Loading...
HomeMy WebLinkAboutBuilding Permit InformationTJr'PAI'ern.�I.;c�r'�' CJ t• C:[�rytf'ttllV_C'/"t— I�tI:V1?LOPML:NT :.�t- n:,Lv -,:III c�rrnslt= Lc�[1 CARMEL ZONING 03D!NANCE Z-160, SECTIO"' 29.4.2(3): THE 11t:ILDING COMMISSIONER (DIRECTOR, DEPT. OF CO?t%l! N1'rY DEVELOPMENT OR S' ,)FF) SILT.'., APPROVE GR DENY THE IMPROVEMENT LOCATION mmiT (BUILDING PERMIT) W!T!IIN FIV!: 0) WORKING DAYOF Til!: RECEIPT OF THE WRITTEN APPLICA'riON FO'!" AND ACCO!:!'i NY!`1G 'AL%T!:!:IA'-S. TUF. 1i11'ROVEaENT LOCATION PERMIT (BUILDING PERMIT) SHALL 3E ISSUED 1,41!EN TV': PROPUi,12D STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RES111:C'!'S '!'O '11115 O!I')!ti1+SCl:. The following ust t-iirecuiyud_try the"r�,at�cr',rnt of Cormunit ry Development before any building_or rur:odoli u' mrnur e:ur b„ +we nevi.d ,fir t:_,ued bathe staff: _ 1. A complutee improvement Location Permit application. 2. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list I2-valuus on wa'.ls, ceilings, etc. If a commercial construction, Plans must be st:enpud approved by the Indiana State Department of Fire Prevention and !luilding Safety. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilitie,, whichever applies) or septic permit (Hamilton County Health Deparuncnr). G. Three (3) copies of it site or plot plan showing the following REQUIRED information (can be obtained from Chu landowner or land developer): Lot drawn to scale All dimensions Scale and North arrow All roads, alleys; right-of-ways, etc. All other utilities and drainage right-of-ways and..easements - Any applicable flood plain arc:. - Building p:,d elevation and lot corner elevations All accessory buildings -- existing or proposed - Al! sid._walks and driveways 1 Sewer and water lines, septic system and well location Drainage flow arrows All drainage swales and subsurface facilities (retention/detention areas. etc Dime " ional cross sections of all drainage swales Swnp pwo) (siunp pwnp pits) showing discharge locations Cuothermal heat pwnp discharge locations Drainai;e Swaler::_ All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Community Development -performing a final inspection of any structure per plans on file. or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not loss than 4 to 1. If this information is not submitted, it will extend the time it takes to get an.approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SI'12 PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. SIGNATURE: ADDRESS: NAME OF'PL VALID STATE PLUMBING LICENSE NUMBER: