Loading...
HomeMy WebLinkAboutIDEM Water NOI signed 05.17.18NOTICE OF INTENT TO CONSTRUCT A WATER MAIN EXTENSION State Form 49008 (R314-15) Approved by State Board of Accounts, 2015 General Construction Permit ForExtensions 1. Title of proposed project 2. County of proposed project Copperleaf Hamilton 3. Location of proposed project (including nearest public intersection and nearest quarter Section, Township, Range) Approximately 1,200 ft west of West Road on the south side of 131st Street, Carmel, IN 46077 SW Quarter, Section 30, 18N, R3E 4. Name, title, e-mail address and firm of responsible person (as defined in 327 IAC 8-3.5-6) 5. Telephone number of responsible person Jeremy Lollar; Director of Land Development, jeremy.lollar@pultegroup.com ( 317) 575-2350 Pulte Homes of Indiana, LLC 6, Address of responsible person (number and street, city, state, and ZIP code) 11590 N Meridian St, Suite 530, Carmel, IN 46032 7. Name of Public Water System (PWS) 8. PWS identification number City of Carmel 5229004 9. Address of PWS (number and street, city, state, and ZIP code) 10. Telephone number of PWS 30 W. Main Street, Carmel, IN 46032 ( 317) 571-2451 11, Name and firm of professional engineer 12. Telephone number of professional engineer Brandon T. Burke, HWC Engineering ( 317-) 347-3663 13. Address (number and street, city, state, and ZIP code) and a -mai] address of professional engineer 135 N Pennsylvania Street, Suite 2800, Indianapolis, IN 46204 14, Name and e-mail address of developer (!f applicable) 15. Telephone number of developer Jeremy Lollar, jeremy.lollar@pultegroup.com ( 317) 575-2350 16. Address of developer (number and street, city, state, and ZIP code) 11590 N Meridian St, Suite 530, Carmel, IN 46032 17. Timing of construction (check one of the following): The proposed construction of the water main will begin on Aug 2018 and be completed on Aug 2019 (Cannot begin construction less than thirty (30) days after IDEM receives a complete and sufficient NOL.) ❑ The proposed construction schedule will be submitted separate from this NOI at least ten (10) working days before the commencement of the construction and will include a copy of the information on the first page or this NOI. (Cannot begin construction less than thirty (30) days after IDEM receives a complete and sufficient NOL. 18. Fee Schedule: The complete NOI form may be submitted by e-mail (dwnoi@idem.in.gov) orbyceffied moil to the ❑ No fee, exempted under 327 IAC 8-3-7(a). address mow. If No fee for water main extensions under 2,500 linear feet. Indiana Department of Environmental Management ❑ $150 for water main extensions from 2,501 to 5,000 linear feet. Drinking Water Permits Section (IGCN Rm 1201) 100 North Senate Avenue ❑ $250 for water main extensions from 5001 to 10,000 linear feet. Indianapolis, IN 46204 ❑ $500 for water main extensions greater than 10,000 linear feet. ffa fee is required, see instructions forpayment options. 19. Certifications: Responsible Person: "I certify that I have reviewed and understand the applicability and eligibility requirements of this rule and that the water main proposed with the submission of this NOI meets the applicability and eligibility requirements of this rule. I also certify that the design and construction of this project will be performed under my direction or supervision to assure conformance with 327 IAC 8-3.5 and will meet all local rules or laws, regulations and ordinances. The information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. Signature of response le -pe n Date signed (month, day, year) Professional Engineer: "I certify under the penalty of law that the design of this project will be performed under my direction or supervision to assure conformance with 327 IAC 8- 3.5 and that the plans and specification will require the construction of said project to be performed in conformance with this rule. The design of the proposed project will meet all local rules or law, regulations and ordinances. The information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment." Sign ure n rofessionat-ergiiteer Date signed fmonth, day, year) Ille At -� r Page 4 of 5 Developer: "I certify under the penalty of law that the construction of this project will be performed under my direction or supervision to assure conformance with 327 IAC 8-3.5. The construction of proposed project will meet all local rules or laws, regulations and ordinances. The information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment." gnaMTe n evelo a Date signed (month, day, year) PWS Representative: "I certify under the penalty of law that I have agreed to furnish water to the area in which the water main is proposed. I acknowledge the public water system's responsibility for examining the plans and specifications to determine that the proposed water main meet local rules or laws and ordinances. I also acknowledge the public water system's responsibilities as outlined in 327 IAC 8-3.5-12. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment." Signature of PWS representative Date signed (month, day, year) Project Design Criteria: Alternative Technical Standards (327 IAC 8-3.2-20) 20. Are any "Alternative Technical Standards" proposed to be used in this project? ❑ Yes, I have attached copies of the approval with the NOI. to No Public Water System Capacity Status 21. The PWS's Daily Production Firm Capacity: A. 34 MGD B. 23,611 GPM 22. The PWS's five (5) highest demand days in the previous two (2) years only: Demand (MGD) Date (month, day, year) 1. 20.686 8/7/16 2• 19.458 8/8/16 3• 19.431 8/9/16 4• 19.355 8/3/16 5. 19.161 8/2/16 23. Average of five (5) Peak Daily Demand (PDD) listed above: C. 19.62 MGD 24. Ratio of PDD to PWS Daily Production Capacity = (Item D = Item C / Item A x 100) D. 57.70 % 25. Anticipated Customer Demand of Proposed Water Main Residential Customers: E. Number of h 28omesgpm/home) F.Average Daily Demand times Peaking Factor (at least 0.87 0.87 G. TotalAverage Daily Demand times Peaking Factor (G = E x F) 24.36 gpm Other (Commercial and lndustrial Customers: Description (including size of domestic meter): Average Daily Demand (the "Safe Maximum Operating Capacity" of domestic meter) 28 1" Meter @ 50 GPM 50 gpm gpm Sub Total: H. 50 gpm Total Customer Demand of Proposed Water Main (gpm) _ (Item G + item H) 1. 74.36 gpm Ratio of total Customer Demand of Proposed Water Main (gpm) to the PWS Daily Production Firm Capacity (gpm) (Item J = Item I/ Item B x 100) J. 0.315 26. Cross Connection Hazard Prevention A. Are any of the new customers included in Section 25 designated as cross connection hazards (see instructions)? ❑ Yes 91 No ❑ NIA B. Will an air gap be constructed or a reduced pressure principal backflow preventer be installed on the customer's service line? ❑ Yes m No ❑ N/A Page 5 of 5