HomeMy WebLinkAbout08 21 00 - DoorsMidtown West Studio M Architecture and Planning
Carmel, IN November 10, 2017
08 21 00 - 1
SECTION 08 21 00 – DOORS
PART 1 - GENERAL
1.1 SUMMARY
A. See Door Schedule for complete list of door and frame types.
B. Provide Hollow Core 6'-8” interior doors in all units in non-rated walls.
C. Unit Entry at Corridor - Fire rated doors - Mineral Core 20 min rated
doors
1.2 SUBMITTALS
A. Submit product data, samples, shop drawings, warranty.
PART 2 – PRODUCTS
2.1 Products: As selected by Architect complying with the following:
A. 2 panels “shaker” style doors.
B. Factory or shopped finished in specified colors
PART 3 - INSTALLATION
3.1 Comply with requirements of Section 01000 - Project Requirements.
3.2 Comply with NFPA 80 for rated assemblies.
3.3 Refer unit notes for under cutting requirements. Adjust header height by finished
floor material. Assume 1 1/8” gypcrete topping on 3/8” acoustical mat.
END OF SECTION