Loading...
HomeMy WebLinkAboutA121.0 New Construction PlanR R RR MW MW PWR BREAK 22Y 47/47T2 47/47T2 47/47W2 47/47T2 47/47W2 47/47W2 47/47T2 47/47W2 22Y 47/47T2 47/47T2 47/47W2 47/47T2 47/47W2 47/47W2 47/47T2 47/47W2 F67/48G F67/24N F67/48G F67/24N F67/48G F67/24N F67/48G F67/24N R60 R60 R60 R60 R60 R60 60N P 60N 60N A4860 A4860 A4860 60N P 60N 60N A4860 A4860 A4860 60/60 A 60/60A 60/60A 60/60A 60/60A 60/60A 60R 60R 60R 60R 60R 60R 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 30/60 (1)CG991. (1)CG991. (2)CG991. 42B 07A 07A 07A 42B 42B 07A 07A 07A 42B 07A 07A 42B 07A 07A 07A 42B 57B 22A 07A 42B 42B 07A 07A 07A 42B 57B 22A 22A 57B 42B 07A 07A 07A 07A 07A 42B 07A 07A 07A 07A 07A 42B 07A 07A 07A 07A 07A 42B 07A 07A 07A 07A 07A 42B 07A 07A 07A 07A 07A 07A 42B 42B 07A 07A 07A 07A 07A 07A 42B 57B 22A 22A 22A 22A 57B 22A 57B 42B 07A 07A 07A 07A 42B 42B 07A 07A 07A 07A 42B 22A 22A 57B 22A 22A 57B 22A 22A 22A 22A 57B 22A 22A 22A 22A 22A 22A 57B 22A 22A 42B 42B 2/42B 2/42B 42B 42B 2/42B 2/42B 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 30/72 42/72 72/42 24/60 42/72 72/42 24/60 36/5 42/5 36/5 42/3 42/3 42/3 42/3 36/3 36/3 36/3 36/3 36/3 36/3 42/3 42/3 42/3 42/3 42/3 42/3 42/3 42/3 42/5 42/5 42/5 36/3 36/3 36/3 36/3 R1 360. R1 360. R1 360. R1 360. R1360. R1 360. D60 60 D6060 D6060 D6060 D6060 D6060 D6060 D6060 D6060 D6060 D6060 D6060 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/48R 42/60R 42/48R 68/29F 68/29F 68/29F 68/29F 68/29F 68/29F 68/29F 68/29F 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 42/60R 24/48 24/48 24/48 24/48 NIC 16'- 8" 9'- 2" CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL 14'- 0" 17'- 2" 12'- 3" 17'- 7" 17'- 7" 1'- 8" CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL CORE DRILL 17'- 4" 17'-5" 17'-11" 17'- 8" 17'- 9" 17'- 8" 17'- 9" 7'- 4" 5'- 8" 11'-3" 21'- 4" 12'- 6" 9'- 11" 5'- 10 3_ 4 " 5'- 5" 6'- 8" 6'- 6" 5'- 5" 3'-0" 5'-0" CORE DRILL CORE DRILL 14'- 0" 5 5 5 BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF OFO15 OFO15 BF BF BF BF BF BF BF BF 3 3 3 3 BF BF OFO15 OFO15 BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF OFO15 OFO15 3 3 3 3 3 3 BF BF BF BF OFO15 OFO15 OFO15 OFO15 BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BBF BBF BBF BBF 3 3 3 3 3 3 3 3 5 5 5 BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF FF FF FF FF FF FF FF FF FF BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 BF OFO15 1 5 5 5 5 5 BF BF 2 2 BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF FF FF BF BF 2 2 FF FF 3 3 3 3 123 SF DATA 131 250 SF SPIRITUAL LIBRARY 130 SF 134 MAIL/VENDING 130 82 SF SECURITY STORAGE 142A 207 SF MEETING 114 A401 1A A401 2A A401 2B CLR. 5' - 1" CLR. 5' - 1" 451 SF WELCOME 141 436 SF WELCOME ENTRY 142 58 SF HAVEN 139 1231 SF PLAZA 135 85 SF STOR 211 SF 135A STOR 135B 124 SF STOR. 113 110 SF HAVEN 111 739 SF PLAZA 107 317 SF AMR/ STAT FLIGHT 109 4790 SF OPEN OFFICE 118 146 SF HAVEN 116 122 SF HAVEN 105 207 SF DATA ROOM 104 1043 SF TRAINING ROOM A 125 1424 SF TRAINING ROOM B 126 35 SF STOR-RISK 121 81 SF STOR 126A 138 SF MAIL 127 66 SF CLOSET 128 459 SF FACILITIES 129 248 SF DATA EXP. 132 91 SF HAVEN 117 A301 1B A301 2B A301 3A A301 1C A301 3E E RF1 E RF1 E V1.2 E V1.3 279 SF MEETING SPACE 136 410 SF EXIT CORRIDOR 106 251 SF TELEHEALTH WKRM 102 842 SF LOBBY EAST 124 464 SF ELEVATOR LOBBY 123 983 SF LOBBY WEST 122 667 SF CORRIDOR 147A 451 SF CORRIDOR 147B 142A 137 133 135A 126B 126A 126 125 134 E M1 E M1 E M1 E M1 E M1 A401 3A 3 3 3 5 4 4 2 E MW1 E MW1 141 5024 SF OPEN OFFICE 101 10 10 1 1 1 1 1 10 10 10 10 10 10 9 9 58 SF HAVEN 138 58 SF HAVEN 140 11 10 11 11 11 11 10 10 10 138 139 140 136 106A 90 MIN 14 A301 2E A301 2F 15 15 15 15 15 15 15 15 15 15 15 12 12 134A 56 SF PRAYER ROOM 134A 378 SF TELEPRESESENCE 133 135B 107 SF BADGING 137 121 355 SF MEN'S 144A 363 SF WOMEN'S 144B 414 SF MEN'S 148A 443 SF WOMEN'S 148B 2037 SF FITNESS CENTER 148 491 SF Room 149 196 SF Room 149B 243 SF Room 152 243 SF Room 151 151 SF Room 149A 111 SF Room 150 1 106 20 19 19 19 E IM1 E TR1 E TR1 E CM2 2599 SF TRANSFER CENTER 110 E M1 E M1 E M1 E M1 25 T TA-3 E TA-3 146 SF OFFICE 115 TA205 1 152 SF STAIR 003 152 SF STAIR 001 91 SF STAIR 002 97 SF HAVEN 112 293 SF PRINT 108 389 SF VESTIBULE 122A 129 SF FREIGHT 120 142 SF SUPPORT 119 E V1.1 F CR TBD 128 1 1 1 ALIGN 9 9 106B 90 MIN 110 113 114 115 105 101 90 MIN 111 112 106 SF STOR- REMOTE CARE/MED ALERT 103 5' - 10 3/4" 14 14 15 15 15 15 15 15 117 103 6 9 10 14 11 1 21 5' - 0" 21 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 13' - 11" 2' - 5" 30 TRUE NORTH arcDESIGN PROJECT NUMBER: DATE: DRAWING TITLE: DRAWING NUMBER: REVISIONS: DRAWN BY: CLIENT PROJECT NUMBER: 201 N. Delaware Street, Suite B Indianapolis, IN 46204 317.951.9192 T | 317.951.9194 F www.arcdesign.us This drawing and its contents are the property of arcDESIGN P.C., and shall not be reproduced in whole or in part by any means, mechanical or electronic, without express written permission of arcDESIGN. 4/5/2018 2:23:18 PM C:\Users\kfunston\Documents\Revit 2017 Local\250 W 96th_firestone bldg_CENTRAL_kfunston.rvt ASCENSION | ST. VINCENT A121 NEW CONSTRUCTION PLAN - FIRST FLOOR 15140A 03.06.2018 100% CONSTRUCTION DOCUMENTS 30029-INDIANAPOLIS - ST. VINCENT HEALTH ADMINISTRATION OFFICE 250 W. 96TH STREET - PARKWOOD BUILDING INDIANAPOLIS, IN 46260 AD/DS ININD30029 3/32" = 1'-0" 6A LEVEL 1 - NEW CONSTRUCTION PLAN EQUIPMENT SCHEDULE EST. QTY. MARK DESCRIPTION PROVIDED BY 100 - CONTRACTOR FURNISHED / CONTRACTOR INSTALLED 14 MW1 MICROWAVE CONTRACTOR 9 RF1 REFRIGERATOR/FREEZER CONTRACTOR 3 RF2 ADA COMPLIANT REFRIGERATOR, UNDER-COUNTER CONTRACTOR 200 - OWNER FURNISHED / CONTRACTOR ROUGH-IN 1 CA1 MARKETING - CREATIVE WORK ROOM CART AND LAMINATER, EXISTING OWNER 1 CA3 MARKETING - CREATIVE WORK ROOM CART AND BINDING MACHINE, EXISTING OWNER 2 CM1 COMMERCIAL COFFEE MAKER OWNER 1 CP2 COMPUTER/MONITOR SCREEN - BOARDROOM OWNER 1 CU1 MARKETING - CREATIVE WORK ROOM CUTTING MACHINE, EXISTING OWNER 2 D1 DATA RACK OWNER 1 DW1 DISHWASHER, EXISTING OWNER 1 F5 MARKETING - CREATIVE WORK ROOM HEAT PRESS, EXISTING OWNER 85 M1 MONITOR OWNER 10 P1 PRINTER; ALL-IN-ONE DESKTOP OWNER 13 P2 PRINTER: MULTI-FUNCTION DEVICE, FLOOR STANDING OWNER 1 P3 MARKETING - CREATIVE WORK ROOM DESKTOP LASER PRINTER, EXISTING OWNER 1 P4 MARKETING - CREATIVE WORK ROOM DESKTOP PRINTER, EXISTING OWNER 1 P5 PLOTTER (AIS), EXISTING OWNER 1 PR1 AV CONSULTANT 1 PS1 AV CONSULTANT 4 RF3 REFRIGERATOR/FREEZER, EXISTING OWNER 5 SB1 SHRED IT BIN OWNER 1 TP1 TELEPRESENCE FURNITURE/EQUIPMENT WITH MONITOR SCREENS, EXISTING OWNER 1 V1.1 TOUCHPOINT FOOD VENDING COMPONENT. TOUCHPOINT 3 V1.2 TOUCHPOINT FOOD VENDING COMPONENT. TOUCHPOINT 3 V1.3 TOUCHPOINT FOOD VENDING COMPONENT. TOUCHPOINT 400 - OWNER FURNISHED / OWNER INSTALLED 1 CA2 MARKETING - CREATIVE WORK ROOM CART AND XYRON MACHINE, EXISTING OWNER 1 CT1 MARKETING - CREATIVE WORK ROOM EXISTING COUNTER, EXISTING OWNER 3 F1 MARKETING - CREATIVE WORK ROOM EXISTING BISLEY LOCKED FILE, EXISTING OWNER 1 F2 MARKETING - CREATIVE WORK ROOM EXISTING BOX BOX, EXISTING OWNER 1 F4 MARKETING - CREATIVE WORK ROOM EXISTING FILE WITH DRAWING DRAWERS, EXISTING OWNER 1 S1 MARKETING - CREATIVE WORK ROOM EXISTING SHELVING UNIT, EXISTING OWNER 2 S2 MARKETING - CREATIVE WORK ROOM EXISTING OPEN TALL SHELVING, EXISTING OWNER 2 S3 MARKETING - CREATIVE WORK ROOM EXISTING OPEN SHORT SHELVING, EXISTING OWNER 2 T1 MARKETING - CREATIVE WORK ROOM EXISTING TABLE, EXISTING OWNER 7 TR1 TRASH/RECYCLING RECEPTACLE FURNITURE VENDOR FLOOR PLAN NOTES 1 GLAZED DEMOUNTABLE FURNITURE PARTITION, BY OTHERS. GC RESPONSIBLE FOR PROVIDING AND INSTALLING WINDOW FILM. REFER TO ELEVATIONS FOR MORE DETAILS. 2 EXISTING RECEPTION DESK TO REMAIN. 3 EXISTING STAIR TOWER TO REMAIN, DO NOT BLOCK PATH OF EGRESS. 4 EXISTING RESTROOMS TO REMAIN IN PLACE. 5 OPERABLE PARTITION WALL. REFER TO SPECIFICATIONS FOR MORE INFORMATION. 6 CUSTOM CASEWORK TO INTEGRATE EXISTING ARTWORK AND ARTIFACTS. PROVIDE ALLOWANCE FOR THIS FEATURE. DETAILS TO BE DETERMINED AND COORDINATED WITH ARCHITECT. 7 SECURITY BADGING STATION. 8 DECORATIVE RESIN PANEL SYSTEM, DP-1. 9 CASEWORK BY FURNITURE VENDOR. 10 EXISTING CARD READER TO BE REUSED. 11 SALVAGED / NEW CARD READER TO BE INSTALLED AT THIS LOCATION. PROVIDE ELECTRICAL ROUGH-IN. 12 OWNER PROVIDED STAINED GLASS UNIT TO BE REINSTALLED IN THIS LOCATION. REFER TO DETAILS ON A-501 FOR FURTHER INFORMATION. 14 2 HOUR RATED WALL. PATCH TO MATCH FINISH OF EXISTING ADJACENT. 15 PATCH SILL, AS REQUIRED DUE TO DEMOLITION OF PERPENDICULAR WALL. MATCH EXISTING ADJACENT. SEE TYPICAL DETAIL ON A-501. 16 EXISTING STAINED GLASS DOOR UNIT TO BE INSTALLED. 17 PROVIDE FIRE TREATED BLOCKING, FOR POTENTIAL FUTURE GRAB BAR INSTALLATION. 18 FIRE EXTINGUISHER CABINET, BY GC. EXTINGUISHER BY OWNER. MATCH EXISTING CABINETS IN BUILDING. 19 EXISTING FIRE EXTINGUISHER AND CABINET. 20 REUSE SALVAGED FIRE EXTINGUISHER CABINET. 21 PROVIDE ROLLER WINDOW SHADES, ENTIRE WINDOW OPENING. PROVIDE ALTERNATE PRICING FOR MOTORIZED SHADES. 22 DUAL ROLLER WINDOW SHADES, ENTIRE WINDOW OPENING, BY OTHERS. 23 COAT ROD AND STORAGE SHELF, SEE SHEET A-501 FOR DETAILS. 24 PROVIDE FILM FOR ENTIRE WINDOW COVERED BY WALL. COORDINATE FILM SPECIFICATION W/ ARCHITECT. 25 NEW PREFORMED METAL STAIR AND RAILING FOR EXISTING RAISED FLOOR. 26 PROVIDE CUSTOM-CUT WINDOW FILM (WF2) GRAPHIC (APPROX. 12'W x 8'H). IMAGE FILE TO BE PROVIDED BY ARCHITECT. 27 PROVIDE HEAVY-DUTY 18" DEEP MELAMINE SHELVING ONS STANDARDS. PROVIDE 24" VERTICALLY BETWEEN SHELVES. 28 PROVIDE WINDOW FILM (WF2) ON ENTIRETY OF DOOR GLAZING. 29 PROVIDE 3M SCOTCHSHIELD SAFETY & SECURITY WINDOW FILM ULTRA 600 ON FULL INTERIOR FACE OF GLASS. 30 INSTALL SALVAGED 10' TALL STEELCASE WALL SYSTEM. 31 CONTRACTOR TO PROVIDE 40" HIGH METAL STUD AND GYPSUM BOARD WALL. 1 11.20.2017 COORD. & UPDATES 4 01.17.2018 PR02 6 01.26.2018 PR03- FIRST FLOOR SOUTH 05/01/18 Nick Mishler