HomeMy WebLinkAboutSmock Fansler/Eng/CO #6/88,750/96th & Hazel Dell Landscaping – Project #16-ENG-15CITY OF CARMEL
TO: Smock Fansler CONTRACT CHANGE ORDER NO.: 6
2910 W. Minnesota St. DATE: 4/10/18
Indianapolis, IN 46241 PROJECT NAME: 16 -ENG -15 V RRo,.
CITY REQ. NO.: 6 b
CITY PO NO.: 100272
CITY PO DATE: 4/5/17
I. You are hereby directed to make the following changes in this contract:
An additional 4625 LFT of Horizontal Bared Conduit were required for the project due to existing
conduit being un -useable at the current depths. An additional 83 Calendar Days will be added due to all
additional work. This Change Order will establish Liquidated Damages for estimated days over the
Substantial Completion Date.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+) OR (-) DAYS
21 -Horizontal Bored Conduit $101,750.00
33 -Contractor Mark-up -$ 13,000.00 0
II. The following referenced documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other: see appendix A for back up documentation
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Sum prior to this Change Order $ 3,162,279.75
Contract Sum will be increased/deeFeasW by this Change Order $ 88,750.00
New Contract Sum including this Change Order $ 3,251,029.75
Contract Time Prior to this Change Order 10/28/2017 Substantial Completion Date
11/15/2017 Final Completion Date
Net Increased/decreased resulting from this Change Order 83 Days
Current Contract Time including this Change Order 1/19/2018 Substantial Completion Date
2/7/2018 Final Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes
Are Recommended:
Lochmueller Group Inc.
Engineer
3502 Woodview Trace, Suite 150
Address
Indiananolis. IN 46268
City/State/Zip
The Above Changes
Are Accepted:
Smock Fansler
Contractor
2910 W. Minnesota St.
Address
Indianapolis. IN 46241
City/State/Zip
By: :�� -1 C -L. By:
Phone: 317-695-1474
Phone: 317-714-3223
Date: 9/29/2017 Date: 4-19-2018
Approved:
ro(&.5eyt
/ Y IZl
Member
City
ESTE
t�
Christy S. Paul e , Clerk -Treasurer
Date:
� 1,2 011(
16 -ENG -15 Change Order 6 Appendix A
CITY OF CARMEL Page 21-1
HAZEL DELL AND KEYSTONE ROUND A BOUT IMPROVEMENTS
PROJECT 16 -ENG -15
ITEM #21 HORIZONTAL BORED CONDUIT (LFT)
Planned Quantity 2000.0 Ift
Date
Length
Diameter
From Pae
Ref #
Comments
9/28/2017
11 Ift
1 in
IR 1.0
1
Installed by
Barthul
9/28/2017
11 Ift
1 in
IR 1.0
2
Installed by
Barthul
11/29/2017
45 Ift
4 in
IR 1.0
3
9/28/2017
11 Ift
1 in
IR 1.0
4
Installed by
Barthul
11/27/20171
70 Ift
4 in
IR 1.0
5
11/28/2017
51 Ift
4 in
IR 1.0
6
9/28/2017
11 Ift
1 in
IR 1.0
7
Installed by
Barthul
9/28/2017
11 Ift
1 in
IR 1.0
8
Installed by
Barthul
9/28/2017
11 Ift
1 in
IR 1.0
9
Installed by
Barthul
11/28/2017
59 Ift
4 in
IR 1.0
10
9/28/2017
11 Ift
1 in
IR 1.0
11
Installed by
Barthul
8/3/2017
15 Ift
2 in
IR 1.1
1
9/13/2017
75 Ift
4 in
IR 1.1
2
9/13/2017
15 Ift
2 in
IR 1.1
3
8/8/2017
135 Ift
4 in
IR 1.1
4
8/8/2017
135 Ift
4 in
IR 1.1
5
8/31/2017
110 Ift
4 in
IR 1.1
6
8/29/2017
110 Ift
4 in
IR 1.1
7
8/3/2017
15 Ift
2 in
IR 1.1
8
9/12/2017
70 Ift
4 in
IR 1.1
9
8/3/2017
15 Ift
2 in
IR 1.1
10
8/4/2017
110 Ift
4 in
IR 1.1
11
8/7/2017
100 Ift
2 in
IR 1.1
12
7/23/2017
15 Ift
2 in
IR 1.2
1
10/6/2017
75 Ift
4 in
IR 1.2
2
10/6/2017
110 Ift
4 in
IR 1.2
3
7/23/2017
15 Ift
2 in
IR 1.2
4
7/24/2017
95 Ift
4 in
IR 1.2
5
9/21/2017
135 Ift
4 in
IR 1.2
6
7/23/2017
15 Ift
2 in
IR 1.2
7
9/26/2017
65 Ift
4 in
IR 1.2
8
7/23/2017
15 Ift
2 in
IR 1.2
9
7/25/2017
101 Ift
4 in
IR 1.2
10
7/26/2017
125 Ift
4 in
IR 1.2
11
This page Total = 1973 Ift
From Pae Subtotal
21-1
1973 Ift
21-2
2389 Ift
21-3
2263 Ift
Item total
6625 Ift
To Page F-1 of FCR
CITY OF CARMEL
HAZEL DELL AND KEYSTONE ROUND A BOUT IMPROVEMENTS
PROJECT 16 -ENG -15
ITEM #21 HORIZONTAL BORED CONDUIT
Planned Quantity 2000.0 Ift
Page 21-2
Date
Length
Diameter
From Pae
Ref # Comments
10/26/2017
15 Ift
2 in
IR 1.3
1
11/30/2017
21 Ift
2 in
IR 1.3
2
11/30/2017
78 Ift
4 in
IR 1.3
3
11/30/2017
78 Ift
4 in
IR 1.3
4
11/30/2017
57 Ift
4 in
IR 1.3
5
10/26/2017
15 Ift
2 in
IR 1.3
6
10/26/2017
15 Ift
2 in
IR 1.3
7
11/29/2017
60 Ift
4 in
IR 1.3
8
11/30/2017
72 Ift
4 in
IR 1.3
9
11/30/2017
22 Ift
2 in
IR 1.3
10
10/26/2017
15 Ift
2 in
IR 1.3
11
11/29/2017
88 Ift
4 in
IR 1.3
12
11/28/2017
76 Ift
4 in
IR 1.3
13
10/26/2017
15 Ift
2 in
IR 1.3
14
11/28/2017
115 Ift
4 in
IR 1.3
15
10/26/2017
15 Ift
2 in
IR 1.3
16
11/29/2017
60 Ift
4 in
IR 1.3
17
11/29/2017
75 Ift
4 in
IR 1.3
18
1/24/2018
75 Ift
4 in
IR 1.4
1
1/29/2018
59 Ift
4 in
IR 1.4
2
1/11/2018
86 Ift
4 in
IR 1.4
3
12/7/2017
70 Ift
4 in
IR 1.4
4
12/5/2017
60 Ift
4 in
IR 1.4
5
1/23/2018
105 Ift
4 in
IR 1.4
6
1/25/2018
80 Ift
4 in
IR 1.4
7
12/11/2017
70 Ift
4 in
IR 1.4
8
2/27/2018
15 Ift
4 in
IR 1.4
9
2/27/2018
15 Ift
4 in
IR 1.4
10
2/26/2018
80 Ift
4 in
IR 1.4
11
1/11/2018
110 Ift
2 in
IR 1.4
12
12/1/2017
80 Ift
4 in
IR 1.5
1
12/1/2017
100 Ift
2 in
IR 1.5
2
12/7/2017
30 Ift
4 in
IR 1.5
3
12/4/2017
70 Ift
4 in
IR 1.54
12/5/2017
60 Ift
4 in
IR 1.5
5
12/5/2017
70 Ift
4 in
IR 1.5
6
12/6/2017
80 Ift
4 in
IR 1.5
7
12/6/2017
91 Ift
4 in
IR 1.5
8
12/1/2017
15 Ift
2 in
IR 1.5
9
12/8/2017
76 Ift
4 in
IR 1.5 1
10
Total = 2389 Ift To Page 21-1 of FCR
CITY OF CARMEL
HAZEL DELL AND KEYSTONE ROUND A BOUT IMPROVEMENTS
PROJECT 16 -ENG -15
ITEM #21 HORIZONTAL BORED CONDUIT
Planned Quantity 2000.0 Ift
Page 21-3
Date
Length
Diameter
From Pae
Ref # Comments
10/11/2017
15 Ift
2 in
IR 1.6
1
10/11/2017
15 Ift
2 in
IR 1.6
2
11/27/2017
29 Ift
4 in
IR 1.6
3
11/27/2017
110 Ift
4 in
IR 1.6
4
11/30/2017
120 Ift
2 in
IR 1.6
5
10/11/2017
15 Ift
2 in
IR 1.6
6
11/29/2017
50 Ift
4 in
IR 1.6
7
11/22/2017
60 Ift
4 in
IR 1.6
8
11/21/2017
54 Ift
2 in
IR 1.6
9
11/16/2017
20 Ift
2 in
IR 1.6
10
11/13/2017
25 Ift
4 in
IR 1.6
11
10/11/2017
15 Ift
2 in
IR 1.6
12
11/7/2017
55 Ift
4 in
IR 1.6
13
11/16/2017
65 Ift
4 in
IR 1.6
14
11/14/2017
50 Ift
2 in
IR 1.6
15
11/14/2017
50 Ift
2 in
IR 1.6
16
11/14/2017
60 Ift
4 in
IR 1.6
17
10/11/2017
15 Ift
2 in
IR 1.6
18
11/27/2017
365 Ift
1" & 3/4"
IR 1.6
19 Crew pulled 2 conduits in one bore
11/18/2017
100 Ift
4 in
IR 1.6
20
10/11/2017
15 Ift
2 in
IR 1.6
21
11/30/2017
50 Ift
4 in
IR 1.6
22
10/12/2017
70 Ift
4 in
IR 1.7
1
10/9/2017
65 Ift
4 in
IR 1.7
2
10/3/2017
15 Ift
2 in
IR 1.7
3
11/3/2017
75 Ift
4 in
IR 1.7
4
11/2/2017
55 Ift
4 in
IR 1.7
5
11/1/2017
55 Ift
4 in
IR 1.7
6
10/3/2017
15 Ift
2 in
IR 1.7
7
10/26/2017
80 Ift
4 in
IR 1.7
8
10/31/2017
45 Ift
4 in
IR 1.7
9
10/20/2017
55 Ift
4 in
IR 1.7
10
10/19/2017
35 Ift
4 in
IR 1.7
11
10/3/2017
15 Ift
2 in
IR 1.7
12
10/19/2017
60 Ift
4 in
IR 1.7
13
10/16/2017
50 Ift
4 in
IR 1.7
14
10/18/2017
60 Ift-F
4 in
IR 1.7
15
10/17/2017
160 Ift
2 in
IR 1.7
16
Total = 2263 Ift To Page 21-1 of FCR
Memo
TO: Doug Haney, Corporation Counsel
From: Lisa Scott
CC: Jeremy Kashman
Date. 04/23/18
Re. C.O. #6 96"' & Hazel Dell RAB Project #16 -ENG -15
Doug, please find attached 1 original of same change order for project #16 -ENG -15 96th & Hazel Dell RAB. Please
review & initial for the next BPW Meeting.
Change Order #6- Original Contract Amount: $2,961,546.50 Increase: $88,750.00 New Contract Amount
$3,251,029.75
Thank you,
Lisa Scott
0 Page 1