Loading...
HomeMy WebLinkAbout08 21 00 - DoorsMidtown West Studio M Architecture and Planning Carmel, IN November 10, 2017 08 21 00 - 1 SECTION 08 21 00 – DOORS PART 1 - GENERAL 1.1 SUMMARY A. See Door Schedule for complete list of door and frame types. B. Provide Hollow Core 6'-8” interior doors in all units in non-rated walls. C. Unit Entry at Corridor - Fire rated doors - Mineral Core 20 min rated doors 1.2 SUBMITTALS A. Submit product data, samples, shop drawings, warranty. PART 2 – PRODUCTS 2.1 Products: As selected by Architect complying with the following: A. 2 panels “shaker” style doors. B. Factory or shopped finished in specified colors PART 3 - INSTALLATION 3.1 Comply with requirements of Section 01000 - Project Requirements. 3.2 Comply with NFPA 80 for rated assemblies. 3.3 Refer unit notes for under cutting requirements. Adjust header height by finished floor material. Assume 1 1/8” gypcrete topping on 3/8” acoustical mat. END OF SECTION