HomeMy WebLinkAboutM3.1 Mechanical14390 CLAY TERRACE BLVD re d
CARMEL, INDIANA 46032
WPG007
SPACE F30A - LANDLORD IMPROVEMENTS
PROJECT NUMBER:
SHEET:
FOR
WASHINGTON PRIME GROUP
180 EAST BROAD STREET, COLUMBUS, OH 43215
ISSUE DATE
PERMIT FEB. 01, 2018
COPYRIGHT 2018. ALL DRAWINGS
AND SPECIFICATIONS SHALL
REMAIN THE PROPERTY OF RED
ARCHITECTURE + PLANNING LLC
AND MAY NOT BE USED,
DUPLICATED OR ALTERED
WITHOUT THE WRITTEN CONSENT
OF THE ARCHITECT.
M3.1
2/9/2017 7:51 PM
SPECIFICATIONS - DIVISION 22 - PLUMBING
GENERAL CONDITIONS
A. GENERAL
1. THIS CONTRACT SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE INTO CONSIDERATION MECHANICAL,
ELECTRICAL AND GENERAL TRADE WORK IN PLACE AND WORK TO BE PUT INTO PLACE PRIOR TO BIDDING.
REROUTING OF DUCTWORK, PIPING, AND EQUIPMENT, AS REQUIRED TO MISS THIS WORK SHALL BE
ACCOMPLISHED AT NO ADDITIONAL COST TO THE OWNER.
B. SCOPE OF WORK
1. THE WORK INCLUDES MODIFICATION TO THE EXISTING PLUMBING SYSTEM AND PROVIDING NEW MATERIALS,
FITTINGS AND ACCESSORIES NECESSARY FOR A COMPLETE FUNCTIONING PLUMBING SYSTEM. THE WORK ALSO
INCLUDES ROUGH-IN AND FINAL CONNECTIONS TO EQUIPMENT PROVIDED BY OTHERS. ALL WORK SHALL BE IN
ACCORDANCE WITH OWNER'S REQUIREMENTS, STATE AND LOCAL CODES AND/OR ORDINANCES AND IS
SUBJECT TO INSPECTION.
2. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, INCIDENTALS, DETAILS, ETC. NECESSARY TO
PROVIDE A COMPLETE, OPERATIONAL AND APPROVED PLUMBING SYSTEM, INCLUDING BUT NOT LIMITED TO ALL
ITEMS AND ELEMENTS DESCRIBED IN THE PLUMBING SPECIFICATION AND SHOWN ON THE PLUMBING DRAWINGS,
AND AS REQUIRED FOR COORDINATION AND/OR INTERFACE WITH WORK UNDER SEPARATE CONTRACT AS
INDICATED BY COMPLETE CONSTRICTION DOCUMENTATION PACKAGE.
3. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR SATISFACTORILY ADDRESSING ALL REVIEW AND INSPECTION
AUTHORITIES REQUIREMENTS AND DIRECTIVES IN REGARD TO METHODS OF INSTALLATION NECESSARY FOR FINAL
APPROVAL.
C. SUBSTITUTIONS AND MISCELLANEOUS EQUIPMENT
1. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED
HEREIN. WHERE ONE OR MORE NAMES OF MANUFACTURERS ARE MENTIONED ANY ONE MAY BE UTILIZED.
2. ALTERNATIVE EQUIPMENT MAY BE BID AS A SUBSTITUTION TO THAT SPECIFIED WITH THE APPROPRIATE DEDUCT
NOTED. HOWEVER; THE EQUIPMENT SUBSTITUTED SHALL MEET ALL SPECIFICATIONS IN DESIGN AND BE SUBJECT TO
OWNER AND/OR ENGINEER APPROVAL. ANY ADDITIONAL COST INCURRED DUE TO SUBSTITUTION SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
3. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE PIPING SYSTEMS SUCH AS FITTING, HANGERS, ETC., CAN
BE OF ANY RECOGNIZED MANUFACTURER PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET BY THE
ENGINEER.
D. DRAWINGS
1. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW THE APPROXIMATE LOCATION OF OUTLETS,
EQUIPMENT AND PIPING.
2. THE EXACT LOCATION OF OUTLETS, EQUIPMENT AND PIPING MAY BE CHANGED FROM TIME TO TIME AS WORK
PROGRESSES. UNDER THIS CONTRACT ALL LOCATIONS SHALL BE VERIFIED WITH ALL TRADES AND THAT THEY ARE
ACCORDING TO THE LATEST INFORMATION AVAILABLE. SHOULD THIS NOT BE DONE THE WORK WILL BE
CHANGED AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. THE OWNER RESERVES THE RIGHT TO MAKE MINOR CHANGES IN LOCATION OF EQUIPMENT AND PIPING
ARRANGEMENTS UP TO THE TIME OF ROUGH-IN WITHOUT ADDITIONAL COSTS TO THE OWNER.
4. THE DRAWINGS AND SPECIFICATION ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIALS OR
LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NO MENTIONED IN BOTH. ANY MATERIAL OR
LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS BUT WHICH IS
OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR
CHARACTER SHALL BE FURNISHED UNDER THIS CONTRACT.
E. CLEANING UP
1. UNLESS OTHERWISE NOTED, ALL EXCESS MATERIALS AND DEBRIS CAUSED BY THIS WORK SHALL BE COME THE
PROPERTY OF THE CONTRACTOR AND PROMPTLY BE REMOVED FROM THE SITE. ALL FIXTURES AND EQUIPMENT
INSTALLED SHALL BE THOROUGHLY CLEANED WEEKLY. ALL MOTORS AND EQUIPMENT SHALL BE COVERED OR
OTHERWISE PROTECTED FORM CONSTRUCTION DUST AND DEBRIS. NO EQUIPMENT OTHER THAN THOSE
DESIGNED TO ARE TO BE EXPOSED TO INCLEMENT WEATHER. TOUCH UP ALL SCRATCHES AND REPAIR ANY DENTS
IN EQUIPMENT.
F. CUTTING AND PATCHING
1. CUTTING FOR OPENINGS, WHEN NECESSARY, SHALL BE DONE BY THIS CONTRACTOR WITH SUCH TOOLS AND
METHODS AS TO PREVENT UNNECESSARY DAMAGE TO SURROUNDING AREAS OR EQUIPMENT.
2. FILL SPACE IN ALL AREAS PACKING WHERE REQUIRED TO MAINTAIN FIRE RATING, OPENINGS SHALL BE
TEMPORARILY FIRE STOPPED UNTIL PERMANENT FIRE STOPPING IS DONE. THIS INCLUDES HOLES LEFT DUE TO
REMOVAL OF PIPING.
3. PATCHING SHALL MATCH EXISTING SURFACES IN KIND AND FINISH, AND SHALL BE DONE BY THE GENERAL
CONTRACTOR.
4. NO STRUCTURAL MEMEBER WILL BE CUT INTO WITHOUT THE EXPRESSED PERMISSION THE OWNER'S
REPRESENTATIVE.
G. GUARANTEE
1. ALL LABOR AND MATERIALS FURNISHED UNDER THIS CONTRACT SHALL BE GUARANTEED FOR A PERIOD OF ONE
(1) YEAR FORM THE DATE OF FINAL ACCEPTANCE BY THE OWNER WHICH WILL COMMENCE UPON THE FINAL
INSPECTION BY THE ENGINEER. DURING THIS TIME, ALL LEAKS, CORRECTION OF ALL THE FAILURES TO SUCH
MATERIAL AND THE CORRECTION OF ALL DISCREPANCIES WITH THE PLUMBING CODE, THE CONTRACT
DRAWINGS, AND THE PROJECT SPECIFICATIONS SHALL BE DONE UNDER THIS CONTRACT AT NO ADDITIONAL
EXPENSE TO THE OWNER.
H. EXCAVATION AND BACKFILL
1. THIS CONTRACTOR SHALL EXCAVATE AND BACKFILL ALL TRENCHES AND OTHER EXCAVATIONS REQUIRED FOR
LAYING DRAINS, SEWERS, APPURTENANCES AND OTHER EXCAVATIONS REQUIRED FOR HIS WORK.
2. EARTH FILL: SOIL AS APPROVED BY THE OWNER'S REPRESENTATIVE, FREE OF ORGANIC SOIL, SOD, ROOTS,
WOOD, METAL, RUBBISH, DEBRIS, LUMPS OR EXCESSIVE AMOUNTS OF CLAY AND ROCKS GREATER THAN 2" IN
DIAMETER; CAPABLE OF BEING COMPACTED INTO DENSE AND STABLE CONDITIONS AS SPECIFIED.
3. ALL UNDERGROUND PIPING SHALL BE INSTALLED ON A MINIMUM OF A 3" BED OF COMPACTED SAND. ALL
UNDERGROUND PIPING SHALL BE BACKFILLED BY HAND TO A LEVEL OF 6" ABOVE THE PIPE WITH CLEAN SAND.
ALL BACKFILL SHALL BE MADE IN LIFTS NOT TO EXCEED 12". EACH LIFT SHALL BE MECHANICALLY COMPACTED
TO A MINIMUM OF 92% MODIFIED PROCTOR.
4. PROTECT ALL UTILITIES SHOWN ON DRAWINGS OR ENCOUNTERED IN THE CONSTRUCTION WORK. ANY DAMAGE
TO UTILITIES SHALL BE REPAIRED BY THIS CONTRACTOR TO OWNER'S SATISFACTION, WITHOUT COST TO THE
OWNER.
5. THIS CONTRACTOR SHALL REMOVE ANY UNUSABLE OF SURPLUS EXCAVATED MATERIAL FROM THE SITE.
I. RECORD DRAWINGS
1. THIS CONTRACTOR SHALL KEEP AN ACCURATE RECORD OF ALL DEVIATIONS FROM CONTRACT DRAWINGS AND
SPECIFICATIONS. HE SHALL NEATLY AND CORRECTLY ENTER IN COLORED PENCIL ANY DEVIATIONS ON THE BLUE
PRINTS OR BLUE LINE DRAWINGS. AT COMPLETION OF THE PROJECT DELIVER DRAWINGS TO OWNER'S
REPRESENTATIVE.
PERMITS AND FEES
1. THE PLUMBING CONTRACTOR SHALL APPLY FOR AND PAY ANY REVIEW INSPECTION, PERMIT, LICENSE, TESTING
AND/OR OTHER SERVICE FEES REQUIRED BY ALL REVIEW/INSPECTION/APPROVAL AUTHORITIES IN CONNECTION
WITH THE WORK UNDER THIS CONTRACT.
2. ALL WORK SHALL ALSO BE INSTALLED IN ACCORDANCE WITH REGULATIONS OF THE FIRE UNDERWRITERS HAVING
JURISDICTION AND LOCAL UTILITIES. CONTRACTOR SHALL ALSO SECURE ANY PERMITS OR PAY ANY FEES TO THE
LOCAL UTILITY COMPANIES FOR THE WORK REQUIRED.
PRODUCTS GENERAL
1. WHERE ITEMS/ELEMENTS ARE INDICATED HEREIN TO BE LISTED/APPROVED. THE INTENT OF THE SPECIFICATION IS
THAT SAID ITEM/ELEMENT SHALL BE LISTED BY ALL APPLICABLE MATERIAL/CONSTRUCTION STANDARDS, AND
SUBJECT TO FINAL APPROVAL (INCLUDING METHODS OF INSTALLATION) BY ALL REVIEW/INSPECTION/APPROVAL
AUTHORITIES.
2. UNLESS INDICATED OTHERWISE, ALL PLUMBING CONTRACT ITEMS/ELEMENTS (PIPE, FITTINGS, VALVES,
SPECIALTIES, FIXTURES, EQUIPMENT, ETC.) MATERIALS, CONSTRUCTION, PERFORMANCE, TESTING AND METHODS
OF INSTALLATION TO BE AS LISTED/APPROVED BY ALL APPLICABLE MATERIAL/ CONSTRUCTION/ INSTALLATION
STANDARDS FOR SAME, AND BE IN ACCORDANCE WITH THE REQUIREMENTS OF ALL REVIEW/INSPECTION/
APPROVAL AUTHORITIES. THIS INCLUDES, BUT IS NOT LIMITED TO, THE STANDARDS AND AUTHORITIES REFERENCED
IN THIS SPECIFICATION. IN THE ABSENCE OF SUCH STANDARDS AND/OR REQUIREMENTS, THE
ITEM/ELEMENTMANUFACTURER'S RECOMMENDATIONS, AS CONFIRMED BY THE PLUMBING CONTRACTOR IN
ADVANCE, SHALL BE FOLLOWED.
3. UNLESS INDICATED OTHERWISE, ALL PLUMBING PIPING SHALL BE IN ACCORDANCE WITH THE FOLLOWING
STANDARDS IN REGARD TO MATERIALS, CONSTRUCTION, DIMENSIONS/TOLERANCES, TYPE OF
SERVICE/TRANSMISSION MEDIUM (WATER, AIR, GAS, ETC.) AND METHODS OF INSTALLATION (AS APPLICABLE),
AND SHALL BE SO LISTED. FINAL APPROVAL FOR USE IS SUBJECT TO THE REQUIREMENTS OF THE REVIEW AND
INSPECTION AUTHORITIES:
a. CAST IRON PIPE, FITTINGS AND JOINING METHODS; PER APPLICABLE ASTM/ANSI/ASME/CISPI STANDARDS.
b. COPPER/COPPER ALLOY/BRASS PIPE/TUBE, FITTINGS AND JOINING METHODS; PER APPLICABLE
ASTM/ANSI/ASME STANDARDS. IN ADDITION, WHERE UTILIZED FOR POTABLE WATER SERVICE, ALL ELEMENTS
SHALL BE PER APPLICABLE NSF STANDARDS.
4. ALL PLUMBING CONTRACT ITEMS/ELEMENTS SHALL HAVE THE MANUFACTURER'S MARK OF NAME AND THE
QUALITY OF THE PRODUCT OR IDENTIFICATION OF SAME CAST, EMBOSSED, STAMPED OR INDELIBLY MARKED ON
EACH ITEM/ELEMENT IN ACCORDANCE WITH THE STANDARDS UNDER WHICH THEY ARE ACCEPTED AND
APPROVED PER APPLICABLE CODE(S).
5. PLUMBING UTILITY CONNECTIONS PROVIDE FOR ITEMS OR ELEMENTS NOT INCLUDED IN THE PLUMBING
CONTRACT.
a. UNLESS INDICATED OTHERWISE, THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL TRAPS AND
STOPS (AS APPLICABLE) AS REQUIRED FOR ITEMS FURNISHED UNDER SEPARATE CONTRACT. THIS INCLUDES
ITEMS WITH CONNECTIONS BY THE PLUMBING CONTRACTOR OR WITH CONNECTIONS UNDER SEPARATE
CONTRACT.
b. UNLESS INDICATED OTHERWISE, FIXTURE TRAPS ABOVE FLOOR SLAB CONNECTED TO THE SANITARY WASTE
SYSTEM SHALL BE CAST BRASS P-TRAPS WITH INTEGRAL CLEANOUT. P-TRAPS BELOW FLOOR SLAB TO BE CAST
IRON, LESS CLEANOUT. SEE DRAWINGS FOR SIZES.
c. UNLESS INDICATED OTHERWISE, FIXTURE TRAPS CONNECTED TO WASTE OR DRAIN SYSTEMS OTHER THAN THE
SANITARY WASTE SYSTEM SHALL BE OF THE SAME MATERIAL AND CONSTRUCTION TYPE AS THE ASSOCIATED
PIPING SYSTEM. P-TRAPS TO BE PROVIDED AS INDICATED ON THE DRAWINGS.
d. UNLESS INDICATED OTHERWISE, SUPPLY ROUGH-INS TO BE FURNISHED WITH ACCESSIBLE SHUT OFFS AT
CONNECTIONS POINTS. SHUT OFFS AT SUPPLY ROUGH-INS FOR FIXTURES (SINKS, LAVATORIES, ETC.) TO BE
ANGLES TYPE COMPRESSION STOPS. SHUT OFFS AT SUPPLY ROUGH-INS FOR EQUIPMENT OF OTHER ELEMENTS
TO BE IN-LINE VALVES AS SPECIFIED FOR INDIVIDUAL SERVICES.
e. UNLESS INDICATED OTHERWISE, WHERE CONNECTION ELEMENTS DESCRIBED HEREIN ARE EXPOSED IN
LOCATIONS OTHER THAN THE RESTRICTED ACCESS UTILITY OR MAINTENANCE AREAS, ALL METALLIC
COMPONENTS TO BE FURNISHED WITH A POLISHED CHROME FINISH. WALL OR OTHER STRUCTURE PIPING
PENETRATIONS AT THESE LOCATION TO BE PROVIDED WITH POLISHED CHROME FINISH ESCUTCHEONS.
EXECUTION GENERAL
1. WHERE STANDARDS, CODES OR GUIDELINES ARE REFERENCED HERIN AND THROUGHOUT THE PLUMBING
CONTRACT DOCUMENTATION, INCLUDING PLANS AND SPECIFICATIONS, THE LATEST VERSION/EDITION SHALL BE
APPLIED, UNLESS THE BUILDING CODE REFERENCES ANOTHER VERSION/EDDITION, WHICH SHALL TAKE
PRECEDENCE.
2. REFER TO PROJECT DOCUMENTATION FURNISHED WITH THE COMPLETE CONSTRUCTION PACKAGE IN ADVANCE
OF WORK FOR OVERALL COORDINATION AND VERIFICATION OF REQUIREMENTS AT WORK OF OTHER TRADES
RELATING TO, INTERFACING WITH, AND/OR IMPACTING WORK IN THE PLUMBING CONTRACT. THIS INCLUDES
EXACT LOCATIONS, QUANTITIES, PHYSICAL SIZES, ROUGH-IN DETAILS, PIPE ROUTING, CONNECTION SIZES, ETC.,
FOR ITEMS INCLUDING BOTH IN THE PLUMBING CONTRACT AND UNDER SEPARATE CONTRACT. COORDINATE
INSTALLATION AND INTERFACE REQUIREMENTS WITH THE APPROPRIATE CONTRACTOR(S) IN ADVANCE OF
WORK.
3. INCLUDE ANY MINOR DETAILS, ITEMS AND/OR ELEMENTS ESSENTIAL TO NECESSARY APPROVALS AND
SUCCESSFUL OPERATION IN ADDITION TO THE ITEMS SPECIFIED HEREIN AND SHOWN ON THE DRAWINGS.
4. SEE GENERAL "PLUMBING NOTES" ON DRAWINGS FOR ADDITIONAL CONDITIONS AND REQUIREMENTS RELATIVE
TO THE PLUMBING CONTRACT.
5. PLUMBING ITEMS AND ELEMENTS SHALL BE INSTALLED WITH DUE REGARD TO PRESERVATION OF THE STRENGTH
OF STRUCTURAL MEMBERS AND PREVENTION OF DAMAGE TO WALLS, SURFACES AND OTHER STRUCTURES
THROUGH INSTALLATION, BEARING SUPPORT OF SUBSEQUENT USAGE OF PLUMBING ITEMS AND ELEMENTS. NO
FRAMING OR OTHER SUPPORT STRUCTURE SHALL BE CUT, NOTCHED OR BORED IN EXCESS OF LIMITATIONS
SPECIFIED IN THE BUILDING CODE, OR BY THE MANUFACTURER OF THE FRAMING OR OTHER SUPPORT
STRUCTURE, AS CONFIRMED IN ADVANCE OF WORK BY THE PLUMBING CONTRACTOR.
SLEEVES
1. SLEEVE MATERIAL: BLACK STEEL PIPE, MACHINE CUT, LARGE ENOUGH TO ALLOW 1/4" CLEARANCE ALL AROUND
PIPE AND PIPE COVERING. USE MACHINE CUT COPPER SLEEVES FOR NON-INSULATED COPPER PIPE.
2. SLEEVES IN PARTITIONS TO HAVE LENGTH EQUAL TO THE THICKNESS OF FINISHED PARTITIONS. SLEEVES IN FLOORS
OF FINISHED AREAS TO PROJECT 2" ABOVE THE FINISHED FLOOR. SLEEVES IN FLOORS OF NON-FINISHED AREAS
TO PROJECT 2" ABOVE THE FINISHED FLOOR. FILL SPACE BETWEEN PIPE AND SLEEVES INTO EXPOSED AREAS WITH
SEALING COMPOUND. REAM ALL SLEEVES BEFORE INSTALLING.
PLUMBING INSULATION
1. GENERAL
a. PROVIDE LISTED INSULATION COVER FOR ALL ITEMS/ELEMENTS AS SPECIFIED HEREIN, AS SHOWN ON
DRAWINGS, AND FOR ANY OTHER ITEMS/ELEMENTS REQUIRING SAME.
b. INSULATE PIPING AND ASSOCIATED ACCESSORIES AND APPURTENANCES INCLUDING IN THE FOLLOWING
SYSTEMS:
1. DOMESTIC COLD WATER AND HOT WATER.
2. PRODUCTS
a. ALL INSULATING MATERIALS, INCLUDING JACKETS, CEMENTS, ADHESIVES, VAPOR BARRIERS, ETC., SHALL BE
U.L. LISTED, WITH A FLAME SPREAD RATING NOT TO EXCEED 25, AND A SMOKE DEVELOPMENT RATING NOT
TO EXCEED 50. ALL EXTERIOR FINISHES SHALL HAVE A MINIMUM SERVICE TEMPERATURE LIMIT (FSTM 70) OF
MINUS 50 TO 220 DEGREES F.
b. MOLDED PLASTIC FITTING COVERS SHALL BE U.L. LISTED WITH A FLAME SPREAD RATING NOT TO EXCEED 25,
AND A SMOKE DEVELOPMENT RATING NOT TO EXCEED 50.
c. INSULATED THICKNESS IS BASED ON INSULATION HAVING THERMAL RESISTANCE IN THE RANGE OF 4.0 HR F.
FT2/BTU TO 4.6 HR F. FT2/BTU PER INCH OF THICKNESS ON A FLAT SURFACE AT A MEAN TEMPERATURE OF 75
DEGREES F. MINIMUM INSULATION THICKNESS SHALL BE INCREASED FOR MATERIALS HAVING R VALUES LESS
THAN 4.0 OR MAY BE REDUCED FOR MATERIALS HAVING R VALUES GREATER THAN 4.6 TO GIVE EQUIVALENT
"R" VALUES.
d. PIPE COVERS SHALL BE SIMILAR TO JOHNS MANVILLE "MICRO-LOK" GLASS FIBER INSULATION, RATED FOR 850
DEGREES F. WITH A FACTORY APPLIED AP-T ALL-PURPOSE SELF-SEALING VAPOR BARRIER JACKET. BUTT STRIPS
SHALL BE MINIMUM 3" WIDE, AND OF SAME MATERIAL AS JACKET. EQUAL MATERIALS, INCLUDING THICKNESS
AND CONDUCTIVITY RATINGS/LISTINGS. AS MANUFACTURED BY OWENS CORNING, KNAUF OR MANSON
MAY BE FURNISHED, AT THE CONTRACTOR'S OPTION. WHERE INSULATION THICKNESS IS INDICATED FOR
COVER HEREIN. IT IS NOMINAL THICKNESS REQUIRED THICKNESS.
e. ALL CEMENTS, ADHESIVES, FINISHES, AND ASSOCIATED MATERIALS SHALL BE SIMILAR TO THAT PROVIDED BY
FOSTER. EQUAL MATERIALS AS PROVIDED BY CHILDERS OR VIMASCO MAY BE FURNISHED AT THE
CONTRACTOR'S OPTION.
f. LONGITUDINAL LAP JOINTS AND BUTT STRIPS FOR GLASS FIBER PIPING INSULATION SHALL BE SECURED WITH
STAPLES ON THREE (3) INCH CENTERS, AND SEALED WITH AN APPROVED VAPOR BARRIER ADHESIVE WHERE
APPLICABLE. STAPLES ARE NOT REQUIRED WHEN INSULATION UTILIZES A "DOUBLE" ADHESIVE SELF-SEALING
SYSTEM.
3. EXECUTION
a. COVER DOMESTIC COLD WATER AND HOT WATER PIPING WITH 1" THICKNESS GLASS FIBER PIPE INSULATION.
b. ALL APPURTENANCES AND ACCESSORIES SUCH AS VALVES, FLANGES, UNIONS, ETC. INSTALLED IN
REFERENCED PIPING SHALL BE WRAPPED WITH FULL THICKNESS INSULATION AND COVERED WITH A LISTED
MOLDED PLASTIC FITTING COVER, OR AN OPEN MESH GLASS CLOTH SHALL BE FIRE RESISTANT MASTIC.
c. USE 12" LONG SECTIONS OF CALCIUM SILICATE RIGID INSULATION, WITH JACKET SAME AS ADJACENT PIPE
COVERING FOR TRANSFER OF SUPPORT TO PIPING AT EACH HANGER, WITHOUT STRESS TO THE PIPE
COVERING ASSEMBLY. AT THE CONTRACTOR'S OPTION, AN APPROVED WOOD OR HIGH-DENSITY (20 LB./CU.
FT.) FIBERGLASS BLOCK MAY BE SUBSTITUTED FOR THE RIGID INSULATION SECTION. VAPOR BARRIER TO BE
MAINTAINED THROUGHOUT.
d. ALL APPLICATIONS SHALL BE MADE ON CLEAN, DRY SURFACES WITH ALL JOINTS BUTTED FIRMLY TOGETHER.
e. INSULATION MUST RUN CONTINUOUS THROUGH HANGERS, SLEEVES AND WALL FOR ALL COLD WATER AND
HOT WATER PIPING.
f. INSULATION SHALL NOT BE APPLIED UNTIL GENERAL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO
MINIMIZE POTENTIAL FOR PHYSICAL OR MOISTURE DAMAGE TO THE COVER ASSEMBLY. ALL DAMAGED
COVER SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
g. INSTALL PROTECTIVE SLEEVE ON ALL INSULATED, EXPOSED PIPES PENETRATING THE FLOOR STRUCTURE.
h. HANGER RODS MUST BE PERPENDICULAR BEFORE INSULATION IS INSTALLED.
BUILDING SOIL, WASTE AND VENT SYSTEM
1. APPLICATIONS FOR SANITARY AND VENT SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
a. SANITARY AND VENT PIPING FROM DESIGNATED POINTS WITH ALL CONNECTIONS.
b. DRAINAGE AND VENT PIPING FOR ALL OTHER MISCELLANEOUS SYSTEMS OR EQUIPMENT AS INDICATED ON
DOCUMENTS AND AS REQUIRED.
c. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SANITARY PIPING FINAL CONNECTIONS AND ALL
INDIRECT PIPING FROM EQUIPMENT TO DRAIN TO COMPLETE THE SANITARY WASTE AND VENT PIPING SYSTEM
AND TO COMPLETE THE INDIRECT DRAINAGE PIPING SYSTEM TO OPERATE ALL EQUIPMENT AND FIXTURES
PROPERLY.
2. SCOPE
a. FURNISH A COMPLETE SYSTEM OF INTERIOR SOIL WASTE DRAINAGE (INCLUDES SANITARY AND VENT PIPING)
FROM BUILDING FIXTURES, EQUIPMENT, AND ANY OTHER ELEMENTS REQUIRING THE SAME.
3. PRODUCTS
a. DRAINAGE WASTE AND VENT (DWV) PIPING TO BE AS FOLLOWS (INCLUDES SANITARY, VENT, STORM &
GREASE WASTE):
1. ASTM A 74, CISPI HS 74 CAST IRON SERVICE WEIGHT HUB AND SPIGOT PIPE AND FITTINGS WITH NEOPRENE
GASKETS OR ASTM A 888, CISPI 301 CAST IRON SERVICE WEIGHT HUBLESS PIPE AND FITTINGS WITH ASTM C
1277, CISPI 310 HUBLESS COUPLINGS. HUBLESS COUPLINGS TO BE INSTALLED ABOVE GRADE ONLY.
2. ASTM D 2665, SCHEDULE 40 TYPE 1, GRADE 1 PVC DWV PIPE AND ASTM D 2665, MADE TO ASTM D 3311,
FITTINGS WITH ASTM F 656 ADHESIVE PRIMER AND ASTM D 2564 SOCKET SOLVENT SOLDER JOINTS AND
CONNECTIONS. PLASTIC PIPING NOT PERMITTED FOR INSTALLATION IN RETURN AIR PLENUMS OR
LOCATIONS EXPOSED TO RETURN AIR PLENUMS.
4. EXECUTION
a. ALL CAST IRON SOIL PIPE SHALL BE BITUMASTIC COATED INSIDE AND OUTSIDE. ALL CAST IRON PIPING
(INCLUDING JOINTS AND CONNECTIONS) SHALL BE INSTALLED IN ACCORDANCE WITH STANDARDS AS SET
FORTH BY THE CAST IRON SOIL PIPE INSTITUTE (CSPI).
b. AT THE CONTRACTOR'S OPTION, HUBLESS CAST IRON SOIL PIPE MAY BE JOINED BY USING HEAVY DUTY
"CLAMP ALL" COUPLINGS IN LIEU OF "NO-HUB" COUPLINGS. COUPLINGS ARE TO BE MADE OF 24 GAUGE
TYPE 304 STAINLESS STEEL WITH HI-TORQUE CLAMPS AND NEOPRENE GASKETS. COUPLINGS SHALL BE
INSTALLED AND TESTED IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS.
c. PLASTIC PIPING SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS, WITH PARTICULAR ATTENTION TO REQUIREMENTS FOR JOINING METHODS, SUPPORT,
AND ALLOWANCES FOR EXPANSION AND CONTRACTION. PLASTIC PIPING SHALL NOT BE INSTALLED IN ANY
RETURN AIR PLENUM OR CHASE THAT IS USED FOR RETURN AIR.
d. COORDINATE INSTALLATION WITH STRUCTURE, EXISTING CONDITIONS AND WORK OF OTHER TRADES AT AND
ADJACENT TO SOIL, WASTE AND VENT SERVICE PIPING INSTALLATION.
DOMESTIC WATER PIPING SYSTEMS
1. GENERAL
a. THE DOMESTIC WATER PIPING SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
1. COLD WATER SUPPLY, HOT WATER SUPPLY.
2. PRODUCTS
a. PIPE AND FITTINGS.
1. ABOVE GROUND PIPING UP TO AND INCLUDING 3" SIZE TO BE ASTM B88, ANSI/NSF 61 TYPE L HARD
DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND SOCKET SOLDER JOINTS AND
CONNECTIONS. TEE DRILL MECHANICAL SADDLE CONNECTIONS MAY BE UTILIZED FOR BRANCH
TAKE-OFFS. PIPING BELOW GRADE 2" DIAMETER AND SMALLER SHALL BE ASTM B88 LISTED/APPROVED TYPE
K SOFT COPPER TUBING IN A SINGLE LENGTH WITH NO IN-LINE COUPLINGS OR JOINTS. COMPLETED
INSTALLATION TO BE RATED 135 S.W.P AND 400 W.O.G.
2. BALL VALVES 3" SIZE AND SMALLER SHALL BE LEAD-FREE TWO-PIECE BRONZE BODY BALL VALVE, SOLDERED
CONNECTIONS, UNION CONNECTION BODY, TEFLON SEATS, FULL PORT WITH BLOW OUT PROOF STEM,
ADJUSTABLE PACKING GLAND, CHROME PLATED BRONZE BALL AND LEVER HANDLE LABELED FOR THE
SERVICE CONTROLLED. DESIGN FOR 150 S.W.P. AND 400 W.O.G. EQUAL TO APOLLO 70LF SERIES.
3. VALVES BY MILWAUKEE, NIBCO OR WATTS MAY BE FURNISHED AT THE CONTRACTOR'S OPTION.
5. ALL DOMESTIC WATER PIPING SHALL BE CLEAN, FLUSHED AND TESTED PER STATE AND LOCAL HEALTH
DEPARTMENT REQUIREMENTS.
6. ALL DOMESTIC WATER PIPING SHALL BE CERTIFIED SAFE FOR HUMAN CONSUMPTION BY A CERTIFIED
PROFESSIONAL BY THE STATE OF WEST VIRGINIA (BACTERIAL CERTIFICATION NUMBER) EMPLOYED BY A
TESTING LABORATORY THAT STATES THE SYSTEM MEETS THE DEPARTMENT OF HEALTH REQUIREMENTS AND IS
APPROVED FOR HUMAN CONSUMPTION.
7. SOLDER AND FLUX MATERIAL SHALL BE CERTIFIED "LEAD FREE" AND LISTED FOR USE WITH POTABLE WATER
SYSTEMS.
3. EXECUTION
a. ALL PIPING THAT SUPPLIES A FLUSH VALVE, SOLENOID VALVE (OTHER THAN SLOW-CLOSING TYPE) SPRING
RETURN OPERATOR OR OTHER QUICK CLOSING TYPE DEVICE SHALL HAVE A SHOCK ABSORBER INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. UNLESS INDICATED OTHERWISE, WHERE
MULTIPLE FIXTURES OR EQUIPMENT IN ADJACENT LOCATIONS (SUCH AS WITHIN A CHASE OR OTHER
ENCLOSURE) ARE SUPPLIED BY COMMON PIPING MANIFOLD, A PROPERLY SIZED AND INSTALLED SHOCK
ABSORBER MAY BE UTILIZED.
b. RUN ALL WATER PIPING LEVEL AND CONCEAL WHENEVER POSSIBLE. PIPING TO BE INSTALLED TO ALLOW
COMPLETE DRAIN DOWN OF SYSTEM BACK TO MAIN RISER AT BASE OF SYSTEM WHENEVER POSSIBLE.
c. COORDINATE INSTALLATION WITH STRUCTURE, SITE CONDITIONS AND WORK OF OTHER TRADES AT AND
ADJACENT TO DOMESTIC WATER SERVICE PIPING INSTALLATIONS.
4. FLUSHING AND STERILIZATION
a. FLUSH OUT ALL DOMESTIC WATER PIPING SYSTEMS TO REMOVE ALL DIRT AND GREASE FROM PIPING AND
EQUIPMENT BEFORE SYSTEMS ARE PLACED INTO OPERATION. CLEAN STRAINERS AFTER EACH FLUSHING UNTIL
THE STRAINER REMAINS CLEAN.
b. AFTER DOMESTIC WATER LINES ARE ALL INSTALLED, STERILIZE LINES AS PRESCRIBED BY AWWA-C-651.
STERILIZATION SHALL BE DONE UNDER IMMEDIATE-ON-THE-JOB SUPERVISION OF A WATER TESTING
LABORATORY REGULARLY ENGAGED IN THE SERVICE AND SHALL BE DONE PER THEIR INSTRUCTIONS. ALL FEES
FOR TESTING AND TEST EQUIPMENT SHALL BE PAID BY THIS CONTRACTOR.
c. FURNISH A CERTIFICATE OF STERILIZATION AND APPROVAL FOR HUMAN CONSUMPTION SIGNED BY A
PROFESSIONAL ENGINEER REGISTERED WITHIN THE STATE AND REGULARLY IN THE EMPLOY OF THE TESTING
LABORATORY. CERTIFICATION SHALL BE FURNISHED TO THE ARCHITECT/ENGINEER PRIOR TO ANY PAYMENT IS
MADE.
d. STERILIZATION: CHLORINATING MATERIAL EITHER LIQUID CHLORINE MEETING AWWA STANDARD B301,
SODIUM OR CALCIUM HYPOCHLORITE MEETING AWWA STANDARD B300.
6. EXECUTION
a. WITH ALL OUTLETS CLOSED, FILL SYSTEM TO WORKING PRESSURE AND CLOSE VALVE AT SUPPLY MAIN.
b. A CLEANING SOLUTION CONTAINING NOT LESS THAN 150 PARTS PER MILLION OF CHLORINE SHALL BE
INTRODUCED INTO THE SYSTEM.
c. EACH OUTLET, HOT AND COLD, SHALL BE TESTED DURING FILL TO PROVE THE PRESENCE OF CHLORINE AT
THAT OUTLET AND VALVES AND FAUCETS SHALL BE OPENED AND CLOSED SEVERAL TIMES DURING THE
DISINFECTING TIME PERIOD.
d. WATER PIPING SYSTEMS SHALL REMAIN FILLED FOR A PERIOD OF 24 HOURS AND EACH OUTLET SHALL BE
AGAIN TESTED AND SHALL PRODUCE NOT LESS THAN 100 PARTS PER MILLION OF CHLORINE AT THE END OF
THE RETENTION PERIOD.
e. ALL OUTLETS SHALL BE OPENED WIDE AND THE MAIN SUPPLY VALVES OPENED. FLUSHING SYSTEM WITH
WATER UNTIL THE CHLORINE CONTENT IS NOT GREATER THAN 0.2 PARTS PER MILLION OR UNTIL APPROVED BY
THE HEALTH DEPARTMENT. FLUSH DRAIN VALVES.
f. AFTER FINAL FLUSHING ALL AERATORS ON PLUMBING BRASS SHALL BE REMOVED, CLEANED AND
REINSTALLED.
g. STERILIZATION TEST MAY BE PERFORMED AT THE SAME TIME THE PRESSURE TEST IS PLACED ON THE SYSTEM.
WATER HAMMER ARRESTORS
1. SIMILAR TO ZURN SHOCKTROL SERIES Z-1700, SIZED AND INSTALLED AS RECOMMENDED BY THE MANUFACTURER
FOR SPECIFIC CONDITIONS AT EACH LOCATION.
2. EQUAL SHOCK ABSORBERS AS MANUFACTURED BY J.R. SMITH, JOSAM, SIOUX CHIEF OR PRECISION PLUMBING
PRODUCTS MAY BE PROVIDED AT THE CONTRACTOR'S OPTION.
DRAINS, CLEANOUTS, AND DRAINAGE SPECIALTIES
1. GENERAL
e. FURNISH AND INSTALL DRAINS, CLEANOUTS AND DRAINAGE SPECIALTIES AS INDICTED ON THE DRAWINGS,
AND ELSEWHERE AS REQUIRED FOR COMPLETE DRAINAGE, ACCESS AND SPECIAL FUNCTION/OPERATION AT
ALL ITEMS/ELEMENTS AND AREAS REQUIRING SAME AND FOR PROPER INTEGRATION WITH THE BUILDING
DRAINAGE SYSTEM.
f. UNLESS INDICATED OTHERWISE, ALL ITEMS/ELEMENTS AND THEIR COMPONENT PARTS DESCRIBED HEREIN TO
BE OF METALLIC CONSTRUCTION WHEN SUCH IS AVAILABLE FOR THE BASE SPECIFIED ITEM/ELEMENT. USE OF
PLASTIC, COMPOSITE, OR OTHER NON-METALIC COMPONENTS AND/OR MATERIALS BY LISTED ALTERNATE
ITEMS/ELEMENTS IS PROHIBITED.
2. PRODUCTS
a. THIS CONTRACTOR MAY, AT HIS OPTION, USE ABS PLASTIC PLUGS IN LIEU OF BRONZE PLUGS WHERE
SPECIFIED, EXCEPT ABS PLUGS SHALL NOT BE PERMITTED IN RETURN AIR PLENUMS OR AT EXPOSED
LOCATIONS. LOCATION OF THE RETURN AIR PLENUM TO BE CONFIRMED WITH THE HVAC CONTRACTOR.
b. EQUAL DRAINS, DRAINAGE SPECIALTIES AND CLEANOUTS AS MANUFACTURED BY ZURN, ZURN LC, JOSAM,
SIOUX CHIEF, WATTS, JRS PRODUCTS, OR J.R. SMITH MAY BE FURNISHED AT THE CONTRACTOR'S OPTION.
3. EXECUTION
a. PROVIDE A COMPATIBLE FASTENING ASSEMBLY WITH INTERNAL SECONDARY DRAINAGE FLANGE AND
WEEPHOLES FOR ALL ITEMS SPECIFIED HEREIN BEING INSTALLED IN STRUCTURES HAVING A WATER PROOF
MEMBRANE, FLASHING, VAPOR BARRIER, OR SIMILAR ELEMENT PROVIDED UNDER SEPARATE CONTRACT.
INSTALLATION CONDITIONS TO BE VERIFIED FROM ARCHITECTURAL DOCUMENTATION AND COORDINATED
WITH THE APPROPRIATE CONTRACTOR.
b. COUNTER FLASHING (WHEN REQUIRED) FOR ITEMS SPECIFIED HEREIN IS TO BE COMPATIBLE WITH
WATERPROOF MEMBRANE, VAPOR BARRIER, FLASHING, OR SIMILAR ELEMENTS PROVIDED UNDER SEPARATE
CONTRACT AT THE INTERFACE POINT. COUNTER FLASHING TO BE PROVIDED AND SET IN PLACE BY THE
PLUMBING CONTRACTOR. BUT WILL BE MADE WATERTIGHT BY THE CONTRACTOR INSTALLING THE
MEMBRANE, VAPOR BARRIER, FLASHING OR SIMILAR ELEMENTS PROVIDED UNDER SEPARATE CONTRACT.
INSTALLATION CONDITIONS TO BE VERIFIED FROM ARCHITECTURAL DOCUMENTATION AND COORDINATED
WITH THE APPROPRIATE CONTRACTOR.
c. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING ALL DRAINS, CLEANOUTS AND OTHER ITEMS SO
NOTED INSTALLED FLUSH AND LEVEL WITH FINISH WALL, FLOOR OR OTHER STRUCTURE AS APPLIES.
COORDINATE INSTALLATION WITH CONTRACTOR'S PROVIDING ASSOCIATED STRUCTURE, INCLUDING
REQUIRED ELEVATIONS AND DIMENSIONAL LOCATIONS. ITEMS NOT PROPERLY INSTALLED SHALL BE REMOVED
AND REPLACED TO THE SATISFACTION OF THE OWNERS' ON-SITE REPRESENTATIVE.
d. ALL ITEMS AND ACCESSORIES SPECIFIED HEREIN ARE TO BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS, AND IN ACCORDANCE THE THE REQUIREMENTS OF THE
INSPECTION/APPROVAL AUTHORITIES.
e. WITH THE EXCEPTION OF CLEANOUTS, ALL ITEMS SPECIFIED ARE TO HAVE CONNECTION SIZE SAME AS
CONNECTED PIPING SIZE SHOWN ON THE DRAWINGS, UNLESS DIRECTED OTHERWISE.
f. CLEANOUTS ARE TO HAVE OUTLET SIZE, CONNECTION PIPE AND FITTINGS OF SAME SIZE AS SHOWN ON
PLANS FOR WASTE/DRAIN PIPING BEING SERVED, UP TO AND INCLUDING 3" SIZE. CLEANOUTS ARE TO HAVE
OUTLET SIZE, CONNECTING PIPE AND FITTINGS OF 4" SIZE WHEN SHOWN ON THE DRAWINGS SERVING
WASTE/DRAIN PIPING 4" SIZE AND LARGER.
g. COORDINATE LOCATIONS OF ITEMS SPECIFIED HEREIN, AND INSTALLED IN OR AT STRUCTURE PROVIDED
UNDER SEPARATE CONTRACT, RELATIVE TO FOUNDATIONS, BEAMS AND OTHER STRUCTURE ELEMENTS TO
AVOID CONFLICTS. MAKE MINOR ADJUSTMENTS AS REQUIRED FOR PROPER INSTALLATION, CLEARANCE
AND ACCESSIBILITY. REFER TO ARCHITECTURAL/STRUCTURAL DOCUMENTATION IN ADVANCE OF WORK AND
COORDINATE INSTALLATION WITH THE APPROPRIATE CONTRACTOR.
PIPE ANCHORS, HANGERS AND SUPPORTS
1. ALL PIPING SHALL BE SEPARATELY HUNG AND SUPPORTED FROM APPROVED STRUCTURAL MEMBERS OR
CONCRETE OVERHEAD STRUCTURE ONLY. NO PIPE SHALL BE HUNG FROM ROOF DECK, PIPE DUCTS, OR OTHER
COMPONENTS OR EQUIPMENT OF OTHER TRADES.
2. PROVIDE LISTED/APPROVED ADJUSTABLE HANGERS, INSERTS, BRACKETS, CLAMPS, SUPPLEMENTAL STEEL AND
OTHER DEVICES REQUIRED FOR PROPER SUPPORT OF ALL PIPE LINES.
3. HANGERS SHALL BE DESIGNED TO ALLOW FOR EXPANSION AND CONTRACTION AND TO ALLOW INSULATION
(WHERE APPLICABLE) TO RUN CONTINUOUSLY THROUGH HANGERS.
4. WIRE OR STRAP HANGERS ARE NOT PERMITTED. ADJUST HANGERS SO AS TO DISTRIBUTE WEIGHT LOAD EQUALLY
ON ATTACHMENTS.
5. USE OF TRAPEZE HANGERS DO NOT PERMIT THE ELIMINATION OF THE PIPING INSULATION TO NOT BE
CONTINUOUS THRU THE HANGER.
6. NO PIPE SHALL BE SUPPORTED FROM ANOTHER PIPE. ALL HANGERS SHALL BE PLUMBED BEFORE INSULATION IS
APPLIED AND ALL HANGERS SHALL BE DOUBLE NUTTED. ALL HANGERS SHALL MEET LOCAL CODE REQUIREMENTS.
ALL PLASTIC PIPE SHALL BE INSTALLED AND SUPPORTED PER MANUFACTURERS INSTRUCTIONS.
PLUMBING FIXTURES
1. GENERAL
a. FURNISH AND INSTALL ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES AS SPECIFIED HEREIN AT
LOCATIONS INDICATED ON THE DRAWINGS. FIXTURES TO BE PROVIDED FREE OF DEFECTS AND SET IN A NEAT,
FINISHED AND UNIFORM MANNER.
b. WHERE FIXTURES ARE INDICATED TO BE HANDICAP ACCESSIBLE, INSTALL AS DIRECTED HEREIN AND IN
COMPLIANCE WITH THE CODES AND GUIDELINES REFERENCED.
2. PRODUCTS
a. PLUMBING FIXTURES, TRIM, FITTINGS, ACCESSORIES, APPURTENANCES, ETC. NOT INCLUDED HEREIN ARE AS
SPECIFIED ON PLAN.
b. CHINA PLUMBING FIXTURES AND ACCESSORIES AS MANUFACTURED BY SLOAN.
c. BATTERY POWERED, SENSOR ACTIVATED FAUCETS AND ACCESSORIES AS MANUFACTURED BY SLOAN.
d. SEATS FOR WATER CLOSETS AS MANUFACTURED BY BEMIS, CHURCH, OR OLSONITE MAY BE FURNISHED AT
THE CONTRACTOR'S OPTION. ALL SEATS ARE TO BE FURNISHED WITH SELF-SUSTAINING STAINLESS STEEL CHECK
HINGES UNLESS NOTED OTHERWISE.
e. EQUIVALENT FIXTURE CARRIERS AS MANUFACTURED BY ZURN, JOSAM, J. R. SMITH, MIFAB, OR WATTS MAY BE
FURNISHED AT THE CONTRACTOR'S OPTION.
f. UNLESS INDICATED OTHERWISE, ALL EXPOSED METALLIC PARTS, PIPING, TRIM, FITTINGS, ACCESSORIES,
APPURTENANCES, ETC, ASSOCIATED WITH PLUMBING FIXTURES SHALL BE POLISHED CHROME FINISH WHEN
AVAILABLE. PROVIDE POLISHED CHROME PLATED BRASS ESCUTCHEONS ON PIPING AT ALL EXPOSED
STRUCTURE PENETRATIONS (WALLS, FLOORS, CEILINGS, CASEWORK, ETC,) AND AT ALL FIXTURE
CONNECTIONS.
g. AT ALL HANDICAP ACCESS LAVATORIES AND/OR SINKS WITH EXPOSED SUPPLY AND DRAIN PIPING BELOW,
PROVIDE PRE-FABRICATED CLOSED CELL VINYL INSULATION/COVER ASSEMBLIES WITH SEAMLESS PVC
JACKET FOR ALL SUPPLY (FULL RANGE OF HOT, COLD AND TEMPERED) AND DRAIN PIPING. ASSEMBLY TO BE
SIMILAR TO MCGUIRE PRO-WRAP SERIES, OFFSET DRAINS (IF USED) TO BE PROVIDED WITH COVER ASSEMBLIES
SPECIFICALLY DESIGNED FOR SAME. ASSEMBLIES TO BE LISTED BY MANUFACTURER AS HANDICAP ACCESS
COMPLIANT.
3. EXECUTION
a. PROVIDE INDIVIDUAL ACCESSIBLE STOP VALVES ON ALL FIXTURES AND EQUIPMENT SUPPLY PIPING.
b. INSTALL ALL FIXTURES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
c. MOUNTING HEIGHTS OF FIXTURES AS ASSOCIATED EQUIPMENT AS INDICATED ON ARCHITECTURAL
DRAWINGS.
d. JOINTS FORMED WHERE FIXTURES COME INTO CONTACT WITH WALLS OF FLOORS SHALL BE SEALED
WATERTIGHT WITH AND APPROVED SEALING COMPOUND, COORDINATE INSTALLATION AND COLOR WITH
THE CONSTRUCTION MANAGER.
04/30/18
Nick Mishler