Loading...
HomeMy WebLinkAboutA3 - CT2G 3FB4ELEVATION CT2G ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 4 0-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A" SQ FTG 3100 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 4 0.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 4 .13 5.17 4 .66 4 5.00 11 0 AT EAVE 6.20 5.17 5.69 55.00 0 82.00 TOTAL (MIN) 10.33 10.33 10.35 100.00 HIGH - RIDGE VENT 4 .13 5.17 5.17 4 9.50 1 0 38.00 AT EAVE 6.20 5.17 5.28 50.50 0 76.00 TOTAL (MIN) 10.33 10.33 10.4 5 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE 02/26/18 Mike Sheeks