehicle highway fund. 20_
Clerk-Treasurer
Jones& Henry Engineers, Ltd.
3103 Executive Parkway, Suite.300
Toledo, Ohio-43606
k.,&luWThE re. 419.413.0611
CITY OF CARMEL Invoice number 68748
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7240 CARMEL/TRAINING
CARMEL, IN 46032 CENTER 2016/2017 BID DOCUMENTS
Professional services performed through January 31,2018
Professional engineering services in connection with developing bid documents for a Training Center in the Control Building
2nd floor in accordnce with our Letter Agreement 9-16 dated November 30,2016 and Letter Agreement 10-17.
The projected fee is$161,500.
9-001 TRAINING CENTER 2016/2017 BID DOCUMENTS-DSGN
Labor
Billed
Units Rate Amount
ADMINISTRATIVE ASSISTANT 0.25 60.00 15.00
ENGINEER 23.00 95.00 2,185.00
PROJECT ENGINEER 1.00 104.00 104.00
TECHNICIAN 98.00 90.00 8,820.00
Labor subtotal 122.25 11,124.00
Reimbursable
Cost Billed
Amount Multiplier Amount
Computer/CAD Usages 980.00 1.10 1,078.00
Phase subtotal 12,202.00
Invoice total 12,202.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 TRAINING CENTER 2016/2017 BID DOCUMENTS-DSGN
9-002 TRAINING CENTER 2016/2017 BID DOCUMENTS-CONST
Total 161,500.00 123,569.61 12,202.00 135,771.61
Thank you for your business.
Page 1
w �!
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
0 Toledo, Ohio 43606
'°"'&I d•,�"° 419.473.9611
CITY OF CARMEL Invoice number 68747
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7236 CARMEL/SEWER LINING
CARMEL, IN 46032
Professional services performed through January 31,2018
Professional engineering services in connection with developing bid documents for sewer lining in accordance with our letter
agreement 10-16 dated November 30,2016.
The projected fee is$63,000.
9-001 SEWER LINING
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 8.00 100.00 800.00
SENIOR PROJECT MANAGER 6.00 154.00 924.00
Labor subtotal 14.00 1,724.00
Phase subtotal 1,724.00
Invoice total 1,724.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SEWER LINING
Total 63,000.00 59,154.85 1,724.00 60,878.85
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
bma Fle Th�W d�r'"d - 419.473.9611
CITY OF CARMEL Invoice number 68753
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7363 CARMEL/SECONDARY
CARMEL, IN 46032 HYDRAULICS
Professional services performed through January 31,2018
Professional engineering services in connection with the evaluation of the hydraulic issues in the Secondary System at the
WWTP and develop a conceptual method to add alum in the MLSS in accordance with our Letter Agreement No.9-17.
The projected fee is$27,500.
9-001 SECONDARY HYDRAULICS
Labor
Billed
Units Rate Amount
SENIOR PROJECT MANAGER 16.00 150.00 2,400.00
SENIOR ENGINEER 1.00 126.00 126.00
Labor subtotal 17.00 2,526.00
Phase subtotal 2,526:00
Invoice total 2,526.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SECONDARY HYDRAULICS
Total 27,500.00 9,777.90 2,526.00 12,303.90
Thank you for your business.
Page 1
Jones:& Henry Engineers, Ltd.
3103 Executive:Parkway, Suite 300
Toledo., Ohio 43606
'°'°'A' m` r�ML 419.473.9611
r
CITY OF CARMEL Invoice number 68752
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7356 CARMEL/LOWES WAY
CARMEL, IN 46032 LINER
Professional services performed through January 31,2018
Professional engineering services in connection with preparing bid documents and assisting during construction of a
structural liner in approximately•1300 ft of 27 in interceptor sewer in accordance with our Letter Agreement No. 7-17 and
Engineering Service Agreement dated November 3, 1999.
The projected fee is$51,500.
9-001 LOWES WAY LINER -DESIGN
Labor
Billed
Units Rate Amount
ADMINISTRATIVE ASSISTANT 0.50 60.00 30.00
CONSTRUCTION.SERV SPECIALIST 49.00 100.00 4,900.00
Labor subtotal 49.50 4,930.00
Reimbursable
Cost Billed
° Amount Multiplier Amount
PRINTING,COPYING,BLUEPRINTING 261.12 1.10 287.23
Phase subtotal 5,217.23
9-002 LOWES WAY LINER-CONST
Labor
Billed
Units Rate Amount
PRINCIPAL 1.00 137.00 137.00
SENIOR PROJECT MANAGER 4.50 150.00 675.00
Labor subtotal 5.50 812.00
Phase subtotal 812.00
Invoice total 6,029.23
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 LOWES WAY LINER -DESIGN
9-002 LOWES WAY LINER-CONST
Total 51,500.00 29,906.58 6,029.23 35,935.81
Thank you foryour business.
Page 1
Jones & Henry Engineers, Ltd.-
3103
td.3103 Exedutiv..e Parkway, ,Suite 300
Toledo; Ohio 43606
11WdTh ' 419.473.9611
CITY OF CARMEL Invoice number 68754
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7376 CARMEL/ON CALL WW
CARMEL, IN 46032 2018
Professional services performed through January 31,2018
Professional engineering services in connection with various services requested by the City for the Wastewater Utility in
accordance with our Letter Agreement Number 11-17.
The projected fee is$25,000.
9-001 ON CALL WW 2018
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 13.00 100.00 1,300.00
Invoice total 1,300.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 ON CALL WW 2018
Total 25,000.00 0.00 1,300.00 1,300.00
Thank you for your business.
v �
Page 1
VOUCHER NO. 181369 WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev 1995)
ALLOWED 20
Vendor# 171000 IN SUM OF$ ACCOUNTS PAYABLE VOUCHER
JONES &HENRY ENGINEER INC CITY OF CARMEL
3103 Executive Parkway Ste 300 An invoice or bill to be properly itemized must show: kind of service,where performed,
TOLEDO, OH 43606 dates service rendered, by whom, rates per day, number of hours, rate per hour,
numbers of units, price per unit, etc.
Payee
$7,792.00 171000 Purchase Order No.
ON ACCOUNT OF APPROPRATION FOR JONES&HENRY ENGINEER INC Terms
Carmel Water Utility 3103 Executive Parkway Ste 300 Due Date
BOARD MEMBERS
I hereby certify that that attached invoice(s), TOLEDO, OH 43606
or bill(s)is(are)true and correct and that
PO# ACCT# the materials or services itemized thereon for DATE INVOICE# Description
DEPT# INVOICE# Fund# AMOUNT which charge is made were ordered and DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
68750 0RXglendreceived except 4/23/2018 68750 $5,124.00
Wn
68751 01 63 0 08 t$2,668A0 4/23/2018 68751
'±b O $2,668.00
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited
same in accordance with IC 5-11-10-1.6
Cost distribution ledger classification if claim paid motor vehicle highway fund. 20_
Clerk-Treasurer
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
bro,b,bnn� �� 419.473.9611
Flied7NnFlny'"'
CITY OF CARMEL Invoice number 68750
MR.JOHN DUFFY Date_ 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-7348 CARMEL/NORTH .
CARMEL, IN 46032 COLLEGE WATER MAIN
Professional services performed through January 31,2018
Professional engineering services in connection with preparing bid documents and assisting during construction of a new
water main on North College Avenue in accordance with our Letter Agreement No.6-17.
The projected fee is$106,000.
9-001 NORTH COLLEGE WATER MAIN-DESIGN
Labor
Billed
Units Rate Amount
SENIOR PROJECT MANAGER 3.00 154.00 462.00
SENIOR ENGINEER 37.00 126.00 4,662.00
Labor subtotal 40.00 5,124.00
Phase subtotal 5,124.00
Invoice total 5,124.00 -
Contract
,124.00 -Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 NORTH COLLEGE WATER MAIN-DESIGN
9-002 NORTH COLLEGE WATER MAIN-CONSTR
Total 106,000.00 29,359.67 5,124.00 34,483.67
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive.Parkway, Suite 300
Toledo, Ohio 43606
419.473.9611
n�ami.w�°
t
CITY OF CARMEL Invoice number 68751
MR.JOHN DUFFY Date 02/12/2018
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 06451-7355 CARMEL/ON CALL-
CARMEL, IN 46032 WATER UTILITIES
Professional services performed through January 31,2018
Professional engineering services in connection with various services requested by the City of Carmel for the Water Utilitiy in
accordance with our Letter Agreement 8-17 dated October 2,2017 and Engineering Service Agreement dated November 2,
1999.
The projected fee is$25,000
9-001 ON CALL-WATER UTILITIES
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST r 22.00 100.00 2,200.00
SENIOR PRINCIPAL 3.00 156.00 468.00
Labor subtotal 25.00 2,668.00
Phase subtotal 2,668.00
Invoice total 2,668.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 ON CALL-WATER UTILITIES
TotaL 25,000.00 10,014.42 2,668.00. 12;682.42
Thank you for your business.
Page 1