HomeMy WebLinkAbout01 03 00 - AllowancesMidtown West Studio M Architecture and Planning
Carmel, IN November 10, 2017
01 03 00 - 1
SECTION 01 03 00 – ALLOWANCES
1.1 SUMMARY
A. Include scheduled allowances in the project cost; allowance is for cost of
materials only, delivered and unloaded at the site, as well as installation.
1.2 ALLOWANCES
A. ADA signage allowance.
B. Garage signage allowance.
END OF SECTION