Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M001.1B
ProductsPlotIDLength ProductPlies Net QtyFJ1 18-00-00 11-7/8" BCI® 5000s-1.8 1 6FJ2 16-00-00 11-7/8" BCI® 5000s-1.8 1 3FJ3 14-00-00 11-7/8" BCI® 5000s-1.8 1 7FJ4 4-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ5 2-00-00 11-7/8" BCI® 5000s-1.8 1 6BM1 22-00-00 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP22BM2 12-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP22BM3 24-00-00 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP22BM4 22-00-00 1-3/4" x 20" VERSA-LAM® 2.0 3100 SP22BM5 14-00-00 11-7/8" BCI® 5000s-1.8 1 1BBO1 18-00-00 3-08 x 1-08-00 Generic Material 1 1Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB15Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 15PBO1 10-00-00 3-08 x 3-08 Generic Material 1 1Connector SummaryPlotIDQty Manuf ProductHu1 1 USPTHDH414Hu2 5 USPTHF20112Hu3 11 USPTHF20112Hu4 6 USPTHF20112Hu5 6 USPTHF20925BM3BM2BM4BBO1BM5Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1FJ4FJ2Hu3Hu11Hu3Hu2Hu4Hu5FJ1FJ2FJ3FJ5Bk1Sheet: 1/1DWG:Order #:By:Date: 5/7/2018Scale: NTSBC FRAMER1804013816B The GroveSecond FloorNOTE:ALLMEASUREMENTSTO BE VERIFIEDIN THE FIELD.Revisions:BY:cut, notch or drill flangesDO NOTDN01above to bearing below.Solid block all posts fromF0810-10d nails.Nail withFiller block.Install tight to top flange.mount hanger load exceeds 250 lbs.Backer block required where topBacker block (12" wide min.)Nail with 10- 10d nails.Install tight to top flange.Joist hangerF10NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FORDETAILS NOT SHOWNAll I- Joists and Versa-Lam BeamsMust Be Installed per TheBoise Cascade Installation Guide!-----------------------------Todo yo- los Rayos de Viguetas yVersa-Huída Deben Ser Instaladospor La Guía de la Instalación deCascada de Boise!FOR MULTIPLE PLY BEAMCONNECTION SEE THE"CONNECTION DIAGRAM"SUPPLIED WITH JOB PACKAGEGarage Header -BM1Comment 1