HomeMy WebLinkAboutTPS005.C4.0.SWPPPOcA OcA
OcA OcA
OcA OcA
OcA
OcA
Equality Blvd.Community DriveF.F.E. = 755.70
(NAVD 88 DATUM)
F.F.E. = 755.70
A/C A/C
EXISTING STORM WATER
SWALE / DETENTION
CONCRETE WASHOUT BMP
30 CY ROLLOFF PROVIDED BY
REPUBLIC WASTE SERVICES
OR SEE DETAIL 04/C4.1
Equality Blvd.Community DriveCONSTRUCTION LIMITS = 0.24 Ac±
CONSTRUCTION LIMITS TO MATCH
SOUTH PROPERTY LINE
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS CONTRACTOR RESPONSIBLE TO KEEP ROAD & PARKINGSPACES FREE OF DUST/DEBRIS/MUD AT ALL TIMESCONTRACTOR TO REPAIR &
RESTORE EXISTING CURB,
PERVIOUS PAVERS,
LANDSCAPING, ETC. AS NEEDED
CONTRACTOR TO REPAIR & RESTORE
EXISTING LANDSCAPING, ETC. AS NEEDED
TEMPORARY CONSTRUCTION
ENTRANCE
CONTRACTOR RESPONSIBLE TO KEEP DETENTION
FACILITY FREE OF DUST/DEBRIS/MUD AT ALL TIMES
PS PS PS PS
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.
GROUP, INC.PROF
E
SS
ION A L E NG INEERIND
IA NA
PE10910647
STATE OF
-o NREG I S TER
E
DBR IA N S CR
O
SSTPS.005
C4.0NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.STORMWATER POLLUTION PREVENTION PLANPLAY SCHOOL at LEGACY - CLASSROOM ADDITION14454 COMMUNITY DRIVECARMEL, INDIANA 4603302/16/2018
CONTRACTOR NOTE
NO EARTH DISTURBING ACTIVITY MAY
COMMENCE WITHOUT AN APPROVED STORM
WATER MANAGEMENT PERMIT.
TOPOGRAPHIC & BOUNDARY NOTE REVISION RECORD
LEGEND:
GENERAL NOTES
CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE
(I.E. COMMUNITY DRIVE & EQUALITY BLVD.) "BROOM CLEAN" AND FREE
OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF-SITE.
DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND
PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR
LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C9.0 FOR
SPECIFICATIONS.
ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER
GASKET CONFORMING TO ASTM C 443
CONTRACTOR (NOT THE PROJECT SITE OWNER) WILL BE RESPONSIBLE
FOR THE DISPOSAL OF ANY SOIL, MATERIALS, ETC. NO OFF-SITE
BORROWS OR STOCKPILES WILL BE NEEDED FOR THIS PROJECT.
STORM SEWER SYSTEM NOTE
ALL STORM SEWER INFRASTRUCTURE TO BE
CONSTRUCTED WITH THIS PROJECT SHALL
BE PRIVATELY OWNED AND MAINTAINED BY
THE PLAY SCHOOL AT LEGACY, INC.
DEVELOPMENT SUMMARY
TOTAL SITE AREA = 2.01 ACRES +/-
TOTAL DISTURBED AREA = 0.24 ACRES +/-
GRADING NOTES
GENERAL NOTES
ADDITIONAL EROSION CONTROL
MEASURES MAY BE REQUIRED IN
THE FIELD BY THE INSPECTOR
PS
EB
NS
EROSION CONTROL NOTES
TS
TSMULCHING NOTE
FERTILIZER NOTE
SEEDING NOTE
1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE
COMMENCING WITH CONSTRUCTION.
2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED
BY THE CITY INSPECTORS PRIOR TO INSTALLATION.
EROSION CONTROL NOTES
SCALE: 1" = 100'
SOILS MAP
CONTROL CONTACT:
EROSION
SOILS DESCRIPTIONS & LIMITATIONS
05/23/18