Loading...
HomeMy WebLinkAboutA001BUILDING 3 INSTALL NEW SHUTTERS INSTALL (2) NEW EXTERIOR DOORS INSTALL (2) NEW EXTERIOR ENTRY ROUGH IN AND INSTALL (2) COACH LIGHTS INSTALL (8) NEW COLUMNS REMOVE AND RE INSTALL GUTTERS EXISTING ROOF STRUCTURE TO REMAIN FRAME NEW TEMPORARY SUPPORT WALLS INSTALL NEW FOOTERS FOR COLUMNS AND NEW CONCRETE SLAB POUR NEW CONCRETE SLAB WITH BROOM FINISH 2'-8" 1' 4" 8' NEW 11"X 11" X 28" OR 12" DIAMETER X 28" TALL CONCRETE PEIR/FOOTING NEW HURRICAN TIES EXISTING ROOFING TO REMAIN EXISTING ROOF STRUCTURE TO REMAIN 8X8 POST SLEEVE 6X6 TREATED POST NEW ABU66Z POST BASE BY SIMPSON STRONG-TIE ANCHOR TO SLAB USING (1) 5/ 8" DIA X 4" LONG EXPANSION ANCHOR NEW 4" CONCRETE SLAB OVER MIN 4" PEA FILL OR OTHER APPROVED SUB BASE MATERIAL #1 2.08.18 Green Village Apartments Exterior 501 1st Ave Carmel, IN 46032 #2 #3 #4 3.12.18 3.19.18 Revision: Date: 5 SHEET OF 7 SIGNATURE / SEAL AA BUILDING 3 ELEVATION ELEVATIONS PLAN SCALE: 1/2" = 1' DESIGNER: ALLISON COPELAND allison@customlivingusa.com C: 317.417.4292 PRE-CONSTRUCTION Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited. 4.9.18 05/04/18 Nick Mishler