HomeMy WebLinkAbout04100001 Building Plans (2)• • •
ZONE "A" PER
SCALED DISTANCE
FROM FLOOD BOUNDARY
& FLOODWAY MAP
# 180081 0013
ELEVATION FROM -
754.0 PER FLOOD INSURANCE STUDY N ou & SE
FOR THE CITY OF CARMEL, HAMILTON C4
COUNTY VOLUME 1 OF 1 PLATE 09P
REVISED MAY 24, 1994.
295.5'
11
1
i
FLOODWAY LIMITS
00
PLOT PLAN LOT # 133
WILLIAMSON RUN
SECTION EIGHT
INSTR. # 93 57039
PC # 1 SLIDE # 374
3678 GOULD DRIVE
NOTE:
LOT 133 LIES PARTIALLY
FLOOD ZONE�-A-
FROM FLOOD i
MAP # 180081 0013C VC10. I - --
MAP REVISED MAY 24, 1994. � 43.4'
` 46.2' I
58.0 _ w____,__
57.3
St2, I 15'DU & SE
36.14' 43.86' 21.82'
W 57.4
s'WAuc 56.8
W -W - --u1- -
_ THM _
3.99
, , •
COMMON AREA
DRAINAGE ESMT
LAKE
NORMAL POOL ELEV = 747.00
r` APPROXIMATE LOCATION
CT} EDGE OF WATER
Z* G -.r?� 'gyp
55.0 - 1 #
133 i �- Z"A• LIMITS
I
' Ss.o
5.0'
`lei BENDER
CWTVA ill W11- " ff-J I I LW -J
Genera Notes
1. ALL EXTERIOR COLORS, FINISHES AND MATERIALS TO MATCH EXISTING HOME.
2. No deviation from these plans shall be made without direction from owner.
3. All pool related details are for reference only. Pool contractor to get separate required permits.
4. All concrete to be 3000 Ib. minimum.
5. Verify all exterior door types. Door allowance $425.00 for both exterior doors.
6. Home owner to do all landscaping, seeding and final grade. Pool contractor to do all rough grading.
7. Exterior to match existing colors. Verify colors with owner prior to start of work.
8. Wood deck to have 2x2 railings vertical with openings less than 4".
9. Pool contractor scope limitations as described in pool contractor notes.
Rat CURB
WATER UNE
COULD DRIVE
50' R /N
SHEET INDEX
1. TITLE SHEET AND SITE PLAN
2. DETAIL SITE PLAN
3. FLOOR PLANS
4. ELEVATIONS, SECTION & DETAILS
5. ELECTRICAL AND HVAC PLANS
>L
O
F-
a
Q
O
O
WJ
Wo
W0
0 0-
zo
W
M Q
c
a
v
c
N
c°.
R
z
W Z C
G Z
0o
g ;IO:
>� o
�o�'
F=Wa0: zv
aa�oM
z
nJ
�.L
W
��F-
VJ
z
F-
W
W
rr=
VJ
W
4F -%v '
11
55.0/
/ - -
$peciftations
i
,slpeD�
` ► .�,`
1. All concrete to be 3,000 pound minimum.
12
I,
' la.o� R�toc•r►t�p
2. All paint to be porter paint. Exterior colors to match existing color. Owner to select interior colors. Three color scheme;
ceiling, walls and trim.
��
p1
_�
} 3c2
5E� p�rArl. st7L' PUJ
D �MLtsIoNS
3• Windows to match existing "Cradco" windows.
s
4. 25 year fiberglass shingles to match existing style and color.
so.2
59'3
I
ss.3
loot, pt: RMrr FIZoM
5. All color selections by owner.
- 30.0'
--
92.88
22.0'
TI s
�I:pI:RA I t�RJ+wIN S
6. Brick to match existing. Utilize home owner brick in blending.
/
59.0
XI i
HoM
3084 L -3-D
M ENMSSY
7. Deck to be 4x4 treated wood posts in 8" diameter holes 3'-0" deep filled with 300# concrete.
"
8. Deck structure to be 5/4 treated wood deck on 2x8 treated
SUNP�/
��
1
joists at 12" O.C. on treated wood beams.
9. Deck beams to be 2-2x6 treated wood between 4x4 posts at 6'-0" O.C. maximum.
10. Provide
x
solid wood skirting on the deck.
s Aar
GnRtGE
BSMT FFE � �i52:8-
- x,51 �
\
57 9
55.4
11. Treated wood deck steps to be same size. Maximum 8" riser and minimum 11 ° tread.
12. Roof overhang to match existing.
25 0'
60.2
59.3
7613
11.79' 19.58'
20.7,
30.11
90-2-1
59.
? LX4
16
owve
3. Wux
35'BL
I
Rat CURB
WATER UNE
COULD DRIVE
50' R /N
SHEET INDEX
1. TITLE SHEET AND SITE PLAN
2. DETAIL SITE PLAN
3. FLOOR PLANS
4. ELEVATIONS, SECTION & DETAILS
5. ELECTRICAL AND HVAC PLANS
>L
O
F-
a
Q
O
O
WJ
Wo
W0
0 0-
zo
W
M Q
c
a
v
c
N
c°.
R
z
W Z C
G Z
0o
g ;IO:
>� o
�o�'
F=Wa0: zv
aa�oM
z
nJ
�.L
W
��F-
VJ
z
F-
W
W
rr=
VJ
W
Pool Contractor Plan Notes
1. Pool rim elevation shall be 756.00' as referenced to first floor elevation of 761.30'.
2. For concrete scoring and brush patterns, see detail.
3. All pool deck concrete area to be done by pool contractor.
4. Concrete to be colored as selected by home owner.
5. Pool contractor to do excavation for room addition. Includes footings.
6. Pool contractor to do all backfill of room addition and final rough grading.
7. Existing home basement sump pump drain to be relocated if disturbed by pool contractor.
8. Final rough grading to be approved by owner and addition contractor.
9. Home owner to rework planting bed at north east comer of existing home.
10. Additional cost to do work for room addition contractor shall be identified separately.
11. Room addition contractor to provide footings and crawl space concrete for addition.
12. Pool equipment enclosure by room addition contractor.
13. Coordinate location of pool equipment with room addition contractor.
• � (, -� � (,_. 2 � �,°_ �, a �"ri Y!� P. � � =. �"�'t � � -�,
ell- iker
I1
s�
PLA
�QuNT
weisr.
— --
� Fc cx)ow -� x ! m � ;� s
------------ - -- - -
General Notes _-_-_
1. ALL EXTERIOR COLORS, FINISHES AND MATERIALS TO MATCH EXISTING HOME.
2. d viation from hese plans shall be ma a without direction from owner.
3. All pool related details are for reference only. Pool contractor to get separate required permits.
4. All concrete to be 3000 ib. minimum.
5. Verify all exterior door types. Door allowance $425.00 for both exterior doors.
6. Home owner to do all landscaping, seeding and final grade. Pool contractor to do all rough grading.
7. Exterior to match existing colors. Verify colors with owner prior to start of work.
8. Wood deck to have 2x2 railings vertical with openings less than 4".
9. Pool contractor scope limitations as described in pool contractor notes.
C3 '._ �u�5'ftU4f ?EGGS
0
s
'37'd
v.
-7.5w* AT wo4wW
EXi5T1 µCp
i
r.l°`-''G J—\.V
�
22L a"
z
0
0
Q
G
0
0
W -j
W 0 ,
W
oj
0 a.
z 0
W
M Q
m
C
C
z
CL
_r• j
0
CL
0
'v
W?C
zz
�OVo+
UOto
1�
Gi
co
_�A,
MOM
IrV
z
CL
_r• j
Room Finishes
1. Crawl space to have epoxy on 4" concrete floor. Walls to be dry lock paint on concrete skimmed 8" masonry block.
2. First floor to have tile on % backer board on 3/4" plywood floor. Walls and ceiling to be eggshell paint on %" GWB.
G9AWL �
r
Specifications
1. All concrete to be 3,000 pound minimum.
2. All paint to be porter paint. Exterior colors to match existing color. Owner to select interior colors. Three color scheme;
ceiling, walls and trim.
3. Windows to match existing "Cradco" windows.
4. 25 year fiberglass shingles to match existing style and color.
5. All color selections by owner.
6. Brick to match existing. Utilize home owner brick in blending.
7. Deck to be 4x4 treated wood posts in 8" diameter holes 3'-0" deep filled with 300# concrete.
8. Deck structure to be 5/4" treated wood deck on 2x8 treated joists at 12" O.C. on treated wood beams.
9. Deck beams to be 2-2x6 treated wood between 4x4 posts at 6'-0" O.C. maximum.
10. Provide solid wood skirting on the deck.
11. Treated wood deck steps to be same size. Maximum 8" riser and minimum 11" tread.
12. Roof overhang to match existing.
General Notes
1. ALL EXTERIOR COLORS, FINISHES AND MATERIALS TO MATCH EXISTING HOME.
2. No deviation from these plans shall be made without direction from owner.
3. All pool related details are for reference only. Pool contractor to get separate required permits.
4. All concrete to be 3000 ib. minimum.
5. Verify all exterior door types. Door allowance $425.00 for both exterior doors.
6. Home owner to do all landscaping, seeding and final grade. Pool contractor to do all rough grading.
7. Exterior to match existing colors. Verify colors with owner prior to start of work.
8. Wood deck to have 2x2 railings vertical with openings less than 4".
9. Pool contractor scope limitations as described in pool contractor notes.
Pool Contractor Plan Notes
1. Pool rim elevation shall be 756.00' as referenced to first floor elevation of 761.30'.
2. For concrete scoring and brush patterns, see detail.
3. All pool deck concrete area to be done by pool contractor.
4. Concrete to be colored as selected by home owner.
5. Pool contractor to do excavation for room addition. Includes footings.
6. Pool contractor to do all backfill of room addition and final rough grading.
7. Existing home basement sump pump drain to be relocated if disturbed by pool contractor.
8. Final rough grading to be approved by owner and addition contractor.
9. Home owner to rework planting bed at north east comer of existing home.
10. Additional cost to do work for room addition contractor shall be identified separately.
11. Room addition contractor to provide footings and crawl space concrete for addition.
12. Pool equipment enclosure by room addition contractor.
13. Coordinate location of pool equipment with room addition contractor.
Demolition Pian Notes
I. Remove existing deck complete.
2. Remove existing trim and siding a required for attachment of new addition roof.
3. Existing door to be removed
4. Existing window to remain on first floor.
5. Existing exterior finish to remain.
u
txGt. aHTeg wlNraow IN raooM
i0
ca
rip -SI Ft-aoR.
8
t
F-1-c-Mneve U16T. P 1. { f VoYIPL MI:aM
bPm ($- 2%frtx 14') AND 60L. (3- 2x4 x$'
PIWO- WAL4 h4 R.Zq. AAD iUPta0Ri1•S f
��o 4k
Roof Plan Notes
0
0
0
i
i•
C
'v
C
1. Match existing shingles and install new 25yr shingles to match existing. Match existing slope.
2. Roof to be 25 year fiberglass three tab shingles to match existing on 15# felt.
3. New 5" gutters to match existing gutters. Review downspout locations wit owner prior to installation.
4. Flash with aluminum against existing house.
4
y
. FIl?i -�s SHIA Ott i
3g4 fLIW&V 03 4 2yG
F_,60 MM--' tASS I?4SULAIbf+
+C4 51LVS ra tc;' o.G, W/5'(2- �IgL=cCTLAs S (R.i3)
%i C-.5 SWVATHIFtf 10 tt;PAR LA? SIDI*.
2? 4rUTTt$ P WK t 1)1& TP -IM
't42)110 aotsTso leo c. W/R-sofeIfJL LASS IKSUL.
7G 1.3
�vvadp bN U014TS
FAct. PR1C W�Tit�S�IL"o.G. mw.
L 5�G110N -A
40 1+.011
yEkM15/ y �, RuwF. t3MRC HOME .ANO
CMU. FILL ALL UaILTS
--/ FTA,
Specifications
1. All concrete to be 3,000 pound minimum.
2. All paint to be porter paint. Exterior colors to match existing color. Owner to select interior colors. Three color scheme;
ceiling, walls and trim.
3. Windows to match existing "Cradco" windows.
4. 25 year fiberglass shingles to match existing style and color.
5. All color selections by owner.
6. Brick to match existing. Utilize home owner brick in blending.
7. Deck to be 4x4 treated wood posts in 8" diameter holes 3'-0" deep filled with 300# concrete.
8. Deck structure to be 514" treated wood deck on 2x8 treated joists at 12" O.C. on treated wood beams.
9. Deck beams to be 2-2x6 treated wood between 44 posts at 6'-0" O.C. maximum.
10. Provide solid wood skirting on the deck.
11. Treated wood deck steps to be same size. Maximum 8" riser and minimum 11" tread.
12. Roof overhang to match existing.
Elevation Notes
1. All exterior materials to mz
2. All siding details to be the
3. Soffit to match existing.
4. All flashing against existinc
5. Brick to match existing.
i.
- _ owi S?I 14 NcUS L t3trYar-t0
I
---------------------
r--O L Z WINDO To Mk Ia445- i
~�X1sT►
NICE t GIC TO
MATCH IsxtsT. -�
` 1
. Yst = I ►.�,�
MA'fGN 1.*4I5i BIRD scrx
lYti 'riztM'
%Kde Tor 9,N i- oN 2xlo mL.
W/ 2YZ Pio TS ypAOCD
_1 4'A"ART ON 2 x FASGIA
_ 7to t .:�
�o
N
tD
Q
!b
C
R
'O
C
O
a
cc
z
�ZC
go��
Ck
z IZ
on
L ce z
Q
W
z
Q
z
a
F—
U
W
z
_a
F—
W
W
.O
O
C
rn
OF s
General Notes
1. ALL EXTERIOR COLORS, FINISHES AND MATERIALS TO MATCH EXISTING HOME.
2. No deviation from these plans shall be made without direction from owner.
3. All pool related details are for reference only. Pool contractor to get separate required permits.
4. All concrete to be 3000 Ib. minimum.
5. Verify all exterior door types. Door allowance $425.00 for both exterior doors.
6. Home owner to do all landscaping, seeding and final grade. Pool contractor to do all rough grading.
7. Exterior to match existing colors. Verity colors with owner prior to start of work.
8. Wood deck to have 2x2 railings vertical with openings less than 4".
9. Pool contractor scope limitations as described in pool contractor notes.
Electrical Notes
1. All wire to be 2/12 with ground.
2. Connect electrical circuits to spares in existing sub panel in basement.
3. All receptacles are to be 20 amp rated.
HVAC Notes
1. All ducts to be 6" flex connected to the main trunk line in the existing home.
2. All grills to be 4x10 floor mounted. Color as selected by homeowner.
3. Return air through the opening after the door remova.l
Specifications
1. All concrete to be 3,000 pound minimum.
2. All paint to be porter paint. Exterior colors to match existing color. Owner to select interior colors. Three color scheme;
ceiling, walls and trim.
3. Windows to match existing "Cradco" windows.
4. 25 year fiberglass shingles to match existing style and color.
5. All color selections by owner.
6. Brick to match existing. Utilize home owner brick in blending.
7. Deck to be 4x4 treated wood posts in 8" diameter holes 3'40" deep filled with 300# concrete.
8. Deck structure to be 514" treated wood deck on 2x8 treated joists at 12" O.C. on treated wood beams.
9. Deck beams to be 2-2x6 treated wood between 4x4 posts at 6'-0" O.C. maximum.
10. Provide solid wood skirting on the deck.
11. Treated wood deck steps to be same size. Maximum 8" riser and minimum 11" tread.
12. Roof overhang to match existing.
z
Q
F-
0
0
G
O
a
� J
�o
w0
0 (L
z0
W z
.m Q
�o
N
Q
c
a
tj
Wz=
zz
r00e-
�c
Big z
UG��y
ON C 4
U)
z
Q
J
CL
J