HomeMy WebLinkAboutA000.1\A1;PER STRUCTURAL DETAIL
TOP OF FOUNDATIONTOP OF FIRST FLOOR
TOP OF SECOND FLOOR
SECOND FLOOR PLATE
WINDOW HEAD HGT.
WINDOW HEAD HGT.
FIRST FLOOR PLATE
FINISHED GRADE
TOP OF FOOTING
SCALE:BASEMENT BUILDING SECTION 11/4" = 1'-0"1
2 CAR GARAGEFOYERCASUAL LIVING
BEDROOM 4 LOFT BEDROOM 3
\pxql;FLOOR SYSTEM, PER STRUCTURAL
\pxql;FLOOR SYSTEM, PER STRUCTURAL \pxql;FLOOR SYSTEM, PER STRUCTURAL
ATTIC INSULATION, PER CODE
\pxql;FLOOR SYSTEM, PER STRUCTURAL
ATTIC SPACE
131415
89101112
1234567
12345678111091213141516
BASEMENT
\pxql;BASEMENT INSULATION IF REQUIRED, PER CODE
\A1;10'-2{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
\A1;10'-1{\H0.750000x;\S1#8;}"\A1;9'-2{\H0.750000x;\S7#8;}"
17
\A1;PER STRUCTURAL DETAIL
TOP OF FOUNDATIONTOP OF FIRST FLOOR
TOP OF SECOND FLOOR
SECOND FLOOR PLATE
WINDOW HEAD HGT.
WINDOW HEAD HGT.
FIRST FLOOR PLATE
FINISHED GRADE
TOP OF FOOTING
SCALE:BASEMENT BUILDING SECTION 21/4" = 1'-0"2
12
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;AT GAME ROOM
\A1;11'-1"\A1;AT GATHERING ROOM
\A1;1'-6"\A1;1'-0"128
2 CAR GARAGE ENTRY GATHERING
LOFT HALL GAME ROOM
\pxql;PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER
\pxql;ATTIC INSULATION, PER CODE
\pxql;BASEMENT INSULATION IF REQUIRED, PER CODE\pxql;BASEMENT INSULATION IF REQUIRED, PER CODE
\pxql;WALL INSULATION, PER CODE
\pxql;WALL INSULATION, PER CODE
\pxql;INSULATION, PER CODE
\pxql;FLOOR SYSTEM, PER STRUCTURAL
\pxql;FLOOR SYSTEM, PER STRUCTURAL
\A1;8'-1{\H0.750000x;\S1#4;}"
\A1;8'-2{\H0.750000x;\S7#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
\A1;10'-1{\H0.750000x;\S1#8;}"
\A1;8'-1{\H0.750000x;\S1#8;}"...........................
PLAN NAME
SHEET
PRODUCTION MANAGER
DATE / DESCRIPTION
NPC PLAN NUMBERLAWSON PLAN ID
GARAGE HANDING
REV #
NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS
INITIAL RELEASE DATE:CURRENT RELEASE DATE:
(c) Copyright Pulte Home Corporation - 2018
Joel Hampshire 03/01/2016
Right
Skyview
2056.300.00.CPM
LOT 193
02/22/20181900 E. Golf Road, - Suite 300Schaumburg, Illinois 60173Midwest Zone OfficePLOTTED: April 9, 2018 / Rudolph Sanchez / 2056-SKYVIEW-IN-WCLY-SECT.DWG
A2
B.1Building Section 1 & 2.Basement Foundation 05/17/18
William Hohlt