Spring Mill Road Reconstruction
I I Ih, -to W-10
CHANGE ORDER #12
Irrigation —111'h Street and Spring Mill Road RAB
Contract Price prior to this Change Order $9,575,524.44
Contract Price will be increased by this Change Order $16,160.21
New Contract Price including this Change Order $9,591,684.65
Amount
Adjusted Contract
Price
Cumulative %Change
from Original Contract
Original Contract
$8,592,091.16
$8,592,091.16
N/A
COl
(-333.18)
$8,591,757.98
-0.004%
CO2
$36,031.35
$8,627,789.33
0.42%
CO3
$123,808.23
$8,751,597.56
1.86%
C04
$11,656.00
$8,763,253.66
1.99%
C05
$4,140.25
$8,767,393.91
2.04%
C06
$640,929,94
$9,408,323.85
9.50%
C07
$13,18350
$9,421,507.35
9.65%
C08
$32,465.92
$9,453,973.27
10.03%
C09
$91,297.27
$9,545,270.54
11.09%
CO10
$7,996.08
$9,553,266.62
11.19%
C011
$22,257.82
$9,575,524.44
11.45%
C012
$16,160.21
$9,591,684.65
11.63%
Pagel of 2
CITY OF CARMEL
TO: Lucas Clark CONTRACT CHANGE ORDER NO.: 12
Rieth-Riley Construction Co., Inc. DATE: 4/30/2018
Box 27s
175 PROJECT NAME: Spring 1751 W. Minnesota Street p g Mill Road Reconstruction /
Indianapolis, IN 46221 Project # 16 -ENG -52
CITY REQ. NO.:
CITY PO NO.: 34297
CITY PO DATE: 9/8/2016
I. You are directed to make the following changes in this Contract: o
*All work associated with the descriptions below as well as the below referenced Change
Proposal in Paragraph II'.
>Addition of irrigation at the newly constructed I I I' Street and Spring Mill Road
RAB and the surrounding median islands per the Change Proposal submitted on
4/30/2018.
*NOTE: This work includes the installation of an irrigation controller box inside of
the `Pl Cabinet' previously installed under the above referenced contract. This
change order will ultimately delete Item #65, `Irrigation Controller Bos', which will
be officially deleted with the final balancing change order for this project.
*This Change order will create one new item, ITEM #143bbb — Irrigation — i l 1`h Street
and Spring Mill Road RAB, which will be paid as a LUMP SUM in the amount of
$16,160.21.
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order:
*Change Proposal as provided by Rieth-Riley Construction Co., Inc. on 4/30/2018.
*Change Order 12 QTY Adjustments Breakdown
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 9,575,524.44
Contract Price will be increased/deeFeased by this Change Order $ 16,160.21
New Contract Price including this Change Order $ 9,591,684.65
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
ARA
Page 2 of 2
The Above Changes Are
Recommended:
United Consulting
ENGINEER
1625 N. Post Road
Address
Indianapolis, IN 46219
City/State/Zip
By. Utz
Phone: 317.724.5582
Date: 5/2/2018
The Above Changes Are
Accepted:
Rieth-Riley
CONTRACTOR
1751 W. Minnesota Street
Address
Indianapolis, IN 46206 _
City/State/Zip
Pkdn _J
Date:
Approved:
Mary
Lori/W3PgW, Member
A T:
hristine S. Pauley, Clerk -
Treasurer
Jedny kashmain, P.E.
City Engineer
Date:
IETHjl?ILEY CoNsmucnoN Co., INc.
100% Quality • 100% Employee Owned • Over 100 Years
April 30, 2018
Bret Smiley SENT VIA ELECTRONIC MAIL ONLY:
United Consulting
Construction Manager Bret.Smiley@ucindy.com
1625 N. Post Road
Indianapolis, IN 46219
RE: Spring Mill Road Improvements —111th Street RAB Irrigation options
City of Carmel Project No. 16 -ENG -27
Rieth-Riley Project No. 3200671
Dear Mr. Smiley,
Per City of Carmel direction in the field, Rieth-Riley Construction is proposing the following pay item be
added to the above referenced project.
111th Street Irrigation 1.00 LS $16,160.21
Supporting documentation is included on the following pages. Please call with any questions.
Thanks
Lucas S. Clark
Project Manager
RIETH-RILEY CONSTRUCTION CO., INC.
cc: Eric Holmes
John Tuddy
P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com
oudebush Grading, Inc
P17155 Harger Court. Noblesville, L\T 46060 Phone: 317-770-9970 • Fax: 317-770-6636
Proposal Submitted To: Job Name Spring Mill Road landscape Improvements
Rieth-Riley Location Carmel
Phone Date 4/11/18
Fax Plan Date
Attention Lucas Clark Estimated By: Andy Shoemake
Line Item
Description
Quantity Unit
Unit Price
Total
Mill Irrigation -Per Landtech
1 Lump
10
Design. See attache pro
n special conditions.u
= $20,985.91
Voluntary Alternate
2002
111th & Spring Mill Irrigation - Per WIS
1 Lump
$ 14,691.10
$ 14,691.10
Design. See attached proposal from WIS
for description and special conditions.
10% Markup
= $16,160.21
Special Conditions
1 Proposal excludes a stub -up for connection to the water source and a 120VAC power supply.
2 Proposal based on work being performed within a standard Monday through Friday work week.
3 Soil testing, organic, and inorganic soil amendments have been excluded from this proposal.
4 Traffic Control has been excluded from this proposal.
5 Quantities are based on the Itemized proposal. Invoicing shall be based on actual installed quantities at the unit price shown
6 Proposal excludes all bonding and railroad protective liability insurance.
7 Proposal is bid as a complete package. Pricing Is subject to change if line items are deleted from this proposal.
8 This proposal excludes sales tax.
Acceptance Of Proposal
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified. This proposal may be withdrawn if not accepted within 30 days.
Authorized Agent Signature and Printed Name Date
�`// ag1N�t74 �� caS�aPe Ir,�9_
154 V c
)MMI1111MIJ11AXnUtllhittruilllU011101f11M111r11r1111111lirI1111Jl141111/1111/111)111r s CIT rls
WaterSense CLIA
wis I'ARtNIR „i
a�t�c
WALKER IRRIGATION SYSTEMS, INC. PROPOSAL
RESIDENTIAL • COMMERCIAL
www.walkerirrigation.com
7334 E. 65th St, Indianapolis, IN 46256 • (317) 255-1574 Fax (317) 253-5407 • info(>walkeritrigation.com
To Roudebush Grading Inc.
Attu: Andy Shoemake____---------_------ PRtces FIRM uNITL 5/9/2018
--._____--_.-- - ------ STARTING DATE TBD
- - - - -- - TERMS Net. Up n.Completion_ Less Progress
DATE 4I912018. --- Billings-__
RE 111th & SpringmillRAB_IIrigation Proposal_._-__
----------------------- \
We propose to furnish all the materials and perform all the labor necessary for the completion of }
...an automatic irrigation system based upon the Irrigation Plan provided on Sheet L103 from the Construction
Packet. This is a design build which consists of 4 turf zones and adheres to the specifications set forth by the
City of Carmel.
This proposal includes a Weathermatic controller, Weathermatic flow sensing bundles (specified by the City
of Carmel), Weathermatic AirCard with 3 year service plan (specified by the City of Carmel), 1 - 1" Wilkins
RPZ backflow preventer and enclosure, and all other parts necessary for the completion and operation of the
proposed system.
We assume that the controller will be installed in the P1 cabinet provided and that a conduit will also be
provided to the interior of the cabinet.
We assume the site contractor will install the sleeves necessary during that phase of construction. We ask
that we be notified of the sleeve installation so that we may run our piping and wire at that time.
All parts carry a 3 year manufacturers' warranty against defects and all labor is guaranteed for one full year
from the date of completion.
This proposal, when accepted and signed by the purchaser, shall become a purchase order. It covers all terms and
agreements between the parties. 1
IF ACCEPTED, PLEASE SIGN AND RETURN ONE COPY OF THE AGREEMENT.
ACCEPTED BY
J Walker CLIA, CIT
W LK R IRRIGATION SYSTEMS, INC.
Andy Shoemake
From: Joe Walker <Info@walkerirrigation.com>
Sent: Monday, April 09, 2018 1:45 PM
To: Andy Shoemake
Subject: Re: CARMEL ROUNDABOUTS -IR -1 CIRCLE AND TIPS.PDF
Attachments: 111th & Springmill RAB Proposal - LandTech - Roudebush.pdf, 111th & Springmill RAB
Proposal - Roudebush.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
01
Good afternoon ... As we discussed I have attached two proposal; one based on the design by LandTech and,
the other, a revised version of my original. I wanted to include my voluntary alternate as a viable option, but
will be more than happy to adhere to the design provided or discuss the differences between the two. I was
not able to get the plans scanned and sent along with this email, but should be available to meet later this
week to look things over as schedules permit.
We have worked on several of these projects over the past few years and have a good idea of the
requirements and specifications of the Carmel Street Department, however I included a couple bullet points to
show the major differences of the two designs:
The provided design has 8 zones and 96 sprinkler heads (using traditional spray nozzles; converting to
MP Rotators would add $1,200 to that cost), which are broken down into specific hydrozones
Our design has 4 zones and 31 sprinkler heads (using MP Rotators), which apply water to the turf and
broadcast water over the landscape areas
I have included the WeatherMatic flow package, flow -sensing tee, and controller; Wilkins RPZ backflow
preventer and StrongBox enclosure; SAM -PRS type sprinklers, master valve, and quick coupler valve to
both proposals
Please let me know what works best with everyone's week so we can schedule a meeting in the next couple
days.
I look forward to talking with you all soon.
Sincerely,
Joe Walker CLIA, CIT
Walker Irrigation Systems, Inc.
info@Walkerlrrigation.com
O: 317-25S-1574
C: 317-339-3196
Pg. 1 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order 812 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Qua ntit
UNIT PRICE
Original Total
Construction Constrvction
Chan a al Qt s. Chane 82 Qt s.
New Total
Quant'[
New Total Dollar
Amount
16 -ENG -52 QUANTITIES
1
CONSTRUCTION ENGINEERING
8143
Paid .'=.3Y'
LS
1
$160,203.01
$160,203.01
0.03
1.03
$160,203.01
2
MOBILIZATION AND DEMOBILIZATION
LS
1
$211,891.55
$211,891.55
1.00
$211891.55
3
CLEARING RIGHT OF WAY
LS
1
$295,223.93
$295,223.93
1.00
$295,223.93
4
PAVEMENT REMOVAL
SYS
459
$14.60
$6,701.40
459.00
$6,701.40
5
CENTERCURB CONCRETE REMOVE
SYS
34
$42.39
$1,441.26
34.00
$1,441.26
6
CURB,
URB CONCRETE REMOVE
LFT
77
$7.82
$602.14
77.00
$602.14
7
CURB AND GUTTER,REMOVE
LFT
2,914
$6.05
$17,629.70
2914.00
$17,629.70
8
PIPE ABANDON GROUT AND FILL
EACH
5
$438.20
$2,191.00
5.00
$2,191.00
9
SIDEWALK CONCRETE REMOVE
SYS
223
$16.70
$3,724.10
223.00
$3,724.10
10
INLET REMOVE
EACH
4
$607.04
$2,428.16
4.00
$2,428,16
11
FENCE CHAIN. LINK REMOVE
LFT
492
$4.50
$2,214.00
492.00
$2,214.00
11.
GUARDRAI REMOVE
LFT
73S
$6.50
$4,777.50
73S.00
$4,777.50
116
BRIDGE RAIUNG REMOVE
LFT
248
$18.50
$4,SU.00
248.00
$4,588.00
12
MANHOLE REMOVE
EACH
1
$898.30
$898.30
1.00
$898.30
13
ICURB TURNOUT REMOVEEACH
1
$84.36
$84.36
1.00
$84.36
14
CONCRETE WALL REMOVE
LFT
170
$49.07
$8341.90
170.00
$6,341.90
IS
PIPE REMOVE
LFT
$32
$38.16
$31,749.12
832.00
$31,749.12
16
FENCE FARM FIELD REMOVE
LFT
1,662
$2.7S
$4,S70.50
1,662.00
$4,570.50
17EXCAVATION
COMMON
CYS
24,762
$5.81
$143,867.22
24,762.00
$143,867.22
18
BORROW
CYS
15,953
$0.01
$159.53
15,953.00
$159.53
19
SEDIMENT REMOVE
CYS
63
$38.62
$2,433.06
63.00
$2,433.06
20
TEMPORARY CHECK DAM REVETMENT RIPRAP
TON
8
$57.15
$457.20
8.00
$457.20
21
TEMPORARY INLET PROTECTION
EACH
154
$65.00
$10,010.00
15000
$10,010.00
22
ITEMPORARY MULCH
TON
29
$450.00
$13,050.00
29.00
$13,050.00
23
TEMPORARY SILT FENCE
LFT
12,404
$1.9S
$24,187.80
12,404,40
$24,187.80
24
NO.2 STONE
TON
400
$25.25
$10,100.00
400.00
$10,100.00
25
TEMPORARY GE LE
SYS
940
$2.79
$2,622.60
940.00
$2,622.60
26
TEMPORARY SEED MIXTURE
LBS
1,740
$0.25
$435.00
1,740.00
$435.00
27
SUBGRADE TREATMENT TYPE 11
SYS
960
$22.67
$21,763.20
92S.00
$20,969.75
28
SUBGRADE TREATMENT TYPE IB
SYS
53,215
$6.03
$320,886.45
54,114.00
$326,307.42
29
STRUCTURE BACKFILL, TYPE
CYS
13,538
$25.66
$347,385.08
13,541.00
$347,462.06
30
DRYING SOILS FOR EMBANKMENT
TON
655
$125.00
$81,875.00
655.00
$81,875.00
31
COMPACTED AGGREGATE NO. 53 BASE
TON
3,062
$27.60
$84,511.20
3,015.OD
$83,214.00
32
WIDENING WITH HMA TYPE C
TON
11
$183.09
$2,013.99
11.00
$2,013.99
33
MILLING ASPHALT 11 IN.
SYS
381
$12.00
$4,572.00
381.00
$4,572.00
34
MILLING ASPHALT
SYS
488
$12.00
$5,856.00
488.00
$5,856.00
36
HMA SURFACE 7YPEC
TONS
3,206
$58.59
$187,839.54
48.00
3,254.00
$190,651.86
37
HMA INTERMEDIATE TYPE
TONS
5,187
$51.56
$267,441.72
79.00
5,266.00
$271,510.96
38
HMA BASE TYPE
TONS
140518
$49.54
$719,221.72
272.00
14,790.00
$732,696.60
39
HMA INTERMEDIATE OG TYPE
TONS
6,567
$50.09
$328,941.03
5700
6,624.00
$331,796.16
40
HMA FOR TEMPORARY PAVEMENT, C
UNDISTRIBUTED
TON
500
$103.00
$51,500.00
500.00
$51,500.00
41
ASPHALT FOR TACK COAT
TON
29
$0.01
$0.29
44.00
$0.44
42
PC' 7114.
SYS
241
$63.87
$15,392.67
241.00
$15,392.67
43
GUABDIuu WOOD BEAM
LFT
72S
$314.00
$227,650.00
725.00
$227,650.00
43.
GUARDRAIL BURIED END
LFT
8
$8,600.00
$68,800.00
8.00
$68,800.00
44
HMA FOR SIDEWALK
TON
2,243
$79.93
$179,282.99
2,205.00
$176,245.65
45
SIDEWALK CONCRETE
SYS
391
$43.80
$17,125.80
391.00
$17,125.80
46
CURB RAMP CONCRETE
SYS
440
$155.70
$68,508.00
579.OD
$90,150.30
47
CURB INTEGRAL CONCRETE
245
$33.04
$8,094.80
245.00
$8,094.80
48
CURB AND GUTTER CONCRETE TYPE II
18,824
$16.04
$301,936.%
18,824.00
$301,936.%
49
CURB AND GUTTER,CONCRETE TYPE III
13,729
$15.01
$206,072.29
13,666.OD
$205126.66
50
CENTER CURB D CONCRETE
115
$181.22
$22,652.50
125.00
$22,652.50
51CURB
TURNOUT
ISY�SH
2
$1,183.91
$2,367.82
2.00
$2,367.82
S2
CURB AND GUTTER ROLL CURB
308
$29.50
$9,086.00
308.00
$9,086.00
53
HMA FOR APPROACHES TYPEC
681
$89.44
$60,908.64
11` "i
800.00
$71,552.00
54
PCCP FOR APPROACHES 61N.
574
$52.72
$30,261.28
537.00
$28,310.64
5S
PCCP FOR APPROACHES 91N.
412
$64.54
$26,590.48
412.00
$26,59078-
56
MAILBOX ASSEMBLY SINGLE RESET
EACH
13
$185.00
$2,405.00
13.00
$2,405.00
57
GEOTEXTILES
M
68
51.18
$80.24
80.00
$94.40
58
RIPRAP REVETMENT
TON
28
$85.06
$2,381.68
33.00
$2,806.98
59
MOBILIZATION AND DEMOBILIZATION FOR SEEDING
EACH
7
$50.00
$350.00
7.00
$350.00
60
EROSION CONTROL BLANKET
SYS
1,016
$1.17
$1,188.72
1,016.00
$1,188.72
61WATER
kGAL
102
$1.00
$102.00
102.00
$102.00
62
SO DDING NURSERY
SYS
28,063
$3.25
$91,204.75
28,063.00
$91,204.75
63
64
IRRIGATION CONTROLLER BOX
FIELD OFFICE B
EACH
MOS
1
15
$8,500.00
$2,286.99
$8,500.00
$34,304.85
1 D
15.00
$8,500.00
$34,304.85
Pg. 2of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order #12 - QuantiAdjustments
ITEM NO.
DESCRIPTION
UNIT
OrIgIml
QRarlt
UNIT PRICE
Od81Ml Total
Construction Construction
Chan epl qt s. Chan ep2 qt
Naw Tohl
QWr1t
Naw Tobl Dellar
Amour#
65
TIMBER CURB
LFT
124
$196.00
$24,304.00
124.00
$24,304.00
66
PIPE TYPE 2 CIRCULAR 361N,
LFT
1,415
$95.84
$135,613.60
16.0(1
1,431.00
$137,147.04
67
PIPE, TYPE 4 CIRCULAR, 61N.
LFT
18,429
$4.35
$80,166.15
18,429.00
$80,166.15
68
PIPE TYPE 4, CIRCULAR, 81N.
LFT
54
$8.00
$432.00
54.00
$432.00
69
PIPE TYPE 2, CIRCULAR 121N.
LFT
4,232
$39.45
$166,952.40
16.00
4,208.00
$166,OOS.60
70
PIPE TYPE 2, CIRCULAR 151N.
LFT
416
$50.95
$21,195.20
12.00
428.00
$210806.60
71
PIPE TYPE 2, CIRCULAR 19 IN.
LFT
1,099
$46.37
$50,960.63
(2 WI
1,097.00
$50,867.89
72
PIPE TYPE 2, CIRCULAR 211N.
LFT
299
WAS
$16,498.82
299.00
$16,498.82
73
PIPE TYPE 2, CIRCULAR 241N.
LFT
670
$60.93
$40,823.10
ii Wi
669.00
$40,762.17
74
PIPE TYPE 2, CIRCULAR 271N.
LFT
25
$123.09
$3,077.25
40.00
54,923.60
75
PIPE TYPE 2, CIRCULAR 301N.
LFT
195
$75.60
$14,742.00
195.00
$14,742.00
76
PIPE TYPE 2, CIRCULAR 421N.
LFT
355
$130.20
$46,221.00
3S5.00
$46,221.00
77
PIPE, TYPE 2, CIRCULAR, 481N.
LFT
1,590
$151.85
$241,441.50
1,590.00
$241,441.50
776
PIPE TYPE 2 DEFORMED MIN. AREA 3.3 SFT
LFT
48
$80.30
$3,854.40
21.00
$1,686.30
77b
PIPE TYPE 2, DEFORMED MIN. AREA S.I SFT
LFT
S46
$107.60
$58,749.60
546.00
$58,749.60
78
STORMWATERTREATMENT SYSTEM 2.08 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
79
STORMWATER TREATMENT SYSTEM 2.9 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
80
STORMWATERTREATMENT SYSTEM 2.23 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,260.78
81
STORMWATER TREATMENT SYSTEM 1.12 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
82
STORMWATER TREATMENT SYSTEM 2.76 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
83
STORMWATER TREATMENT SYSTEM 1.65CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
84
VIDEO INSPECTION FOR PIPE
LFT
10,325
$1.29
$13,319.25
10,314.00
$13,305.06
85
PIPE END SECTION DIAMETER 121N.
EACH
3
$873.60
$2,620.80
5.00
$4,368.00
86
PIPE END SECTION DIAMETER 151N.
EACH
2
$917.11
$1,834.22
2.00
$1,834.22
87
PIPE END SECTION DIAMETER 181N.
EACH
4
$971.48
$3,885.92
4.00
$3,885.92
as
ounET PROTECTOR. 3
EACH
2
$1,050.00
$2,100.00
2.00
$2,100.00
89
VIDEO INSPECTION FOR UNDERDRAINS
LFT
3,000
SO"
$2,970.00
3,000.00
$2,970.00
90
AGGREGATE FOR UNDERDRAINS
CYS
1,659
$45.50
$75,484.50
1,659.00
$75,184.50
91
GEOTEKTILES FOR UNDERDRAIN
SYS
16,587
$1.15
$19,075.05
16,587.00
$19,075.OS
92
IMANHOLEJ10
EACH
6
$4,602.60
$27,615.60
7.00
$32,218.20
93
CASTING ADJUST TO GRADE
EACH
13
$623.76
$8,108.88
13.00
$8,108.88
94
INLET J30
EACH
46
$2,443.76
$112,412.96
47.00
$114,856.72
95
INLET M10
EACH
5
$2,448.81
$12,244.05
5.00
$12,244.05
96
CATCH BASIN K10
EACH
41
$2,601.45
$106,659.45
40.00
$104,058.00
97
MANHOLE C4
EACH
30
$2,817.34
$85,420.20
26.00
$74,030.84
98
CATCH BASIN, F7
EACH
1
$1,974.33
$1,974.33
1.00
$1,974.33
99
MANHOLE K4
EACH
17
$8,549.72
$145,345.24
23.00
$196,643.56
100
MANHOLE 14
EACH
20
$5,140.48
$102,809.60
14.00
$71,966.72
101
CATCH BASIN M10
EACH
41
$2,617.76
$107,328.16
41.00
$107,328.16
102
DETENTION OUTFALL STRUCTURE D
EACH
5
$8,666.12
$43,330.60
4.00
$34,664.48
103
DETENTION OUTFALL STRUCTURE E
EACH
1
$9,077.18
$9,077.18
1.00
59,077.18
104
CONSTRUCTION SIGN C
EACH
3
$297.00
$891.00
3.00
$891.00
105
ROAD CLOSURE SIGN ASSEMBLY
EACH
6
$507.00
$3,042.00
6.00
$30042.00
lOSa
TEMPORARY PAVEMENT MARKING 41N
LFT
6,000
$0.67
$4,020.00
6,000.00
$4,020.00
3051,
TEMPORARY PAVEMENT MARKING, REMOVABLE, NN
LFT
2,600
$1.05
$2,730.00
2,600.00
$2,730.00
106
DETOUR ROUTE MARKER ASSEMBLY
EACH
22
$152.00
$3,344.00
22.00
$3,344.00
107
CONSTRUCTION SIGN A
EACH
14
$249.00
$3,486.00
14.00
$3,486.00
108
CONSTRUCTION SIGN 8
EACH
13
$104.00
$1,352.00
13.00
$1,352.00
109
MAINTAINING TRAFFIC
LS
1
$153,029.18
$153,029.18
1.00
$153,029.18
110
BARRICADE III -B
LFT
264
$30.00
$7,920.00
264.00
$7,920.00
111
STREET SIGN POST
EACH
6
$1,850.00
$11,100.00
6.00
$11,100.00
112
SIGN SHEET AND SUPPORTS REMOVE
EACH
33
$25.00
$825.00
33.00
$625.00
113
SIGN POST, SQUARE TYPE 1 UNREINFORCED ANCHOR
BASE
LFT
425
$14.00
$5,950.00
125.00
$5,950.00
114
SIGN SHEET WITH LEGEND 0.090 IN.
SFT
184
$17.00
$3,128.00
38.:x1
222.00
$3,77COD
115
SIGN SHEET WITH LEGEND 0.1001N.
SFT
117
$19.00
$2,223.00
/2.00
189.00
$3,59LOD
116
CONDUIT PVC 21N. SCHEDULE 40
LFT
493
$8.00
$3,944.00
493.00
$3,944.00
117
CONDUTT HDPE 21N. SCHEDULE 80
LFT
162
$12.00
$1,944.00
162.00
$1,944.00
118
ORNAMENTAL LIGHT POLE, FOUNDATION,
LUMINARIES
EACH
6
$8,900.00
$53,400.00
6.00
$53,100.00
119
HANDHOLE FOR INTERDUCr
EACH
31
$975.00
$30,225.00
31.00
$30,22S.OD
120
PVC SCHEDULE 404"
LFT
91502
$5.00
$47,510.00
9,502.00
547 510.00
SCHEDULE 404' INTERDUCT
LFT
9,502
$9.00
$85,518.00
9,502.00
$85,528.00
PVC SCHEDULE 804"
LFT
20S
$7.00
$1,435.00
205.00
$1,435.00
PVC SCHEDULE 80-4-INTERDUCT
LFT
205
$20.00
$4,100.00
205.00
$4,100.00
ItlPVC
HANDHOLE LIGHTING
EACH
4
$650.00
$2,600.00
4.00
$2,600.00SERVICE
POINT II MODIFIED
EACH
1
$5,500.00
$5,500.00
1.00
$5,500WIRE
NO.6 COPPER, IN PLASTIC DUCT 4 C
LFT
162
$8.00
$1,2%.00
I162.00
$1,2%.00
Pg. 3of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order #12 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Q..nt
UNIT PRICE
Odgiml Total
Construction Constr,Ri,n
Chan a #1 Qt s. Chan a #2 Qt
New Total
Quarrt
Naw Total D.Ilar
Amount
127
WIRE, NO, 6 COPPER, IN PLASTIC DUCT, IN TRENCH, 4
lC
LFT
493
$8.00
$3,944.00
493.00
$3,944.00
128
CONNECTOR KITUNFUSED
EACH
6
$37.00
$222.00
6.00
$222.00
129
CONNECTOR KIT, FUSED
EACH
6
$35.00
$210.00
6.00
$210.00
130
MULTIPLE COMPRESSION FITTING, WATERPROOFED
EACH
17
$21.00
$357.00
17.00
$357.00
131
INSULATION LINK WATERPROOFED
EACH 1
28
$15.00
1 $420.00
28.00
$420.00
132
WIRE TW HW N0. 10 COPPER STRANDED
LET
471
$1.00
$471.00
471.00
$471.00
133
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE WHITE, 241N,
LFT
928
$5.65
$5,243.20
928.00
$5,243.20
134
LINE THERMOPLASTIC, BROKEN WHITE 41N.
LFT
592
$1.95
$1,154.40
592.00
$1,154.40
135
LINE THERMOPLASTIC SOLID WHITE 41N.
LET
2,050
$0.73
$1,496.50
2,399.00
$1,751.27
136
LINE THERMOPLASTIC, DOTTED WHITE 81N.
LFT
116
$3.15
$365.40
116.00
$365.40
137
TRANSVERSE MARKING, THERMOPLASTIC, YIELD
LINE WHITE 361N.
LFT
47
$12.20
$573.40
47.00
$573.40
138
LINE THERMOPLASTIC, SOLID YELLOW 41N.
LFT
3,449
$0.73
$2,517.77
3,724.00
$2,718.52
139
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHITE, 241N.
LFT
117
$5.65
$661.05
1.00
118.00
$666.70
140
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
26
$109.00
$2,834.00
P. ix1
34.00
$3,706.00
141
SNOWPLOWABLE RAISED PAVEMENT MARKER
EACH
155
$25.00
$3,875.00
155.00
$3,875.00
141
LINE THERMOPLASTIC, SOLID YELLOW, 9IN.
LFT
2,269
$1.90
$4,311.10
2,324.00
$4,415.60
143
LINE THERMOPLASTIC, SOLID YELLOW 121N.
LET
460
$2.85
$1,311.00
477.00
$1,359.45
143.
20" DUCTILE IRON WATER MAIN
LFT
1,520
$109.72
1 $166,774.40
1,520.00
$166,774.40
1436
8' DUCTILE IRON WATER MAIN
LFT
80
$9010
1 $7,216.00
80.00
$7,216.00
1430
8" GATE VALVE
EACH
1
$10477.28
$1,477.28
1.00
$1,477.28
143d
20' K 8' STAINLESS TAPPING SADDLE AND VALVE
EACH
1
$80354.44
$8,354.44
1.00
$8,354.44
143.
8" WATER MAIN LOWERING
EACH
1
$5,599.00
$5,599.00
1.00
$5,599.00
1432
10" WATER MAIN LOWERING
EACH
1
$6,260.48
$6,260.48
1.00
$6,260.48
1438
16"WATER MAIN LOWERING
EACH
1
$10,776.14
$10,776.14
1.00
$10,776.14
143h
20" WATER MAIN LOWERING
EACH
6
$13,814.76
$82,888.56
6.00
$82,888.56
1431
8' WATER MAIN CONNECTION
EACH
2
$3,475.74
$6,951.48
2.00
$6,951.48
1431
20' WATER MAIN CONNECTION
EACH
4
$4,486.76
$17,947.04
4.00
$17,947.04
143k
LONG SIDE SERVICE
EACH
1
$3,882.93
$3,882.93
1.00
$3,882.93
1431
METER PIT RELOCATION
EACH
1
$1,327.05
$1,327.05
1.00
$1,327.05
143.
BACKFLOW RELOCATION
EACH
1
$525.38
$525.38
1.00
$525.38
143n
RELOCATE SAMPLING STATION
EACH
1
$10518.42
$1,518.42
1.00
$1,518.42
143.
ADJUST VAVLE TO GRADE REMOVE & REPLACE
HYDRANT & ADJUST TO GRADE
EACH
17
$4,476.55
$76,101.35
17.00
$76,101.35
143p
NEW HYDRANT ASSEMBLY
EACH
5
$6,016.55
$30,082.75
5.00
$30,082.75
143q
REMOVE AND RETIRE HYDRANT
EACH
3
$626.30
$1,878.90
3.00
$1,878.90
143r
ADJUST VALVE TO GRADE
EACH
19
$321.44
$5,785.92
18.00
$5,785.92
143,
VALVE RETIREMENT
EACH
3
$585.16
$1,755.48
3.00
$1,755.48
143t
LINE STOPS 20" UNDISTRIBUTED
EACH
4
517,268.55
$69,074.20
4.00
$69074.20
143,
DETENTION OUTFALL STRUCTURE,T- per Change
Order#1
$8,332.94'
....
1.00
$ 2.94
143,
SEPTIC REPLACEMENT - er Change Order #2
LS
0
$36,031,35
$0.00
1.00
$36,031.35
143.
DECORATIVE SOLAR FLASHER - per Change Order#3
EACH
0
$7,806.66
$0.00
6.00
6.00
$46,839.96
143x
LIGHT POLE RELOCATION - per Chagne Order 95
LS
0
$4,140.25
$0.00
0.00
1.00
$4,140.25
143y
CONSTRUCTION ENGINEERING - per Change Order 93
LS
D
$4,087.00
$0.00
0.00
1.00
$4,087.00
1432
MOBILIZATION&DEMOBILIZATION -per Change
0rder 96
LS
0
$37,456.19
$0.00
0.00
1.00
537,456.19
143aa
MAINTENANCE OF TRAFFIC- per Change 0rder 46
LS
0
$20,676.66
$0.00
0.00
1.00
$20,676.66
14366
CONCRETE WASH -OFF FACILTY - per Change Order#6
EACH
D
$432.00
$0.00
0.00
1.00
$432.00
143cc
DORSET BLVD. SIGN WALL - per Change Order#6
EACH
D
$58,582.27
$0.00
0.00
2.00
5117,164,54
143dd
DORSET BLVD, RAB MASONRY WALL - per Change
Order #6
EACH
0
$58,630.88
$0,00
0.00
1.00
$58,630.88
143ee
111TH STREET STONE WORK- per Change Order #6
EACH
0
$31,912.26
$0.00
0 00
1.00
$31,912.26
143ff
PLANTINGSOILBACKFILL-per Change Order#6
CVS
0
$71.50
$0.00
0.00
1,158.00
$82,797.00
143.8
IRRIGATION SERVICE&CONNECTIONS - per Change
Order 46
EACH
0
$3,500.00
$0.00
0 D
1.00
$3,500.00
Pg. 4 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order R32- Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
quant it
UNIT PRICE
Original Total
Construction Construction
Chan a pl Qt s. Chan a p2 Qt s.
New Total
Qua nt it
New Total Dollar
Amount
143hh
IRRIGATION BORING&JACKING - per Change Order
p6
LFT
0
$60.50
$0.00
0,00
100,00
$6,050.00
143ii
IRRIGATIONCONTROLS/BACKFLOW PREVENTERS-
per Change Order 96
EACH
0
$2,827.00
$0.00
0.00
1.D0
$2,827.00
143}J
CONTROL VALVES, DRIP TUBING, EMITTERS - per
Change Order 96
LS
0
$15,306.50
SOCK)
0.00
1.00
$15,306.50
143kk
ELECTRIC SERVICE AND CONNECTIONS - per Change
Order 96
EACH
0
$8,814.87
$0.00
OCO
1.00
$8,814.87
14311
ELECTRIC CONDUIT BORING AND JACKING - per
Change Order 96
LET
0
$65.29
$0.00
0.00
100.00
$6,529.00
143mm SIGN WALL LIGHTING- per Change Order 46
EACH
0
$1,641.88
$0.00
0.00
2.00
$3,283.76
143nn
DORSET BLVD. WALL LIGHTING- per Change Order 96
EAC :I+.
0
$1,641.88
$0.00
0.00
1.00
$1,641.88
1430o
STREET TREES- per Change Order 96
EACH
0
$42900
$0.00
0.00
78.00
$33,462.00
143pp
ORNAMENTAL TREES- per Change Order 96
EACH
0
$330. DO
50.00
0.00
104.00
$34,320.00
143gq
EVERGREEN TREES- per Change Order p6
EACH
0
$253.00
$0.00
0.00
53.00
$13,409.00
113rr
SHRUBS- per Change Order 96
EACH
0
$44.00
$0.00
0.00
798.00
$35,112.00
1431,
ORNAMENTAL GRAS SES- per Change Order 96
EACH
0
$33.00
$0.00
0.00
269.00
$8,877.00
1430
PERENIALS- per Change Order 96
EACH
0
$13.20
$0.00
0.00
5,653. DO
$74,619.60
143uu
SEDGE, PLANTS- per Change Order 06
EACH
0
$13.20
$0.00
0.00
1,954.00
525,792.80
143-
HARDWOOD MULCH- per Change Order 96
CVS
0
$82.50
$0.00
0.00
222.00
$18,315.00
143_
LANDSCAPE IMPROVEMENTS/WILLIAMS CREEK-
per Change Order 97
LS
0
$13,183.50
$0.00
0.00
1.00
513,183.50
143a><
Section 5 Sanitary & Water Addtions - per Change
Order p8
LS
0
$32,465.92
$0 .00
0.00
.0
70
$32,465.92
143yy
Carmel Water U tilities Subgrade Heallog - per Change
Order 99
LS
0
$91,297.27
$0.00
000
1.00
591,297.27
143zz
Addtion of Colored Concrete at 111th Street RAO
Truck Apron - per Change Order 910
LS
0
$7,996,08
$0.00
0.00
1.00
$7,996.08
143aaa
Additional Winter Work/2016&2017-per Change
order 911
LS
0
$22,257.82
$0.00
0.00
1.00
$22,257,82
143bbb
Irrigation- 111th Street and Spring Mill Road RAB-
er Change Order 912
LS
0
$16,160.21
$0.00
_J
1.00
$16,160.21
16 -SW -07 QUANTITIES
144
EXCAVATION, COMMON
CYS
883
$35.00
$30,905.00
883.00
$30,905.00
145
BORROW
CYS
2,782
$0.01
$27.82
2,782.00
$27.82
146
SEDIMENT REMOVE
CYS
10
$33.74
$337.40
10.00
$337.40
147
TEMPORARY INLET PROTECTION
EACH
14
$65.00
$910.00
14.00
$910.00
148
TEMPORARY SILT FENCE
LFT
2,105
$1.79
$3,767.95
2,105.00
$3,767.95
149
TEMPORARY SEED MIXTURE
LBS
44
$0.25
$12.00
48.00
$12.00
150
SUBGRADE TREATMENT TYPE II
M
59
$24.80
$1,463.20
59.00
$1,463.20
151
SUBGRADE TREATMENT TYPE III
SYS
1,597
$1.83
$2,922.51
1,597.00
$2,922.51
152
SUBGRADE TREATMENT TYPE IB
SYS
4,596
$6.73
$30,931.08
4,596.00
$30,931.08
153
STRUCTURE BACKFILL, TYPE
CYS
177
$25.66
$4,541.82
177.00
$4,541.82
154
STRUCTURE BACKFILL, TYPE 2
CYS
266
$92.94
$24,722.04
266.00
$24,722.04
155
STRUCTURE BACKFILL TYPE 5
CYS
36
$73.45
$2,644.20
36.00
$2,644.20
156
COMPACTED AGGREGATE NO. 53 BASE
TON
295
$32.87
$9,696.65
295.00
$9,696.65
157
HMA SURFACE TYPE
TON
292
$71.46
$20,866.32
292.00
$20,866.32
158
MMA INTERMEDIATE TYPE
TON
487
$56.71
$27,617.77
487.00
$27,617.77
1584
HMA INTERMEDIATE OG TYPE
TON
641
$54.13
$34,697.33
641.00
$34,697.33
159
HMA BASE TYPE C
TON
1,207
$51.90
$62,643.30
1,207.00
$62,643.30
160
ASPHALT FOR TACK COAT
TON
4
$0.01
$0.04
4.00
$0.04
161
HMA FOR SIDEWALKS
TON
221
$87.33
$19,299.93
221.00
$19,299.93
162
SIDEWALK CONCRETE 4'
S
39
$51.81
$2,020.59
39.00
$2,020.59
163
CURB RAMP CONCRETE
SYS
25
$175.41
$4,385.25
25.00
$4,385.25
164
DETECTABLE WARNING SURFACES
SYS
5
$326.25
$1,631.25
5.00
$1,631.25
165
HANDRAIL, 481N. ITEM DELETED ppr CHANGE ORDER
84
LFT
58
$120.00
$6,960.00
0.00
$0.00
166
CU RB AND GUTTER CONCRETE TYPE II
LFT
1,830
$19.05
$34,861.50
1,830.00
$34,861.50
167
CURB AND GUTTER TURNOUT CONCRETE
LET 1
6
$469.97
$2,819.82
6.00
$2,819.82
Pg. 5of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order #12 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Ori(Inal
Quant
UNIT PRICE
Construction C-t-mn
Od(irul Total
Chan a pl Q[ Chan a p2 q[
Naw Tobl
Qwm
Now Total Dollar
Amoum
168
CONCRETE ROLL CURB & GUTTER
LET
262
$48.66
$12,748.92
262.00
$12,748.92
169
PCCP FOR APPROACHES 61N.
SYS
59
$60.95
$3,596.05
59.00
$3,596.05
170
MAILBOX ASSEMBLY, TRIPLE
EACH
1
$22S.00
$225.00
1.00
$225.00
171
GEOTEXTILES
SYS
1,140
$0.99
$1,128.60
1,140.00
$1,128.60
172
RIPRAP CLASS 1
TON
1,070
$46.35
$490594.50
1,070.00
$49,594.50
173
RIPRAP REVETMENT
TON
260
$23.16
$6,021.60
260.00
$6,021.60
174
IRIPRAP, UNIFORM HAND LAIDI
TON 1
4
$95.96
$383.84
4.00
$383.84
175
MOBILIZATION AND DEMOBILIZATION FOR SEEDING
EACH
2
$50.00
$100.00
2.00
$100.00
176
EROSION CONTROL BLANKET
SYS
1,375
$1.17
$1,608.75
1,375.00
$1,608.75
177
WATER
M.G.
25
$1.00
$25.00
25.00
$25.00
178
TOPSOIL
CYS
1,169
$45.64
$53,353.16
1,169.00
$53,353.16
179
SODDING NURSERY
SYS
3,540
$3.25
$11,505.00
3,540.00
$11,50500
180
CONCRETE, CLASS, A
CYS
17
$252.59
$4,294.03
17.00
$4,294.03
181
241N. SDR 11 HDPE WATER MAIN
LET
176
$305.36
$53,743.36
176.00
$53,743.36
182
1201N, RESTRAIN E D JOINT DUCTILE IRON
LET
25
$724.08 1
$18,102.00
25.00
$18,10200
183
20' LINE STOP
EACH
2
$17,268.55
$34,537.10
2.00
$34,S37.30
184
201N. CONNECTION
EACH
2
$6,202.22
$12,404.44
2.00
$12,404.4
185
REMOVE REPLACE AND RELOCATE FIRE HYDRANT
EACH
1
$5,261.37
$5,261.37
1.00
$5,261.37
186
ADJUST VALVE BOX TO GRADE
EACH
3
$468.3
$1,405.29
3.00
$1,405.29
187
PIPE TYPE 4, CIRCULAR, 61N.
LET
2,274
$4.75
$10,801.50
2,274.00
$30,801.50
188
PIPE UNDERDRAIN, OUTLET 6 IN.
LET
191
$14.50
$2,769.50
191.00
$2,769.50
189
PIPE TYPE 2, CIRCULAR, 121N.
LET
642
$42.68
$270400.56
642.00
$270400.56
190
PIPE TYPE 2, CIRCULAR, 151N.
LET
15
$235.30
$3,529.50
15.00
$3,529.50
191
VIDEO INSPECTION FOR PIPE
LEE
655
$2.39
$1,565.45
655.00
$1,565.45
192
PIPE END SECTION DIAMETER 12 IN.
EACH
1
$873.58
$873.58
1.00
$873.58
193
VIDEO INSPECTION FOR UNDERDRAINS
LFT
3,000
$0.99
$2,970.00
3,000.00
$2,970.00
194
AGGREGATE FOR UNDERDRAINS
CYS
94
$5000
$4,700.00
94.00
$4,700.00
195
GEOTEXTILES FOR UNDERORAIN
SYS
1,076
$2.40
$2,582.40
1,076.00
$2,582.40
196
YARD LIGHTS ADJUST TO GRADE
EACH
7
$250.00
$1,750.00
7.00
$1,750.00
197
CASTING ADJUST TO GRADE
EACH
6
$866.87
$5,201.22
6.00
$5,201.22
198
INLET E7
EACH
1
$1,881.90
$1,881.90
1.00
$1,881.90
199
IINLET, M10
EACH
9
$2,448.81
$22,039.29
9.00
$22,039.29
200
PIPE CATCH BASIN, 181N.
EACH
1
$10314.06
$1,314.06
1.00
$1,314.06
201
MANHOLE C4
EACH
3
$2,951.74
$8,855.22
3.00
$8,855.22
202
INLET, AR
EACH
3
$2,186.40
$6,559.20
3.00
$6,559.20
203
REINFORCED CONCRETE ARCH (MIN AREA = 105.0
SET.)
LFT
64
$3,216.76
$205,872.64
64.00
$205,872.64
2D4
DETOUR ROUTE MARKER ASSEMBLY
EACH
19
$146.00
$2,774.00
19.00
$2,774.00
205
CONSTRUCTION SIGN, A
EACH
17
$244.00
$4,148.00
17.00
$4,148.00
206
CONSTRUCTION SIGN B
EACH
2
$105.00
$210.00
2.00
$210.00
207
BARRICADE III -B
LFT
SO
$30.00
$1,500.00
50.00
$1,500.00
208
SIGNPOST, SQUARE TYPE I REINFORCED ANCHOR
BASE
LFT
81
$14.00
$1,134.00
$1.00
$1,134.00
209
SIGN GROUND MOUNTED RESET
EACH
8
$20.00
$160.00
8.00
$160.00
210
LINE THERMOPLASTIC, SOLID WHITE 41N.
LET
209
$0.73
$152.57
209.00
$152.57
211
LINE THERMOPLASTIC SOLID YELLOW 41N.
LET
2,073
$0.73
$1,513.29
2,073.00
$1,513.29
212
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHITE, 241N.
LFT
15
$5.65
$84.75
15.00
$84.75
213
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE, WHITE, 61N.
LET
103
$1.40
$144.20
103.00
$144.20
214
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
1
$109.00
$109.00
1.00
$109.00
215
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
ONLY
EACH
1
$147.00
$147.00
1.00
$147.00
216 -'NPIJBIRN
MAN HANDRAIL - per Change Order
p4
LET
0
$3 .95
$0.00
5800 "$e,Airo
217
CANCELLATION CHARGE (Original Handrail Design)-
per Change Order 94
LS
0
$465.00
$0.00
1.00
$465.00
= Adjusted quantities las of this Change Orden
New Items
011 111111 IOIAf
$S 112 091 11,
NEW TOTAL =
$9,5911684.65
Memo
To: Doug Haney, Corporation Counsel
From: Lisa Scott
CC: Jeremy Kashman
Date: 05/08/18
Re: C.O. #12 Spring Mill Reconstruction 111th to Main Street Project #16 -ENG -52 — Irrigation for 111th &
Spring Mill
Doing, please find attached 1 original of same change order for project #16 -ENG -52 Spring Mill Reconstruction from
111 to Main Street. Please review & initial for the next BPW Meeting.
Change Order #12- Original Contract Amount: $8,592,091.16 Increase: $16,160.21 New Contract Amount
$9,591,684.65
Thank you,
Lisa Scott