Loading...
HomeMy WebLinkAboutM-101FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC T 1 13 12 11 10 9 8 7 6 5 4 3 2 A B C D E F G H 0.9A 14 0.9 J 13 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H 0.9A 0.9 J 14 M M J J P P 11.9 11.9 F.1 F.1 F.9 F.9 K K B.1 B.1 B.2 B.2 15 15 14.1 14.1 10.8 10.8 9.9 9.9 12 12 9 9 8 8 7 7 6.1 6.1 5 5 3.9 3.9 0.5A 0.5A 4 4 3 3 0.9 10 0.9 10 11 11 .95A .95A L L 2 2 4.9 4.9 1 1 A A B B C C D D E E F F G G H H 6 6 13 13 0.7A 0.7A 2.1 2.1 0.4A 0.4A 0.6A 0.6A 0.9A 0.9A 15.2 15.2 Q Q 1.5 1.5 N N 1.6 1.6 M.5 M.5 N.5 N.5 4.7 4.7 4.8 4.8 SG1 75 SG1 100 SG2 50 EUH-5 EUH-5 EUH-4 EUH-1 EUH-1 EUH-2 16/10 SG1 100 SG1 75 6 ø 6 ø EF-1 LV-5 6 ø 6 ø 6 ø 1 FCU-1 8 9 3 4 5 TG2 EUH-4 6 6 6 6 6 6 6 10 6 ø 6 ø 2 2 2 6ø FD FUTURE RETAIL SPACE. NO WORK IN THIS AREA. 14168 RM 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317.706.2075 www.enverityENG.com Project: Developer: Sheet Number: Engineer: By: Sheet Title: COPYRIGHT & OWNERSHIP OF DOCUMENTS Enverity Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue Date Park East Retail The Hamilton Building Carmel, Indiana 46032 THI S DOCUMENT I S AN INSTRUMENT OF SERVICES AND I S THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESI GN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN I S CONFIDENTIAL. I TS SUBMI SSI ON AND DISTRIBUTION TO OTHER PARTIES I S NOT TO BE CONSTRUED AS PUBLICATION I N DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RI GHTS. ALL INFORMATION CONTAINED HEREI N CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESI GN GROUP, LLC. NO PART OR WHOLE OF THI S DESI GN, THESE DRAWINGS, OR THE RESULTING BUI LDI NG OR BUI LDI NGS, OR PORTIONS OF THE RESULTING BUI LDI NG OR BUI LDI NGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLI SHED, MODIFIED OR OTHERWISE DISTRIBUTED I N ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESI GN GROUP, LLC. © COPY RIGHT 2015 JAMES R. STUTZMAN, AIA, Carmel, I ndiana. 100% Construction Documents JL M-101 Mechanical First Floor 08/31/17 08/31/17 N 3/32" = 1'-0" 1 Mechanical Ground Level Plan SHEET KEYNOTES 1 PROVIDE TRAPPED 3/4" PLENUM RATED CPVC CONDENSATE DRAIN LINE AND TERMINATE ABOVE HUB DRAIN LOCATED IN MECHANICAL CLOSET. DO NOT BLOCK FILTER ACCESS. 2 DUCT UP TO SUPPLY GRILLE ON SECOND FLOOR. SEE M-102. 3 ROUTE REFRIGERANT LINES UP INSIDE WALL AND CONNECT TO CONDENSING UNIT ON ROOF. SIZE REFRIGERANT PIPES PER MANUFACTURER'S INSTRUCTIONS. 4 FURNISH AND INSTALL FLOOR MOUNTED FAN COIL UNIT. PROVIDE FLEXIBLE CONNECTION AT FCU DISCHARGE BEFORE CONNECTION TO 16"X10" SUPPLY DUCTWORK. 5 FURNISH AND INSTALL TRANSFER GRILLE 6" ABOVE DOOR FRAME. 6 INSTALL UNIT HEATER 10' AFF. 7 INSTALL UNIT HEATER 12" AFF. 8 FURNISH AND INSTALL 7-DAY PROGRAMMABLE THERMOSTAT 48" AFF. 9 FURNISH AND INSTALL BATHROOM EXHAUST FAN EF-1 6" BELOW CEILING. USE ONLY SMOOTH RADIUS ELBOWS (R/D-1.5). 10 INSTALL LOUVER 10' AFF. INTERLOCK EF-6 AND LV-6. 0 8' 16' 24' 04/16/18 Nick Mishler