Loading...
HomeMy WebLinkAbout01 03 00 - AllowancesMidtown West Studio M Architecture and Planning Carmel, IN November 10, 2017 01 03 00 - 1 SECTION 01 03 00 – ALLOWANCES 1.1 SUMMARY A. Include scheduled allowances in the project cost; allowance is for cost of materials only, delivered and unloaded at the site, as well as installation. 1.2 ALLOWANCES A. ADA signage allowance. B. Garage signage allowance. END OF SECTION