Loading...
HomeMy WebLinkAboutM003.1BFrame in Field 2x4 Ledger 2x4 Ledger2x4 Ledger2x4 LedgerA2BD1BFG FB TG TB SBS3BRG NBRG1 V7 V9 V10 V8 V11 V22 V29 V25 V7 V9 V12 V15 V18 PBPB2PB3APB2JUS26JUS26JUS28HUS26JUS28JUS26JUS26JUS26JUS26JUS26JUS26JUS26JUS26JUS26JUS26HUS26HUS26HUS26HUS26HUS26HUS26HUS26HUS26No Soln.No Soln.No Soln.A2(3) S(4)R(4)N(3) N1(3) PB3(4)PB3(10) S1(3)S2(4)S3(4)RM(10)1-09-122-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-005-042-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-01-002-00-00 2-00-00 2-00-00 2-00-00 1-08-08 40-01-081-10-08 2-00-00 2-00-00 1-08-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-122-00-002-00-002-00-002-00-002-00-003-10-12 KB MBLB1 LB L2B MGK1 V28V24V23V27V26V21JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26K(5)M(3)L(2)L1(5)K2(3)2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-06-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-04-00 Order #: 18040137 The Grove @ Legacy - 16B 7216 Cherry Creek Boulevard Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are designed as individual building components to be incorporated into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified onthe placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem andfor the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss PlateInstitute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVALTHIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OROTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Drawn By: K. BronnenbergDate: 5/8/18 Model Stockbridge Notes: 1) Valley trusses are designed to sit on sheathing. 2) Installation of all temporary and permanent braces is essential.See truss drawings, BCSI-1 Building Component Safety informationand building designers requirements. 3) Provide solid bearing for beams and girders. See Code and/orbuilding deigners requirements. 4) Truss are NOT designed to be field modified unless noted otherwise. If any alterations are to be considered ALWAYS consult a qualified truss designer or engineer BEFORE making any alterations. 5) Add/remove overhangs as needed. Multi-Ply Girder Truss:See drawing of multi-ply girders for fastening pattern to connect plysso they act as one. All plys must be fastened together before supportedtrusses or framing is attached to girders. Hangers:Install all hangers per manufacturers requirements.