Loading...
HomeMy WebLinkAboutM3.1 Mechanical14390 CLAY TERRACE BLVD re d CARMEL, INDIANA 46032 WPG007 SPACE F30A - LANDLORD IMPROVEMENTS PROJECT NUMBER: SHEET: FOR WASHINGTON PRIME GROUP 180 EAST BROAD STREET, COLUMBUS, OH 43215 ISSUE DATE PERMIT FEB. 01, 2018 COPYRIGHT 2018. ALL DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF RED ARCHITECTURE + PLANNING LLC AND MAY NOT BE USED, DUPLICATED OR ALTERED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. M3.1 2/9/2017 7:51 PM SPECIFICATIONS - DIVISION 22 - PLUMBING GENERAL CONDITIONS A. GENERAL 1. THIS CONTRACT SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE INTO CONSIDERATION MECHANICAL, ELECTRICAL AND GENERAL TRADE WORK IN PLACE AND WORK TO BE PUT INTO PLACE PRIOR TO BIDDING. REROUTING OF DUCTWORK, PIPING, AND EQUIPMENT, AS REQUIRED TO MISS THIS WORK SHALL BE ACCOMPLISHED AT NO ADDITIONAL COST TO THE OWNER. B. SCOPE OF WORK 1. THE WORK INCLUDES MODIFICATION TO THE EXISTING PLUMBING SYSTEM AND PROVIDING NEW MATERIALS, FITTINGS AND ACCESSORIES NECESSARY FOR A COMPLETE FUNCTIONING PLUMBING SYSTEM. THE WORK ALSO INCLUDES ROUGH-IN AND FINAL CONNECTIONS TO EQUIPMENT PROVIDED BY OTHERS. ALL WORK SHALL BE IN ACCORDANCE WITH OWNER'S REQUIREMENTS, STATE AND LOCAL CODES AND/OR ORDINANCES AND IS SUBJECT TO INSPECTION. 2. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, INCIDENTALS, DETAILS, ETC. NECESSARY TO PROVIDE A COMPLETE, OPERATIONAL AND APPROVED PLUMBING SYSTEM, INCLUDING BUT NOT LIMITED TO ALL ITEMS AND ELEMENTS DESCRIBED IN THE PLUMBING SPECIFICATION AND SHOWN ON THE PLUMBING DRAWINGS, AND AS REQUIRED FOR COORDINATION AND/OR INTERFACE WITH WORK UNDER SEPARATE CONTRACT AS INDICATED BY COMPLETE CONSTRICTION DOCUMENTATION PACKAGE. 3. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR SATISFACTORILY ADDRESSING ALL REVIEW AND INSPECTION AUTHORITIES REQUIREMENTS AND DIRECTIVES IN REGARD TO METHODS OF INSTALLATION NECESSARY FOR FINAL APPROVAL. C. SUBSTITUTIONS AND MISCELLANEOUS EQUIPMENT 1. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE ONE OR MORE NAMES OF MANUFACTURERS ARE MENTIONED ANY ONE MAY BE UTILIZED. 2. ALTERNATIVE EQUIPMENT MAY BE BID AS A SUBSTITUTION TO THAT SPECIFIED WITH THE APPROPRIATE DEDUCT NOTED. HOWEVER; THE EQUIPMENT SUBSTITUTED SHALL MEET ALL SPECIFICATIONS IN DESIGN AND BE SUBJECT TO OWNER AND/OR ENGINEER APPROVAL. ANY ADDITIONAL COST INCURRED DUE TO SUBSTITUTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO EXPENSE TO THE OWNER. 3. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE PIPING SYSTEMS SUCH AS FITTING, HANGERS, ETC., CAN BE OF ANY RECOGNIZED MANUFACTURER PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET BY THE ENGINEER. D. DRAWINGS 1. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW THE APPROXIMATE LOCATION OF OUTLETS, EQUIPMENT AND PIPING. 2. THE EXACT LOCATION OF OUTLETS, EQUIPMENT AND PIPING MAY BE CHANGED FROM TIME TO TIME AS WORK PROGRESSES. UNDER THIS CONTRACT ALL LOCATIONS SHALL BE VERIFIED WITH ALL TRADES AND THAT THEY ARE ACCORDING TO THE LATEST INFORMATION AVAILABLE. SHOULD THIS NOT BE DONE THE WORK WILL BE CHANGED AT NO ADDITIONAL EXPENSE TO THE OWNER. 3. THE OWNER RESERVES THE RIGHT TO MAKE MINOR CHANGES IN LOCATION OF EQUIPMENT AND PIPING ARRANGEMENTS UP TO THE TIME OF ROUGH-IN WITHOUT ADDITIONAL COSTS TO THE OWNER. 4. THE DRAWINGS AND SPECIFICATION ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIALS OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NO MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE FURNISHED UNDER THIS CONTRACT. E. CLEANING UP 1. UNLESS OTHERWISE NOTED, ALL EXCESS MATERIALS AND DEBRIS CAUSED BY THIS WORK SHALL BE COME THE PROPERTY OF THE CONTRACTOR AND PROMPTLY BE REMOVED FROM THE SITE. ALL FIXTURES AND EQUIPMENT INSTALLED SHALL BE THOROUGHLY CLEANED WEEKLY. ALL MOTORS AND EQUIPMENT SHALL BE COVERED OR OTHERWISE PROTECTED FORM CONSTRUCTION DUST AND DEBRIS. NO EQUIPMENT OTHER THAN THOSE DESIGNED TO ARE TO BE EXPOSED TO INCLEMENT WEATHER. TOUCH UP ALL SCRATCHES AND REPAIR ANY DENTS IN EQUIPMENT. F. CUTTING AND PATCHING 1. CUTTING FOR OPENINGS, WHEN NECESSARY, SHALL BE DONE BY THIS CONTRACTOR WITH SUCH TOOLS AND METHODS AS TO PREVENT UNNECESSARY DAMAGE TO SURROUNDING AREAS OR EQUIPMENT. 2. FILL SPACE IN ALL AREAS PACKING WHERE REQUIRED TO MAINTAIN FIRE RATING, OPENINGS SHALL BE TEMPORARILY FIRE STOPPED UNTIL PERMANENT FIRE STOPPING IS DONE. THIS INCLUDES HOLES LEFT DUE TO REMOVAL OF PIPING. 3. PATCHING SHALL MATCH EXISTING SURFACES IN KIND AND FINISH, AND SHALL BE DONE BY THE GENERAL CONTRACTOR. 4. NO STRUCTURAL MEMEBER WILL BE CUT INTO WITHOUT THE EXPRESSED PERMISSION THE OWNER'S REPRESENTATIVE. G. GUARANTEE 1. ALL LABOR AND MATERIALS FURNISHED UNDER THIS CONTRACT SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR FORM THE DATE OF FINAL ACCEPTANCE BY THE OWNER WHICH WILL COMMENCE UPON THE FINAL INSPECTION BY THE ENGINEER. DURING THIS TIME, ALL LEAKS, CORRECTION OF ALL THE FAILURES TO SUCH MATERIAL AND THE CORRECTION OF ALL DISCREPANCIES WITH THE PLUMBING CODE, THE CONTRACT DRAWINGS, AND THE PROJECT SPECIFICATIONS SHALL BE DONE UNDER THIS CONTRACT AT NO ADDITIONAL EXPENSE TO THE OWNER. H. EXCAVATION AND BACKFILL 1. THIS CONTRACTOR SHALL EXCAVATE AND BACKFILL ALL TRENCHES AND OTHER EXCAVATIONS REQUIRED FOR LAYING DRAINS, SEWERS, APPURTENANCES AND OTHER EXCAVATIONS REQUIRED FOR HIS WORK. 2. EARTH FILL: SOIL AS APPROVED BY THE OWNER'S REPRESENTATIVE, FREE OF ORGANIC SOIL, SOD, ROOTS, WOOD, METAL, RUBBISH, DEBRIS, LUMPS OR EXCESSIVE AMOUNTS OF CLAY AND ROCKS GREATER THAN 2" IN DIAMETER; CAPABLE OF BEING COMPACTED INTO DENSE AND STABLE CONDITIONS AS SPECIFIED. 3. ALL UNDERGROUND PIPING SHALL BE INSTALLED ON A MINIMUM OF A 3" BED OF COMPACTED SAND. ALL UNDERGROUND PIPING SHALL BE BACKFILLED BY HAND TO A LEVEL OF 6" ABOVE THE PIPE WITH CLEAN SAND. ALL BACKFILL SHALL BE MADE IN LIFTS NOT TO EXCEED 12". EACH LIFT SHALL BE MECHANICALLY COMPACTED TO A MINIMUM OF 92% MODIFIED PROCTOR. 4. PROTECT ALL UTILITIES SHOWN ON DRAWINGS OR ENCOUNTERED IN THE CONSTRUCTION WORK. ANY DAMAGE TO UTILITIES SHALL BE REPAIRED BY THIS CONTRACTOR TO OWNER'S SATISFACTION, WITHOUT COST TO THE OWNER. 5. THIS CONTRACTOR SHALL REMOVE ANY UNUSABLE OF SURPLUS EXCAVATED MATERIAL FROM THE SITE. I. RECORD DRAWINGS 1. THIS CONTRACTOR SHALL KEEP AN ACCURATE RECORD OF ALL DEVIATIONS FROM CONTRACT DRAWINGS AND SPECIFICATIONS. HE SHALL NEATLY AND CORRECTLY ENTER IN COLORED PENCIL ANY DEVIATIONS ON THE BLUE PRINTS OR BLUE LINE DRAWINGS. AT COMPLETION OF THE PROJECT DELIVER DRAWINGS TO OWNER'S REPRESENTATIVE. PERMITS AND FEES 1. THE PLUMBING CONTRACTOR SHALL APPLY FOR AND PAY ANY REVIEW INSPECTION, PERMIT, LICENSE, TESTING AND/OR OTHER SERVICE FEES REQUIRED BY ALL REVIEW/INSPECTION/APPROVAL AUTHORITIES IN CONNECTION WITH THE WORK UNDER THIS CONTRACT. 2. ALL WORK SHALL ALSO BE INSTALLED IN ACCORDANCE WITH REGULATIONS OF THE FIRE UNDERWRITERS HAVING JURISDICTION AND LOCAL UTILITIES. CONTRACTOR SHALL ALSO SECURE ANY PERMITS OR PAY ANY FEES TO THE LOCAL UTILITY COMPANIES FOR THE WORK REQUIRED. PRODUCTS GENERAL 1. WHERE ITEMS/ELEMENTS ARE INDICATED HEREIN TO BE LISTED/APPROVED. THE INTENT OF THE SPECIFICATION IS THAT SAID ITEM/ELEMENT SHALL BE LISTED BY ALL APPLICABLE MATERIAL/CONSTRUCTION STANDARDS, AND SUBJECT TO FINAL APPROVAL (INCLUDING METHODS OF INSTALLATION) BY ALL REVIEW/INSPECTION/APPROVAL AUTHORITIES. 2. UNLESS INDICATED OTHERWISE, ALL PLUMBING CONTRACT ITEMS/ELEMENTS (PIPE, FITTINGS, VALVES, SPECIALTIES, FIXTURES, EQUIPMENT, ETC.) MATERIALS, CONSTRUCTION, PERFORMANCE, TESTING AND METHODS OF INSTALLATION TO BE AS LISTED/APPROVED BY ALL APPLICABLE MATERIAL/ CONSTRUCTION/ INSTALLATION STANDARDS FOR SAME, AND BE IN ACCORDANCE WITH THE REQUIREMENTS OF ALL REVIEW/INSPECTION/ APPROVAL AUTHORITIES. THIS INCLUDES, BUT IS NOT LIMITED TO, THE STANDARDS AND AUTHORITIES REFERENCED IN THIS SPECIFICATION. IN THE ABSENCE OF SUCH STANDARDS AND/OR REQUIREMENTS, THE ITEM/ELEMENTMANUFACTURER'S RECOMMENDATIONS, AS CONFIRMED BY THE PLUMBING CONTRACTOR IN ADVANCE, SHALL BE FOLLOWED. 3. UNLESS INDICATED OTHERWISE, ALL PLUMBING PIPING SHALL BE IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN REGARD TO MATERIALS, CONSTRUCTION, DIMENSIONS/TOLERANCES, TYPE OF SERVICE/TRANSMISSION MEDIUM (WATER, AIR, GAS, ETC.) AND METHODS OF INSTALLATION (AS APPLICABLE), AND SHALL BE SO LISTED. FINAL APPROVAL FOR USE IS SUBJECT TO THE REQUIREMENTS OF THE REVIEW AND INSPECTION AUTHORITIES: a. CAST IRON PIPE, FITTINGS AND JOINING METHODS; PER APPLICABLE ASTM/ANSI/ASME/CISPI STANDARDS. b. COPPER/COPPER ALLOY/BRASS PIPE/TUBE, FITTINGS AND JOINING METHODS; PER APPLICABLE ASTM/ANSI/ASME STANDARDS. IN ADDITION, WHERE UTILIZED FOR POTABLE WATER SERVICE, ALL ELEMENTS SHALL BE PER APPLICABLE NSF STANDARDS. 4. ALL PLUMBING CONTRACT ITEMS/ELEMENTS SHALL HAVE THE MANUFACTURER'S MARK OF NAME AND THE QUALITY OF THE PRODUCT OR IDENTIFICATION OF SAME CAST, EMBOSSED, STAMPED OR INDELIBLY MARKED ON EACH ITEM/ELEMENT IN ACCORDANCE WITH THE STANDARDS UNDER WHICH THEY ARE ACCEPTED AND APPROVED PER APPLICABLE CODE(S). 5. PLUMBING UTILITY CONNECTIONS PROVIDE FOR ITEMS OR ELEMENTS NOT INCLUDED IN THE PLUMBING CONTRACT. a. UNLESS INDICATED OTHERWISE, THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL TRAPS AND STOPS (AS APPLICABLE) AS REQUIRED FOR ITEMS FURNISHED UNDER SEPARATE CONTRACT. THIS INCLUDES ITEMS WITH CONNECTIONS BY THE PLUMBING CONTRACTOR OR WITH CONNECTIONS UNDER SEPARATE CONTRACT. b. UNLESS INDICATED OTHERWISE, FIXTURE TRAPS ABOVE FLOOR SLAB CONNECTED TO THE SANITARY WASTE SYSTEM SHALL BE CAST BRASS P-TRAPS WITH INTEGRAL CLEANOUT. P-TRAPS BELOW FLOOR SLAB TO BE CAST IRON, LESS CLEANOUT. SEE DRAWINGS FOR SIZES. c. UNLESS INDICATED OTHERWISE, FIXTURE TRAPS CONNECTED TO WASTE OR DRAIN SYSTEMS OTHER THAN THE SANITARY WASTE SYSTEM SHALL BE OF THE SAME MATERIAL AND CONSTRUCTION TYPE AS THE ASSOCIATED PIPING SYSTEM. P-TRAPS TO BE PROVIDED AS INDICATED ON THE DRAWINGS. d. UNLESS INDICATED OTHERWISE, SUPPLY ROUGH-INS TO BE FURNISHED WITH ACCESSIBLE SHUT OFFS AT CONNECTIONS POINTS. SHUT OFFS AT SUPPLY ROUGH-INS FOR FIXTURES (SINKS, LAVATORIES, ETC.) TO BE ANGLES TYPE COMPRESSION STOPS. SHUT OFFS AT SUPPLY ROUGH-INS FOR EQUIPMENT OF OTHER ELEMENTS TO BE IN-LINE VALVES AS SPECIFIED FOR INDIVIDUAL SERVICES. e. UNLESS INDICATED OTHERWISE, WHERE CONNECTION ELEMENTS DESCRIBED HEREIN ARE EXPOSED IN LOCATIONS OTHER THAN THE RESTRICTED ACCESS UTILITY OR MAINTENANCE AREAS, ALL METALLIC COMPONENTS TO BE FURNISHED WITH A POLISHED CHROME FINISH. WALL OR OTHER STRUCTURE PIPING PENETRATIONS AT THESE LOCATION TO BE PROVIDED WITH POLISHED CHROME FINISH ESCUTCHEONS. EXECUTION GENERAL 1. WHERE STANDARDS, CODES OR GUIDELINES ARE REFERENCED HERIN AND THROUGHOUT THE PLUMBING CONTRACT DOCUMENTATION, INCLUDING PLANS AND SPECIFICATIONS, THE LATEST VERSION/EDITION SHALL BE APPLIED, UNLESS THE BUILDING CODE REFERENCES ANOTHER VERSION/EDDITION, WHICH SHALL TAKE PRECEDENCE. 2. REFER TO PROJECT DOCUMENTATION FURNISHED WITH THE COMPLETE CONSTRUCTION PACKAGE IN ADVANCE OF WORK FOR OVERALL COORDINATION AND VERIFICATION OF REQUIREMENTS AT WORK OF OTHER TRADES RELATING TO, INTERFACING WITH, AND/OR IMPACTING WORK IN THE PLUMBING CONTRACT. THIS INCLUDES EXACT LOCATIONS, QUANTITIES, PHYSICAL SIZES, ROUGH-IN DETAILS, PIPE ROUTING, CONNECTION SIZES, ETC., FOR ITEMS INCLUDING BOTH IN THE PLUMBING CONTRACT AND UNDER SEPARATE CONTRACT. COORDINATE INSTALLATION AND INTERFACE REQUIREMENTS WITH THE APPROPRIATE CONTRACTOR(S) IN ADVANCE OF WORK. 3. INCLUDE ANY MINOR DETAILS, ITEMS AND/OR ELEMENTS ESSENTIAL TO NECESSARY APPROVALS AND SUCCESSFUL OPERATION IN ADDITION TO THE ITEMS SPECIFIED HEREIN AND SHOWN ON THE DRAWINGS. 4. SEE GENERAL "PLUMBING NOTES" ON DRAWINGS FOR ADDITIONAL CONDITIONS AND REQUIREMENTS RELATIVE TO THE PLUMBING CONTRACT. 5. PLUMBING ITEMS AND ELEMENTS SHALL BE INSTALLED WITH DUE REGARD TO PRESERVATION OF THE STRENGTH OF STRUCTURAL MEMBERS AND PREVENTION OF DAMAGE TO WALLS, SURFACES AND OTHER STRUCTURES THROUGH INSTALLATION, BEARING SUPPORT OF SUBSEQUENT USAGE OF PLUMBING ITEMS AND ELEMENTS. NO FRAMING OR OTHER SUPPORT STRUCTURE SHALL BE CUT, NOTCHED OR BORED IN EXCESS OF LIMITATIONS SPECIFIED IN THE BUILDING CODE, OR BY THE MANUFACTURER OF THE FRAMING OR OTHER SUPPORT STRUCTURE, AS CONFIRMED IN ADVANCE OF WORK BY THE PLUMBING CONTRACTOR. SLEEVES 1. SLEEVE MATERIAL: BLACK STEEL PIPE, MACHINE CUT, LARGE ENOUGH TO ALLOW 1/4" CLEARANCE ALL AROUND PIPE AND PIPE COVERING. USE MACHINE CUT COPPER SLEEVES FOR NON-INSULATED COPPER PIPE. 2. SLEEVES IN PARTITIONS TO HAVE LENGTH EQUAL TO THE THICKNESS OF FINISHED PARTITIONS. SLEEVES IN FLOORS OF FINISHED AREAS TO PROJECT 2" ABOVE THE FINISHED FLOOR. SLEEVES IN FLOORS OF NON-FINISHED AREAS TO PROJECT 2" ABOVE THE FINISHED FLOOR. FILL SPACE BETWEEN PIPE AND SLEEVES INTO EXPOSED AREAS WITH SEALING COMPOUND. REAM ALL SLEEVES BEFORE INSTALLING. PLUMBING INSULATION 1. GENERAL a. PROVIDE LISTED INSULATION COVER FOR ALL ITEMS/ELEMENTS AS SPECIFIED HEREIN, AS SHOWN ON DRAWINGS, AND FOR ANY OTHER ITEMS/ELEMENTS REQUIRING SAME. b. INSULATE PIPING AND ASSOCIATED ACCESSORIES AND APPURTENANCES INCLUDING IN THE FOLLOWING SYSTEMS: 1. DOMESTIC COLD WATER AND HOT WATER. 2. PRODUCTS a. ALL INSULATING MATERIALS, INCLUDING JACKETS, CEMENTS, ADHESIVES, VAPOR BARRIERS, ETC., SHALL BE U.L. LISTED, WITH A FLAME SPREAD RATING NOT TO EXCEED 25, AND A SMOKE DEVELOPMENT RATING NOT TO EXCEED 50. ALL EXTERIOR FINISHES SHALL HAVE A MINIMUM SERVICE TEMPERATURE LIMIT (FSTM 70) OF MINUS 50 TO 220 DEGREES F. b. MOLDED PLASTIC FITTING COVERS SHALL BE U.L. LISTED WITH A FLAME SPREAD RATING NOT TO EXCEED 25, AND A SMOKE DEVELOPMENT RATING NOT TO EXCEED 50. c. INSULATED THICKNESS IS BASED ON INSULATION HAVING THERMAL RESISTANCE IN THE RANGE OF 4.0 HR F. FT2/BTU TO 4.6 HR F. FT2/BTU PER INCH OF THICKNESS ON A FLAT SURFACE AT A MEAN TEMPERATURE OF 75 DEGREES F. MINIMUM INSULATION THICKNESS SHALL BE INCREASED FOR MATERIALS HAVING R VALUES LESS THAN 4.0 OR MAY BE REDUCED FOR MATERIALS HAVING R VALUES GREATER THAN 4.6 TO GIVE EQUIVALENT "R" VALUES. d. PIPE COVERS SHALL BE SIMILAR TO JOHNS MANVILLE "MICRO-LOK" GLASS FIBER INSULATION, RATED FOR 850 DEGREES F. WITH A FACTORY APPLIED AP-T ALL-PURPOSE SELF-SEALING VAPOR BARRIER JACKET. BUTT STRIPS SHALL BE MINIMUM 3" WIDE, AND OF SAME MATERIAL AS JACKET. EQUAL MATERIALS, INCLUDING THICKNESS AND CONDUCTIVITY RATINGS/LISTINGS. AS MANUFACTURED BY OWENS CORNING, KNAUF OR MANSON MAY BE FURNISHED, AT THE CONTRACTOR'S OPTION. WHERE INSULATION THICKNESS IS INDICATED FOR COVER HEREIN. IT IS NOMINAL THICKNESS REQUIRED THICKNESS. e. ALL CEMENTS, ADHESIVES, FINISHES, AND ASSOCIATED MATERIALS SHALL BE SIMILAR TO THAT PROVIDED BY FOSTER. EQUAL MATERIALS AS PROVIDED BY CHILDERS OR VIMASCO MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. f. LONGITUDINAL LAP JOINTS AND BUTT STRIPS FOR GLASS FIBER PIPING INSULATION SHALL BE SECURED WITH STAPLES ON THREE (3) INCH CENTERS, AND SEALED WITH AN APPROVED VAPOR BARRIER ADHESIVE WHERE APPLICABLE. STAPLES ARE NOT REQUIRED WHEN INSULATION UTILIZES A "DOUBLE" ADHESIVE SELF-SEALING SYSTEM. 3. EXECUTION a. COVER DOMESTIC COLD WATER AND HOT WATER PIPING WITH 1" THICKNESS GLASS FIBER PIPE INSULATION. b. ALL APPURTENANCES AND ACCESSORIES SUCH AS VALVES, FLANGES, UNIONS, ETC. INSTALLED IN REFERENCED PIPING SHALL BE WRAPPED WITH FULL THICKNESS INSULATION AND COVERED WITH A LISTED MOLDED PLASTIC FITTING COVER, OR AN OPEN MESH GLASS CLOTH SHALL BE FIRE RESISTANT MASTIC. c. USE 12" LONG SECTIONS OF CALCIUM SILICATE RIGID INSULATION, WITH JACKET SAME AS ADJACENT PIPE COVERING FOR TRANSFER OF SUPPORT TO PIPING AT EACH HANGER, WITHOUT STRESS TO THE PIPE COVERING ASSEMBLY. AT THE CONTRACTOR'S OPTION, AN APPROVED WOOD OR HIGH-DENSITY (20 LB./CU. FT.) FIBERGLASS BLOCK MAY BE SUBSTITUTED FOR THE RIGID INSULATION SECTION. VAPOR BARRIER TO BE MAINTAINED THROUGHOUT. d. ALL APPLICATIONS SHALL BE MADE ON CLEAN, DRY SURFACES WITH ALL JOINTS BUTTED FIRMLY TOGETHER. e. INSULATION MUST RUN CONTINUOUS THROUGH HANGERS, SLEEVES AND WALL FOR ALL COLD WATER AND HOT WATER PIPING. f. INSULATION SHALL NOT BE APPLIED UNTIL GENERAL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO MINIMIZE POTENTIAL FOR PHYSICAL OR MOISTURE DAMAGE TO THE COVER ASSEMBLY. ALL DAMAGED COVER SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. g. INSTALL PROTECTIVE SLEEVE ON ALL INSULATED, EXPOSED PIPES PENETRATING THE FLOOR STRUCTURE. h. HANGER RODS MUST BE PERPENDICULAR BEFORE INSULATION IS INSTALLED. BUILDING SOIL, WASTE AND VENT SYSTEM 1. APPLICATIONS FOR SANITARY AND VENT SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: a. SANITARY AND VENT PIPING FROM DESIGNATED POINTS WITH ALL CONNECTIONS. b. DRAINAGE AND VENT PIPING FOR ALL OTHER MISCELLANEOUS SYSTEMS OR EQUIPMENT AS INDICATED ON DOCUMENTS AND AS REQUIRED. c. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SANITARY PIPING FINAL CONNECTIONS AND ALL INDIRECT PIPING FROM EQUIPMENT TO DRAIN TO COMPLETE THE SANITARY WASTE AND VENT PIPING SYSTEM AND TO COMPLETE THE INDIRECT DRAINAGE PIPING SYSTEM TO OPERATE ALL EQUIPMENT AND FIXTURES PROPERLY. 2. SCOPE a. FURNISH A COMPLETE SYSTEM OF INTERIOR SOIL WASTE DRAINAGE (INCLUDES SANITARY AND VENT PIPING) FROM BUILDING FIXTURES, EQUIPMENT, AND ANY OTHER ELEMENTS REQUIRING THE SAME. 3. PRODUCTS a. DRAINAGE WASTE AND VENT (DWV) PIPING TO BE AS FOLLOWS (INCLUDES SANITARY, VENT, STORM & GREASE WASTE): 1. ASTM A 74, CISPI HS 74 CAST IRON SERVICE WEIGHT HUB AND SPIGOT PIPE AND FITTINGS WITH NEOPRENE GASKETS OR ASTM A 888, CISPI 301 CAST IRON SERVICE WEIGHT HUBLESS PIPE AND FITTINGS WITH ASTM C 1277, CISPI 310 HUBLESS COUPLINGS. HUBLESS COUPLINGS TO BE INSTALLED ABOVE GRADE ONLY. 2. ASTM D 2665, SCHEDULE 40 TYPE 1, GRADE 1 PVC DWV PIPE AND ASTM D 2665, MADE TO ASTM D 3311, FITTINGS WITH ASTM F 656 ADHESIVE PRIMER AND ASTM D 2564 SOCKET SOLVENT SOLDER JOINTS AND CONNECTIONS. PLASTIC PIPING NOT PERMITTED FOR INSTALLATION IN RETURN AIR PLENUMS OR LOCATIONS EXPOSED TO RETURN AIR PLENUMS. 4. EXECUTION a. ALL CAST IRON SOIL PIPE SHALL BE BITUMASTIC COATED INSIDE AND OUTSIDE. ALL CAST IRON PIPING (INCLUDING JOINTS AND CONNECTIONS) SHALL BE INSTALLED IN ACCORDANCE WITH STANDARDS AS SET FORTH BY THE CAST IRON SOIL PIPE INSTITUTE (CSPI). b. AT THE CONTRACTOR'S OPTION, HUBLESS CAST IRON SOIL PIPE MAY BE JOINED BY USING HEAVY DUTY "CLAMP ALL" COUPLINGS IN LIEU OF "NO-HUB" COUPLINGS. COUPLINGS ARE TO BE MADE OF 24 GAUGE TYPE 304 STAINLESS STEEL WITH HI-TORQUE CLAMPS AND NEOPRENE GASKETS. COUPLINGS SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. c. PLASTIC PIPING SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS, WITH PARTICULAR ATTENTION TO REQUIREMENTS FOR JOINING METHODS, SUPPORT, AND ALLOWANCES FOR EXPANSION AND CONTRACTION. PLASTIC PIPING SHALL NOT BE INSTALLED IN ANY RETURN AIR PLENUM OR CHASE THAT IS USED FOR RETURN AIR. d. COORDINATE INSTALLATION WITH STRUCTURE, EXISTING CONDITIONS AND WORK OF OTHER TRADES AT AND ADJACENT TO SOIL, WASTE AND VENT SERVICE PIPING INSTALLATION. DOMESTIC WATER PIPING SYSTEMS 1. GENERAL a. THE DOMESTIC WATER PIPING SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: 1. COLD WATER SUPPLY, HOT WATER SUPPLY. 2. PRODUCTS a. PIPE AND FITTINGS. 1. ABOVE GROUND PIPING UP TO AND INCLUDING 3" SIZE TO BE ASTM B88, ANSI/NSF 61 TYPE L HARD DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND SOCKET SOLDER JOINTS AND CONNECTIONS. TEE DRILL MECHANICAL SADDLE CONNECTIONS MAY BE UTILIZED FOR BRANCH TAKE-OFFS. PIPING BELOW GRADE 2" DIAMETER AND SMALLER SHALL BE ASTM B88 LISTED/APPROVED TYPE K SOFT COPPER TUBING IN A SINGLE LENGTH WITH NO IN-LINE COUPLINGS OR JOINTS. COMPLETED INSTALLATION TO BE RATED 135 S.W.P AND 400 W.O.G. 2. BALL VALVES 3" SIZE AND SMALLER SHALL BE LEAD-FREE TWO-PIECE BRONZE BODY BALL VALVE, SOLDERED CONNECTIONS, UNION CONNECTION BODY, TEFLON SEATS, FULL PORT WITH BLOW OUT PROOF STEM, ADJUSTABLE PACKING GLAND, CHROME PLATED BRONZE BALL AND LEVER HANDLE LABELED FOR THE SERVICE CONTROLLED. DESIGN FOR 150 S.W.P. AND 400 W.O.G. EQUAL TO APOLLO 70LF SERIES. 3. VALVES BY MILWAUKEE, NIBCO OR WATTS MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 5. ALL DOMESTIC WATER PIPING SHALL BE CLEAN, FLUSHED AND TESTED PER STATE AND LOCAL HEALTH DEPARTMENT REQUIREMENTS. 6. ALL DOMESTIC WATER PIPING SHALL BE CERTIFIED SAFE FOR HUMAN CONSUMPTION BY A CERTIFIED PROFESSIONAL BY THE STATE OF WEST VIRGINIA (BACTERIAL CERTIFICATION NUMBER) EMPLOYED BY A TESTING LABORATORY THAT STATES THE SYSTEM MEETS THE DEPARTMENT OF HEALTH REQUIREMENTS AND IS APPROVED FOR HUMAN CONSUMPTION. 7. SOLDER AND FLUX MATERIAL SHALL BE CERTIFIED "LEAD FREE" AND LISTED FOR USE WITH POTABLE WATER SYSTEMS. 3. EXECUTION a. ALL PIPING THAT SUPPLIES A FLUSH VALVE, SOLENOID VALVE (OTHER THAN SLOW-CLOSING TYPE) SPRING RETURN OPERATOR OR OTHER QUICK CLOSING TYPE DEVICE SHALL HAVE A SHOCK ABSORBER INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. UNLESS INDICATED OTHERWISE, WHERE MULTIPLE FIXTURES OR EQUIPMENT IN ADJACENT LOCATIONS (SUCH AS WITHIN A CHASE OR OTHER ENCLOSURE) ARE SUPPLIED BY COMMON PIPING MANIFOLD, A PROPERLY SIZED AND INSTALLED SHOCK ABSORBER MAY BE UTILIZED. b. RUN ALL WATER PIPING LEVEL AND CONCEAL WHENEVER POSSIBLE. PIPING TO BE INSTALLED TO ALLOW COMPLETE DRAIN DOWN OF SYSTEM BACK TO MAIN RISER AT BASE OF SYSTEM WHENEVER POSSIBLE. c. COORDINATE INSTALLATION WITH STRUCTURE, SITE CONDITIONS AND WORK OF OTHER TRADES AT AND ADJACENT TO DOMESTIC WATER SERVICE PIPING INSTALLATIONS. 4. FLUSHING AND STERILIZATION a. FLUSH OUT ALL DOMESTIC WATER PIPING SYSTEMS TO REMOVE ALL DIRT AND GREASE FROM PIPING AND EQUIPMENT BEFORE SYSTEMS ARE PLACED INTO OPERATION. CLEAN STRAINERS AFTER EACH FLUSHING UNTIL THE STRAINER REMAINS CLEAN. b. AFTER DOMESTIC WATER LINES ARE ALL INSTALLED, STERILIZE LINES AS PRESCRIBED BY AWWA-C-651. STERILIZATION SHALL BE DONE UNDER IMMEDIATE-ON-THE-JOB SUPERVISION OF A WATER TESTING LABORATORY REGULARLY ENGAGED IN THE SERVICE AND SHALL BE DONE PER THEIR INSTRUCTIONS. ALL FEES FOR TESTING AND TEST EQUIPMENT SHALL BE PAID BY THIS CONTRACTOR. c. FURNISH A CERTIFICATE OF STERILIZATION AND APPROVAL FOR HUMAN CONSUMPTION SIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITHIN THE STATE AND REGULARLY IN THE EMPLOY OF THE TESTING LABORATORY. CERTIFICATION SHALL BE FURNISHED TO THE ARCHITECT/ENGINEER PRIOR TO ANY PAYMENT IS MADE. d. STERILIZATION: CHLORINATING MATERIAL EITHER LIQUID CHLORINE MEETING AWWA STANDARD B301, SODIUM OR CALCIUM HYPOCHLORITE MEETING AWWA STANDARD B300. 6. EXECUTION a. WITH ALL OUTLETS CLOSED, FILL SYSTEM TO WORKING PRESSURE AND CLOSE VALVE AT SUPPLY MAIN. b. A CLEANING SOLUTION CONTAINING NOT LESS THAN 150 PARTS PER MILLION OF CHLORINE SHALL BE INTRODUCED INTO THE SYSTEM. c. EACH OUTLET, HOT AND COLD, SHALL BE TESTED DURING FILL TO PROVE THE PRESENCE OF CHLORINE AT THAT OUTLET AND VALVES AND FAUCETS SHALL BE OPENED AND CLOSED SEVERAL TIMES DURING THE DISINFECTING TIME PERIOD. d. WATER PIPING SYSTEMS SHALL REMAIN FILLED FOR A PERIOD OF 24 HOURS AND EACH OUTLET SHALL BE AGAIN TESTED AND SHALL PRODUCE NOT LESS THAN 100 PARTS PER MILLION OF CHLORINE AT THE END OF THE RETENTION PERIOD. e. ALL OUTLETS SHALL BE OPENED WIDE AND THE MAIN SUPPLY VALVES OPENED. FLUSHING SYSTEM WITH WATER UNTIL THE CHLORINE CONTENT IS NOT GREATER THAN 0.2 PARTS PER MILLION OR UNTIL APPROVED BY THE HEALTH DEPARTMENT. FLUSH DRAIN VALVES. f. AFTER FINAL FLUSHING ALL AERATORS ON PLUMBING BRASS SHALL BE REMOVED, CLEANED AND REINSTALLED. g. STERILIZATION TEST MAY BE PERFORMED AT THE SAME TIME THE PRESSURE TEST IS PLACED ON THE SYSTEM. WATER HAMMER ARRESTORS 1. SIMILAR TO ZURN SHOCKTROL SERIES Z-1700, SIZED AND INSTALLED AS RECOMMENDED BY THE MANUFACTURER FOR SPECIFIC CONDITIONS AT EACH LOCATION. 2. EQUAL SHOCK ABSORBERS AS MANUFACTURED BY J.R. SMITH, JOSAM, SIOUX CHIEF OR PRECISION PLUMBING PRODUCTS MAY BE PROVIDED AT THE CONTRACTOR'S OPTION. DRAINS, CLEANOUTS, AND DRAINAGE SPECIALTIES 1. GENERAL e. FURNISH AND INSTALL DRAINS, CLEANOUTS AND DRAINAGE SPECIALTIES AS INDICTED ON THE DRAWINGS, AND ELSEWHERE AS REQUIRED FOR COMPLETE DRAINAGE, ACCESS AND SPECIAL FUNCTION/OPERATION AT ALL ITEMS/ELEMENTS AND AREAS REQUIRING SAME AND FOR PROPER INTEGRATION WITH THE BUILDING DRAINAGE SYSTEM. f. UNLESS INDICATED OTHERWISE, ALL ITEMS/ELEMENTS AND THEIR COMPONENT PARTS DESCRIBED HEREIN TO BE OF METALLIC CONSTRUCTION WHEN SUCH IS AVAILABLE FOR THE BASE SPECIFIED ITEM/ELEMENT. USE OF PLASTIC, COMPOSITE, OR OTHER NON-METALIC COMPONENTS AND/OR MATERIALS BY LISTED ALTERNATE ITEMS/ELEMENTS IS PROHIBITED. 2. PRODUCTS a. THIS CONTRACTOR MAY, AT HIS OPTION, USE ABS PLASTIC PLUGS IN LIEU OF BRONZE PLUGS WHERE SPECIFIED, EXCEPT ABS PLUGS SHALL NOT BE PERMITTED IN RETURN AIR PLENUMS OR AT EXPOSED LOCATIONS. LOCATION OF THE RETURN AIR PLENUM TO BE CONFIRMED WITH THE HVAC CONTRACTOR. b. EQUAL DRAINS, DRAINAGE SPECIALTIES AND CLEANOUTS AS MANUFACTURED BY ZURN, ZURN LC, JOSAM, SIOUX CHIEF, WATTS, JRS PRODUCTS, OR J.R. SMITH MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 3. EXECUTION a. PROVIDE A COMPATIBLE FASTENING ASSEMBLY WITH INTERNAL SECONDARY DRAINAGE FLANGE AND WEEPHOLES FOR ALL ITEMS SPECIFIED HEREIN BEING INSTALLED IN STRUCTURES HAVING A WATER PROOF MEMBRANE, FLASHING, VAPOR BARRIER, OR SIMILAR ELEMENT PROVIDED UNDER SEPARATE CONTRACT. INSTALLATION CONDITIONS TO BE VERIFIED FROM ARCHITECTURAL DOCUMENTATION AND COORDINATED WITH THE APPROPRIATE CONTRACTOR. b. COUNTER FLASHING (WHEN REQUIRED) FOR ITEMS SPECIFIED HEREIN IS TO BE COMPATIBLE WITH WATERPROOF MEMBRANE, VAPOR BARRIER, FLASHING, OR SIMILAR ELEMENTS PROVIDED UNDER SEPARATE CONTRACT AT THE INTERFACE POINT. COUNTER FLASHING TO BE PROVIDED AND SET IN PLACE BY THE PLUMBING CONTRACTOR. BUT WILL BE MADE WATERTIGHT BY THE CONTRACTOR INSTALLING THE MEMBRANE, VAPOR BARRIER, FLASHING OR SIMILAR ELEMENTS PROVIDED UNDER SEPARATE CONTRACT. INSTALLATION CONDITIONS TO BE VERIFIED FROM ARCHITECTURAL DOCUMENTATION AND COORDINATED WITH THE APPROPRIATE CONTRACTOR. c. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING ALL DRAINS, CLEANOUTS AND OTHER ITEMS SO NOTED INSTALLED FLUSH AND LEVEL WITH FINISH WALL, FLOOR OR OTHER STRUCTURE AS APPLIES. COORDINATE INSTALLATION WITH CONTRACTOR'S PROVIDING ASSOCIATED STRUCTURE, INCLUDING REQUIRED ELEVATIONS AND DIMENSIONAL LOCATIONS. ITEMS NOT PROPERLY INSTALLED SHALL BE REMOVED AND REPLACED TO THE SATISFACTION OF THE OWNERS' ON-SITE REPRESENTATIVE. d. ALL ITEMS AND ACCESSORIES SPECIFIED HEREIN ARE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, AND IN ACCORDANCE THE THE REQUIREMENTS OF THE INSPECTION/APPROVAL AUTHORITIES. e. WITH THE EXCEPTION OF CLEANOUTS, ALL ITEMS SPECIFIED ARE TO HAVE CONNECTION SIZE SAME AS CONNECTED PIPING SIZE SHOWN ON THE DRAWINGS, UNLESS DIRECTED OTHERWISE. f. CLEANOUTS ARE TO HAVE OUTLET SIZE, CONNECTION PIPE AND FITTINGS OF SAME SIZE AS SHOWN ON PLANS FOR WASTE/DRAIN PIPING BEING SERVED, UP TO AND INCLUDING 3" SIZE. CLEANOUTS ARE TO HAVE OUTLET SIZE, CONNECTING PIPE AND FITTINGS OF 4" SIZE WHEN SHOWN ON THE DRAWINGS SERVING WASTE/DRAIN PIPING 4" SIZE AND LARGER. g. COORDINATE LOCATIONS OF ITEMS SPECIFIED HEREIN, AND INSTALLED IN OR AT STRUCTURE PROVIDED UNDER SEPARATE CONTRACT, RELATIVE TO FOUNDATIONS, BEAMS AND OTHER STRUCTURE ELEMENTS TO AVOID CONFLICTS. MAKE MINOR ADJUSTMENTS AS REQUIRED FOR PROPER INSTALLATION, CLEARANCE AND ACCESSIBILITY. REFER TO ARCHITECTURAL/STRUCTURAL DOCUMENTATION IN ADVANCE OF WORK AND COORDINATE INSTALLATION WITH THE APPROPRIATE CONTRACTOR. PIPE ANCHORS, HANGERS AND SUPPORTS 1. ALL PIPING SHALL BE SEPARATELY HUNG AND SUPPORTED FROM APPROVED STRUCTURAL MEMBERS OR CONCRETE OVERHEAD STRUCTURE ONLY. NO PIPE SHALL BE HUNG FROM ROOF DECK, PIPE DUCTS, OR OTHER COMPONENTS OR EQUIPMENT OF OTHER TRADES. 2. PROVIDE LISTED/APPROVED ADJUSTABLE HANGERS, INSERTS, BRACKETS, CLAMPS, SUPPLEMENTAL STEEL AND OTHER DEVICES REQUIRED FOR PROPER SUPPORT OF ALL PIPE LINES. 3. HANGERS SHALL BE DESIGNED TO ALLOW FOR EXPANSION AND CONTRACTION AND TO ALLOW INSULATION (WHERE APPLICABLE) TO RUN CONTINUOUSLY THROUGH HANGERS. 4. WIRE OR STRAP HANGERS ARE NOT PERMITTED. ADJUST HANGERS SO AS TO DISTRIBUTE WEIGHT LOAD EQUALLY ON ATTACHMENTS. 5. USE OF TRAPEZE HANGERS DO NOT PERMIT THE ELIMINATION OF THE PIPING INSULATION TO NOT BE CONTINUOUS THRU THE HANGER. 6. NO PIPE SHALL BE SUPPORTED FROM ANOTHER PIPE. ALL HANGERS SHALL BE PLUMBED BEFORE INSULATION IS APPLIED AND ALL HANGERS SHALL BE DOUBLE NUTTED. ALL HANGERS SHALL MEET LOCAL CODE REQUIREMENTS. ALL PLASTIC PIPE SHALL BE INSTALLED AND SUPPORTED PER MANUFACTURERS INSTRUCTIONS. PLUMBING FIXTURES 1. GENERAL a. FURNISH AND INSTALL ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES AS SPECIFIED HEREIN AT LOCATIONS INDICATED ON THE DRAWINGS. FIXTURES TO BE PROVIDED FREE OF DEFECTS AND SET IN A NEAT, FINISHED AND UNIFORM MANNER. b. WHERE FIXTURES ARE INDICATED TO BE HANDICAP ACCESSIBLE, INSTALL AS DIRECTED HEREIN AND IN COMPLIANCE WITH THE CODES AND GUIDELINES REFERENCED. 2. PRODUCTS a. PLUMBING FIXTURES, TRIM, FITTINGS, ACCESSORIES, APPURTENANCES, ETC. NOT INCLUDED HEREIN ARE AS SPECIFIED ON PLAN. b. CHINA PLUMBING FIXTURES AND ACCESSORIES AS MANUFACTURED BY SLOAN. c. BATTERY POWERED, SENSOR ACTIVATED FAUCETS AND ACCESSORIES AS MANUFACTURED BY SLOAN. d. SEATS FOR WATER CLOSETS AS MANUFACTURED BY BEMIS, CHURCH, OR OLSONITE MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. ALL SEATS ARE TO BE FURNISHED WITH SELF-SUSTAINING STAINLESS STEEL CHECK HINGES UNLESS NOTED OTHERWISE. e. EQUIVALENT FIXTURE CARRIERS AS MANUFACTURED BY ZURN, JOSAM, J. R. SMITH, MIFAB, OR WATTS MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. f. UNLESS INDICATED OTHERWISE, ALL EXPOSED METALLIC PARTS, PIPING, TRIM, FITTINGS, ACCESSORIES, APPURTENANCES, ETC, ASSOCIATED WITH PLUMBING FIXTURES SHALL BE POLISHED CHROME FINISH WHEN AVAILABLE. PROVIDE POLISHED CHROME PLATED BRASS ESCUTCHEONS ON PIPING AT ALL EXPOSED STRUCTURE PENETRATIONS (WALLS, FLOORS, CEILINGS, CASEWORK, ETC,) AND AT ALL FIXTURE CONNECTIONS. g. AT ALL HANDICAP ACCESS LAVATORIES AND/OR SINKS WITH EXPOSED SUPPLY AND DRAIN PIPING BELOW, PROVIDE PRE-FABRICATED CLOSED CELL VINYL INSULATION/COVER ASSEMBLIES WITH SEAMLESS PVC JACKET FOR ALL SUPPLY (FULL RANGE OF HOT, COLD AND TEMPERED) AND DRAIN PIPING. ASSEMBLY TO BE SIMILAR TO MCGUIRE PRO-WRAP SERIES, OFFSET DRAINS (IF USED) TO BE PROVIDED WITH COVER ASSEMBLIES SPECIFICALLY DESIGNED FOR SAME. ASSEMBLIES TO BE LISTED BY MANUFACTURER AS HANDICAP ACCESS COMPLIANT. 3. EXECUTION a. PROVIDE INDIVIDUAL ACCESSIBLE STOP VALVES ON ALL FIXTURES AND EQUIPMENT SUPPLY PIPING. b. INSTALL ALL FIXTURES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. c. MOUNTING HEIGHTS OF FIXTURES AS ASSOCIATED EQUIPMENT AS INDICATED ON ARCHITECTURAL DRAWINGS. d. JOINTS FORMED WHERE FIXTURES COME INTO CONTACT WITH WALLS OF FLOORS SHALL BE SEALED WATERTIGHT WITH AND APPROVED SEALING COMPOUND, COORDINATE INSTALLATION AND COLOR WITH THE CONSTRUCTION MANAGER. 04/30/18 Nick Mishler