Loading...
HomeMy WebLinkAboutPlot PlanM ERTIFIED BY A% BASED OM ANS FOR EAMS iGw:g_�pos�l fcis�ep • i>'i ',t I^-nc: I. Required absorption field system; a.' 31 wide trench (see cross section) D. 8' n.inirun spacirg-center of the to center of the C. 4 gO lin, feet plus O feet end loops of absorption line 10009al. septic tank minimum with aCceSs riser 3. $oil pipe specifications: a. 4" ASTM -D 1785 Schedulc 40 solid plastic inside line, from building to tank and from tank to first distribution box. D. 4" sealed plastic pipe (ASTM -O 3034) from distribution Dox to d(striuution box and from distribution box to absorption field. C. All Ha dlten County and State of Indiana Standards to apply. 3EI.ERAL IATES: I. After system is installed and Defore backfilling, the Office of Paul I. Cripe, Inc. attuntion Ursell Cox and/or Joe Gatilff 1641-6777), and Bruce Hdmilton of HamilTcn County Health Department (773-0132) will be called for final inspections. Request for "Final lnspuction" will require a 24 nour notice to Me above offices. 2. Construction of septic system will De done when the soils are dry. 3. System as designed and shown is done with the intention of the system being installed at minimus depths. 4. :Io clay fill material will De placed over absorption field. Natural ground line to remain as much as possible. ,. Finisn grading ever au sorpT ion Il ela will De done to ootain positive surface drainage away froc. field. Any finish gracing Sone in area of absorption field will be done with lignt equipr..ent. 6. No construction traffic tc be allowed In area of absorption field. 7. All absorption fiele fi mors to bo placed at minimum depins to ?eep system in ache permaaule soils. 2. Existing cor.todr lines shown should De verified before construction begins. Dasign shown is based on contours shown. SOIL TYPE Ib AJREA OF AuSORPTION FIELD IS BROOkSTON/CROSBY TS SHOWN ARE SET PITH TRE INTENTION NG i BELOW TRE ABSORPTION FIELD. r --FINISH GRADE 6"-8" TOPSOIL L" COURSE WASHED GRAVEL 4w jyRFORATED PLASTIC PIPE 1� (RIGID) ' II( I _ BSOURFACE DRAIN DSS SECTION IIA A" NO SCALE FINISH GRADE EARTH BACKFILL tl "L CCURSE WASHED GRAVEL •• I 4• 4 PERFORATED PLASTIC PIPE I ' (RIGID) SUBSURFACE DRAIN CROSS SECTION') B -B II EXISTING GRADE FINISH GRADE EARTH 8ACKFK.L H N 0�� ° � ', TED BL%.D7 WG I , ',p c11WV COURSE VAk%IED GRAVEL N 4w PERFORATED PVC Mr - zr ABSORPTION UNE CROSS SECTIONNo scALF a SPRlNGMILL STREAMS SECTION -LOT 8 a ■