HomeMy WebLinkAboutA301.0 Interior Elevations2 2
141
E M1
18 8
1
135A
E MW1
E MW1
E MW1 8
13
1
3' - 0"
F
3' - 6" 3' - 6" 3' - 6" 3' - 6" 9' - 0"
2' - 10"
E TR1 E TR1
7' - 0"
E RF1 E RF1
1
E V1.2 E V1.3
7' - 5" 3' - 6" 3' - 6" 3' - 9" 1' - 6" 11' - 9"
7 15
E IM1 E CM2
2' - 10"
E V1.1
133 134 130
22
22 22
10" 69" - VERIFY
1 1/2" TRIM VERIFY
84" -
TRIM
2' - 2 1/2"
TRIM VERIFY
36 1/8" -
TRIM
E TP1
E M1 E M1
18
4
30' - 6"
E M1
2
2 2
2
OPEN TO
BEYOND
18
110 2 2
CG CG
5' - 7"
114 115 104 117
111 112
E RF1 E RF1
E MW1
E MW1
E IM1 E CM2
1 13
F 3' - 0" 1' - 9" 2' - 9" 3' - 0" 4' - 0" 3' - 0"
2' - 10"
7' - 0"
E TR1
E MW1
E M1 E M1
18
7' - 3 1/2"
2
105
2 2 2
140 139 138
2 2 2
136
E M1
125
18
OPERABLE
PARTITION
POCKET
E M1
18
2 103
CG
arcDESIGN PROJECT NUMBER:
DATE:
DRAWING TITLE:
DRAWING NUMBER:
REVISIONS:
DRAWN BY:
CLIENT PROJECT NUMBER:
201 N. Delaware Street, Suite B
Indianapolis, IN 46204
317.951.9192 T | 317.951.9194 F
www.arcdesign.us
This drawing and its contents are the property
of arcDESIGN P.C., and shall not be
reproduced in whole or in part by any means,
mechanical or electronic, without express
written permission of arcDESIGN.
4/5/2018 2:23:31 PM C:\Users\kfunston\Documents\Revit 2017 Local\250 W 96th_firestone bldg_CENTRAL_kfunston.rvt
ASCENSION | ST. VINCENT
A301
INTERIOR
ELEVATIONS
15140A
03.06.2018
100% CONSTRUCTION
DOCUMENTS
30029-INDIANAPOLIS - ST. VINCENT HEALTH
ADMINISTRATION OFFICE
250 W. 96TH STREET - PARKWOOD BUILDING
INDIANAPOLIS, IN 46260
AD/DS
ININD30029
1/4" = 1'-0"
1/4" = 1'-0" 1A 1ST FLOOR NORTH ELEVATION WELCOME ENTRY
2A 1ST FLOOR NORTH ELEVATION WELCOME
1/4" = 1'-0"
1/4" = 1'-0" 1B 1ST FLOOR NORTH ELEVATION PLAZA
2B 1ST FLOOR SOUTH ELEVATION PLAZA
1/4" = 1'-0"
1/4" = 1'-0" 3A 1ST FLOOR EAST ELEVATION SOUTH CORRIDOR 2
4A 1ST FLOOR NORTH ELEVATION TELEPRESENCE
1/4" = 1'-0"
1D 1ST FLOOR NORTH ELEVATION TRAINING ROOM B
1/4" = 1'-0"
3B 1ST FLOOR NORTH ELEVATION TRAINING ROOM A
1/4" = 1'-0"
1C 1ST FLOOR WEST ELEVATION OFFICES
1/4" = 1'-0"
3D 1ST FLOOR WEST ELEVATION PLAZA 1/4" = 1'-0"
2D 1ST FLOOR NORTH ELEVATION- AMR/ STAT FLIGHT
INTERIOR ELEVATION NOTES
1 CASEWORK BY FURNITURE VENDOR.
2 GLAZED DEMOUNTABLE FURNITURE PARTITION, BY OTHERS. GC RESPONSIBLE
FOR PROVIDING AND INSTALLING WINDOW FILM. COORDINATE FILM
REQUIREMENTS WITH ARCHITECT.
3 FABRIC-WRAPPED ACOUSTIC PANELS (WC1). PANELS TO FULLY COVER WALL
ABOVE CHAIR RAIL. PANELS TO HAVE 1" WOOD TRIM AROUND EXTERIOR ONLY
(NOT INDIVIDUAL PANEL). SIZE AND SHAPE OF PANELS TO BE DETERMINED AND
COORDINATED WITH ARCHITECT.
4 OPERABLE PARTITION WALL.
6 CUSTOM CASEWORK TO INTEGRATE EXISTING ARTWORK AND ARTIFACTS.
PROVIDE ALLOWANCE FOR THIS FEATURE. DETAILS TO BE DETERMINED AND
COORDINATED WITH ARCHITECT.
7 CASEWORK ISLAND (CASEWORK AND COUNTER) BY FURNITURE VENDOR. BASE
CABINETS UNDER HALF OF ISLAND, CANTILEVERED COUNTER ON OTHER. BASE
CABINETS TO HAVE SOLID SURFACE (SS1) WRAP WITH WATERFALL EDGE.
8 POTENTIAL ARTWORK/BRANDING LOCATION. COORDINATE WITH ARTWORK
VENDOR.
9 CUSTOM CASEWORK DESK. SEE DETAILS FOR MORE INFORMATION.
10 FIRE EXTINGUISHER CABINET (FEC)
11 WOOD CHAIR RAIL. REFER TO DETAIL 6A/A502 FOR PROFILE. SPECIES AND
STAIN COLOR TO MATCH EXISTING BOARDROOM TABLE. ALIGN BOTTOM OF
CHAIR RAIL WITH XXXXXXXXXXXXX
12 RESIN PANEL AND INSTALLATION HARDWARE TO BE PROVIDED BY GC.
13 SOLID SURFACE COUNTERTOP (SS2) WITH 4" BACKSPLASH BY FURNITURE
VENDOR.
14 SOLID SURFACE COUNTERTOP (SS1) BY FURNITURE VENDOR.
15 NEW SINK TO BE INSTALLED IN EXISTING LOCATION. REFER TO P-SERIES.
16 EXISTING CASEWORK TO REMAIN
18 COORDINATE POWER/ DATA REQUIREMENTS AND MONITOR INSTALLATION
HEIGHTS WITH OWNER AND ARCHITECT.
19 WRITABLE WHITE BOARD PAINT, WP1
20 SIGNAGE TO BE COORDINATED WITH SIGNAGE VENDOR
21 WALLCOVERING WC2
22 STAINED GLASS WINDOWS AND DOORS TO BE REMOVED FROM 10330 N.
MERIDIAN ST (INDIANAPOLIS), SALVAGED, AND RE-INSTALLED AT THIS
LOCATION. PROVIDE NEW WOOD TRIM AND CONFIRM STAIN WITH ARCHITECT.
VERIFY SIZE AND SHAPE PRIOR TO INSTALLATION.
23 QUARTZ COUNTERTOP (SS1) BY GC.
24 CUSTOM MILLWORK. PROVIDE ALLOWANCE FOR THIS FEATURE. DETAILS TO BE
DETERMINED AND COORDINATED WITH ARCHITECT.
25 PROVIDE WALLCOVERING WC1 (APPLIED DIRECTLY TO WALL, NOT WRAPPED ON
ACOUSTIC PANEL).
26 PROVIDE 2" BACKSPLASH.
1/4" = 1'-0"
2E 1ST FLOOR EAST ELEVATION HAVEN, STORAGE
1/4" = 1'-0"
1/4" = 1'-0" 1F 1ST FLOOR WEST ELEVATION HAVEN 140A, 140B, 140C
2F 1ST FLOOR WEST ELEVATION MEETING SPACE 141
1/4" = 1'-0"
4D 1ST FLOOR WEST ELEVATION TRAINING ROOM A
1/4" = 1'-0"
4B 1ST FLOOR SOUTH ELEVATION HAVENS
6 01.26.2018 PR03- FIRST FLOOR SOUTH
6
6 6
6
6
1/4" = 1'-0"
6 3E WEST ELEVATION WEST OPEN OFFICE
05/01/18
Nick Mishler