Loading...
HomeMy WebLinkAboutA136.0 Finish PlanSTAIR 003 MEN'S 144A WOMEN'S 144B STAIR 002 STAIR 001 WOMEN'S 148B Room 149A Room 149 Room 149B Room 150 Room 151 Room 152 CLOSET 128 RB1 LVT2 P1 MEN'S 148A FITNESS CENTER 148 PLAZA 107 RB1 LVT1 P1 AMR/ STAT FLIGHT 109 RB1 CPT1 P1 HAVEN 111 RB1 CPT1 P1 HAVEN 105 RB1 CPT1 P1 DATA ROOM 104 RB1 EXIST. P1 HAVEN 117 RB1 CPT1 P1 MEETING 114 RB1 CPT1 P1 MAIL 127 RB1 CPT1 P1 WELCOME 141 RB1 CPT1 P1 DATA 131 RB1 CONC1 P1 MAIL/VENDING 130 RB1 LVT2 P1 SPIRITUAL LIBRARY 134 RB1 CPT1 P1 DATA EXP. 132 RB1 CONC1 P1 SECURITY STORAGE 142A RB1 CPT1 P1 STOR 135B RB1 CPT1 P1 STOR-RISK 121 RB1 CPT3 P1 STOR 126A RB1 CPT1 P1 TRAINING ROOM A 125 RB1 CPT1 P1 TRAINING ROOM B 126 RB1 CPT1 P1 MEETING SPACE 136 RB1 CPT1 P1 STOR 135A RB1 LVT1 P1 LOBBY WEST 122 SUPPORT 119 RB1 LVT2 P1 FREIGHT 120 RB1 LVT2 P1 FACILITIES 129 RB1 LVT2 P1 HAVEN 116 RB1 CPT1 P1 OPEN OFFICE 118 RB1 CPT1 P1 WELCOME ENTRY 142 RB1 LVT1 P1 EXIT CORRIDOR 106 RB1 CPT3 P1 LOBBY EAST 124 ELEVATOR LOBBY 123 CORRIDOR 147B RB1 CPT3 P1 CORRIDOR 147A RB1 CPT1 P1 PLAZA 135 RB1 LVT1 P1 P2 ALIGN TELEHEALTH WKRM 102 RB1 CPT1 P1 HAVEN 140 RB1 CPT1 P1 HAVEN 139 RB1 CPT1 P1 HAVEN 138 RB1 CPT1 P1 P2 P2 P2 MEETING SPACE 288 RB1 CPT1 P1 OPEN OFFICE 101 RB1 CPT1 P1 ALIGN LVT2 CPT1 TELEPRESESENCE 133 RB1 CPT1 P1 PRAYER ROOM 134A RB1 CPT1 P1 VESTIBULE 124A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 VESTIBULE 122A BADGING 137 RB1 CPT1 P1 CPT1 EXIST ALIGN P2 CPT1 CPT3 0" CG ? ? ? ? ? CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG CG P2 OFFICE 115 RB1 CPT1 P1 STOR. 113 RB1 CPT1 P1 HAVEN 112 RB1 CPT1 P1 P2 P2 P2 P2 P2 P2 TRANSFER CENTER 110 RB1 CPT 1 P1 CPT1 LVT1 STOR- REMOTE CARE/MED ALERT 103 RB1 CPT1 P1 CG CG CG CG CG CG CG CG CG CG CG CG 6 P2 CG CG CG CG CG CG CG CG CG CG CG CG INTERIOR FINISH GENERAL NOTES THE FOLLOWING GENERAL NOTES ARE APPLICABLE THROUGHOUT THESE CONSTRUCTION DRAWINGS. A. ALL WALLS TO BE PAINTED P1 UNLESS NOTED OTHERWISE. B. PROCEEDING WITH THE INSTALLATION OF FINISHES WILL BE CONSTRUED THAT THE INSTALLER AND/OR FINISHER HAS INSPECTED AND ACCEPTED THE SUBSTRATE FOR RECEIVING THE WORK. NO CHANGE ORDER WILL BE ISSUED TO RECTIFY CONCEALED, UNKNOWN CONDITIONS OR UNSATISFACTORY SUBSTRATE ONCE THE FINISH WORK HAS PROCEEDED. C. CONTRACTOR TO IMMEDIATELY NOTIFY DESIGNER IF A SPECIFIED FINISH ITEM BECOMES UNAVAILABLE. D. ALL DRYWALL BULKHEADS TO BE PAINTED P4 UNLESS NOTED OTHERWISE. E. PAINT ALL VENTS, MEP SYSTEMS/ACCESSORIES, ETC. TO MATCH ADJACENT WALL OR CEILING UNLESS NOTED OTHERWISE. TRUE NORTH arcDESIGN PROJECT NUMBER: DATE: DRAWING TITLE: DRAWING NUMBER: REVISIONS: DRAWN BY: CLIENT PROJECT NUMBER: 201 N. Delaware Street, Suite B Indianapolis, IN 46204 317.951.9192 T | 317.951.9194 F www.arcdesign.us This drawing and its contents are the property of arcDESIGN P.C., and shall not be reproduced in whole or in part by any means, mechanical or electronic, without express written permission of arcDESIGN. 4/5/2018 2:23:23 PM C:\Users\kfunston\Documents\Revit 2017 Local\250 W 96th_firestone bldg_CENTRAL_kfunston.rvt ASCENSION | ST. VINCENT A136 FINISH PLAN - FIRST FLOOR 15140A 03.06.2018 100% CONSTRUCTION DOCUMENTS 30029-INDIANAPOLIS - ST. VINCENT HEALTH ADMINISTRATION OFFICE 250 W. 96TH STREET - PARKWOOD BUILDING INDIANAPOLIS, IN 46260 AD/DS ININD30029 3/32" = 1'-0" 1 LEVEL 1 - INTERIOR FINISH PLAN 1 11.20.2017 COORD. & UPDATES 4 01.17.2018 PR02 6 01.26.2018 PR03- FIRST FLOOR SOUTH 6 05/01/18 Nick Mishler